DLM
PRESENTATION
     d l m
   Delattre Levivier Maroc
d l m
Delattre Levivier Maroc


          DELATTRE LEVIVIER MOROCCO
          DELATTRE LEVIVIER MOROCCO 

              Morocco leader in heavy metal construction

               DLM was established in 1950
               Largest construction & Erection Company in North Africa
               Annual turnover of  50 million Euro
               Professionally managed with a diversified team of 1200 professionals
               Fabrication capacity: 15 000 tons per year
               Production 2,5 millions Hours 

      Over five decades, the company developed leadership position in Construction & 
       Erection works for the Core Sector industries such us :                       25%
                                                                                                                  10%
                                                                     25%
       Petrochemical industry                                                                                      10%
                                                                                    30%
       Cement industry
       Mining & heavy equipment for infrastructure                       Petrochemical industry

       Energy                                                            Energy

                                                                                 Cement industry

                                                                                 Mining & heavy equipment for infrastructure

                                                                                 Off-shore & Export
                                                                                                                               2
d l m
Delattre Levivier Maroc


                    Production sites in Morocco
                    P d i       i i M
               3 Sites of production
                 Aïn Sbaâ 
                Tit Mellil
                Jorf Lasfar 
               Construction sites depending on contracts




                 36,000 m2 site, with             100,000 m2 site, with           20,000 m2 site with 2000 
                 15,000 m2 under cover and        6,750 m2 under cover. A         m2
                 20,000 m2 under hoist.           shot‐blasting building and a    under cover.
                 2 bays beneath traveling         1,750‐m2 paint booth.           2 bays beneath traveling
                 crane.
                 crane                            1 bay beneath traveling         crane.
                                                                                  crane
                 Payload 80 tonnes                crane.                          Payload 20 tonnes
                 (lifted by traveling crane).     Payload 100 tonnes (lifted by   lifted by traveling crane)
                 Max. load capacity:              traveling crane) Max. load      Max. load capacity:
                 120 tonnes of finished parts     capacity:                       20 tonnes of finished parts
                                                  100 tonnes of finished parts



                                                                                                                3
d l m
Delattre Levivier Maroc


              Respected Company
              Respected Compan




                                                                                            The best contractor award delivered by
                                                                                             Shell for the respect of HSSE quality
                                                                                                              p            q     y
 Quality insurance system ISO 9001 version 2000




                                             The certificate of authorization for U-Stamp
                                         delivered by ASME for Boiler and Pressure Vessel




                                                                                    DLM won the first prize of the Quality Trophy
                                                                                organized by the O.C.P Group among 3000 suppliers
                                                                                  g        y                 p      g         pp
   Security trophy delivered by Professional
      Association for Cement Company
                                                                                                                               4
d l m
Delattre Levivier Maroc


              Clients




                          5
d l m
Delattre Levivier Maroc




           WORLD CLASS FABRICATION
           CAPABILITIES




     Cold bending up to
     • 100 mm at Ain Sebaa workshop
     •70 mm at Tit Mellil workshop
      70         t e wo s op
d l m
Delattre Levivier Maroc

                      WORLD CLASS FABRICATION
                      CAPABILITIES




                                New technology of CNC cutting:
                                • Stroke: 40m
                                •4 torches
                                •Thickness: 2mm to 300mm
d l m             WORLD CLASS FABRICATION
Delattre Levivier Maroc


                    CAPABILITIES




                                      Max lifting capacity :
                          80 T at Ain Sebaa workhop / 8.5 m under hook
                          100 T at Tit Mellil wokshop/12.5 m under hook
d l m
Delattre Levivier Maroc


                          WORLD CLASS WELDING
                          CAPABILITIES
                    More than 350 qualified welding procedures
                    Team of 100 qualified welders “ASME AWS ”
                                                   ASME, AWS…
                    Technical Welding
                      Gas tungsten arc welding
                      MIG & MAG welding machines
                      Automatic welding machines
                    Material
                      Carbon steel
                      Low alloys steels
                      Alloy steel
                      Stainless steel
d l m                   WORLD CLASS FABRICATION
Delattre L i i M
Dl       Levivier Maroc

                          CAPABILITIES
           Ain Sebaa workshop
             Metallic blasting cabin 4x8x24m
             Heat treatment cabin 4x4x15m
             Tit Melil Workshop
             • Shot blasting cabin 6X6X30
             m Capacity 1000 m2 per day
             • Painting tunnel with heaters
             6X6X30 m Capacity 1000 m2
             per day
d l m
Delattre Levivier Maroc


                              Engineering facilities
              Storage tanks
                          •Software «Tank » ( Calculation according to
                          API650)
              PIPING
                          •CADWORK (PID)
                          •Solidworks-Routing module
                                            g
              Design and drawing
                          •Autocad (V2000- V2002- V2004-V2006)
                          •Solidworks (dessin 3D )
                           Solidworks
              FEM
                          •ANSYS
                          •Robot mellinium
d l m
Delattre Levivier Maroc


