SlideShare una empresa de Scribd logo
1 de 29
Descargar para leer sin conexión
April 2013
    NYSE MKT: URG • TSX: URE
Disclaimer
 This presentation contains “forward-looking statements,” within the meaning of applicable securities laws, regarding events or conditions that may occur in the future.
 Such statements include without limitation the Company’s timeframe for events leading to and culminating in the commencement of production at Lost Creek (including
 procurement, construction and commissioning); the timing and outcome of the challenge to the BLM Record of Decision; the ability and timing of the Company to secure
 project financing including the state bond process; the technical and economic viability of Lost Creek (including the projections contained in the preliminary analysis of
 economics of the Lost Creek Property); timing and completion of closing of the Pathfinder transaction; the ability to complete additional favorable uranium sales
 agreements and ability to reduce exposure to volatile market; the potential of exploration targets throughout the Lost Creek Property (including the ability to expand
 resources); the further exploration, development and permitting of exploration projects including Lost Soldier, the Nebraska properties, Screech Lake and, following a
 closing, at PMC projects; the long term effects on the uranium market of events in Japan in 2011 including supply and demand projections; and whether a re-rating of the
 Company will occur as production nears. These statements are based on current expectations that, while considered reasonable by management at this time, inherently
 involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Numerous factors could cause actual events to differ materially
 from those in the forward-looking statements. Factors that could cause such differences, without limiting the generality of the following, include: risks inherent in
 exploration activities; volatility and sensitivity to market prices for uranium; volatility and sensitivity to capital market fluctuations; the impact of exploration competition; the
 ability to raise funds through private or public equity financings; imprecision in resource and reserve estimates; environmental and safety risks including increased
 regulatory burdens; unexpected geological or hydrological conditions; a possible deterioration in political support for nuclear energy; changes in government regulations
 and policies, including trade laws and policies; demand for nuclear power; weather and other natural phenomena; delays in obtaining or failures to obtain required
 governmental, environmental or other project approvals; and other exploration, development, operating, financial market and regulatory risks. Although Ur-Energy Inc.
 believes that the assumptions inherent in the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of
 the date of this presentation. Ur-Energy Inc. disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new
 information, future events or otherwise.

 Cautionary Note Regarding Projections: Similarly, this presentation also may contain projections relating to an extended future period and, accordingly, the estimates
 and assumptions underlying the projections are inherently highly uncertain, based on events that have not taken place, and are subject to significant economic, financial,
 regulatory, competitive and other uncertainties and contingencies beyond the control of Ur-Energy Inc. Further, given the nature of the Company's business and industry
 that is subject to a number of significant risk factors, there can be no assurance that the projections can be or will be realized. It is probable that the actual results and
 outcomes will differ, possibly materially, from those projected.

 The attention of investors is drawn to the Risk Factors set out in the Company's Annual Information Form and Annual Report on Form 40-F, dated February 27, 2013
 which are filed, respectively, with the regulatory authorities in Canada on SEDAR and with the U.S. Securities and Exchange Commission on EDGAR. (www.sedar.com
 and http://www.sec.gov/edgar.shtml)

 Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources: the information presented uses the terms "measured",
 "indicated" and "inferred" mineral resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United
 States Securities and Exchange Commission does not recognize these terms. United States investors are cautioned not to assume that all or any part of measured or
 indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred
 mineral resource exists, or is economically or legally minable.

 John Cooper, Ur-Energy Project Geologist, P.Geo., SME Registered Member and Qualified Person as defined by National Instrument 43-101, and Catherine
 Bull, Ur-Energy Project Engineer, Wyoming P.E., SME Registered Member and Qualified Person as defined by National Instrument 43-101, reviewed and
 approved the technical information contained in this presentation.




NYSE MKT: URG • TSX: URE
                                                                                          2
Ur-Energy at a Glance
                                                            Advanced pre-production project at Lost Creek,
                                                             Wyoming
                                                                        Completed licensing activities in October 2012
                                                                        Initiated site construction in October 2012
                                                                        First production forecast for second half 2013

                                                            Expanding resources through acquisition and
                                                             exploration
                                                                        Definitive agreement to acquire Pathfinder Mines
                                                                         Corporation
                                                                        Continued expansion at the Lost Creek Property

 Secured revenue stream through long term sales agreements
          Exclusive marketing agreement with NuCore
 $17 million top-up financing in February 2012
 Advancing application for $34 million Wyoming Industrial Revenue Bond
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                           3
Ur-Energy’s Market Position
        Share Capital & Cash Position                                        NYSE MKT: URG
        As of 2/27/13
        Shares Outstanding                       121.37M
        Stock Options & RSUs                       8.50M
        Warrants                                    .15M
        Fully Diluted                            130.02M

        Market Cap (03/22/13)                C$111.66M

        Cash (12/31/12)                         C$17.9M



       Cash per Share (12/31/12)   ~C$0.148
       Share Price (03/22/13)         C$0.91
       52 Week Range            C$.64 - $1.29                                    TSX: URE
       Avg. Daily Volume           ~251,000
       (3-mo URG & URE 03/22/13)

       Member of S&P/TSX SmallCap Index


       Geographical Distribution as of 6/30/12

       United States          ~46%
       Canada                 ~40%
       Other                  ~14%

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         4
Analyst Coverage

    United States

    Roth Capital Partners                            Brian Post (New York, NY)                           1.949.720.7178


    Canada
    Dundee Securities                             David A. Talbot (Toronto, ON)                          1.416.350.3082
    Haywood Securities                            Colin Healey (Vancouver, BC)                           1.604.697.7400
    Raymond James                                 David Sadowski (Vancouver, BC)                         1.604.659.8255
    RBC Capital                                   Adam Schatzker (Toronto, ON)                           1.416.842.7850

  Ur-Energy Inc. is followed by the analysts listed above. This list, including the firms and individual analysts at these firms, is subject to
  change at any time without notice. Please note that any opinions, estimates, forecasts, conclusions or recommendations regarding
  Ur-Energy Inc. performance made by these analysts are theirs alone and do not represent opinions, estimates, forecasts, conclusions,
  recommendations or predictions of Ur-Energy Inc. or its management. Ur-Energy Inc. does not by its reference above or in any other
  manner imply its endorsement of or concurrence with such information, conclusions or recommendations.


