SlideShare a Scribd company logo
1 of 55
Northern California:

    Roseville
  Central California:

      Clovis

www.lpengineers.com
•   Firm History
         •   Professional Services
         •   Office Staff and Locations
         •   Key Team Members
         •   Portfolio
         •   BIM Experience
         •   Sustainability
         •   Q&A




Agenda
Clovis Office            Roseville Office


1980      1985           1990        1995                2000      2005              2010




  1983 - Lencioni Associates was formed in Clovis by Gary Lencioni.
  1988 - Sean Pourvakil joined Lencioni Associates.
  1998 - EnerCal Engineering was formed in Roseville by Sean Pourvakil.
  2003 - LP Consulting Engineers, Inc. was formed by combining the resources of
     EnerCal Engineering and Lencioni Associates.
  2003 - LP Consulting Engineers, Inc. added Electrical Engineering services.



                              Firm History
Mechanical, Electrical & Plumbing
              • Master Planning
              • Site Surveying
              • Engineering
              • Commissioning
          Energy Modeling
              • LEED®
              • CHPS
              • Energy Utility Rebate Programs
              • Title 24 Compliance




Professional Services
LP Consulting Engineers consists of 29 professionals in two offices.
•   Roseville Office……………………………………….………15 Team Members
       (4) Project Managers, (4) Designers, (5) Technicians and
       (2) in Administration
•   Clovis Office…………………………………………………..14 Team Members
       (4) Project Managers,(3) Designers, (5)Technicians and
       (2) in Administration
•   Professional Engineers…………………………….………….5 Team Members
•   LEED® Accredited Professionals…………………….………7 Team Members
•   In-training to take LEED® AP Exam this month………….…5 Team Members


                                Offices
Sean Pourvakil
                         President & CEO, Managing Principal

            MECHANICAL                                    ELECTRICAL

Garen Lencioni……Vice President, Principal     Peter Kwan…………………..Principal
Jason DeDora…Production/Project Manager       James Lim……Electrical Dept Manager
Steve Zagyi………...Senior Project Manager       Tom Schlepp…………Project Manager
Ken Kuphaldt…..………….Project Manager           Richard Chen………...Project Manager
Ryan Ennis………………………..Designer                 Ciprian Paduraru…………….Designer
Jacob Mills………………………...Designer               Marco Salazar……………….Designer


                     Key Team Members
We have experience in a wide variety of
projects, including the following:
 • Civic / Community – Community
   Center, City Hall, Parks
 • Medical – Hospital, Clinic, MOB, VA
 • Retail / Commercial – Big Box,
   Specialty, Restaurant, Office
 • Municipal – Police, Fire, Military
 • Education – K-12, Higher Education




                                Portfolio
Civic / Community
LEED    BIM


                         Brentwood Civic Center
 • 60,000 SF City Hall with Council Chambers
 • 32,000 SF Community Center with Community Hall
 • 113,000 SF Parking Structure
 • 2.3 acre Community Park
 • Goal is LEED® Silver, currently submitting enough points for LEED® Gold
 • With our high efficiency HVAC and Lighting, we beat Title 24 by over 21% for 4
   points on EA Credit 1 – Optimized Energy Performance
 • As part of the Master Planning, we coordinated to provide the utilities and capacity
   for the entire site build-out


                      Civic / Community
Brentwood Civic Center
                       New City Hall, Community Center,
                       Parking Structure and Community
                                      Park
LEED   BIM




             Civic / Community
Rumsey Tribal Center
•   22,000 SF, single story.
•   New Community Center in Brooks, CA.
•   This building serves as a community center,
    elementary school and tribal office for the
    Rumsey Band of Wintun Indians on its Cache
    Creek reservation.
•   Facilities include an exhibition space for tribal
    art and artifacts, an assembly/conference
    space reminiscent of a traditional tribal lodge, a
    library, classrooms, daycare rooms and an
    office suite.




                          Civic / Community
Rumsey Tribal Center




      Civic / Community
St. Patrick Parish
•   Located in Merced, CA, this 15,000 square foot
    church facility included a full kitchen and 7,500
    square foot hall.
•   Because of the high visibility of the grilles, we
    coordinated closely with the architect to ensure
    that we maintained the appearance of all
    ceilings and walls.




                          Civic / Community
Santa Fe Depot
•   This rehabilitation project
    brought the historic depot
    back into a fully functioning
    rail station.
•   The main floor serves as
    the rail station and the
    second floor is set up to
    provide future lease able
    office space.
•   The completed project has won several awards including a Preservation Design
    Award from the California Preservation Foundation and a Historic Preservation
    Award from the Fresno City Historical Society.




                          Civic / Community
Medical
Sutter Roseville – MOB II
   •   Provided our engineering services to the
       mechanical design-build contractor, we
       designed the mechanical and plumbing
       systems.
   •   This two-story medical office building is
       located on the same site as the Sutter
       Roseville Hospital.
   •   Through close coordination with Sutter
       Health, we ensured that all plumbing
       requirements for equipment were
       provided.
   •   The HVAC system included two large
       rooftop air conditioners; variable air
       volume (VAV) boxes with reheat at the
       exterior zones provided by a roof-
       mounted boiler.