              References




                                        OFFSHORE
               Cement Industry                       Mines and Chemical




                           Wind P
                           Wi d Power              Energy

         18/01/2010                                                  12
d l m
Delattre Levivier Maroc


          Principaux Références en Energie
                          Construction et montage de 2 bacs de stockage d’ammoniac liquide, double
                                            enveloppe et des circuits de dépotage

                          Client : MAROC PHOSPHORE (Groupe OCP)

                          Capacité : 44 000 m3 chacun, ammoniac liquide à -33°C

                          Dimensions : hauteur 44 m - diamètre bac extérieur 43.8

                          Tonnage : 3600 tonnes, acier à haute teneur en nickel
                                                         h                  k l

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’assemblage : Site chimique de Jorf Lasfar

                          Heures travaillées : 300 000 heures

                          Date de réalisation : 2006




                                               Bacs de stockage d’ammoniac                           13
d l m
Delattre Levivier Maroc

                          Construction et montage de 12 bacs de stockage (Fuel Gazoil Eau )
                                                                         (Fuel, Gazoil,

                          Client : SOCOIN

                          Capacité : 20000 m3

                          Dimensions : hauteur 18 m - diamètre bac extérieur 39m

                          Tonnage : 2200 T

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’
                          Li   d’assemblage : Sit ONE à Mohammedia
                                      bl      Site      M h    di

                          Date de réalisation :2006




                                                      Bacs de stockage d’acide phosphorique   14
d l m
Delattre Levivier Maroc

                          Construction et montage de 2 bacs de stockage d’acide phosphorique- Clé en main
                                                                        d acide
                          (Génie civil, tuyauterie, électricité…)

                          Client : Groupe OCP

                          Capacité : 2 x 5000 m3

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’assemblage : Site OCP SAFI

                          Date de réalisation :2008




                                                              Bacs de stockage d’acide phosphorique 15
d l m
Delattre Levivier Maroc




                          Client : SDH (Groupement d'entreprises SHELL, TOTAL et ATLASSAHARA)

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’assemblage : SDH-DAKHLA

                          Date de réalisation :2006




         18/01/2010                                                                             16
d l m
Delattre Levivier Maroc




                          Client : SDH (Groupement d'entreprises SHELL, TOTAL et ATLASSAHARA)

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’assemblage : SDH DAKHLA
                                              SDH-DAKHLA

                          Date de réalisation :2006




         18/01/2010                                                                             17
d l m
Delattre Levivier Maroc


                          Etude, fabrication et montage - Réservoirs à toits flottant Samir.
                                                           é

                          Client : Spie-Capag

                          Capacité : 3x 80 000 m3/2x 30 000 m3/1x10 000 m3

                          Tonnage : Poids total. 6000 T

                          Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                          Lieu d’assemblage : Site SAMIR à Mohammedia

                          Date de réalisation :1994




                                                                          Réservoirs à toit flottants
                                                                                                        18
d l m
Delattre Levivier Maroc



                    Etude, fabrication et montage - réservoirs pour produits pétroliers à toits flottants.

                    Client : PERINI

                    Capacité : 120.000 m3

                    Dimensions : diamètre bac extérieur 102 m

                    Tonnage : Poids unit. 2400 T

                    Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

                    Lieu d’assemblage : Site SAMIR à Mohmadia

                    Date de réalisation :1992-1993




                                                                                                             19
PRINCIPAUX REFERENCES DE DLM EN TUYAUTERIE




                                             20
Année         Client                                 Désignation                                   Volume     Délai

2003        SAMIR       Arrêt des unités des huiles à la raffinerie Samir Mohammedia                18 647"    3 mois

                        Installations de la tuyauterie de la centrale thermique à cycle combiné
                                              y                             q      y                54 100"   10 mois
2004        BROCHIER/   de TAHADDART.
            SIEMENS     Matières: CS(A105/A106…), SS(TP316/TP304/TP321/1.4539…)
                        AS(P11/P22/P91…).
                        Fourniture, fabrication et montage de la tuyauterie vapeur, produit et       152t      6 mois
2004/2005   COSUMAR     condensat.
                        condensat
                        Matières: CS
            Maroc       Réalisation des réseaux de tuyauterie de la nouvelle unité de stockage       702t      8 mois
2005/2006   Phosphore   et transfert d'ammoniac à Jorf Lasfar.
                        Matières: CS + SS
2005        SDH         Nouveau dépôt pétrolier à Dakhla: Réseau incendie et produit.               29 200"    6 mois
                        Matières: CS
2004        SAMIR       Substitution of the blow down Diam 36" 24" 18" 16" 12" and 8".              10 572"   1semaine
                        Matières: CS
2006        Maroc       Remplacement des circuits en acier au carbone des unités de                 5 400"
                                                                                                      400      3 mois
            Phosphore   production des engrais DAP à Jorf Lasfar.
                        Fourniture, Fabrication et montage de trois stations de pompage à             83t      7 mois
2006        CEGELEC     Oujda.
                        Matières: Acier au carbone galvanisé
                        Installation des i li
                        I t ll ti d pipelines 8" et 10" de réception et de soutage reliant l
                                                       t     d é       ti  td      t      li t le   11 000"    6 mois
                                                                                                                   i
2007        SDH         dépôt SDH au port de DKHLA.
                        Matières: CS
2007        SOGEA       Conduite acier DN 2200 Ep 20mm d'eau brute à BOUREGRAG.                      252t      6 mois
                        Matières: Acier revêtu.
2007        SHELL       Travaux de construction de la réserve incendie du dépôt Tan Tan

