Off-grid PV – Policy and Regulatory enablers




        September 3-5, 2012, Bangalore India
About RESolve


•   Advisory firm with strong capabilities in Strategic, Regulatory , Commercial and
    Technical aspects of renewable energy projects

•   Founded by professionals from India and Germany with strong global exposure

•   Specific focus on Solar PV and Wind in India

•   Offerings in
     – Advisory on Concept-to-Commissioning of PV projects
     – Policy and Regulatory advice




                                       Off-grid PV                                     2
Overview


1. Introduction

2. Policy and regulatory environment

3. Challenges

4. Possible enablers

                       Off-grid PV     3
Why Off-grid?
•   About 30% of India’s population(400 million) do not have access to electricity.
•   Over 90% of this population live in villages.

                                              Already electrified villages

            163,641
                                              De-Electrified villages

                               356,393        Un-Electrified villages
          90,684
               27,878                         Un-Qualified villages (very less
                                              or no population)

•   Electricity transmission losses >30% (one of the highest in the world)


                                         Off-grid PV                                  4
Type of off-grid customers
.
    PV as an alternative to Rural                     Urban


    Kerosene               Lanterns, Home lighting,   Home Lighting
                           cooking

    Diesel                 Diesel water pumps         Diesel generators


    Free/Subsidized        Water pumps
    power




                                    Off-grid PV                           5
Overview


1. Introduction

2. Policy and regulatory environment

3. Challenges

4. Possible enablers

                       Off-grid PV     6
JNNSM Goals and Policy support

• Off-grid PV systems target – 2 GW by 2022
• Solar lighting – 20 Million households by 2022

• Policy support




                                   Off-grid PV     7
Regulatory support : Off-grid RECs

• Two models likely

   1.   Regular model - Power producer sells RECS at the exchange in addition to selling power at
        mutually agreed price

   2.   Franchisee model - Power producer to
         i. become a franchisee of a Discom
         ii. supply to the rural consumer as per the state electricity regulatory commission
              determined rates
         iii. The Discom pays the franchisee for the power generation and fulfills its RPO.


But, what about metering? More clarity needed..




                                           Off-grid PV                                          8
Overview


1. Introduction

2. Policy and regulatory environment

3. Challenges

4. Possible enablers

                       Off-grid PV     9
Challenges – Big systems(>10 kW)

1. Technical                   2. Financing            3. Others

•   Service centers and        •   High initial cost   • Subsidy disbursal
    technical assistance for                             timescale
    the installed products     •   Financing

•   Installation issues like
    structures

•   Lack of local workforce
    for assistance

•   Operation and
    maintenance cost


                                      Off-grid PV                            10
Challenges – Small systems(<10 kW)

1. Technical                              2. Financing                          3. Institutional
• System specifications                   • Capital subsidies                   • In some cases, banks
       –   Customization difficult                                                  like NABARD add
       –   Reduces choice and                                                       one more level of
           innovation possibilities       •   Margin requirements
                                                                                    bureaucracy
       –   Energy                             on loans

                                                                                •   Synergies across
•    Benchmark cost                                                                 ministries
       –   Framed for AC systems
       –   Not suited for DC
           systems


•    Servicing and
     maintenance cost


The ideas are elaborated by SELCO in the document The National Solar Mission – A practitioner’s Perspective
                                                  Off-grid PV                                                 11
Overview


1. Introduction

2. Policy and regulatory environment

3. Challenges

4. Possible enablers

                       Off-grid PV     12
Enablers– Big systems(>10 kW)

1. Technical                   2. Financing               3. Others

•   National level             • Encourage retail         • Reduce subsidy
    Certification similar to     financing for off-grid     disbursal timescale
    PV Installer                 systems by banks
    Certification by North
    American Board of
    Certified Energy
    Practitioners(NABCEP)

•   Standardizing off-grid
    systems to reduce
    engineering cost




                                     Off-grid PV                                  13
Enablers – Small systems(<10 kW)