Medical
Fresno Imaging Center
•   This 10,000 sq.ft. medical building
    houses the first San Joaquin Valley
    M.R.I.
•   This project won the National AIA and
    Modern Health Care Design Award of
    Excellence.




                                     Medical
Veterans Affairs                      Kaiser Permanente
•   We have worked on a wide variety       •   We are a Kaiser Permanente
    of medical projects on VA facilities       approved consultant
    including:
                                           •   We have worked on a variety of
     • Hospitals                               projects including:
     • Clinics                                  • Modernization
     • Pharmacies                               • New Construction
                                                • Tenant Improvement




                                  Medical
UC Davis Medical Group                   PeachTree Healthcare
•    We have performed site                          Clinic
     investigation and OSHPD             •   13,300 SF clinic in Linda, CA
     compliance reports on MEP
     systems.                            •   New OSHPD III facility.
•    We provided mechanical,             •   Provided mechanical engineering
     plumbing and electrical                 services to the design-build
     engineering services to bring an        contractor.
     existing facility up to OSHPD III
     requirements.




                                   Medical
Retail / Commercial
Uptown Monterey Retail
                    •     20,000 SF Retail/Restaurant
                          Center
LEED
                    •     Provided MEP design, energy
                          modeling & documentation,
                          commissioning and submittal of
                          MEP credits to USGBC.
                    •     Reduced water use, high
                          efficiency package unit system,
                          and high performance lighting.
                    •     We provided commissioning
                          services to meet the LEED®
                          requirements.
                    •     This project was the first retail
                          center in California to obtain
                          LEED® certification. Achieved
                          LEED® Silver.




       Retail / Commercial
HealthNet Office Building
•   We designed the mechanical and plumbing systems for this three-story office building
    in Sacramento, CA.
•   The mechanical system consisted of large rooftop air conditioners and variable air
    volume (VAV) boxes with reheat at the exterior zones provided by a roof-mounted
    boiler.
•   Split into two packages, we provided plans for the shell building including everything
    installed on or penetrating the external surfaces of the building as well as running the
    ductwork mains and all underground plumbing. In the tenant improvement package,
    we ran all above slab plumbing and placed VAV boxes, low velocity ductwork and
    grilles/diffusers.

                        Retail / Commercial
Merced County Bank
     •   Located in Merced, CA this three story
         30,000 SF building serves as a bank on the
         first floor and corporate administrative offices
         on the second and third floors.
     •   A combination of rooftop package units and
         split-system units were used to provide the
         necessary zone control in the tight ceiling
         spaces between floors.




Retail / Commercial
State Comp Corporate Office
               Building
•   This 120,000 SF four-story office building
    includes an underground parking structure
    for 120 cars.
•   The HVAC system includes: state of the art
    packaged variable frequency chilled/hot
    water pump system, (2) high efficiency
    screw chillers, (2) hot water boilers and fan
    powered VAV system with re-heat.
•   The building exceeded Title 24
    requirements by 20% and received a rebate
    from PG&E.




                      Retail / Commercial
LEED




                              Blue Shield - Lodi
•   167,000 SF, two-story office building.
•   The project included open office, kitchen/cafeteria, data room and conference
    facilities.
•   We served as the plumbing engineer as a consultant to the design-build
    contractor.
•   Coordinated on production LEED® documents including: basis of design, owner
    project requirements, water use reduction templates.




                      Retail / Commercial
Municipal
LEED

      Cotati Police Station
•   4,000 SF Police Facility
•   One of the first LEED® certified
    public safety projects in the nation.
•
                                                Yuba City Police Expansion
    We implemented methods of water
    conservation to help the building       •   Remodel and Expansion of existing Police
    achieve LEED® certification.                Facility
                                            •   Provided MEP services for remodel and
                                                addition of new office, exercise, locker
                                                room and restroom facilities.
                                            •   Close coordination was required to keep
                                                this 24 hr emergency facility operating
                                                during the expansion.

                                     Municipal
Ebbetts Pass Fire Station
•    14,700 SF Fire Station
•    3,354 SF garage designed to
     accommodate winter weather
     conditions
•    Radiant floor heating at the
     apparatus bays
•    Key site amenities include an on-
     site 750 gallon fueling station, 1250
     gallon diesel fueling station, an
     emergency generator




                                     Municipal
Education
CHPS   BIM
                 South Lake Tahoe High School
                 •   30,000 SF, two-story ORG building.
                 •   30,000 SF, two-story CTE building.
                 •   Both projects are in the process of
                     achieving CHPS certification.
                 •   BIM – The projects were designed
                     collaboratively using Revit® MEP 2009
                     to create an integrated building model.
                 •   Collision detection was performed
                     between: architectural, structural,
                     lighting and mechanical systems.
                 •   More information will be discussed in the
                     BIM section of this presentation.

             Education
CHPS

      Hurd Barrington Elementary
                 School
•    55,000 SF, Five building campus.
•    New Elementary School in Newman, CA.
•    The buildings have many green features
     such as displacement ventilation, water
     conserving fixtures, PV system and solar
     water heating for the Cooking Kitchen.
•    Provided MEP design, energy management
     system design, energy modeling &
     documentation, and submittal of MEP credits
     for CHPS-Verified Certification.