2009        OCP         Travaux de tuyauterie laverie Khouribga                                     78 000"    7 mois
                                                                                                                         21
Réalisation de la Station de Transfert énergétique et de pompage sur le site d’Afourer

Travaux réalisés : Fabrication, transport, montage et peinture
Transport des matières ouvragées
Assurance qualité
Fabrication des conduites forcées
Fabrication des vannes et grille
Protection anticorrosion
Clients : ALSTOM
Lieu de construction : AFOURER Maroc
                       AFOURER-Maroc
Date de réalisation : 26/10/2003




                                                                                         22
:
   F b i ti      tM t
   Fabrication et Montage :
      Charpente métallique 1200 T
      Tuyauterie 250 T
      Bardage 30000 m² m
 Clients : EET / SIEMENS
Lieu de construction : TAHADDART-Maroc
 Date de réalisation : 2004




                                         23
Reference Export
Project Fabrication of Hoppers &silos for COMURHEX Malvési
Execution date : ongoing
Client : AREVA                                                                       Project Cement Industry
Project Fabrication of storage silos for COMURHEX Pierrelatte                        Execution date : 1996
Execution date : ongoing                                                             Clients : POLYSIUS/ LES CIMENTS DU LIBAN (S.C.L.)
Client : AREVA
                                                                                       Project Fabrication Wagon rocker tumbler for Tunisia.
                                                                                       Execution date : 1995
Morocco the first partener with OCP                                                    Clients :CHEMICAL GROUP TUNISIAN (GCT)


Project Fabrication of silos for Mauritania
iron mine
Execution date :1997
Client :SNIM                                                                                                   Project Cement Industry
Steel constraction for Gold mine SABODALA                                                                      Execution date : 1999
Execution date : 2008                                                                                          Clients : R.A.K. CEMENT CO /Technip
Clients : Ausenco                                                    Catalyst converter with Stainless steel
Fabrication de 2 Boilers, 2 Condensates,
                                                                     Execution date : 2008
2 Absorbing & Phosphoric dusts
                                                                     Client : AREVA NC
Execution date : 2000
                                                                     Site: Cominak contact Acid Plant Revamping- NIGER
Clients : ICS

SADIOLA HILL GOLD PROJECT
Execution date :1997
Client : SEMOS
                                                                                                    Project:Fabrication virole tournante
 Project Gold mine of BURKINA FASO                                                                  Execution date : ongoing
 Execution date : 2007                                                                              Client : COMESSA
 Client : Etruscan
 Site : BURKINA FASO (YOUGA)

  Project:EMARAUDE PROJECT(Platform)
  Execution date : 2008
  Client : Perenco
  Site : Congo)
 Project:Fabrication of 9Risers Anchors        Project:Fabrication 13 Piles & Plem
                                               Execution date : 2009
 Execution date : 2007                         Client : SBM for CHEVRON
        : Acergy
 Client 18/01/2010                             Site : ANGOLA                                                                               24
d l m
Delattre Levivier Maroc


       Platform
       Pl tf

                  Client : PERENCO
                  EMARAUDE PROJECT
                  EMARAUDE PROJECT
                  DLM Yard: Jorf Lasfar 
                  Exportation country: CONGO
                  Dimensions: 45 x 45 x 85 m
                  Construction total weight 3000 t
                  Total weight with equipment 4000t




                                                      25
d l m
Delattre Levivier Maroc


       SBM OFFSHORE / SIGLE BUOY MORRING (SBM) ANGOLA FOR CHEVRON
       SBM OFFSHORE / SIGLE BUOY MORRING (SBM) ANGOLA FOR CHEVRON
      13 PILES:
      Client : SBM for CHEVRON
      Exportation country: ANGOLA
      Exportation country: ANGOLA
      Unit weight: 19 T
      Dimensions: 19 000 x 980 x 40 to 100 mm
      Total constructed weight: 247 Tons
      Total constructed weight: 247 Tons

           PLEM 3:
           Dimensions: Length: 12,6 
                           g
           m, width: 11m
           Total constructed weight: 
           173Tons

