Nevada County CA 
60 miles from Sacramento 
150 miles from San Francisco
Bridgeport Covered Bridge, Nevada County CA 
Longest single span covered bridge in the U.S. (251 feet)
Strategic 
Growth 
Plan 
Pyramid
History & Future of Performance 
Measures 
• The Past: Safety, LOS, Community input & 
Common Sense. 
• The Present: Federal/State regulatory 
requirements: MAP 21, SB 375, State 
Transportation Improvement Program 
Guidelines. 
• The Future: Cost effective expenditure of 
public funding on infrastructure that achieves 
State, Regional, & Community goals
Definitions & Applications 
Performance measures are tools that help 
us to determine existing conditions across 
the transportation system and to evaluate 
the effectiveness of proposed investments 
by using a "measure" to evaluate anticipated 
and/or actual progress toward achieving a 
specific benchmark or "target" that is tied to 
an overarching goal. 
Amador County Transportation Commission, 
2014 RTP Update
• Performance measures can be either 
quantitative (data: e.g. LOS) or qualitative 
(values: (e.g. historic character). 
• A State-level quantitative performance 
measure may be very different than one 
that is based on regional data and goals. 
• Performance measures are used 
differently at plan-level, program-level, and 
project level.
• Plan-level – selecting a plan alternative 
• Program-level – establishing project 
priorities in a Capital Improvement Program 
(CIP) 
• Project-level – screening project alternatives 
and measuring refined design features. 
• The level of analysis needed & data 
available are not the same at each step.
In California, rural agencies are concerned 
that performance measures developed by, 
and for, urban areas of the state will skew 
the prioritization of funding toward those 
urban areas.
Rural Counties Task Force 
Local Roads Needs Assessment 
Draft Report 
RCTF Committee 
November 21, 2014
Project Objectives 
Compare revenues vs. pavement needs 
Perform three funding scenarios 
– Existing Funding (preventive maintenance first) 
– Existing Funding (worst first) 
– $$ to reach specific PCI goals 
Review other performance measures
Performance Measures 
Must be: 
– Meaningful 
– Repeatable & reproducible 
– Economical 
Pavement distress (PCI) 
– Widespread use nationally and in California 
– Well known, historical data available 
Roughness (IRI) 
– Not common on local roads 
– Not appropriate for rural roads e.g. chip seals
Some Facts and Figures
Average PCI
Average PCI 
66 (Statewide) 
58 (Rural Counties)
This is what 58 looks like …
How Bad is 58? 
100 
70 
PCI 58 
50 
25 
0 
Time (years) 
$3.85/sy 
$17.50/sy 
$27.50/sy 
$57/sy
Needs Per Capita Comparisons 
10 Year Needs 10 Year Needs Per Capita
Funding Shortfall 
Pavement 
Needs* 
($ million) 
Funding 
Available 
($ million) 
Shortfall 
($ million) 
Local Roads $ 7,275 $3,080 $ 4,195 
State Highways $ 732** 
Unknown 
* Target PCI di ffers by county. Average i s 68. 
** State highways are 10 year needs
1. Existing Budget (Prev. Maintenance) 
Nevada County
2. Existing Budget (Worst First) 
Nevada County
3. Reach PCI = 75 
Nevada County
Projected Conditions in 2034 
Nevada 
County
1. Existing Budget (Prev. Maintenance) 
Alpine County
2. Existing Budget (Worst First) 
Alpine County
Conclusions 
Average PCI for rural roads = 58 
20 year analysis to reach target PCI 
– Impacts of existing funding ($3.08 billion) 
• Average PCI drops to 42 
• Deferred maintenance = $6.7 to $8.1 billion 
– Funding to reach target (PCI = 68) is $7.3 billion 
– Shortfall = $4.2 billion 
State highways = $732 million (10 years)
Performance Monitoring Indicators for 
Transportation Planning 
Purpose: 
–Standardized, common set of transportation 
indicators 
–California MPOs and State Agencies 
Completed: June 2013
200 + Indicators 
Most Commonly Used by MPOs and State 
Agencies 
Methods and Data Sources 
Input from MPOs 
Input from State Agencies 
Set of 10 Indicators
MAP-21 Performance Measurement Goals 
•Congestion Reduction 
•Infrastructure Condition 
•System Reliability 
•Safety 
•Economic Vitality 
•Environmental Sustainability
Proposed Performance Monitoring Indicators 
1. Vehicle Miles Traveled 5. Fatalities/Serious Injuries 
2. Mode Share – travel to work 6. Transit accessibility 
3. State of good repair 7. Travel time to jobs 
a. Highways 8. Change in agricultural 
b. Local streets land 
c. Bridges 9. CO2 Emissions reductions 
d. Transit Assets 
4. Freeway/Highway Travel Time 
Reliability (Buffer Index)
Next Steps for Rural California 
Complete “Performance Monitoring Indicators for 
Small Urban and Rural Transportation Planning” 
Review and analyze the applicability of the nine 
performance monitoring indicators identified in the 
SANDAG study for implementation in small urban and 
rural areas.
The results of this study will be provided to 
CALTRANS to inform participation in the MAP 21 
process, to the California Transportatiion Commission 
for inclusion in the 2016 STIP Guidelines and will give 
guidance to small urban and rural agencies RTP and 
RTIP processes.