                                   Education
Central Valley High School
 •   This new High School campus opened for the
     2005-2006 school year.
 •   The campus mechanical system consisted of a
     central plant system with (2) 244-TON air-
     cooled screw chillers and (3) 2 million BTU
     boilers.
 •   As a part of the master planning, we made
     provisions for plant expansion for the future
     expansion of an auditorium and additional
     classroom wings.
 •   Fabric duct systems were used in several of the
     buildings to provide cost savings and blend in
     with the architecture.



Education
LEED

           Livermore High School
•   CTE Agricultural Facility.
•   New agriculture and technology complex
    with an agriculture lab, animal science lab,
    metal shop and fabrication lab as well as
    classroom space.
•   Energy efficient components were
    incorporated such as daylighting and a
    green roof for the animal science building.
•   Registered under LEED® Schools. We are
    providing the commissioning services
    required for LEED® certification.



                                    Education
Ruby Bridges Elementary School
•   Located on the site of the decommissioned Alameda Naval Airbase, is this 49,906 SF,
    600 student elementary school.
•   Efficient HVAC and lighting design allowed us to secure a rebate from the utility
    company through the Savings by Design program.


                                  Education
Ruby Bridges
 Elementary
   School




Education
Sierra College
•   We provided Mechanical
    engineering services to provide new
    load shifting thermal energy storage
    systems for (3) existing chilled water
    plants.
•   The projects included full storage
    chilled water plants with chillers,
    variable flow pumping and ice banks
    totaling more than 1,300 ton-hours
    of cooling capacity during on-peak
    demand.



                                   Education
CHPS




           Buchanan High School Energy & Technology Center
•    8,000 SF building in Clovis, CA.
•    Provided MP design, energy modeling & documentation of MEP systems, and
     submittal of MP Credits for CHPS certification.
•    LP Consulting Engineers, Inc. also provided consulting to the Architect on LEED®
     process and possible points to attempt.
•    This classroom building will serve as an alternative energy technology learning center
     for students. The building will be constructed to allow the students to explore and
     learn from the building. Key items of interest are a vegetative roof, a displacement
     ventilation HVAC system, radiant floor heating, photovoltaic system, wind turbines and
     wall modules that allow the students to test the thermal conductivity of the walls.

                                    Education
Building Information Modeling
Brentwood Civic Center

           AutoCAD® MEP




BIM
South Lake Tahoe High School
        ORG Building
          Revit® MEP




BIM
South Lake Tahoe High School
        ORG Building
          Revit® MEP




BIM
South Lake Tahoe High School
        CTE Building
          Revit® MEP




BIM
South Lake Tahoe High School
        CTE Building
          Revit® MEP




BIM
Sustainability
We pride ourselves on being on the cutting edge of sustainability:
 • Cotati Police Facility – One of the first LEED® certified Public Safety project in
   the United States.
 • Uptown Monterey Retail – First LEED® certified retail center in the State of
    California.
 • Our company policy is all Mechanical and Electrical design team members
   must become LEED® AP (LEED® AP+).
 • We have designed 17 projects that have or are in the process of achieving LEED®
   and/or CHPS certification.




                            Sustainability
Photovoltaic System



   •   Renewable energy generation system.
   •   We have extensive experience in PV systems.
   •   We work as a consultant to SunPower on a
       variety of projects.
   •   We are currently under contract with SunEdison
       to place PV systems on existing Walgreens
       buildings throughout the country.
   •   We design systems on rooftops, parking
       structures, ground arrays.
   •   PV systems are becoming more cost effective
       making them more attractive to owner occupied
       buildings; such as K-12, Higher Ed., corporate
       offices, large retailers, etc.


Sustainability
Thermal Energy Storage




Full Storage     Partial Storage    Demand Limiting




               Sustainability
Evaporative Condensing
             Air Conditioning



                 •   Cost effective energy
                     efficiency. Typically, add
                     $1,000 per ton.
                 •   Can be installed in a
                     standard packaged
                     rooftop unit system.
                 •   Up to 13.5 EER. (Title 24
                     min. is 10.8 EER for this
                     type of system.)
                 •   Available for both
                     constant volume and
                     variable volume
                     mechanical systems.


Sustainability
Daylight Harvesting



•   Adjusting the output of electric
    lighting in a daylight area adjacent
    to a window or skylight via a
    daylight photo sensor that detects
    light levels in the space that can
    turn lighting ON/OFF or dimming
    control.
•   The light level is the user-defined
    day-light level that must be reached
    before the lights are turned on/off or
    dimming is turned up or down.




                               Sustainability
Occupancy Based Lighting Control

•   Switching lighting on and off in response to the occupancy of a particular space
    via occupancy sensors that respond to the individual usage of a controlled space
    are effective at eliminating energy waste. Occupancy sensor types include:
    o Passive Infrared Technology (PIR)
    o Ultrasonic Technology
    o Dual Technology combines the best of both PIR and ultrasonic technologies
•   Scheduling control manages lighting according to time schedules based on when
    buildings are open/occupied and closed/unoccupied via a master lighting control
    system panel that automatically turns all lighting on/off with the exception of
    emergency lighting.