         PLEM 4:
         Client: SBM 
         Dimensions: Length: 17 
         Dimensions: Length: 17
         m, width: 11m
         Total constructed 
         weight: 225 Tons
         weight: 225 Tons
d l m
Delattre Levivier Maroc


       Risers Anchors
       Ri     A h
      Client: Acergy for ESSO
      Construction of 9 risers anchors 

      Total weight: 162 Tons
      Execution date: 2007
      Exportation country: CONGO
        p                y
       SMART SHOSE
       Fabrication and equipments integration (660 T) over a barge for the transport of an oil platform
       Client : Eiffel.
       Execution date : 1996
       Exportation country: CONGO
       The smart‐shose project is made up of four supports of platform offshore. The supports are 
       equipped of the explosive rod.
Export


 Client : FFBL-Pakistan

 Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)




    Séparateur d’ammoniac




                                                            28
Bouilleur
Client : CREPS (Senegal)

Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca)

Date de réalisation :2001




                                                           29
Converter R401 (AREVA/NIGER)




18/01/2010                                  30
Montage à blanc culbuteur à
  Wagon pour la Tunisie.




                              Montage à blanc d’un carter
                              refroidisseur pour la Tunisie.



                                                               31
OTHER ACTIVITIES
 WIND POWER 

                                      Wind Power




Client: GAMESA
Wind Power Plant70MW for Essaouira
Wind Power Plant 140 MW for Tangier


   Client: CED
   wind energy towers 54 MW for KOUDIA AL BAIDA


                                                   32
•Mine & chemistry
 Mi       h it
•Cement plant
•Sugar plant
•Port handling
Sucrerie de Sidi bennour Cosumar.

                                     Tour de diffusion arbre
                                       central - Cosumar.




       Laveur de gaz                Four à chaud - Ø 8.534
                                                         m.
Dévésiculeur cheminée de
      lavage gaz DAP.




      Fabrication et montage
d’équipements chaudronnés pour
unité sulfurique Imacid Jorf Lasfar.   35
Pressure Tank for Project Upgrade
                                                             Chlorine tank.
         of SAMIR/MOROCCO




                                       Exchangers evaporators Ø 3,5 m.




                                          Two submerged propan tanks

                                   (Ø 6,3 m length 57 m) of 1.700 m3 each (unit
                                                  weight 330 T.)




TWO INSTRUMENT AIR BUFFER VESSEL
 FOR SAMIR MOHAMMEDIA/MOROCCO
         Fabricated in 2008
                                                                                  36
4.000
              4 000 m3 sphere butan and 2 cigars200 m3.
                              butan.                m3
 Evaporator




Condenser




                                                          37

Más contenido relacionado

Más de RCREEE

Gender challenges in clean energy sector can network
Gender challenges in clean energy sector can networkGender challenges in clean energy sector can network
Gender challenges in clean energy sector can networkRCREEE
 
Climate and energy policies advocacy of youth in the arab world
Climate and energy policies advocacy of youth in the arab worldClimate and energy policies advocacy of youth in the arab world
Climate and energy policies advocacy of youth in the arab worldRCREEE
 
Women in energy a world full of opportunities lcec
Women in energy a world full of opportunities  lcecWomen in energy a world full of opportunities  lcec
Women in energy a world full of opportunities lcecRCREEE
 
Women and sustainability in green mind
Women and sustainability in green mindWomen and sustainability in green mind
Women and sustainability in green mindRCREEE
 
Energy entrepreneurship artik energy
Energy entrepreneurship  artik energyEnergy entrepreneurship  artik energy
Energy entrepreneurship artik energyRCREEE
 
The women behind ewb kuwait
The women behind ewb kuwaitThe women behind ewb kuwait
The women behind ewb kuwaitRCREEE
 
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...RCREEE
 
Women in energy sector in the mena region rcreee
Women in energy sector in the mena region rcreeeWomen in energy sector in the mena region rcreee
Women in energy sector in the mena region rcreeeRCREEE
 
Awakening diversity in the clean energy sector a key point to achieve sustai...
Awakening diversity in the clean energy sector  a key point to achieve sustai...Awakening diversity in the clean energy sector  a key point to achieve sustai...
Awakening diversity in the clean energy sector a key point to achieve sustai...RCREEE
 
Mitigating environmental impact in non renewable energy the role of women
Mitigating environmental impact in non renewable energy the role of womenMitigating environmental impact in non renewable energy the role of women
Mitigating environmental impact in non renewable energy the role of womenRCREEE
 
HLPD in Vienna_Key Messages
HLPD in Vienna_Key MessagesHLPD in Vienna_Key Messages
HLPD in Vienna_Key MessagesRCREEE
 
HLPD_Setting the scene
HLPD_Setting the sceneHLPD_Setting the scene
HLPD_Setting the sceneRCREEE
 
EU-Egypt Energy Cooperation: A successful model
EU-Egypt Energy Cooperation: A successful modelEU-Egypt Energy Cooperation: A successful model
EU-Egypt Energy Cooperation: A successful modelRCREEE
 
