CYMI ECOURJA CONSORTIUM
         Building sustainable solar parks in India



Confidential

This document is solely for the use of its intended audience.
No part of it may be circulated, quoted or reproduced without the prior approval of EcoUrja or CYMI
Our Core Values



                      Customer                             Environment
         • Best of breed technology adapted      • Sustainable and efficient energy
           to Indian context                       production
         • World class implementation            • Reduction in CO2 footprint
         • On time and on budget delivery of
           services




                   Transparency                           Collaboration
         • Full visibility of transactions and   • Listening and understanding
           processes                               clients needs
         • Full visibility on project cost       • Proactive engagement with clients
           structure and financials                and partners to enable
                                                   achievement of objectives
Grupo ACS – An Introduction
CYMI IN ACS GROUP



                                       M
                                       A
                                       I
                                       N

                                       C
                       Others
                                       Y
                                       M
                                       I

                                       A
  Turnover Year 2007 (Million Euros)   C
                                       T
                                       I
                                       V
                                       I
                                       T
                                       I
                                       E
                                       S
CYMI – Sector Expertise
CYMI – International Locations
Implemented some of the largest MW PV projects in Spain

Project: Villar de Cañas II
• Nominal Power:               9 MWn
• Installation Type:           Grid Connected
• System:                      Fixed ground mounted
• Location:                    Cuenca (Spain)
• Grid Connection Voltage:     20 kV
• Module Supplier:             Yingli
• Inverter Supplier:           Siemens
• Project Status:              In Operation
• Startup:                     March 2008


Project: Enersol Toledo
• Nominal Power:              10 MWn
• Installation Type:          Grid Connected
• System:                     Solar tracking ground mounted
• Location:                   Toledo (Spain)
• Grid Connection Voltage:    20/66 kV
• Module Supplier:            Suntech
• Inverter Supplier:          Siemens
• Tracker Manufacturer        Esaune
• Project Status:             In Operation
• Startup:                    October 2008



        Implemented more than 30 MW grid connected PV projects in Europe
The CYMI EcoUrja Advantage: Why A Bankable EPC Reduces
Project Risks
The CYMI - EcoUrja Advantage

                 • Relevant and significant sector experience with proven individual ability to deliver
                   projects within time and budget
      Team       • In-depth knowledge of the project delivery procedures with established relationships
                   with vendors


                  • EPC with extensive global experience with both Crystalline and Thin Films
    Technology    • Global Supply chain including Indian manufacturers
                  • Extensive database of Indian solar insolation


                  • Ready to deploy 5 MW 10 MW models
   Deployment     • State the art modeling software to visualize solar energy scenarios and data
                  • Annual average CUF of more than 20% at optimum tilt


                  • 4 parcels of land (100 acres) identified in Rajasthan with option to lease further
                    tracts
      Land        • Solar insolation factor between 5.9– 6.2
                  • Waiting for final purchase green signal


                  • 5-8 Km to transmission substation for plant at > 33 kV
       Grid       • Grid access & technical feasibility from state government and state utility arranged



                  • Land acquisition and permits under way with state government and entities
     Permits      • Construction and usage permits prior to PPA with STU. Talks are underway
                  • Water permits to be arranged depending on land and requirement
Our Offering

              PHASE 1:                                PHASE 2:                              PHASE 3:
           Project Initiation                        MOU & PPA                              Execution