                            Sustainability
Classroom Lighting
Integrated Classroom Lighting System (ICLS)
•   Achieve classroom lighting requirements
•   Achieve maximum energy performance points
•   Easily integrated daylight harvesting strategies
•   In the “General Mode”, it provides recommended light levels and illuminates ceilings
    and walls (using the ceiling suspended direct/indirect lighting)
•   In the “A/V Mode”, it ensures presentations are clearly visible while providing
    enough light for proper classroom communications
•   In the “Focus Mode”, light can focus attention. A/V Mode combined with the
    whiteboard light fixture results in a calming environment where attention is focused
    on the whiteboard


                              Sustainability
High Efficiency Lighting

   •   T5 and T5HO fluorescent lamps produce the
       same amount of light using 28 watts as a 32
       watt T8. They have an average life of 20,000
       hrs, compared to 24,000 hrs for the T8.
   •   LED light fixtures produce more light per watt
       than incandescent bulbs. They have an
       average life of 50,000 hrs, compared to 10,000
       to 24,000 hrs for fluorescent lamps. Using 60%
       less energy, they are available for indoor and
       outdoor applications.
   •   Induction lighting are similar to conventional
       fluorescent lamps. They have an average life of
       100,000 hrs, which is 11.4 years of continuous
       operation or 22.8 years of day or night use.
       They are primarily used where replacement
       costs are high.


Sustainability
Summary
• Serving California since 1983
• Offices in Roseville and Clovis
• Experienced professional team
• Experience in a wide variety of project
  types and sizes.
• BIM knowledge and experience using
  both AutoCAD® and Revit®
• Cutting edge of LEED® and CHPS
• Dedicated to Sustainability
• Please feel free to contact us for an
  MEP proposal on your next project
• Thank you for your time


                                    Summary
Questions?

More Related Content

What's hot

Madison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Industries
 
Skyline Presentation
Skyline PresentationSkyline Presentation
Skyline Presentationpoczik21
 
Mnkhan architects general profile
Mnkhan architects general profileMnkhan architects general profile
Mnkhan architects general profileMahbuba Khan
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochuremcgrawrpm
 
Cheshire Oaks Redesigned Live Final Presentation
Cheshire Oaks Redesigned Live Final PresentationCheshire Oaks Redesigned Live Final Presentation
Cheshire Oaks Redesigned Live Final PresentationEdward Dixon
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Archicon
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soqdignagni
 
The business case for leed certification
The business case for leed certificationThe business case for leed certification
The business case for leed certificationStuart Carron
 
Employment presentation
Employment presentationEmployment presentation
Employment presentationdavcal
 

What's hot (14)

New CV (Medical )
New CV  (Medical )New CV  (Medical )
New CV (Medical )
 
Madison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Modular Healthcare Solutions
Madison Modular Healthcare Solutions
 
Skyline Presentation
Skyline PresentationSkyline Presentation
Skyline Presentation
 
Mnkhan architects general profile
Mnkhan architects general profileMnkhan architects general profile
Mnkhan architects general profile
 
Portfolio2010
Portfolio2010Portfolio2010
Portfolio2010
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochure
 
Cheshire Oaks Redesigned Live Final Presentation
Cheshire Oaks Redesigned Live Final PresentationCheshire Oaks Redesigned Live Final Presentation
Cheshire Oaks Redesigned Live Final Presentation
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
Beyond decent homes presentation
Beyond decent homes presentationBeyond decent homes presentation
Beyond decent homes presentation
 
CHC Heavy 2011
CHC Heavy 2011CHC Heavy 2011
CHC Heavy 2011
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
 
The business case for leed certification
The business case for leed certificationThe business case for leed certification
The business case for leed certification
 
Employment presentation
Employment presentationEmployment presentation
Employment presentation
 

Viewers also liked

Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...
Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...
Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...Living Cities
 
Healthcare Business Survival Through Restructuring
Healthcare Business Survival Through RestructuringHealthcare Business Survival Through Restructuring
Healthcare Business Survival Through RestructuringElijah Ezendu
 
Basic concepts on the management of a physical therapy service organization
Basic concepts on the management of a physical therapy service organizationBasic concepts on the management of a physical therapy service organization
Basic concepts on the management of a physical therapy service organizationJuanito 'Jiggs' Lim III
 
Sustaining Harmony in Workplace the New Frontiers
Sustaining Harmony in Workplace the New FrontiersSustaining Harmony in Workplace the New Frontiers
Sustaining Harmony in Workplace the New FrontiersElijah Ezendu
 
Evolution in Health Care Delivery- Urgent Care Centers PPP
Evolution in Health Care Delivery- Urgent Care Centers PPPEvolution in Health Care Delivery- Urgent Care Centers PPP
Evolution in Health Care Delivery- Urgent Care Centers PPPDebbie Fernando
 
Terms of a GP/LP Fund Structure
Terms of a GP/LP Fund StructureTerms of a GP/LP Fund Structure
Terms of a GP/LP Fund StructureRobert Carroll
 
Private Equity Waterfall Notes
Private Equity Waterfall NotesPrivate Equity Waterfall Notes
Private Equity Waterfall NotesAshley Larson
 
Structuring and Financing a Partner Buyout
Structuring and Financing a Partner BuyoutStructuring and Financing a Partner Buyout
Structuring and Financing a Partner BuyoutGreg Tobben
 
Out patient services
Out patient servicesOut patient services
Out patient servicesNc Das
 
Organizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalOrganizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalSarang Bhutada
 

Viewers also liked (13)

Urgent care
Urgent careUrgent care
Urgent care
 
Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...
Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...
Cross-Sector Partnerships 101: Structuring Your Cross-Sector Partnership So I...
 