 1. Technical                         2. Financing                              3. Institutional
• Avoid specifying                   • Decentralized                           •    Elimination of tiered
     components so as to                 procedures and localized                   subsidy disbursement
     facilitate customized               financing to provide ease                  procedures
     solutions                           of access to capital                  •    MNRE acts as single
                                                                                    window for subsidy
• Benchmark costs to                 • Reduction in margin                          disbursement
     be avoided (or)                     requirement on any loan
                                                                               •    All subsidy claims by
• Benchmark costs to                     taken for off-grid                         regional bank branches
     include cost of off-                applications                               to be processed by
     grid solar and                  • Eliminate complications                      MNRE
     maintenance costs                   of loan procurement by                •    Transferring subsidy
                                         diverting ALL subsidies                    disbursement duties to
                                         towards soft loans                         NABARD at a later
                                         instead of capital                         stage
                                         subsidies
The ideas are elaborated by SELCO in the document The National Solar Mission – A practitioner’s Perspective
                                                  Off-grid PV                                                 14
Support for Innovative business models

Pay-as-you-go -Example :Simpa Networks
• Metered solar energy system
• Installed in rural homes
Model
• Purchased for a small upfront cost
• Like ESCO model – recharged by SMS by local agent
• If meter runs out, it switches off and comes back once the user recharges the system
• After 3-5 years, once enough recharges are done the system gets unlocked and the user gets free
   access to electricity.




                                            Off-grid PV                                         15
PV Vouchers instead of Kerosene through
                 Aadhar(UID)

-                     Government
                                                     Part of
                                                    Kerosene
                                                     Subsidy



                                                    Off-grid
                         MNRE                        Fund



        Channel
                                              PDS
        Partners
          Recharge
          Code




                     End User (Rural                Solar
                       Customers)      Code         Meter


                         Off-grid PV                           16
The biggest enabler – removal of subsidies!!

                          Kerosene                                               LPG
PDS kerosene price - Rs.14.83/Litre
                                                   LPG Domestic cylinder - Rs.399/Cylinder
Government Subsidy : Rs.0.82/Litre                 Government Subsidy : Rs.22.58/Cylinder
OMC under recovery : Rs. 32.70/Litre               OMC under recovery : Rs. 346.79/Cylinder
(Price in Delhi Effective Sept 1, 2012)            (Price in Delhi Effective Sept 1, 2012)

                                                   OMC Under-recovery
OMC Under-recovery
                                                   2010-11 : Rs. 21,772 Crores
2010-11 : Rs. 19,484 Crores                        2011-12 : Rs. 29,997 Crores
2011-12 : Rs. 27, 352 Crores


                               Diesel                          Free/subsidized power
OMC Under-recovery                                 Examples
2010-11 : Rs. 34,706 Crores                        •   Tamil Nadu(for farmers)
                                                         – Rs. 1950 crore (2012-13)
2011-12 : Rs. 81,192 Crores
                                                         – 25.5% total power solar in TN goes to agriculture
                                                   •   Andhra Pradesh
                                                         –    Rs. 4200 Crores(2011-12)
                                                         – Rs. 5530 Crores(2012-13)

 Total Under-recovery on fossil fuels ~ Rs. 138,500 Crores(2011-12) – Equivalent to 13.8
 GWp of solar Projects(@ Rs. 10 Crore/MWp) – Wishful thinking?

                                          Off-grid PV                                                      17
Thank you

Madhavan Nampoothiri
 Founder and Director
 madhavan@re-solve.in

Más contenido relacionado

La actualidad más candente

Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
Vijay Kannan
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
Ashish Verma
 
Sma company presentation-en
Sma company presentation-enSma company presentation-en
Sma company presentation-en
ProAkademia
 

La actualidad más candente (20)

Continuous Improvement of Solar PV Plants with Innovative and New Practices
Continuous Improvement of Solar PV Plants with Innovative and New PracticesContinuous Improvement of Solar PV Plants with Innovative and New Practices
Continuous Improvement of Solar PV Plants with Innovative and New Practices
 