EU sustainable development policies& cooperation
EU sustainable development policies& cooperationEU sustainable development policies& cooperation
EU sustainable development policies& cooperationRCREEE
 
EU support to the Energy sector in Jordan
EU support to the Energy sector in JordanEU support to the Energy sector in Jordan
EU support to the Energy sector in JordanRCREEE
 
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...Global Energy Interconnection Enhances Renewable Energy Development & Regiona...
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...RCREEE
 
Netherlands Support to Sustainable Arab Development
Netherlands Support to Sustainable Arab DevelopmentNetherlands Support to Sustainable Arab Development
Netherlands Support to Sustainable Arab DevelopmentRCREEE
 
Report summary on Intended Nationnally determined contributions -Comprehensiv...
Report summary on Intended Nationnally determined contributions -Comprehensiv...Report summary on Intended Nationnally determined contributions -Comprehensiv...
Report summary on Intended Nationnally determined contributions -Comprehensiv...RCREEE
 
Energy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsEnergy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsRCREEE
 
Arab Region Progress in Sustainable Energy Challenges and Opportunities
Arab Region Progress in Sustainable Energy Challenges and OpportunitiesArab Region Progress in Sustainable Energy Challenges and Opportunities
Arab Region Progress in Sustainable Energy Challenges and OpportunitiesRCREEE
 

Más de RCREEE (20)

Gender challenges in clean energy sector can network
Gender challenges in clean energy sector can networkGender challenges in clean energy sector can network
Gender challenges in clean energy sector can network
 
Climate and energy policies advocacy of youth in the arab world
Climate and energy policies advocacy of youth in the arab worldClimate and energy policies advocacy of youth in the arab world
Climate and energy policies advocacy of youth in the arab world
 
Women in energy a world full of opportunities lcec
Women in energy a world full of opportunities  lcecWomen in energy a world full of opportunities  lcec
Women in energy a world full of opportunities lcec
 
Women and sustainability in green mind
Women and sustainability in green mindWomen and sustainability in green mind
Women and sustainability in green mind
 
Energy entrepreneurship artik energy
Energy entrepreneurship  artik energyEnergy entrepreneurship  artik energy
Energy entrepreneurship artik energy
 
The women behind ewb kuwait
The women behind ewb kuwaitThe women behind ewb kuwait
The women behind ewb kuwait
 
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...
Women in Energy in Jordan Challenges, Opportunities and the Way Forward JREEE...
 
Women in energy sector in the mena region rcreee
Women in energy sector in the mena region rcreeeWomen in energy sector in the mena region rcreee
Women in energy sector in the mena region rcreee
 
Awakening diversity in the clean energy sector a key point to achieve sustai...
Awakening diversity in the clean energy sector  a key point to achieve sustai...Awakening diversity in the clean energy sector  a key point to achieve sustai...
Awakening diversity in the clean energy sector a key point to achieve sustai...
 
Mitigating environmental impact in non renewable energy the role of women
Mitigating environmental impact in non renewable energy the role of womenMitigating environmental impact in non renewable energy the role of women
Mitigating environmental impact in non renewable energy the role of women
 
HLPD in Vienna_Key Messages
HLPD in Vienna_Key MessagesHLPD in Vienna_Key Messages
HLPD in Vienna_Key Messages
 
HLPD_Setting the scene
HLPD_Setting the sceneHLPD_Setting the scene
HLPD_Setting the scene
 
EU-Egypt Energy Cooperation: A successful model
EU-Egypt Energy Cooperation: A successful modelEU-Egypt Energy Cooperation: A successful model
EU-Egypt Energy Cooperation: A successful model
 
EU sustainable development policies& cooperation
EU sustainable development policies& cooperationEU sustainable development policies& cooperation
EU sustainable development policies& cooperation
 
EU support to the Energy sector in Jordan
EU support to the Energy sector in JordanEU support to the Energy sector in Jordan
EU support to the Energy sector in Jordan
 
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...Global Energy Interconnection Enhances Renewable Energy Development & Regiona...
Global Energy Interconnection Enhances Renewable Energy Development & Regiona...
 
Netherlands Support to Sustainable Arab Development
Netherlands Support to Sustainable Arab DevelopmentNetherlands Support to Sustainable Arab Development
Netherlands Support to Sustainable Arab Development
 
Report summary on Intended Nationnally determined contributions -Comprehensiv...
Report summary on Intended Nationnally determined contributions -Comprehensiv...Report summary on Intended Nationnally determined contributions -Comprehensiv...
Report summary on Intended Nationnally determined contributions -Comprehensiv...
 