See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         5
Experienced Management Team
                                     Board of Directors
Executive Directors
   Wayne W. Heili, President & Chief Executive Officer (Metallurgical Engineer)
   Jeffrey T. Klenda,* Board Chairman, Executive Director (Mining Finance)

Non-Executive Directors
   W. William Boberg,* Former President & CEO (Professional Geologist)
   James M. Franklin,* Chair-Technical Committee (Professional Geologist)
   Paul Macdonell,* Chair-Compensation and Corp. Governance & Nominating Committees
    (Senior Federal Mediator)
   Thomas H. Parker, Chair-Audit Committee (Professional Engineer)

Officers
 Roger L. Smith, Chief Financial Officer & Chief Administrative Officer (CPA & MBA)
 Steven M. Hatten, VP Operations (Mining Engineer)
 John W. Cash, VP Regulatory Affairs, Exploration & Geology (Geologist & Geophysicist)
 Penne A. Goplerud, Corporate Secretary & General Counsel (JD)
* Founding Directors



 NYSE MKT: URG • TSX: URE
                                                  6
Industry Leading Professionals
 Highly experienced technical and management team
 150 years of direct uranium production experience
      ISR operations experience – Nebraska, Texas, Wyoming & Kazakhstan




NYSE MKT: URG • TSX: URE
                                   7
Nuclear Fuel Demand is Growing
                                                                                435 operable reactors world wide with
                                                                                 374 GWe capacity
                                                                                US NRC approved four new reactor
                                                                                 licenses in 2012
                                                                                   First nuclear power plant licenses in
                                                                                    30+ years

                                                                                Seven new reactor construction starts
                                                                                 in 2012
                                                                                   Russia - 1, China - 4, UAE - 1,
    *Source: UxC Uranium Market Outlook                                             South Korea - 1

     Saudi Arabia & the United Kingdom combined have announced plans to
      build 24 new reactors
     Renewed prospect of restarting Japans reactor fleet with election of new
      pro-nuclear government late in 2012
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         8
Global Supply Picture is Dynamic

  HEU agreement to expire this year
           Provides 13% of world and 45% of US annual supply

  Today’s capital markets present a significant obstacle to
   development of new large scale mining centers
  Current uranium market price does not incentivize new supply
   development or sustain high cost conventional producers
  Large scale production growth is being curtailed for the foreseeable
   future
  New production will only come from a limited number of low cost,
   scalable projects


See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         9
The US Uranium Market
 US demand is not met by US production
          US mines produce ~ 4M lbs of uranium/yr1
          US utilities consume ~55M lbs of uranium/yr1

 Ur-Energy is well positioned to capitalize on this opportunity




1U.S. Energy Information Administration
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         10
Sound Marketing Strategy
                                                                      Balancing strategic and economic
                                                                       benefits of the spot/term price ratio
                                                                      De-risking by securing future
                                                                       revenue stream in an uncertain
                                                                       market
                                                                      Securing pricing that supports
                                                                       development plans for the Lost
                                                                       Creek project
                                                                      Four term contracts secured with
                                                                       North American utilities
 Exclusive representation by NuCore Energy, LLC in off-take
  purchase agreement negotiations
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         11
Ur-Energy’s US Projects




NYSE MKT: URG • TSX: URE
                           12
In-Situ Recovery (ISR) Uranium Mining




                 Environmentally sound production method
                 Well understood by Wyoming state regulators
                 Cost effective, low capital costs

NYSE MKT: URG • TSX: URE
                                    13
The Lost Creek Property
 Upgrade to the NI 43-101 mineral resource estimate on the
 Lost Creek Property (as of April 30, 2012 PEA)
                                                                         Measured: 4.20 Mlbs eU3O8 (in 3.85 Mt @ 0.055%)
                                                                         Indicated: 4.15 Mlbs eU3O8 (in 3.96 Mt @ 0.053%)
                                                                         Inferred: 2.87 Mlbs eU3O8 (in 2.99 Mt @ 0.049%)

                                                                         * Based on grade cutoff of 0.02% eU3O8 and a GT cutoff of 0.3

                                                                          Updated technical report includes land
                                                                           added in 2012 and upgraded resources
                                                                          Exploration targets within the Lost Creek
                                                                           Project and adjoining projects provide
                                                                           potential of additional resources U3O8

 Many of these exploration targets remain conceptual in nature.
                                                                          Lost Creek Project – 4,254 permit acres
 There has been insufficient exploration to define mineral resource
 estimates at all such exploration targets. It is uncertain if further     Adjoining projects – ~38,000 acres
 exploration will result in the additional target areas being
 delineated as further mineral resource.

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                            14
Preliminary Economic Assessment
April 30, 2012 PEA* updates resources and economics
          Extended life of mine to 8 – 10 years
          Mineral resource increase from February 2012 PEA
               45% Increase in measured and indicated resources
               42% Increase in inferred resources

          Estimates operating costs at US $16.12/lb
               Lowest quartile of all uranium producers

          Project internal rate of return (IRR) at 87%
          Capital requirement of only US $31.6M
               Lowest quartile of all developing uranium production facilities

*Preliminary Economic Assessment of the Lost Creek Property, Sweetwater County, Wyoming Prepared by Ur-Energy Inc. – April 30, 2012
(posted on SEDAR and EDGAR)
Cautionary Statement: This PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have the
economic considerations applied to them that would enable them to be categorized as mineral reserves. The estimated mineral recovery used in this PEA is based on
both site-specific laboratory recovery data as well as URE personnel and industry experience at similar facilities. There can be no assurance that recovery at this level
will be achieved.

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                                15
Under Construction
                                                                            Groundbreaking October 2012
                                                                                 Wyoming based contractor hired
                                                                                 Nine month estimated build-out
                                                                            Construction initiated
                                                                               Processing plant
                                                                               First mine unit
                                                                               Auxiliary facilities
                      Deep Disposal Well
                                                                            Capital Requirement of $31.6M
                                                                                 Process plant: $18.8M
                                                                                 Initial production area: $4.7M
                                                                                 Disposal well installation: $6.4M
                                                                                 Infrastructure: $1.7M
                                                                            Staffed for construction
                                                                                 Management personnel
                                                                                 Field support crew
     Interior of Ur-Energy’s Prototype Header House

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                             16
Lost Creek Construction Highlights




Lost Creek Processing Plant Under Construction – March 15, 2013   Installed Vessels and Tanks for Uranium Recovery




             Processing Plant Interior Construction                         Drilling Activities at Mine Unit 1




NYSE MKT: URG • TSX: URE
                                                             17
Pathfinder Mines Corporation
 PMC holds Ur-Energy’s next production center
                             PATHFINDER                                          Definitive purchase agreement
                                                                                  with AREVA signed in July 2012
                                                                                 Three major assets
                                                                                  1. Projects: Shirley Basin &
                                                                                     Lucky Mc
                                                                                  2. PMC’s extensive uranium
                                                                                     exploration database
                                                                                  3. Licensed ISR by-product
                                                                                     disposal facility

        Purchase price: US $13.25 million, 10% down payment, balance
         due on closing, no other monetary obligations prior to closing
        Transaction expected to close in first half of 2013
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         18
Pathfinder Projects
       Brownfield properties, existing infrastructure, permits & licenses
            Awaiting WDEQ and NRC license transfers

       Low holding costs
            Resources located on patented mining claims and state leases

       Shirley Basin
               Historic estimate of resources: >10 million lbs U3O8*
               High grade roll front deposit: average 0.21% U3O8
               Uranium resources can be converted to NI 43-101 compliant
               Shallow, ISR amenable mineralization

       Lucky Mc – Gas Hills
            Historic estimate of resources: 4.7 million lbs U3O8*
            Uranium resources can be converted to NI 43-101 compliant
            Strategic opportunities with nearby developers

*Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified Person has not yet conducted sufficient work to
classify the estimates as such.