Business structure 1
Business structure 1Business structure 1
Business structure 1
 
Healthcare Business Survival Through Restructuring
Healthcare Business Survival Through RestructuringHealthcare Business Survival Through Restructuring
Healthcare Business Survival Through Restructuring
 
Basic concepts on the management of a physical therapy service organization
Basic concepts on the management of a physical therapy service organizationBasic concepts on the management of a physical therapy service organization
Basic concepts on the management of a physical therapy service organization
 
Sustaining Harmony in Workplace the New Frontiers
Sustaining Harmony in Workplace the New FrontiersSustaining Harmony in Workplace the New Frontiers
Sustaining Harmony in Workplace the New Frontiers
 
Evolution in Health Care Delivery- Urgent Care Centers PPP
Evolution in Health Care Delivery- Urgent Care Centers PPPEvolution in Health Care Delivery- Urgent Care Centers PPP
Evolution in Health Care Delivery- Urgent Care Centers PPP
 
Real Estate Joint Venture Partnerships Basics
Real Estate Joint Venture Partnerships BasicsReal Estate Joint Venture Partnerships Basics
Real Estate Joint Venture Partnerships Basics
 
Terms of a GP/LP Fund Structure
Terms of a GP/LP Fund StructureTerms of a GP/LP Fund Structure
Terms of a GP/LP Fund Structure
 
Private Equity Waterfall Notes
Private Equity Waterfall NotesPrivate Equity Waterfall Notes
Private Equity Waterfall Notes
 
Structuring and Financing a Partner Buyout
Structuring and Financing a Partner BuyoutStructuring and Financing a Partner Buyout
Structuring and Financing a Partner Buyout
 
Out patient services
Out patient servicesOut patient services
Out patient services
 
Organizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalOrganizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized Hospital
 

Similar to Northern and Central California Offices History

Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4Keith Callanan
 
R&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioR&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioJosh Rendon
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentationTomKummer
 
Project management through the use of oracle products
Project management through the use of oracle productsProject management through the use of oracle products
Project management through the use of oracle productsp6academy
 
20th Anniversary Slideshow
20th Anniversary Slideshow20th Anniversary Slideshow
20th Anniversary SlideshowJwilbern
 
Team Fishel - The Best Choice Since 1936
Team Fishel - The Best Choice Since 1936Team Fishel - The Best Choice Since 1936
Team Fishel - The Best Choice Since 1936Doug Trench
 
Evan McCoy-Resume
Evan McCoy-ResumeEvan McCoy-Resume
Evan McCoy-ResumeEvan McCoy
 
Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12charkins
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesBlack & Veatch
 
Jbc propectus july 22, 2014
Jbc propectus july 22, 2014Jbc propectus july 22, 2014
Jbc propectus july 22, 2014kenjewer
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10gueste65323
 
Harris Architects 2011
Harris Architects 2011Harris Architects 2011
Harris Architects 2011kaldana
 

Similar to Northern and Central California Offices History (20)

Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4
 
Craig Kelley, Housing Development Center
Craig Kelley, Housing Development CenterCraig Kelley, Housing Development Center
Craig Kelley, Housing Development Center
 
Expert Witness Presentation
Expert Witness PresentationExpert Witness Presentation
Expert Witness Presentation
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
R&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioR&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project Portfolio
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
Chitnis Brochure
Chitnis BrochureChitnis Brochure
Chitnis Brochure
 
Saving the Environment One Building at a Time
Saving the Environment One Building at a TimeSaving the Environment One Building at a Time
Saving the Environment One Building at a Time
 
Project management through the use of oracle products
Project management through the use of oracle productsProject management through the use of oracle products
Project management through the use of oracle products
 
20th Anniversary Slideshow
20th Anniversary Slideshow20th Anniversary Slideshow
20th Anniversary Slideshow
 
Team Fishel - The Best Choice Since 1936
Team Fishel - The Best Choice Since 1936Team Fishel - The Best Choice Since 1936
Team Fishel - The Best Choice Since 1936
 
Finley Hospital
Finley HospitalFinley Hospital
Finley Hospital
 
Evan McCoy-Resume
Evan McCoy-ResumeEvan McCoy-Resume
Evan McCoy-Resume
 
Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical Opportunities
 
Jbc propectus july 22, 2014
Jbc propectus july 22, 2014Jbc propectus july 22, 2014
Jbc propectus july 22, 2014
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Harris Architects 2011
Harris Architects 2011Harris Architects 2011
Harris Architects 2011
 