Energy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsEnergy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitions
 
Arab Region Progress in Sustainable Energy Challenges and Opportunities
Arab Region Progress in Sustainable Energy Challenges and OpportunitiesArab Region Progress in Sustainable Energy Challenges and Opportunities
Arab Region Progress in Sustainable Energy Challenges and Opportunities
 

Capacity building 2010 day 1 DLM

  • 1. DLM PRESENTATION d l m Delattre Levivier Maroc
  • 2. d l m Delattre Levivier Maroc DELATTRE LEVIVIER MOROCCO DELATTRE LEVIVIER MOROCCO  Morocco leader in heavy metal construction DLM was established in 1950 Largest construction & Erection Company in North Africa Annual turnover of  50 million Euro Professionally managed with a diversified team of 1200 professionals Fabrication capacity: 15 000 tons per year Production 2,5 millions Hours  Over five decades, the company developed leadership position in Construction &  Erection works for the Core Sector industries such us : 25% 10% 25% Petrochemical industry 10% 30% Cement industry Mining & heavy equipment for infrastructure Petrochemical industry Energy Energy Cement industry Mining & heavy equipment for infrastructure Off-shore & Export 2
  • 3. d l m Delattre Levivier Maroc Production sites in Morocco P d i i i M 3 Sites of production Aïn Sbaâ  Tit Mellil Jorf Lasfar  Construction sites depending on contracts 36,000 m2 site, with 100,000 m2 site, with 20,000 m2 site with 2000  15,000 m2 under cover and 6,750 m2 under cover. A m2 20,000 m2 under hoist. shot‐blasting building and a under cover. 2 bays beneath traveling 1,750‐m2 paint booth. 2 bays beneath traveling crane. crane 1 bay beneath traveling crane. crane Payload 80 tonnes crane. Payload 20 tonnes (lifted by traveling crane). Payload 100 tonnes (lifted by lifted by traveling crane) Max. load capacity: traveling crane) Max. load Max. load capacity: 120 tonnes of finished parts capacity: 20 tonnes of finished parts 100 tonnes of finished parts 3
  • 4. d l m Delattre Levivier Maroc Respected Company Respected Compan The best contractor award delivered by Shell for the respect of HSSE quality p q y Quality insurance system ISO 9001 version 2000 The certificate of authorization for U-Stamp delivered by ASME for Boiler and Pressure Vessel DLM won the first prize of the Quality Trophy organized by the O.C.P Group among 3000 suppliers g y p g pp Security trophy delivered by Professional Association for Cement Company 4
  • 5. d l m Delattre Levivier Maroc Clients 5
  • 6. d l m Delattre Levivier Maroc WORLD CLASS FABRICATION CAPABILITIES Cold bending up to • 100 mm at Ain Sebaa workshop •70 mm at Tit Mellil workshop 70 t e wo s op
  • 7. d l m Delattre Levivier Maroc WORLD CLASS FABRICATION CAPABILITIES New technology of CNC cutting: • Stroke: 40m •4 torches •Thickness: 2mm to 300mm
  • 8. d l m WORLD CLASS FABRICATION Delattre Levivier Maroc CAPABILITIES Max lifting capacity : 80 T at Ain Sebaa workhop / 8.5 m under hook 100 T at Tit Mellil wokshop/12.5 m under hook
  • 9. d l m Delattre Levivier Maroc WORLD CLASS WELDING CAPABILITIES More than 350 qualified welding procedures Team of 100 qualified welders “ASME AWS ” ASME, AWS… Technical Welding Gas tungsten arc welding MIG & MAG welding machines Automatic welding machines Material Carbon steel Low alloys steels Alloy steel Stainless steel
  • 10. d l m WORLD CLASS FABRICATION Delattre L i i M Dl Levivier Maroc CAPABILITIES Ain Sebaa workshop Metallic blasting cabin 4x8x24m Heat treatment cabin 4x4x15m Tit Melil Workshop • Shot blasting cabin 6X6X30 m Capacity 1000 m2 per day • Painting tunnel with heaters 6X6X30 m Capacity 1000 m2 per day
  • 11. d l m Delattre Levivier Maroc Engineering facilities Storage tanks •Software «Tank » ( Calculation according to API650) PIPING •CADWORK (PID) •Solidworks-Routing module g Design and drawing •Autocad (V2000- V2002- V2004-V2006) •Solidworks (dessin 3D ) Solidworks FEM •ANSYS •Robot mellinium
  • 12. d l m Delattre Levivier Maroc References OFFSHORE Cement Industry Mines and Chemical Wind P Wi d Power Energy 18/01/2010 12