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                               19
Pathfinder Assets
  Historic US uranium exploration database
               Hundreds of project descriptions located in twenty-three states
               Exploration reports dating back as far back as the 1960s
               More than 15,000 drill logs
               Technical and economic evaluations

  ISR by-product disposal facility
               Fully licensed for operation
               Multiple contracts in-place
               Cash generating – money saving
               Scarce asset – 1 of 4 commercial facilities in the US




See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         20
Lost Soldier – 12.2M M&I lbs U3O8
  Can be licensed with NRC as amendment to Lost Creek license

                                                                                     NI 43-101 resource | July 2006
                                                                                         Measured & Indicated: 12.2 Mlbs eU3O8
                                                                                         (in 9.4 Mt @ 0.065%)
                                                                                         Inferred:              1.8 Mlbs eU3O8
                                                                                         (in1.6 Mt @ 0.055%)


                                                                                     M&I resource average GT of 1.1
                                                                                      (17.2 ft @ 0.065% U3O8)
                                                                                     Shallow: 240 feet deep
                                                                                     Over 3,700 drill holes define
                                                                                      deposit
(Technical Report on the Lost Soldier Project, Wyoming, C. Stewart Wallis, Roscoe Postle Associates Inc., July 10, 2006 - Posted on SEDAR)

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                             21
Screech Lake, Thelon Basin, NWT
                                                                              MegaTEM Survey




            Screech
            Lake




                                                                                 0        4
                                                                                 Kilometers
 Completed audio-magnetotelluric geophysical survey, and soil gas
  hydrocarbon and enzyme leach soil geochemistry analyses to better
  define drill targets
See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         22
Ur-Energy – Right Now!

   Growth oriented technical & management team
   Cash resources of C$17.9 million (12/31/12)
   Advanced pre-production project at Lost Creek
         Low-cost uranium production center
         Project construction began in October 2012

   Signed multiple long-term uranium sales agreements
         Reducing company exposure to volatile marketplace

   Re-rating likely as Ur-Energy nears production




See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         23
Re-Rating Potential


       Stage                               EV/Lb
       Producers                           $4.60
       URG                                 $1.30
                       Source: Dundee (Feb 22, 2013)




          URG Upside vs. Producers                                              As Ur-Energy
              3X (+$3.30/Lb)                                                 nears production,
                                                                              re-rating is likely

See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         24
Ur-Energy’s Post Fukushima Accomplishments


            Completed licensing the Lost Creek Project
               Construction began October 2012
            Addition of strategic Lost Creek property positions
               45% expansion of Measured and Indicated resources
               42% increase in Inferred resources
            C$17.25 million project financing completed in 2012
            Agreement to acquire Pathfinder Mines
               Approx.15M lbs of estimated historic resources*




 *Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified Person has not yet conducted sufficient work to
 classify the estimates as such.


 See Disclaimer re Forward-looking Statements and Projections (slide 2)




 NYSE MKT: URG • TSX: URE
                                                                                25
2013 Objectives & News Flow
1.        Advance Lost Creek to production
              Complete construction
              Expand NI 43-101 compliant resources

2.        Pathfinder Mines
              Close transaction
              Transition to operating and regulatory activities
              Bring resources to NI 43-101 compliance

3.        Corporate finance – positive cash position
              Anticipated issuance of Wyoming Industrial Revenue Bond
              Forecasting additional needs

4.        Growth in production profile
              Identify project priorities
              Act on priorities


See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         26
Production Profile


                                                                           Ur-Energy’s strategy
                                                                              Production potential resources
                                                                              Economically recoverable resources
                                                                              Not simply “Pounds in the Ground”




 See Disclaimer re Forward-looking Statements and Projections (slide 2)




 NYSE MKT: URG • TSX: URE
                                                                            27
Ur-Energy Projected Market Share

  US mines produce ~4M lbs of uranium/yr
  US utilities consume ~55M lbs of uranium/yr
  US estimated 2014 production = ~5M lbs/yr
           URG est. 2014 ~1M lbs/yr = 20% of US market share




See Disclaimer re Forward-looking Statements and Projections (slide 2)




NYSE MKT: URG • TSX: URE
                                                                         28
Ur-Energy–The Right People. The Right Projects. Right Now!

                         For more information, please contact:
Wayne Heili, President, Chief Executive Officer & Director
Jeff Klenda, Board Chairman & Director
Rich Boberg, Director of Investor and Public Relations

By Mail:
Ur-Energy Corporate Office
10758 W. Centennial Rd., Suite 200
Littleton, CO 80127 USA

By Phone:
Office 720.981.4588
Toll-Free 866.981.4588
Fax 720.981.5643

By E-mail:
wayne.heili@ur-energy.com
jeff.klenda@ur-energy.com
rich.boberg@ur-energy.com




NYSE MKT: URG • TSX: URE
                                              29

Más contenido relacionado

La actualidad más candente

Aa jnnsm-2012-13
Aa jnnsm-2012-13Aa jnnsm-2012-13
Aa jnnsm-2012-13satyasatya3
 
Rockstone Reasearch- Early warning Report. Belmont Res.Kibby Basin,Nevada/L...
Rockstone Reasearch-  Early warning  Report. Belmont Res.Kibby Basin,Nevada/L...Rockstone Reasearch-  Early warning  Report. Belmont Res.Kibby Basin,Nevada/L...
Rockstone Reasearch- Early warning Report. Belmont Res.Kibby Basin,Nevada/L...Follow me on Twitter @Stockshaman
 
Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Neil Novak
 
Thompson Creek Metal Investor Presentation
Thompson Creek Metal Investor PresentationThompson Creek Metal Investor Presentation
Thompson Creek Metal Investor PresentationCompany Spotlight
 
Thompson Creek Metals Investor Presentation 09/17/12
Thompson Creek Metals Investor Presentation 09/17/12Thompson Creek Metals Investor Presentation 09/17/12
Thompson Creek Metals Investor Presentation 09/17/12Company Spotlight
 