Evans group - Plumbing and Heating
Evans group - Plumbing and HeatingEvans group - Plumbing and Heating
Evans group - Plumbing and Heating
 

Northern and Central California Offices History

  • 1. Northern California: Roseville Central California: Clovis www.lpengineers.com
  • 2. Firm History • Professional Services • Office Staff and Locations • Key Team Members • Portfolio • BIM Experience • Sustainability • Q&A Agenda
  • 3. Clovis Office Roseville Office 1980 1985 1990 1995 2000 2005 2010 1983 - Lencioni Associates was formed in Clovis by Gary Lencioni. 1988 - Sean Pourvakil joined Lencioni Associates. 1998 - EnerCal Engineering was formed in Roseville by Sean Pourvakil. 2003 - LP Consulting Engineers, Inc. was formed by combining the resources of EnerCal Engineering and Lencioni Associates. 2003 - LP Consulting Engineers, Inc. added Electrical Engineering services. Firm History
  • 4. Mechanical, Electrical & Plumbing • Master Planning • Site Surveying • Engineering • Commissioning Energy Modeling • LEED® • CHPS • Energy Utility Rebate Programs • Title 24 Compliance Professional Services
  • 5. LP Consulting Engineers consists of 29 professionals in two offices. • Roseville Office……………………………………….………15 Team Members (4) Project Managers, (4) Designers, (5) Technicians and (2) in Administration • Clovis Office…………………………………………………..14 Team Members (4) Project Managers,(3) Designers, (5)Technicians and (2) in Administration • Professional Engineers…………………………….………….5 Team Members • LEED® Accredited Professionals…………………….………7 Team Members • In-training to take LEED® AP Exam this month………….…5 Team Members Offices
  • 6. Sean Pourvakil President & CEO, Managing Principal MECHANICAL ELECTRICAL Garen Lencioni……Vice President, Principal Peter Kwan…………………..Principal Jason DeDora…Production/Project Manager James Lim……Electrical Dept Manager Steve Zagyi………...Senior Project Manager Tom Schlepp…………Project Manager Ken Kuphaldt…..………….Project Manager Richard Chen………...Project Manager Ryan Ennis………………………..Designer Ciprian Paduraru…………….Designer Jacob Mills………………………...Designer Marco Salazar……………….Designer Key Team Members
  • 7. We have experience in a wide variety of projects, including the following: • Civic / Community – Community Center, City Hall, Parks • Medical – Hospital, Clinic, MOB, VA • Retail / Commercial – Big Box, Specialty, Restaurant, Office • Municipal – Police, Fire, Military • Education – K-12, Higher Education Portfolio
  • 9. LEED BIM Brentwood Civic Center • 60,000 SF City Hall with Council Chambers • 32,000 SF Community Center with Community Hall • 113,000 SF Parking Structure • 2.3 acre Community Park • Goal is LEED® Silver, currently submitting enough points for LEED® Gold • With our high efficiency HVAC and Lighting, we beat Title 24 by over 21% for 4 points on EA Credit 1 – Optimized Energy Performance • As part of the Master Planning, we coordinated to provide the utilities and capacity for the entire site build-out Civic / Community
  • 10. Brentwood Civic Center New City Hall, Community Center, Parking Structure and Community Park LEED BIM Civic / Community
  • 11. Rumsey Tribal Center • 22,000 SF, single story. • New Community Center in Brooks, CA. • This building serves as a community center, elementary school and tribal office for the Rumsey Band of Wintun Indians on its Cache Creek reservation. • Facilities include an exhibition space for tribal art and artifacts, an assembly/conference space reminiscent of a traditional tribal lodge, a library, classrooms, daycare rooms and an office suite. Civic / Community
  • 12. Rumsey Tribal Center Civic / Community
  • 13. St. Patrick Parish • Located in Merced, CA, this 15,000 square foot church facility included a full kitchen and 7,500 square foot hall. • Because of the high visibility of the grilles, we coordinated closely with the architect to ensure that we maintained the appearance of all ceilings and walls. Civic / Community
  • 14. Santa Fe Depot • This rehabilitation project brought the historic depot back into a fully functioning rail station. • The main floor serves as the rail station and the second floor is set up to provide future lease able office space. • The completed project has won several awards including a Preservation Design Award from the California Preservation Foundation and a Historic Preservation Award from the Fresno City Historical Society. Civic / Community
  • 16. Sutter Roseville – MOB II • Provided our engineering services to the mechanical design-build contractor, we designed the mechanical and plumbing systems. • This two-story medical office building is located on the same site as the Sutter Roseville Hospital. • Through close coordination with Sutter Health, we ensured that all plumbing requirements for equipment were provided. • The HVAC system included two large rooftop air conditioners; variable air volume (VAV) boxes with reheat at the exterior zones provided by a roof- mounted boiler. Medical
  • 17. Fresno Imaging Center • This 10,000 sq.ft. medical building houses the first San Joaquin Valley M.R.I. • This project won the National AIA and Modern Health Care Design Award of Excellence. Medical
  • 18. Veterans Affairs Kaiser Permanente • We have worked on a wide variety • We are a Kaiser Permanente of medical projects on VA facilities approved consultant including: • We have worked on a variety of • Hospitals projects including: • Clinics • Modernization • Pharmacies • New Construction • Tenant Improvement Medical
  • 19. UC Davis Medical Group PeachTree Healthcare • We have performed site Clinic investigation and OSHPD • 13,300 SF clinic in Linda, CA compliance reports on MEP systems. • New OSHPD III facility. • We provided mechanical, • Provided mechanical engineering plumbing and electrical services to the design-build engineering services to bring an contractor. existing facility up to OSHPD III requirements. Medical