Analysis of PVSyst Loss Diagram
Analysis of PVSyst Loss DiagramAnalysis of PVSyst Loss Diagram
Analysis of PVSyst Loss Diagram
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentation
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
Sma company presentation-en
Sma company presentation-enSma company presentation-en
Sma company presentation-en
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Electric house summary profile
Electric house summary profileElectric house summary profile
Electric house summary profile
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverter
 
Rooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringRooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net Metering
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India 5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011
 
The MBA of Solar O&M
The MBA of Solar O&MThe MBA of Solar O&M
The MBA of Solar O&M
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 

Destacado

Eai corporate presentation
Eai   corporate presentationEai   corporate presentation
Eai corporate presentation
EAI
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
Jennifer Szaro
 
Solar Boat Facts
Solar Boat FactsSolar Boat Facts
Solar Boat Facts
Adam Hook
 

Destacado (20)

Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Thin films in India(april 18,2012)
Thin films in India(april 18,2012)Thin films in India(april 18,2012)
Thin films in India(april 18,2012)
 
List of PV channelpartners MNRE - JNNSM
List of PV channelpartners MNRE - JNNSMList of PV channelpartners MNRE - JNNSM
List of PV channelpartners MNRE - JNNSM
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhi
 
Marketing Plan - Solar Company
Marketing Plan - Solar CompanyMarketing Plan - Solar Company
Marketing Plan - Solar Company
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business plan
 
Eai corporate presentation
Eai   corporate presentationEai   corporate presentation
Eai corporate presentation
 
Solar PV landscape_india
Solar PV landscape_indiaSolar PV landscape_india
Solar PV landscape_india
 
Webinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumersWebinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumers
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
 
US Smart Grids And PV Integration
US Smart Grids And PV IntegrationUS Smart Grids And PV Integration
US Smart Grids And PV Integration
 
Solar off grid
Solar off gridSolar off grid
Solar off grid
 
PV integration into the grid - cost of storage
PV integration into the grid - cost of storagePV integration into the grid - cost of storage
PV integration into the grid - cost of storage
 
Grid Integration of PV
Grid Integration of PVGrid Integration of PV
Grid Integration of PV
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application ppt
 
Janus Software Demo for Solar Companies - CRM - Field Service GPS Application
Janus Software Demo for Solar Companies - CRM - Field Service GPS ApplicationJanus Software Demo for Solar Companies - CRM - Field Service GPS Application
Janus Software Demo for Solar Companies - CRM - Field Service GPS Application
 
Solar Boat Facts
Solar Boat FactsSolar Boat Facts
Solar Boat Facts
 
List channelpartners sp_jnnsm(02072013)
List channelpartners sp_jnnsm(02072013)List channelpartners sp_jnnsm(02072013)
List channelpartners sp_jnnsm(02072013)
 
SIMA Off-Grid Solar and Financial Access Senior Debt Fund I
SIMA Off-Grid Solar and Financial Access Senior Debt Fund ISIMA Off-Grid Solar and Financial Access Senior Debt Fund I
SIMA Off-Grid Solar and Financial Access Senior Debt Fund I
 

Similar a Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan Nampoothiri

Drivers of Ancillary Services in India
Drivers of Ancillary Services in IndiaDrivers of Ancillary Services in India
Drivers of Ancillary Services in India
IPPAI
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
Andrew Maus
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
Schneider Electric
 
Smart Grid Introduction
Smart Grid Introduction Smart Grid Introduction
Smart Grid Introduction
Nilesh Dhage
 
An introduction to Wireless Small Cell Networks
An introduction to Wireless Small Cell NetworksAn introduction to Wireless Small Cell Networks
An introduction to Wireless Small Cell Networks
Mehdi Bennis
 
Impacts of distributed generation on electricity market
Impacts of distributed generation on electricity marketImpacts of distributed generation on electricity market
Impacts of distributed generation on electricity market
Harsh Dhiman
 
Grid Parity: Are We There Yet?
Grid Parity: Are We There Yet?Grid Parity: Are We There Yet?
Grid Parity: Are We There Yet?
Craig Lawrence
 

Similar a Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan Nampoothiri (20)

Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
 
Drivers of Ancillary Services in India
Drivers of Ancillary Services in IndiaDrivers of Ancillary Services in India
Drivers of Ancillary Services in India
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Mini grid
Mini gridMini grid
Mini grid
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 
Community Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for citiesCommunity Microgrids: A resilient clean energy solution for cities
Community Microgrids: A resilient clean energy solution for cities
 
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon PowerFlinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
 
Minigrid regulation
Minigrid regulationMinigrid regulation
Minigrid regulation
 
Presentation from Sierra Club panel discussion on Microgrids in DC
Presentation from Sierra Club panel discussion on Microgrids in DCPresentation from Sierra Club panel discussion on Microgrids in DC
Presentation from Sierra Club panel discussion on Microgrids in DC
 
Smart Grid Introduction
Smart Grid Introduction Smart Grid Introduction
Smart Grid Introduction
 
NARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsNARUC Joins the Debate on DERs
NARUC Joins the Debate on DERs
 
An introduction to Wireless Small Cell Networks
An introduction to Wireless Small Cell NetworksAn introduction to Wireless Small Cell Networks
An introduction to Wireless Small Cell Networks
 
Day-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSESDay-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSES
 
Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017Presentation to the Australian Energy Week Conference June 2017
Presentation to the Australian Energy Week Conference June 2017
 
Bringing Communications to the Rural Edge
Bringing Communications to the Rural EdgeBringing Communications to the Rural Edge
Bringing Communications to the Rural Edge
 
Impacts of distributed generation on electricity market
Impacts of distributed generation on electricity marketImpacts of distributed generation on electricity market
Impacts of distributed generation on electricity market
 
Unit1
Unit1Unit1
Unit1
 
Grid Parity: Are We There Yet?
Grid Parity: Are We There Yet?Grid Parity: Are We There Yet?
Grid Parity: Are We There Yet?
 