International Lithium Presentation February 2015.
International Lithium Presentation February 2015.International Lithium Presentation February 2015.
International Lithium Presentation February 2015.Kirill Klip
 
Thompson creekfeb13presentation
Thompson creekfeb13presentationThompson creekfeb13presentation
Thompson creekfeb13presentationCompany Spotlight
 
Hudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbayMinerals
 
Hud bay bmo_investorpres2013_feb22_final
Hud bay bmo_investorpres2013_feb22_finalHud bay bmo_investorpres2013_feb22_final
Hud bay bmo_investorpres2013_feb22_finalHudbayMinerals
 
Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014PretiumR
 
International Lithium: Royalty And Strategic Investments Company
International Lithium: Royalty And Strategic Investments Company International Lithium: Royalty And Strategic Investments Company
International Lithium: Royalty And Strategic Investments Company Kirill Klip
 

La actualidad más candente (20)

July 2012 Corporate Presentation
July 2012 Corporate PresentationJuly 2012 Corporate Presentation
July 2012 Corporate Presentation
 
20121005 ure corporate presentation (october 2012 final)
20121005 ure corporate presentation  (october 2012 final)20121005 ure corporate presentation  (october 2012 final)
20121005 ure corporate presentation (october 2012 final)
 
September 2012 Corporate Presentation
September 2012 Corporate PresentationSeptember 2012 Corporate Presentation
September 2012 Corporate Presentation
 
20120710 ure corporate presentation (july 2012)
20120710 ure corporate presentation  (july 2012)20120710 ure corporate presentation  (july 2012)
20120710 ure corporate presentation (july 2012)
 
June 2012 Ur-Energy Corporate Presentation
June 2012 Ur-Energy Corporate PresentationJune 2012 Ur-Energy Corporate Presentation
June 2012 Ur-Energy Corporate Presentation
 
20120808 ure corporate presentation (august 2012 final)
20120808 ure corporate presentation  (august 2012 final)20120808 ure corporate presentation  (august 2012 final)
20120808 ure corporate presentation (august 2012 final)
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
Aa jnnsm-2012-13
Aa jnnsm-2012-13Aa jnnsm-2012-13
Aa jnnsm-2012-13
 
Rockstone Reasearch- Early warning Report. Belmont Res.Kibby Basin,Nevada/L...
Rockstone Reasearch-  Early warning  Report. Belmont Res.Kibby Basin,Nevada/L...Rockstone Reasearch-  Early warning  Report. Belmont Res.Kibby Basin,Nevada/L...
Rockstone Reasearch- Early warning Report. Belmont Res.Kibby Basin,Nevada/L...
 
Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)
 
Thompson Creek Metal Investor Presentation
Thompson Creek Metal Investor PresentationThompson Creek Metal Investor Presentation
Thompson Creek Metal Investor Presentation
 
Thompson Creek Metals Investor Presentation 09/17/12
Thompson Creek Metals Investor Presentation 09/17/12Thompson Creek Metals Investor Presentation 09/17/12
Thompson Creek Metals Investor Presentation 09/17/12
 
International Lithium Presentation February 2015.
International Lithium Presentation February 2015.International Lithium Presentation February 2015.
International Lithium Presentation February 2015.
 
Thompson creekfeb13presentation
Thompson creekfeb13presentationThompson creekfeb13presentation
Thompson creekfeb13presentation
 
Hudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of ShareholdersHudbay's Annual And Special Meeting of Shareholders
Hudbay's Annual And Special Meeting of Shareholders
 
Duluth mar13presentation
Duluth mar13presentationDuluth mar13presentation
Duluth mar13presentation
 
Hud bay bmo_investorpres2013_feb22_final
Hud bay bmo_investorpres2013_feb22_finalHud bay bmo_investorpres2013_feb22_final
Hud bay bmo_investorpres2013_feb22_final
 
Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014Vancouver Resource Investment Conference Jan 20, 2014
Vancouver Resource Investment Conference Jan 20, 2014
 
International Lithium: Royalty And Strategic Investments Company
International Lithium: Royalty And Strategic Investments Company International Lithium: Royalty And Strategic Investments Company
International Lithium: Royalty And Strategic Investments Company
 
Ncp presentation april 2018
Ncp presentation   april 2018Ncp presentation   april 2018
Ncp presentation april 2018
 

Destacado

2011 11 DCU keynote- changing landscape of social media
2011 11 DCU keynote- changing landscape of social media2011 11 DCU keynote- changing landscape of social media
2011 11 DCU keynote- changing landscape of social mediaGillian Muessig
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationMaciej Bilas
 
Access technology
Access technologyAccess technology
Access technology김 성남
 
Miva Merchant Conference 2013 e-Commerce Community Marketing
Miva Merchant Conference 2013 e-Commerce Community MarketingMiva Merchant Conference 2013 e-Commerce Community Marketing
Miva Merchant Conference 2013 e-Commerce Community MarketingGillian Muessig
 
WordCampEDU Scriblio 2009-02-02
WordCampEDU Scriblio 2009-02-02WordCampEDU Scriblio 2009-02-02
WordCampEDU Scriblio 2009-02-02Casey Bisson
 
Folleto Moratto Mar 2010
Folleto Moratto Mar 2010Folleto Moratto Mar 2010
Folleto Moratto Mar 2010marianotortora
 
Presentazione del Master in "Scrittura, Traduzione e Comunicazione nelle pro...
Presentazione del Master in "Scrittura, Traduzione e  Comunicazione nelle pro...Presentazione del Master in "Scrittura, Traduzione e  Comunicazione nelle pro...
Presentazione del Master in "Scrittura, Traduzione e Comunicazione nelle pro...Valentina Efrati
 
Presentación Sherrill Mane
Presentación Sherrill Mane Presentación Sherrill Mane
Presentación Sherrill Mane IAB México
 
The Counter Pop Evolution, English Corregido
The Counter Pop Evolution, English CorregidoThe Counter Pop Evolution, English Corregido
The Counter Pop Evolution, English CorregidoIsis Rodriguez
 
Berkaitan semantik ainol-
Berkaitan semantik  ainol-Berkaitan semantik  ainol-
Berkaitan semantik ainol-Mohammad Yaqin
 
6.01.hash tableintro
6.01.hash tableintro6.01.hash tableintro
6.01.hash tableintroamoldkul
 

Destacado (20)

2011 11 DCU keynote- changing landscape of social media
2011 11 DCU keynote- changing landscape of social media2011 11 DCU keynote- changing landscape of social media
2011 11 DCU keynote- changing landscape of social media
 
Digital Natives
Digital NativesDigital Natives
Digital Natives
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your application
 
Social media for biz
Social media for biz Social media for biz
Social media for biz
 