  • 13. d l m Delattre Levivier Maroc Principaux Références en Energie Construction et montage de 2 bacs de stockage d’ammoniac liquide, double enveloppe et des circuits de dépotage Client : MAROC PHOSPHORE (Groupe OCP) Capacité : 44 000 m3 chacun, ammoniac liquide à -33°C Dimensions : hauteur 44 m - diamètre bac extérieur 43.8 Tonnage : 3600 tonnes, acier à haute teneur en nickel h k l Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : Site chimique de Jorf Lasfar Heures travaillées : 300 000 heures Date de réalisation : 2006 Bacs de stockage d’ammoniac 13
  • 14. d l m Delattre Levivier Maroc Construction et montage de 12 bacs de stockage (Fuel Gazoil Eau ) (Fuel, Gazoil, Client : SOCOIN Capacité : 20000 m3 Dimensions : hauteur 18 m - diamètre bac extérieur 39m Tonnage : 2200 T Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’ Li d’assemblage : Sit ONE à Mohammedia bl Site M h di Date de réalisation :2006 Bacs de stockage d’acide phosphorique 14
  • 15. d l m Delattre Levivier Maroc Construction et montage de 2 bacs de stockage d’acide phosphorique- Clé en main d acide (Génie civil, tuyauterie, électricité…) Client : Groupe OCP Capacité : 2 x 5000 m3 Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : Site OCP SAFI Date de réalisation :2008 Bacs de stockage d’acide phosphorique 15
  • 16. d l m Delattre Levivier Maroc Client : SDH (Groupement d'entreprises SHELL, TOTAL et ATLASSAHARA) Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : SDH-DAKHLA Date de réalisation :2006 18/01/2010 16
  • 17. d l m Delattre Levivier Maroc Client : SDH (Groupement d'entreprises SHELL, TOTAL et ATLASSAHARA) Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : SDH DAKHLA SDH-DAKHLA Date de réalisation :2006 18/01/2010 17
  • 18. d l m Delattre Levivier Maroc Etude, fabrication et montage - Réservoirs à toits flottant Samir. é Client : Spie-Capag Capacité : 3x 80 000 m3/2x 30 000 m3/1x10 000 m3 Tonnage : Poids total. 6000 T Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : Site SAMIR à Mohammedia Date de réalisation :1994 Réservoirs à toit flottants 18
  • 19. d l m Delattre Levivier Maroc Etude, fabrication et montage - réservoirs pour produits pétroliers à toits flottants. Client : PERINI Capacité : 120.000 m3 Dimensions : diamètre bac extérieur 102 m Tonnage : Poids unit. 2400 T Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Lieu d’assemblage : Site SAMIR à Mohmadia Date de réalisation :1992-1993 19
  • 21. Année Client Désignation Volume Délai 2003 SAMIR Arrêt des unités des huiles à la raffinerie Samir Mohammedia 18 647" 3 mois Installations de la tuyauterie de la centrale thermique à cycle combiné y q y 54 100" 10 mois 2004 BROCHIER/ de TAHADDART. SIEMENS Matières: CS(A105/A106…), SS(TP316/TP304/TP321/1.4539…) AS(P11/P22/P91…). Fourniture, fabrication et montage de la tuyauterie vapeur, produit et 152t 6 mois 2004/2005 COSUMAR condensat. condensat Matières: CS Maroc Réalisation des réseaux de tuyauterie de la nouvelle unité de stockage 702t 8 mois 2005/2006 Phosphore et transfert d'ammoniac à Jorf Lasfar. Matières: CS + SS 2005 SDH Nouveau dépôt pétrolier à Dakhla: Réseau incendie et produit. 29 200" 6 mois Matières: CS 2004 SAMIR Substitution of the blow down Diam 36" 24" 18" 16" 12" and 8". 10 572" 1semaine Matières: CS 2006 Maroc Remplacement des circuits en acier au carbone des unités de 5 400" 400 3 mois Phosphore production des engrais DAP à Jorf Lasfar. Fourniture, Fabrication et montage de trois stations de pompage à 83t 7 mois 2006 CEGELEC Oujda. Matières: Acier au carbone galvanisé Installation des i li I t ll ti d pipelines 8" et 10" de réception et de soutage reliant l t d é ti td t li t le 11 000" 6 mois i 2007 SDH dépôt SDH au port de DKHLA. Matières: CS 2007 SOGEA Conduite acier DN 2200 Ep 20mm d'eau brute à BOUREGRAG. 252t 6 mois Matières: Acier revêtu. 2007 SHELL Travaux de construction de la réserve incendie du dépôt Tan Tan 2009 OCP Travaux de tuyauterie laverie Khouribga 78 000" 7 mois 21
  • 22. Réalisation de la Station de Transfert énergétique et de pompage sur le site d’Afourer Travaux réalisés : Fabrication, transport, montage et peinture Transport des matières ouvragées Assurance qualité Fabrication des conduites forcées Fabrication des vannes et grille Protection anticorrosion Clients : ALSTOM Lieu de construction : AFOURER Maroc AFOURER-Maroc Date de réalisation : 26/10/2003 22