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
 

Último

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 

Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan Nampoothiri

  • 1. Off-grid PV – Policy and Regulatory enablers September 3-5, 2012, Bangalore India
  • 2. About RESolve • Advisory firm with strong capabilities in Strategic, Regulatory , Commercial and Technical aspects of renewable energy projects • Founded by professionals from India and Germany with strong global exposure • Specific focus on Solar PV and Wind in India • Offerings in – Advisory on Concept-to-Commissioning of PV projects – Policy and Regulatory advice Off-grid PV 2
  • 3. Overview 1. Introduction 2. Policy and regulatory environment 3. Challenges 4. Possible enablers Off-grid PV 3
  • 4. Why Off-grid? • About 30% of India’s population(400 million) do not have access to electricity. • Over 90% of this population live in villages. Already electrified villages 163,641 De-Electrified villages 356,393 Un-Electrified villages 90,684 27,878 Un-Qualified villages (very less or no population) • Electricity transmission losses >30% (one of the highest in the world) Off-grid PV 4
  • 5. Type of off-grid customers . PV as an alternative to Rural Urban Kerosene Lanterns, Home lighting, Home Lighting cooking Diesel Diesel water pumps Diesel generators Free/Subsidized Water pumps power Off-grid PV 5
  • 6. Overview 1. Introduction 2. Policy and regulatory environment 3. Challenges 4. Possible enablers Off-grid PV 6
  • 7. JNNSM Goals and Policy support • Off-grid PV systems target – 2 GW by 2022 • Solar lighting – 20 Million households by 2022 • Policy support Off-grid PV 7
  • 8. Regulatory support : Off-grid RECs • Two models likely 1. Regular model - Power producer sells RECS at the exchange in addition to selling power at mutually agreed price 2. Franchisee model - Power producer to i. become a franchisee of a Discom ii. supply to the rural consumer as per the state electricity regulatory commission determined rates iii. The Discom pays the franchisee for the power generation and fulfills its RPO. But, what about metering? More clarity needed.. Off-grid PV 8
  • 9. Overview 1. Introduction 2. Policy and regulatory environment 3. Challenges 4. Possible enablers Off-grid PV 9
  • 10. Challenges – Big systems(>10 kW) 1. Technical 2. Financing 3. Others • Service centers and • High initial cost • Subsidy disbursal technical assistance for timescale the installed products • Financing • Installation issues like structures • Lack of local workforce for assistance • Operation and maintenance cost Off-grid PV 10
  • 11. Challenges – Small systems(<10 kW) 1. Technical 2. Financing 3. Institutional • System specifications • Capital subsidies • In some cases, banks – Customization difficult like NABARD add – Reduces choice and one more level of innovation possibilities • Margin requirements bureaucracy – Energy on loans • Synergies across • Benchmark cost ministries – Framed for AC systems – Not suited for DC systems • Servicing and maintenance cost The ideas are elaborated by SELCO in the document The National Solar Mission – A practitioner’s Perspective Off-grid PV 11
  • 12. Overview 1. Introduction 2. Policy and regulatory environment 3. Challenges 4. Possible enablers Off-grid PV 12
  • 13. Enablers– Big systems(>10 kW) 1. Technical 2. Financing 3. Others • National level • Encourage retail • Reduce subsidy Certification similar to financing for off-grid disbursal timescale PV Installer systems by banks Certification by North American Board of Certified Energy Practitioners(NABCEP) • Standardizing off-grid systems to reduce engineering cost Off-grid PV 13
  • 14. Enablers – Small systems(<10 kW) 1. Technical 2. Financing 3. Institutional • Avoid specifying • Decentralized • Elimination of tiered components so as to procedures and localized subsidy disbursement facilitate customized financing to provide ease procedures solutions of access to capital • MNRE acts as single window for subsidy • Benchmark costs to • Reduction in margin disbursement be avoided (or) requirement on any loan • All subsidy claims by • Benchmark costs to taken for off-grid regional bank branches include cost of off- applications to be processed by grid solar and • Eliminate complications MNRE maintenance costs of loan procurement by • Transferring subsidy diverting ALL subsidies disbursement duties to towards soft loans NABARD at a later instead of capital stage subsidies The ideas are elaborated by SELCO in the document The National Solar Mission – A practitioner’s Perspective Off-grid PV 14
  • 15. Support for Innovative business models Pay-as-you-go -Example :Simpa Networks • Metered solar energy system • Installed in rural homes Model • Purchased for a small upfront cost • Like ESCO model – recharged by SMS by local agent • If meter runs out, it switches off and comes back once the user recharges the system • After 3-5 years, once enough recharges are done the system gets unlocked and the user gets free access to electricity. Off-grid PV 15
  • 16. PV Vouchers instead of Kerosene through Aadhar(UID) - Government Part of Kerosene Subsidy Off-grid MNRE Fund Channel PDS Partners Recharge Code End User (Rural Solar Customers) Code Meter Off-grid PV 16
  • 17. The biggest enabler – removal of subsidies!! Kerosene LPG PDS kerosene price - Rs.14.83/Litre LPG Domestic cylinder - Rs.399/Cylinder Government Subsidy : Rs.0.82/Litre Government Subsidy : Rs.22.58/Cylinder OMC under recovery : Rs. 32.70/Litre OMC under recovery : Rs. 346.79/Cylinder (Price in Delhi Effective Sept 1, 2012) (Price in Delhi Effective Sept 1, 2012) OMC Under-recovery OMC Under-recovery 2010-11 : Rs. 21,772 Crores 2010-11 : Rs. 19,484 Crores 2011-12 : Rs. 29,997 Crores 2011-12 : Rs. 27, 352 Crores Diesel Free/subsidized power OMC Under-recovery Examples 2010-11 : Rs. 34,706 Crores • Tamil Nadu(for farmers) – Rs. 1950 crore (2012-13) 2011-12 : Rs. 81,192 Crores – 25.5% total power solar in TN goes to agriculture • Andhra Pradesh – Rs. 4200 Crores(2011-12) – Rs. 5530 Crores(2012-13) Total Under-recovery on fossil fuels ~ Rs. 138,500 Crores(2011-12) – Equivalent to 13.8 GWp of solar Projects(@ Rs. 10 Crore/MWp) – Wishful thinking? Off-grid PV 17