Access technology
Access technologyAccess technology
Access technology
 
Miva Merchant Conference 2013 e-Commerce Community Marketing
Miva Merchant Conference 2013 e-Commerce Community MarketingMiva Merchant Conference 2013 e-Commerce Community Marketing
Miva Merchant Conference 2013 e-Commerce Community Marketing
 
Mg flng welcome 2010 mar
Mg flng welcome 2010 marMg flng welcome 2010 mar
Mg flng welcome 2010 mar
 
WordCampEDU Scriblio 2009-02-02
WordCampEDU Scriblio 2009-02-02WordCampEDU Scriblio 2009-02-02
WordCampEDU Scriblio 2009-02-02
 
MISA BC Conference - 2011
MISA BC Conference - 2011MISA BC Conference - 2011
MISA BC Conference - 2011
 
Folleto Moratto Mar 2010
Folleto Moratto Mar 2010Folleto Moratto Mar 2010
Folleto Moratto Mar 2010
 
Smart Home
Smart HomeSmart Home
Smart Home
 
Presentazione del Master in "Scrittura, Traduzione e Comunicazione nelle pro...
Presentazione del Master in "Scrittura, Traduzione e  Comunicazione nelle pro...Presentazione del Master in "Scrittura, Traduzione e  Comunicazione nelle pro...
Presentazione del Master in "Scrittura, Traduzione e Comunicazione nelle pro...
 
October 2011 Ur-Energy Corporate Presentation
October 2011 Ur-Energy Corporate PresentationOctober 2011 Ur-Energy Corporate Presentation
October 2011 Ur-Energy Corporate Presentation
 
Presentación Sherrill Mane
Presentación Sherrill Mane Presentación Sherrill Mane
Presentación Sherrill Mane
 
Social media & online marketing boot camp
Social media & online marketing boot campSocial media & online marketing boot camp
Social media & online marketing boot camp
 
The Counter Pop Evolution, English Corregido
The Counter Pop Evolution, English CorregidoThe Counter Pop Evolution, English Corregido
The Counter Pop Evolution, English Corregido
 
Aim Final Plans Book
Aim Final Plans BookAim Final Plans Book
Aim Final Plans Book
 
Berkaitan semantik ainol-
Berkaitan semantik  ainol-Berkaitan semantik  ainol-
Berkaitan semantik ainol-
 
David kenneth waldman's_2012_cv_mayv31
David kenneth waldman's_2012_cv_mayv31David kenneth waldman's_2012_cv_mayv31
David kenneth waldman's_2012_cv_mayv31
 
6.01.hash tableintro
6.01.hash tableintro6.01.hash tableintro
6.01.hash tableintro
 

Similar a Ur-Energy April 2013 Corporate Presentation

Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)Urenergy
 
Ure corporate presentation 20140604 (final)
Ure corporate presentation 20140604 (final)Ure corporate presentation 20140604 (final)
Ure corporate presentation 20140604 (final)Urenergy
 
Ure corporate presentation 20141103 (final)
Ure corporate presentation 20141103 (final)Ure corporate presentation 20141103 (final)
Ure corporate presentation 20141103 (final)Urenergy
 
Ure corporate presentation 20140502 (final)
Ure corporate presentation 20140502 (final)Ure corporate presentation 20140502 (final)
Ure corporate presentation 20140502 (final)Urenergy
 
Ure corporate presentation 20140411 (final)
Ure corporate presentation 20140411 (final)Ure corporate presentation 20140411 (final)
Ure corporate presentation 20140411 (final)Urenergy
 
Ure corporate presentation 20140815 (final)
Ure corporate presentation 20140815 (final)Ure corporate presentation 20140815 (final)
Ure corporate presentation 20140815 (final)Urenergy
 
Ure corporate presentation 20141003 (final)
Ure corporate presentation 20141003 (final)Ure corporate presentation 20141003 (final)
Ure corporate presentation 20141003 (final)Urenergy
 
Ure corporate presentation 20131210 (final)
Ure corporate presentation 20131210 (final)Ure corporate presentation 20131210 (final)
Ure corporate presentation 20131210 (final)Urenergy
 
Ure corporate presentation 20150203 (final)
Ure corporate presentation 20150203 (final)Ure corporate presentation 20150203 (final)
Ure corporate presentation 20150203 (final)Urenergy
 
Ure corporate presentation 20150206(final)
Ure corporate presentation 20150206(final)Ure corporate presentation 20150206(final)
Ure corporate presentation 20150206(final)Urenergy
 

Similar a Ur-Energy April 2013 Corporate Presentation (20)

Ur-Energy January 2013 Corporate Presentation
Ur-Energy January 2013 Corporate PresentationUr-Energy January 2013 Corporate Presentation
Ur-Energy January 2013 Corporate Presentation
 
Ur-Energy December 2012 Presentation
Ur-Energy December 2012 PresentationUr-Energy December 2012 Presentation
Ur-Energy December 2012 Presentation
 
November 2012 Ur-Energy Corporate Presentation
November 2012 Ur-Energy Corporate PresentationNovember 2012 Ur-Energy Corporate Presentation
November 2012 Ur-Energy Corporate Presentation
 
Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)
 
Ure corporate presentation 20140604 (final)
Ure corporate presentation 20140604 (final)Ure corporate presentation 20140604 (final)
Ure corporate presentation 20140604 (final)
 
Ure corporate presentation 20141103 (final)
Ure corporate presentation 20141103 (final)Ure corporate presentation 20141103 (final)
Ure corporate presentation 20141103 (final)
 
Ur-Energy April 2012 Corporate Presentation
Ur-Energy April 2012 Corporate PresentationUr-Energy April 2012 Corporate Presentation
Ur-Energy April 2012 Corporate Presentation
 
May 2012 Ur-Energy Corporate Presentation
May 2012 Ur-Energy Corporate PresentationMay 2012 Ur-Energy Corporate Presentation
May 2012 Ur-Energy Corporate Presentation
 
Ure corporate presentation 20140502 (final)
Ure corporate presentation 20140502 (final)Ure corporate presentation 20140502 (final)
Ure corporate presentation 20140502 (final)
 
Ure corporate presentation 20140411 (final)
Ure corporate presentation 20140411 (final)Ure corporate presentation 20140411 (final)
Ure corporate presentation 20140411 (final)
 
Ure corporate presentation 20140815 (final)
Ure corporate presentation 20140815 (final)Ure corporate presentation 20140815 (final)
Ure corporate presentation 20140815 (final)
 
Ure corporate presentation 20141003 (final)
Ure corporate presentation 20141003 (final)Ure corporate presentation 20141003 (final)
Ure corporate presentation 20141003 (final)
 
Ure corporate presentation 20131210 (final)
Ure corporate presentation 20131210 (final)Ure corporate presentation 20131210 (final)
Ure corporate presentation 20131210 (final)
 