  • 21. Uptown Monterey Retail • 20,000 SF Retail/Restaurant Center LEED • Provided MEP design, energy modeling & documentation, commissioning and submittal of MEP credits to USGBC. • Reduced water use, high efficiency package unit system, and high performance lighting. • We provided commissioning services to meet the LEED® requirements. • This project was the first retail center in California to obtain LEED® certification. Achieved LEED® Silver. Retail / Commercial
  • 22. HealthNet Office Building • We designed the mechanical and plumbing systems for this three-story office building in Sacramento, CA. • The mechanical system consisted of large rooftop air conditioners and variable air volume (VAV) boxes with reheat at the exterior zones provided by a roof-mounted boiler. • Split into two packages, we provided plans for the shell building including everything installed on or penetrating the external surfaces of the building as well as running the ductwork mains and all underground plumbing. In the tenant improvement package, we ran all above slab plumbing and placed VAV boxes, low velocity ductwork and grilles/diffusers. Retail / Commercial
  • 23. Merced County Bank • Located in Merced, CA this three story 30,000 SF building serves as a bank on the first floor and corporate administrative offices on the second and third floors. • A combination of rooftop package units and split-system units were used to provide the necessary zone control in the tight ceiling spaces between floors. Retail / Commercial
  • 24. State Comp Corporate Office Building • This 120,000 SF four-story office building includes an underground parking structure for 120 cars. • The HVAC system includes: state of the art packaged variable frequency chilled/hot water pump system, (2) high efficiency screw chillers, (2) hot water boilers and fan powered VAV system with re-heat. • The building exceeded Title 24 requirements by 20% and received a rebate from PG&E. Retail / Commercial
  • 25. LEED Blue Shield - Lodi • 167,000 SF, two-story office building. • The project included open office, kitchen/cafeteria, data room and conference facilities. • We served as the plumbing engineer as a consultant to the design-build contractor. • Coordinated on production LEED® documents including: basis of design, owner project requirements, water use reduction templates. Retail / Commercial
  • 27. LEED Cotati Police Station • 4,000 SF Police Facility • One of the first LEED® certified public safety projects in the nation. • Yuba City Police Expansion We implemented methods of water conservation to help the building • Remodel and Expansion of existing Police achieve LEED® certification. Facility • Provided MEP services for remodel and addition of new office, exercise, locker room and restroom facilities. • Close coordination was required to keep this 24 hr emergency facility operating during the expansion. Municipal
  • 28. Ebbetts Pass Fire Station • 14,700 SF Fire Station • 3,354 SF garage designed to accommodate winter weather conditions • Radiant floor heating at the apparatus bays • Key site amenities include an on- site 750 gallon fueling station, 1250 gallon diesel fueling station, an emergency generator Municipal
  • 30. CHPS BIM South Lake Tahoe High School • 30,000 SF, two-story ORG building. • 30,000 SF, two-story CTE building. • Both projects are in the process of achieving CHPS certification. • BIM – The projects were designed collaboratively using Revit® MEP 2009 to create an integrated building model. • Collision detection was performed between: architectural, structural, lighting and mechanical systems. • More information will be discussed in the BIM section of this presentation. Education
  • 31. CHPS Hurd Barrington Elementary School • 55,000 SF, Five building campus. • New Elementary School in Newman, CA. • The buildings have many green features such as displacement ventilation, water conserving fixtures, PV system and solar water heating for the Cooking Kitchen. • Provided MEP design, energy management system design, energy modeling & documentation, and submittal of MEP credits for CHPS-Verified Certification. Education
  • 32. Central Valley High School • This new High School campus opened for the 2005-2006 school year. • The campus mechanical system consisted of a central plant system with (2) 244-TON air- cooled screw chillers and (3) 2 million BTU boilers. • As a part of the master planning, we made provisions for plant expansion for the future expansion of an auditorium and additional classroom wings. • Fabric duct systems were used in several of the buildings to provide cost savings and blend in with the architecture. Education
  • 33. LEED Livermore High School • CTE Agricultural Facility. • New agriculture and technology complex with an agriculture lab, animal science lab, metal shop and fabrication lab as well as classroom space. • Energy efficient components were incorporated such as daylighting and a green roof for the animal science building. • Registered under LEED® Schools. We are providing the commissioning services required for LEED® certification. Education
  • 34. Ruby Bridges Elementary School • Located on the site of the decommissioned Alameda Naval Airbase, is this 49,906 SF, 600 student elementary school. • Efficient HVAC and lighting design allowed us to secure a rebate from the utility company through the Savings by Design program. Education
  • 35. Ruby Bridges Elementary School Education