  • 23. : F b i ti tM t Fabrication et Montage : Charpente métallique 1200 T Tuyauterie 250 T Bardage 30000 m² m Clients : EET / SIEMENS Lieu de construction : TAHADDART-Maroc Date de réalisation : 2004 23
  • 24. Reference Export Project Fabrication of Hoppers &silos for COMURHEX Malvési Execution date : ongoing Client : AREVA Project Cement Industry Project Fabrication of storage silos for COMURHEX Pierrelatte Execution date : 1996 Execution date : ongoing Clients : POLYSIUS/ LES CIMENTS DU LIBAN (S.C.L.) Client : AREVA Project Fabrication Wagon rocker tumbler for Tunisia. Execution date : 1995 Morocco the first partener with OCP Clients :CHEMICAL GROUP TUNISIAN (GCT) Project Fabrication of silos for Mauritania iron mine Execution date :1997 Client :SNIM Project Cement Industry Steel constraction for Gold mine SABODALA Execution date : 1999 Execution date : 2008 Clients : R.A.K. CEMENT CO /Technip Clients : Ausenco Catalyst converter with Stainless steel Fabrication de 2 Boilers, 2 Condensates, Execution date : 2008 2 Absorbing & Phosphoric dusts Client : AREVA NC Execution date : 2000 Site: Cominak contact Acid Plant Revamping- NIGER Clients : ICS SADIOLA HILL GOLD PROJECT Execution date :1997 Client : SEMOS Project:Fabrication virole tournante Project Gold mine of BURKINA FASO Execution date : ongoing Execution date : 2007 Client : COMESSA Client : Etruscan Site : BURKINA FASO (YOUGA) Project:EMARAUDE PROJECT(Platform) Execution date : 2008 Client : Perenco Site : Congo) Project:Fabrication of 9Risers Anchors Project:Fabrication 13 Piles & Plem Execution date : 2009 Execution date : 2007 Client : SBM for CHEVRON : Acergy Client 18/01/2010 Site : ANGOLA 24
  • 25. d l m Delattre Levivier Maroc Platform Pl tf Client : PERENCO EMARAUDE PROJECT EMARAUDE PROJECT DLM Yard: Jorf Lasfar  Exportation country: CONGO Dimensions: 45 x 45 x 85 m Construction total weight 3000 t Total weight with equipment 4000t 25
  • 26. d l m Delattre Levivier Maroc SBM OFFSHORE / SIGLE BUOY MORRING (SBM) ANGOLA FOR CHEVRON SBM OFFSHORE / SIGLE BUOY MORRING (SBM) ANGOLA FOR CHEVRON 13 PILES: Client : SBM for CHEVRON Exportation country: ANGOLA Exportation country: ANGOLA Unit weight: 19 T Dimensions: 19 000 x 980 x 40 to 100 mm Total constructed weight: 247 Tons Total constructed weight: 247 Tons PLEM 3: Dimensions: Length: 12,6  g m, width: 11m Total constructed weight:  173Tons PLEM 4: Client: SBM  Dimensions: Length: 17  Dimensions: Length: 17 m, width: 11m Total constructed  weight: 225 Tons weight: 225 Tons
  • 27. d l m Delattre Levivier Maroc Risers Anchors Ri A h Client: Acergy for ESSO Construction of 9 risers anchors  Total weight: 162 Tons Execution date: 2007 Exportation country: CONGO p y SMART SHOSE Fabrication and equipments integration (660 T) over a barge for the transport of an oil platform Client : Eiffel. Execution date : 1996 Exportation country: CONGO The smart‐shose project is made up of four supports of platform offshore. The supports are  equipped of the explosive rod.
  • 28. Export Client : FFBL-Pakistan Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Séparateur d’ammoniac 28
  • 29. Bouilleur Client : CREPS (Senegal) Lieu de construction : Ateliers d'Ain Sebaâ (Casablanca) Date de réalisation :2001 29
  • 31. Montage à blanc culbuteur à Wagon pour la Tunisie. Montage à blanc d’un carter refroidisseur pour la Tunisie. 31
  • 32. OTHER ACTIVITIES WIND POWER  Wind Power Client: GAMESA Wind Power Plant70MW for Essaouira Wind Power Plant 140 MW for Tangier Client: CED wind energy towers 54 MW for KOUDIA AL BAIDA 32
  • 33. •Mine & chemistry Mi h it •Cement plant •Sugar plant •Port handling
  • 34. Sucrerie de Sidi bennour Cosumar. Tour de diffusion arbre central - Cosumar. Laveur de gaz Four à chaud - Ø 8.534 m.
  • 35. Dévésiculeur cheminée de lavage gaz DAP. Fabrication et montage d’équipements chaudronnés pour unité sulfurique Imacid Jorf Lasfar. 35
  • 36. Pressure Tank for Project Upgrade Chlorine tank. of SAMIR/MOROCCO Exchangers evaporators Ø 3,5 m. Two submerged propan tanks (Ø 6,3 m length 57 m) of 1.700 m3 each (unit weight 330 T.) TWO INSTRUMENT AIR BUFFER VESSEL FOR SAMIR MOHAMMEDIA/MOROCCO Fabricated in 2008 36
  • 37. 4.000 4 000 m3 sphere butan and 2 cigars200 m3. butan. m3 Evaporator Condenser 37