Ur-Energy October 2013 Corporate Presentation
Ur-Energy October 2013 Corporate PresentationUr-Energy October 2013 Corporate Presentation
Ur-Energy October 2013 Corporate Presentation
 
20110207 ure corporate presentation (february 2011)
20110207 ure corporate presentation (february 2011)20110207 ure corporate presentation (february 2011)
20110207 ure corporate presentation (february 2011)
 
20110322 ure corporate presentation (march 2011 webcast)
20110322 ure corporate presentation (march 2011 webcast)20110322 ure corporate presentation (march 2011 webcast)
20110322 ure corporate presentation (march 2011 webcast)
 
Ure corporate presentation 20150203 (final)
Ure corporate presentation 20150203 (final)Ure corporate presentation 20150203 (final)
Ure corporate presentation 20150203 (final)
 
Ur-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate PresentationUr-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate Presentation
 
Ure corporate presentation 20150206(final)
Ure corporate presentation 20150206(final)Ure corporate presentation 20150206(final)
Ure corporate presentation 20150206(final)
 
Ur-Energy September 2013 Corporate Presentation
Ur-Energy September 2013 Corporate PresentationUr-Energy September 2013 Corporate Presentation
Ur-Energy September 2013 Corporate Presentation
 

Más de Rich Boberg, SHRM-SCP, SPHR, PHRca

Más de Rich Boberg, SHRM-SCP, SPHR, PHRca (17)

Ur-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate PresentationUr-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate Presentation
 
Ur-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and TeleconferenceUr-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and Teleconference
 
Ur-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and TeleconferenceUr-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and Teleconference
 
Ur-Energy February 2016 Corporate Presentation
Ur-Energy February 2016 Corporate PresentationUr-Energy February 2016 Corporate Presentation
Ur-Energy February 2016 Corporate Presentation
 
Ur-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate PresentationUr-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate Presentation
 
Ur-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate PresentationUr-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate Presentation
 
Ur-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate PresentationUr-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate Presentation
 
Ur-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and TeleconferenceUr-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and Teleconference
 
Ur-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate PresentationUr-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate Presentation
 
Ur-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate PresentationUr-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate Presentation
 
Ur-Energy 2015 2Q Webcast and Teleconference Presentation
Ur-Energy 2015 2Q Webcast and Teleconference PresentationUr-Energy 2015 2Q Webcast and Teleconference Presentation
Ur-Energy 2015 2Q Webcast and Teleconference Presentation
 
Ur-Energy August 2015 Corporate Presentation
Ur-Energy August 2015 Corporate PresentationUr-Energy August 2015 Corporate Presentation
Ur-Energy August 2015 Corporate Presentation
 
Ur-Energy August 2015 Corporate Presentation
Ur-Energy August 2015 Corporate PresentationUr-Energy August 2015 Corporate Presentation
Ur-Energy August 2015 Corporate Presentation
 
Ur-Energy Second Quarter 2015 Teleconference and Webcast
Ur-Energy Second Quarter 2015 Teleconference and WebcastUr-Energy Second Quarter 2015 Teleconference and Webcast
Ur-Energy Second Quarter 2015 Teleconference and Webcast
 
June 2015 Corporate Presentation
June 2015 Corporate PresentationJune 2015 Corporate Presentation
June 2015 Corporate Presentation
 
Ur-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate PresentationUr-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate Presentation
 
Ur-Energy May 2013 Corporate Presentation
Ur-Energy May 2013 Corporate PresentationUr-Energy May 2013 Corporate Presentation
Ur-Energy May 2013 Corporate Presentation
 