  • 36. Sierra College • We provided Mechanical engineering services to provide new load shifting thermal energy storage systems for (3) existing chilled water plants. • The projects included full storage chilled water plants with chillers, variable flow pumping and ice banks totaling more than 1,300 ton-hours of cooling capacity during on-peak demand. Education
  • 37. CHPS Buchanan High School Energy & Technology Center • 8,000 SF building in Clovis, CA. • Provided MP design, energy modeling & documentation of MEP systems, and submittal of MP Credits for CHPS certification. • LP Consulting Engineers, Inc. also provided consulting to the Architect on LEED® process and possible points to attempt. • This classroom building will serve as an alternative energy technology learning center for students. The building will be constructed to allow the students to explore and learn from the building. Key items of interest are a vegetative roof, a displacement ventilation HVAC system, radiant floor heating, photovoltaic system, wind turbines and wall modules that allow the students to test the thermal conductivity of the walls. Education
  • 39. Brentwood Civic Center AutoCAD® MEP BIM
  • 40. South Lake Tahoe High School ORG Building Revit® MEP BIM
  • 41. South Lake Tahoe High School ORG Building Revit® MEP BIM
  • 42. South Lake Tahoe High School CTE Building Revit® MEP BIM
  • 43. South Lake Tahoe High School CTE Building Revit® MEP BIM
  • 45. We pride ourselves on being on the cutting edge of sustainability: • Cotati Police Facility – One of the first LEED® certified Public Safety project in the United States. • Uptown Monterey Retail – First LEED® certified retail center in the State of California. • Our company policy is all Mechanical and Electrical design team members must become LEED® AP (LEED® AP+). • We have designed 17 projects that have or are in the process of achieving LEED® and/or CHPS certification. Sustainability
  • 46. Photovoltaic System • Renewable energy generation system. • We have extensive experience in PV systems. • We work as a consultant to SunPower on a variety of projects. • We are currently under contract with SunEdison to place PV systems on existing Walgreens buildings throughout the country. • We design systems on rooftops, parking structures, ground arrays. • PV systems are becoming more cost effective making them more attractive to owner occupied buildings; such as K-12, Higher Ed., corporate offices, large retailers, etc. Sustainability
  • 47. Thermal Energy Storage Full Storage Partial Storage Demand Limiting Sustainability
  • 48. Evaporative Condensing Air Conditioning • Cost effective energy efficiency. Typically, add $1,000 per ton. • Can be installed in a standard packaged rooftop unit system. • Up to 13.5 EER. (Title 24 min. is 10.8 EER for this type of system.) • Available for both constant volume and variable volume mechanical systems. Sustainability
  • 49. Daylight Harvesting • Adjusting the output of electric lighting in a daylight area adjacent to a window or skylight via a daylight photo sensor that detects light levels in the space that can turn lighting ON/OFF or dimming control. • The light level is the user-defined day-light level that must be reached before the lights are turned on/off or dimming is turned up or down. Sustainability
  • 50. Occupancy Based Lighting Control • Switching lighting on and off in response to the occupancy of a particular space via occupancy sensors that respond to the individual usage of a controlled space are effective at eliminating energy waste. Occupancy sensor types include: o Passive Infrared Technology (PIR) o Ultrasonic Technology o Dual Technology combines the best of both PIR and ultrasonic technologies • Scheduling control manages lighting according to time schedules based on when buildings are open/occupied and closed/unoccupied via a master lighting control system panel that automatically turns all lighting on/off with the exception of emergency lighting. Sustainability
  • 51. Classroom Lighting Integrated Classroom Lighting System (ICLS) • Achieve classroom lighting requirements • Achieve maximum energy performance points • Easily integrated daylight harvesting strategies • In the “General Mode”, it provides recommended light levels and illuminates ceilings and walls (using the ceiling suspended direct/indirect lighting) • In the “A/V Mode”, it ensures presentations are clearly visible while providing enough light for proper classroom communications • In the “Focus Mode”, light can focus attention. A/V Mode combined with the whiteboard light fixture results in a calming environment where attention is focused on the whiteboard Sustainability
  • 52. High Efficiency Lighting • T5 and T5HO fluorescent lamps produce the same amount of light using 28 watts as a 32 watt T8. They have an average life of 20,000 hrs, compared to 24,000 hrs for the T8. • LED light fixtures produce more light per watt than incandescent bulbs. They have an average life of 50,000 hrs, compared to 10,000 to 24,000 hrs for fluorescent lamps. Using 60% less energy, they are available for indoor and outdoor applications. • Induction lighting are similar to conventional fluorescent lamps. They have an average life of 100,000 hrs, which is 11.4 years of continuous operation or 22.8 years of day or night use. They are primarily used where replacement costs are high. Sustainability
  • 54. • Serving California since 1983 • Offices in Roseville and Clovis • Experienced professional team • Experience in a wide variety of project types and sizes. • BIM knowledge and experience using both AutoCAD® and Revit® • Cutting edge of LEED® and CHPS • Dedicated to Sustainability • Please feel free to contact us for an MEP proposal on your next project • Thank you for your time Summary