   •Land                                  •Statutory and other clearances       •Budget and timeline
    •Land identification                   •Permit management                    •Detailed budget analysis
    •Land Sale Agreement                   •Environmental management             •Project timeline execution in less
    •Land registration                     •Usage permit management               than 8 months
   •Site Development                       •Construction permit management      •Financial Closure
    •Solar Survey                          •Preparation of other required        •Support with financial closure
    •Geotechnical Survey                    permits                             •Design and Engineering
   •Detailed Project Report               •Financial analysis and modeling       •Inhouse enginnering
    •Plant layout and civil engineering    •Preparation of detailed business     •Innovation in implementation
    •Prelim Technical Design                plan                                 •Indigenization of resources
    •Configuration and specification of    •Preparation of detailed financial   •Project Organisation
     main equipments                        model                               •Procurement of main and auxiliary
    •Technology choice                     •Economic Analysis                    equipments
    •Implementation plan                  •Support with MOU with Power          •Construction
                                           Purchase Authority                    •Civil construction
    •Prelim budget estimation
                                          •Support with PPA wit Power            •Mechanical construction
    •Operation and maintenance
                                           Purchase Authority
   •Grid                                                                         •Electrical construction
    •Grid route survey                                                           •Instrumentation and control
    •Grid route planning and                                                      systems
     preliminary design                                                          •Grid connection
    •Permission from STU for grid                                               •Testing
     connection                                                                  •Cold testing
   •Registration with government body                                            •Warm testing
    •Documentation                                                              •Commissioning
    •Vetting of DPR                                                              •Operator training
    •Approval for grid connection                                                •Guarantee of performance
    •Registration confirmation
Questions & Contact

• www.ecourja.com
• projects@ecourja.com




India                 Spain
Tel: +91 1204540072   Tel: +34 630 05 88 92

Más contenido relacionado

Similar a Cymi Ecourja

Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)anjumehrotra
 
EPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckEPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckJaswin Sood
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project developmentGreenQ Partners
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate OverviewAndrew Maus
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Regulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantRegulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantPresi
 
Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyTransGrid AU
 
Demand Response in Ireland
Demand Response in IrelandDemand Response in Ireland
Demand Response in IrelandKiwiPower1
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
Boo wind power in egypt
Boo wind power in egyptBoo wind power in egypt
Boo wind power in egyptRCREEE
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Aconex
 
D0 1 ricardo_infrastructure & service delivery
D0 1 ricardo_infrastructure & service deliveryD0 1 ricardo_infrastructure & service delivery
D0 1 ricardo_infrastructure & service deliveryRicardo Energy & Environment
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 

Similar a Cymi Ecourja (20)

Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)
 
IRENEC-PPT
IRENEC-PPTIRENEC-PPT
IRENEC-PPT
 
EPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckEPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_Deck
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Regulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantRegulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plant
 
 
MARG-OPENACCESS
MARG-OPENACCESSMARG-OPENACCESS
MARG-OPENACCESS
 
Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering Sydney
 
Demand Response in Ireland
Demand Response in IrelandDemand Response in Ireland
Demand Response in Ireland
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Solar Brochure
Solar BrochureSolar Brochure
Solar Brochure
 
Boo wind power in egypt
Boo wind power in egyptBoo wind power in egypt
Boo wind power in egypt
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015
 
IoT and Smart Grids
IoT and Smart GridsIoT and Smart Grids
IoT and Smart Grids
 
D0 1 ricardo_infrastructure & service delivery
D0 1 ricardo_infrastructure & service deliveryD0 1 ricardo_infrastructure & service delivery
D0 1 ricardo_infrastructure & service delivery
 
Global Solar Summit
Global Solar SummitGlobal Solar Summit
Global Solar Summit
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 

Más de HIMADRI BANERJI

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfHIMADRI BANERJI
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...HIMADRI BANERJI
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxHIMADRI BANERJI
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfHIMADRI BANERJI
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeHIMADRI BANERJI
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning HIMADRI BANERJI
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdfHIMADRI BANERJI
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfHIMADRI BANERJI
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...HIMADRI BANERJI
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012HIMADRI BANERJI
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerjiHIMADRI BANERJI
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...HIMADRI BANERJI
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLHIMADRI BANERJI
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics HIMADRI BANERJI
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal HIMADRI BANERJI
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureHIMADRI BANERJI
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...HIMADRI BANERJI
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji HIMADRI BANERJI
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure HIMADRI BANERJI
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...HIMADRI BANERJI
 

Más de HIMADRI BANERJI (20)