Ur-Energy April 2013 Corporate Presentation

  • 1. April 2013 NYSE MKT: URG • TSX: URE
  • 2. Disclaimer This presentation contains “forward-looking statements,” within the meaning of applicable securities laws, regarding events or conditions that may occur in the future. Such statements include without limitation the Company’s timeframe for events leading to and culminating in the commencement of production at Lost Creek (including procurement, construction and commissioning); the timing and outcome of the challenge to the BLM Record of Decision; the ability and timing of the Company to secure project financing including the state bond process; the technical and economic viability of Lost Creek (including the projections contained in the preliminary analysis of economics of the Lost Creek Property); timing and completion of closing of the Pathfinder transaction; the ability to complete additional favorable uranium sales agreements and ability to reduce exposure to volatile market; the potential of exploration targets throughout the Lost Creek Property (including the ability to expand resources); the further exploration, development and permitting of exploration projects including Lost Soldier, the Nebraska properties, Screech Lake and, following a closing, at PMC projects; the long term effects on the uranium market of events in Japan in 2011 including supply and demand projections; and whether a re-rating of the Company will occur as production nears. These statements are based on current expectations that, while considered reasonable by management at this time, inherently involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Numerous factors could cause actual events to differ materially from those in the forward-looking statements. Factors that could cause such differences, without limiting the generality of the following, include: risks inherent in exploration activities; volatility and sensitivity to market prices for uranium; volatility and sensitivity to capital market fluctuations; the impact of exploration competition; the ability to raise funds through private or public equity financings; imprecision in resource and reserve estimates; environmental and safety risks including increased regulatory burdens; unexpected geological or hydrological conditions; a possible deterioration in political support for nuclear energy; changes in government regulations and policies, including trade laws and policies; demand for nuclear power; weather and other natural phenomena; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; and other exploration, development, operating, financial market and regulatory risks. Although Ur-Energy Inc. believes that the assumptions inherent in the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this presentation. Ur-Energy Inc. disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. Cautionary Note Regarding Projections: Similarly, this presentation also may contain projections relating to an extended future period and, accordingly, the estimates and assumptions underlying the projections are inherently highly uncertain, based on events that have not taken place, and are subject to significant economic, financial, regulatory, competitive and other uncertainties and contingencies beyond the control of Ur-Energy Inc. Further, given the nature of the Company's business and industry that is subject to a number of significant risk factors, there can be no assurance that the projections can be or will be realized. It is probable that the actual results and outcomes will differ, possibly materially, from those projected. The attention of investors is drawn to the Risk Factors set out in the Company's Annual Information Form and Annual Report on Form 40-F, dated February 27, 2013 which are filed, respectively, with the regulatory authorities in Canada on SEDAR and with the U.S. Securities and Exchange Commission on EDGAR. (www.sedar.com and http://www.sec.gov/edgar.shtml) Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources: the information presented uses the terms "measured", "indicated" and "inferred" mineral resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally minable. John Cooper, Ur-Energy Project Geologist, P.Geo., SME Registered Member and Qualified Person as defined by National Instrument 43-101, and Catherine Bull, Ur-Energy Project Engineer, Wyoming P.E., SME Registered Member and Qualified Person as defined by National Instrument 43-101, reviewed and approved the technical information contained in this presentation. NYSE MKT: URG • TSX: URE 2
  • 3. Ur-Energy at a Glance  Advanced pre-production project at Lost Creek, Wyoming  Completed licensing activities in October 2012  Initiated site construction in October 2012  First production forecast for second half 2013  Expanding resources through acquisition and exploration  Definitive agreement to acquire Pathfinder Mines Corporation  Continued expansion at the Lost Creek Property  Secured revenue stream through long term sales agreements  Exclusive marketing agreement with NuCore  $17 million top-up financing in February 2012  Advancing application for $34 million Wyoming Industrial Revenue Bond See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 3
  • 4. Ur-Energy’s Market Position Share Capital & Cash Position NYSE MKT: URG As of 2/27/13 Shares Outstanding 121.37M Stock Options & RSUs 8.50M Warrants .15M Fully Diluted 130.02M Market Cap (03/22/13) C$111.66M Cash (12/31/12) C$17.9M Cash per Share (12/31/12) ~C$0.148 Share Price (03/22/13) C$0.91 52 Week Range C$.64 - $1.29 TSX: URE Avg. Daily Volume ~251,000 (3-mo URG & URE 03/22/13) Member of S&P/TSX SmallCap Index Geographical Distribution as of 6/30/12 United States ~46% Canada ~40% Other ~14% See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 4
  • 5. Analyst Coverage United States Roth Capital Partners Brian Post (New York, NY) 1.949.720.7178 Canada Dundee Securities David A. Talbot (Toronto, ON) 1.416.350.3082 Haywood Securities Colin Healey (Vancouver, BC) 1.604.697.7400 Raymond James David Sadowski (Vancouver, BC) 1.604.659.8255 RBC Capital Adam Schatzker (Toronto, ON) 1.416.842.7850 Ur-Energy Inc. is followed by the analysts listed above. This list, including the firms and individual analysts at these firms, is subject to change at any time without notice. Please note that any opinions, estimates, forecasts, conclusions or recommendations regarding Ur-Energy Inc. performance made by these analysts are theirs alone and do not represent opinions, estimates, forecasts, conclusions, recommendations or predictions of Ur-Energy Inc. or its management. Ur-Energy Inc. does not by its reference above or in any other manner imply its endorsement of or concurrence with such information, conclusions or recommendations. See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 5
  • 6. Experienced Management Team Board of Directors Executive Directors  Wayne W. Heili, President & Chief Executive Officer (Metallurgical Engineer)  Jeffrey T. Klenda,* Board Chairman, Executive Director (Mining Finance) Non-Executive Directors  W. William Boberg,* Former President & CEO (Professional Geologist)  James M. Franklin,* Chair-Technical Committee (Professional Geologist)  Paul Macdonell,* Chair-Compensation and Corp. Governance & Nominating Committees (Senior Federal Mediator)  Thomas H. Parker, Chair-Audit Committee (Professional Engineer) Officers  Roger L. Smith, Chief Financial Officer & Chief Administrative Officer (CPA & MBA)  Steven M. Hatten, VP Operations (Mining Engineer)  John W. Cash, VP Regulatory Affairs, Exploration & Geology (Geologist & Geophysicist)  Penne A. Goplerud, Corporate Secretary & General Counsel (JD) * Founding Directors NYSE MKT: URG • TSX: URE 6
  • 7. Industry Leading Professionals  Highly experienced technical and management team  150 years of direct uranium production experience  ISR operations experience – Nebraska, Texas, Wyoming & Kazakhstan NYSE MKT: URG • TSX: URE 7
  • 8. Nuclear Fuel Demand is Growing  435 operable reactors world wide with 374 GWe capacity  US NRC approved four new reactor licenses in 2012  First nuclear power plant licenses in 30+ years  Seven new reactor construction starts in 2012  Russia - 1, China - 4, UAE - 1, *Source: UxC Uranium Market Outlook South Korea - 1  Saudi Arabia & the United Kingdom combined have announced plans to build 24 new reactors  Renewed prospect of restarting Japans reactor fleet with election of new pro-nuclear government late in 2012 See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 8
  • 9. Global Supply Picture is Dynamic  HEU agreement to expire this year  Provides 13% of world and 45% of US annual supply  Today’s capital markets present a significant obstacle to development of new large scale mining centers  Current uranium market price does not incentivize new supply development or sustain high cost conventional producers  Large scale production growth is being curtailed for the foreseeable future  New production will only come from a limited number of low cost, scalable projects See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 9
  • 10. The US Uranium Market  US demand is not met by US production  US mines produce ~ 4M lbs of uranium/yr1  US utilities consume ~55M lbs of uranium/yr1  Ur-Energy is well positioned to capitalize on this opportunity 1U.S. Energy Information Administration See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 10
  • 11. Sound Marketing Strategy  Balancing strategic and economic benefits of the spot/term price ratio  De-risking by securing future revenue stream in an uncertain market  Securing pricing that supports development plans for the Lost Creek project  Four term contracts secured with North American utilities  Exclusive representation by NuCore Energy, LLC in off-take purchase agreement negotiations See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 11
  • 12. Ur-Energy’s US Projects NYSE MKT: URG • TSX: URE 12
  • 13. In-Situ Recovery (ISR) Uranium Mining  Environmentally sound production method  Well understood by Wyoming state regulators  Cost effective, low capital costs NYSE MKT: URG • TSX: URE 13
  • 14. The Lost Creek Property Upgrade to the NI 43-101 mineral resource estimate on the Lost Creek Property (as of April 30, 2012 PEA) Measured: 4.20 Mlbs eU3O8 (in 3.85 Mt @ 0.055%) Indicated: 4.15 Mlbs eU3O8 (in 3.96 Mt @ 0.053%) Inferred: 2.87 Mlbs eU3O8 (in 2.99 Mt @ 0.049%) * Based on grade cutoff of 0.02% eU3O8 and a GT cutoff of 0.3  Updated technical report includes land added in 2012 and upgraded resources  Exploration targets within the Lost Creek Project and adjoining projects provide potential of additional resources U3O8 Many of these exploration targets remain conceptual in nature.  Lost Creek Project – 4,254 permit acres There has been insufficient exploration to define mineral resource estimates at all such exploration targets. It is uncertain if further Adjoining projects – ~38,000 acres exploration will result in the additional target areas being delineated as further mineral resource. See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 14
  • 15. Preliminary Economic Assessment April 30, 2012 PEA* updates resources and economics  Extended life of mine to 8 – 10 years  Mineral resource increase from February 2012 PEA  45% Increase in measured and indicated resources  42% Increase in inferred resources  Estimates operating costs at US $16.12/lb  Lowest quartile of all uranium producers  Project internal rate of return (IRR) at 87%  Capital requirement of only US $31.6M  Lowest quartile of all developing uranium production facilities *Preliminary Economic Assessment of the Lost Creek Property, Sweetwater County, Wyoming Prepared by Ur-Energy Inc. – April 30, 2012 (posted on SEDAR and EDGAR) Cautionary Statement: This PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. The estimated mineral recovery used in this PEA is based on both site-specific laboratory recovery data as well as URE personnel and industry experience at similar facilities. There can be no assurance that recovery at this level will be achieved. See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 15
  • 16. Under Construction  Groundbreaking October 2012  Wyoming based contractor hired  Nine month estimated build-out  Construction initiated  Processing plant  First mine unit  Auxiliary facilities Deep Disposal Well  Capital Requirement of $31.6M  Process plant: $18.8M  Initial production area: $4.7M  Disposal well installation: $6.4M  Infrastructure: $1.7M  Staffed for construction  Management personnel  Field support crew Interior of Ur-Energy’s Prototype Header House See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 16
  • 17. Lost Creek Construction Highlights Lost Creek Processing Plant Under Construction – March 15, 2013 Installed Vessels and Tanks for Uranium Recovery Processing Plant Interior Construction Drilling Activities at Mine Unit 1 NYSE MKT: URG • TSX: URE 17
  • 18. Pathfinder Mines Corporation PMC holds Ur-Energy’s next production center PATHFINDER  Definitive purchase agreement with AREVA signed in July 2012  Three major assets 1. Projects: Shirley Basin & Lucky Mc 2. PMC’s extensive uranium exploration database 3. Licensed ISR by-product disposal facility  Purchase price: US $13.25 million, 10% down payment, balance due on closing, no other monetary obligations prior to closing  Transaction expected to close in first half of 2013 See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 18
  • 19. Pathfinder Projects  Brownfield properties, existing infrastructure, permits & licenses  Awaiting WDEQ and NRC license transfers  Low holding costs  Resources located on patented mining claims and state leases  Shirley Basin  Historic estimate of resources: >10 million lbs U3O8*  High grade roll front deposit: average 0.21% U3O8  Uranium resources can be converted to NI 43-101 compliant  Shallow, ISR amenable mineralization  Lucky Mc – Gas Hills  Historic estimate of resources: 4.7 million lbs U3O8*  Uranium resources can be converted to NI 43-101 compliant  Strategic opportunities with nearby developers *Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified Person has not yet conducted sufficient work to classify the estimates as such. See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 19
  • 20. Pathfinder Assets  Historic US uranium exploration database  Hundreds of project descriptions located in twenty-three states  Exploration reports dating back as far back as the 1960s  More than 15,000 drill logs  Technical and economic evaluations  ISR by-product disposal facility  Fully licensed for operation  Multiple contracts in-place  Cash generating – money saving  Scarce asset – 1 of 4 commercial facilities in the US See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 20
  • 21. Lost Soldier – 12.2M M&I lbs U3O8  Can be licensed with NRC as amendment to Lost Creek license NI 43-101 resource | July 2006 Measured & Indicated: 12.2 Mlbs eU3O8 (in 9.4 Mt @ 0.065%) Inferred: 1.8 Mlbs eU3O8 (in1.6 Mt @ 0.055%)  M&I resource average GT of 1.1 (17.2 ft @ 0.065% U3O8)  Shallow: 240 feet deep  Over 3,700 drill holes define deposit (Technical Report on the Lost Soldier Project, Wyoming, C. Stewart Wallis, Roscoe Postle Associates Inc., July 10, 2006 - Posted on SEDAR) See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 21
  • 22. Screech Lake, Thelon Basin, NWT MegaTEM Survey Screech Lake 0 4 Kilometers  Completed audio-magnetotelluric geophysical survey, and soil gas hydrocarbon and enzyme leach soil geochemistry analyses to better define drill targets See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 22
  • 23. Ur-Energy – Right Now!  Growth oriented technical & management team  Cash resources of C$17.9 million (12/31/12)  Advanced pre-production project at Lost Creek  Low-cost uranium production center  Project construction began in October 2012  Signed multiple long-term uranium sales agreements  Reducing company exposure to volatile marketplace  Re-rating likely as Ur-Energy nears production See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 23
  • 24. Re-Rating Potential Stage EV/Lb Producers $4.60 URG $1.30 Source: Dundee (Feb 22, 2013) URG Upside vs. Producers As Ur-Energy  3X (+$3.30/Lb) nears production, re-rating is likely See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 24
  • 25. Ur-Energy’s Post Fukushima Accomplishments  Completed licensing the Lost Creek Project  Construction began October 2012  Addition of strategic Lost Creek property positions  45% expansion of Measured and Indicated resources  42% increase in Inferred resources  C$17.25 million project financing completed in 2012  Agreement to acquire Pathfinder Mines  Approx.15M lbs of estimated historic resources* *Ur-Energy is not treating the historic reports as current mineral resources or mineral reserves, because a Qualified Person has not yet conducted sufficient work to classify the estimates as such. See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 25
  • 26. 2013 Objectives & News Flow 1. Advance Lost Creek to production  Complete construction  Expand NI 43-101 compliant resources 2. Pathfinder Mines  Close transaction  Transition to operating and regulatory activities  Bring resources to NI 43-101 compliance 3. Corporate finance – positive cash position  Anticipated issuance of Wyoming Industrial Revenue Bond  Forecasting additional needs 4. Growth in production profile  Identify project priorities  Act on priorities See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 26
  • 27. Production Profile  Ur-Energy’s strategy  Production potential resources  Economically recoverable resources  Not simply “Pounds in the Ground” See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 27
  • 28. Ur-Energy Projected Market Share  US mines produce ~4M lbs of uranium/yr  US utilities consume ~55M lbs of uranium/yr  US estimated 2014 production = ~5M lbs/yr  URG est. 2014 ~1M lbs/yr = 20% of US market share See Disclaimer re Forward-looking Statements and Projections (slide 2) NYSE MKT: URG • TSX: URE 28
  • 29. Ur-Energy–The Right People. The Right Projects. Right Now! For more information, please contact: Wayne Heili, President, Chief Executive Officer & Director Jeff Klenda, Board Chairman & Director Rich Boberg, Director of Investor and Public Relations By Mail: Ur-Energy Corporate Office 10758 W. Centennial Rd., Suite 200 Littleton, CO 80127 USA By Phone: Office 720.981.4588 Toll-Free 866.981.4588 Fax 720.981.5643 By E-mail: wayne.heili@ur-energy.com jeff.klenda@ur-energy.com rich.boberg@ur-energy.com NYSE MKT: URG • TSX: URE 29