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
 

Cymi Ecourja

  • 1. CYMI ECOURJA CONSORTIUM Building sustainable solar parks in India Confidential This document is solely for the use of its intended audience. No part of it may be circulated, quoted or reproduced without the prior approval of EcoUrja or CYMI
  • 2. Our Core Values Customer Environment • Best of breed technology adapted • Sustainable and efficient energy to Indian context production • World class implementation • Reduction in CO2 footprint • On time and on budget delivery of services Transparency Collaboration • Full visibility of transactions and • Listening and understanding processes clients needs • Full visibility on project cost • Proactive engagement with clients structure and financials and partners to enable achievement of objectives
  • 3. Grupo ACS – An Introduction
  • 4. CYMI IN ACS GROUP M A I N C Others Y M I A Turnover Year 2007 (Million Euros) C T I V I T I E S
  • 5. CYMI – Sector Expertise
  • 7. Implemented some of the largest MW PV projects in Spain Project: Villar de Cañas II • Nominal Power: 9 MWn • Installation Type: Grid Connected • System: Fixed ground mounted • Location: Cuenca (Spain) • Grid Connection Voltage: 20 kV • Module Supplier: Yingli • Inverter Supplier: Siemens • Project Status: In Operation • Startup: March 2008 Project: Enersol Toledo • Nominal Power: 10 MWn • Installation Type: Grid Connected • System: Solar tracking ground mounted • Location: Toledo (Spain) • Grid Connection Voltage: 20/66 kV • Module Supplier: Suntech • Inverter Supplier: Siemens • Tracker Manufacturer Esaune • Project Status: In Operation • Startup: October 2008 Implemented more than 30 MW grid connected PV projects in Europe
  • 8. The CYMI EcoUrja Advantage: Why A Bankable EPC Reduces Project Risks
  • 9. The CYMI - EcoUrja Advantage • Relevant and significant sector experience with proven individual ability to deliver projects within time and budget Team • In-depth knowledge of the project delivery procedures with established relationships with vendors • EPC with extensive global experience with both Crystalline and Thin Films Technology • Global Supply chain including Indian manufacturers • Extensive database of Indian solar insolation • Ready to deploy 5 MW 10 MW models Deployment • State the art modeling software to visualize solar energy scenarios and data • Annual average CUF of more than 20% at optimum tilt • 4 parcels of land (100 acres) identified in Rajasthan with option to lease further tracts Land • Solar insolation factor between 5.9– 6.2 • Waiting for final purchase green signal • 5-8 Km to transmission substation for plant at > 33 kV Grid • Grid access & technical feasibility from state government and state utility arranged • Land acquisition and permits under way with state government and entities Permits • Construction and usage permits prior to PPA with STU. Talks are underway • Water permits to be arranged depending on land and requirement
  • 10. Our Offering PHASE 1: PHASE 2: PHASE 3: Project Initiation MOU & PPA Execution •Land •Statutory and other clearances •Budget and timeline •Land identification •Permit management •Detailed budget analysis •Land Sale Agreement •Environmental management •Project timeline execution in less •Land registration •Usage permit management than 8 months •Site Development •Construction permit management •Financial Closure •Solar Survey •Preparation of other required •Support with financial closure •Geotechnical Survey permits •Design and Engineering •Detailed Project Report •Financial analysis and modeling •Inhouse enginnering •Plant layout and civil engineering •Preparation of detailed business •Innovation in implementation •Prelim Technical Design plan •Indigenization of resources •Configuration and specification of •Preparation of detailed financial •Project Organisation main equipments model •Procurement of main and auxiliary •Technology choice •Economic Analysis equipments •Implementation plan •Support with MOU with Power •Construction Purchase Authority •Civil construction •Prelim budget estimation •Support with PPA wit Power •Mechanical construction •Operation and maintenance Purchase Authority •Grid •Electrical construction •Grid route survey •Instrumentation and control •Grid route planning and systems preliminary design •Grid connection •Permission from STU for grid •Testing connection •Cold testing •Registration with government body •Warm testing •Documentation •Commissioning •Vetting of DPR •Operator training •Approval for grid connection •Guarantee of performance •Registration confirmation
  • 11. Questions & Contact • www.ecourja.com • projects@ecourja.com India Spain Tel: +91 1204540072 Tel: +34 630 05 88 92