Más contenido relacionado

La actualidad más candente

Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
pbcgov
 
Water-Resources-ZBR-Report-PFC2016-0660
Water-Resources-ZBR-Report-PFC2016-0660Water-Resources-ZBR-Report-PFC2016-0660
Water-Resources-ZBR-Report-PFC2016-0660
John Carty
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
RPO America
 
Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Act
artba
 

La actualidad más candente (19)

Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
 
Public workshop 2 amherst buffalo- draft_10-23-13
Public workshop  2 amherst buffalo- draft_10-23-13Public workshop  2 amherst buffalo- draft_10-23-13
Public workshop 2 amherst buffalo- draft_10-23-13
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in Minnesota
 
Water-Resources-ZBR-Report-PFC2016-0660
Water-Resources-ZBR-Report-PFC2016-0660Water-Resources-ZBR-Report-PFC2016-0660
Water-Resources-ZBR-Report-PFC2016-0660
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
CP2 Newport Beach 2010
CP2 Newport Beach 2010CP2 Newport Beach 2010
CP2 Newport Beach 2010
 
Rgmc West County Cc Transportation Briefing 110322 Rl
Rgmc West County Cc Transportation Briefing 110322 RlRgmc West County Cc Transportation Briefing 110322 Rl
Rgmc West County Cc Transportation Briefing 110322 Rl
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
 
Crpc
CrpcCrpc
Crpc
 
Grid Un-Locked - Week 1
Grid Un-Locked - Week 1Grid Un-Locked - Week 1
Grid Un-Locked - Week 1
 
Yakima Valley Conference of Government's Prioritization Process
Yakima Valley Conference of Government's Prioritization ProcessYakima Valley Conference of Government's Prioritization Process
Yakima Valley Conference of Government's Prioritization Process
 
Grid Un-Locked - Week 2
Grid Un-Locked - Week 2Grid Un-Locked - Week 2
Grid Un-Locked - Week 2
 
Using FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North DakotaUsing FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North Dakota
 
Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Act
 
Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015
 
Mobility Fees - An Overview
Mobility Fees - An OverviewMobility Fees - An Overview
Mobility Fees - An Overview
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives Analysis
 

Destacado

Destacado (18)

Planning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and TransportationPlanning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and Transportation
 
Iowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on InvestmentIowa's Regional Planning Affiliations: Return on Investment
Iowa's Regional Planning Affiliations: Return on Investment
 
Regional Bike and Hike Plans: The Story of the Croatan Region in Eastern NC
Regional Bike and Hike Plans: The Story of the Croatan Region in Eastern NCRegional Bike and Hike Plans: The Story of the Croatan Region in Eastern NC
Regional Bike and Hike Plans: The Story of the Croatan Region in Eastern NC
 
Partnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North CarolinaPartnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North Carolina
 
Coogan rpo2012
Coogan rpo2012Coogan rpo2012
Coogan rpo2012
 
Fixing America's Surface Transportation Act: Key Freight Highway Provisions
Fixing America's Surface Transportation Act: Key Freight Highway ProvisionsFixing America's Surface Transportation Act: Key Freight Highway Provisions
Fixing America's Surface Transportation Act: Key Freight Highway Provisions
 
Technology Tools for Transportation: Virginia's New River Valley
Technology Tools for Transportation: Virginia's New River ValleyTechnology Tools for Transportation: Virginia's New River Valley
Technology Tools for Transportation: Virginia's New River Valley
 
Oklahoma Regional Transportation Planning
Oklahoma Regional Transportation PlanningOklahoma Regional Transportation Planning
Oklahoma Regional Transportation Planning
 
Promising Practices in Rural Public Transit: Minnesota’s Experience
Promising Practices in Rural Public Transit: Minnesota’s ExperiencePromising Practices in Rural Public Transit: Minnesota’s Experience
Promising Practices in Rural Public Transit: Minnesota’s Experience
 
Federal Transportation Update
Federal Transportation UpdateFederal Transportation Update
Federal Transportation Update
 
Ohio: Infrastructure and Global Access by Steve Mary
Ohio: Infrastructure and Global Access by Steve MaryOhio: Infrastructure and Global Access by Steve Mary
Ohio: Infrastructure and Global Access by Steve Mary
 
Metropolitan And Rural Transportation Planning
Metropolitan And  Rural  Transportation  PlanningMetropolitan And  Rural  Transportation  Planning
Metropolitan And Rural Transportation Planning
 
Thompson rpo2012
Thompson rpo2012Thompson rpo2012
Thompson rpo2012
 
Prioritizing Safety in Nevada County, CA
Prioritizing Safety in Nevada County, CAPrioritizing Safety in Nevada County, CA
Prioritizing Safety in Nevada County, CA
 
Ohio Mid-Eastern Governments Association: Regional Transportation Safety
Ohio Mid-Eastern Governments Association: Regional Transportation SafetyOhio Mid-Eastern Governments Association: Regional Transportation Safety
Ohio Mid-Eastern Governments Association: Regional Transportation Safety
 
Integrating Safety in the Rural Planning Process
Integrating Safety in the Rural Planning ProcessIntegrating Safety in the Rural Planning Process
Integrating Safety in the Rural Planning Process
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
2010 National Rural Transportation Conference
2010 National Rural Transportation Conference2010 National Rural Transportation Conference
2010 National Rural Transportation Conference
 

Similar a Performance Measurement in Rural California

Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
AGC of California
 
12 16-13 caltrain strategic plan overview
12 16-13 caltrain strategic plan overview12 16-13 caltrain strategic plan overview
12 16-13 caltrain strategic plan overview
Adina Levin
 

Similar a Performance Measurement in Rural California (20)

Federal Policy Briefing 7-19-12
Federal Policy Briefing 7-19-12Federal Policy Briefing 7-19-12
Federal Policy Briefing 7-19-12
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road Projects
 
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
 
Federal transportation funding and innovations
Federal transportation funding and innovationsFederal transportation funding and innovations
Federal transportation funding and innovations
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08
 
2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf
 
Roscoe mapd 6.7.12
Roscoe  mapd 6.7.12Roscoe  mapd 6.7.12
Roscoe mapd 6.7.12
 
Public Infrastructure in Massachusetts: Costs, Strategies, and Funding
Public Infrastructure in Massachusetts: Costs, Strategies, and FundingPublic Infrastructure in Massachusetts: Costs, Strategies, and Funding
Public Infrastructure in Massachusetts: Costs, Strategies, and Funding
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Planning Partnerships in No. Arizona
Planning Partnerships in No. ArizonaPlanning Partnerships in No. Arizona
Planning Partnerships in No. Arizona
 
Lecture 5.pptx
Lecture 5.pptxLecture 5.pptx
Lecture 5.pptx
 
12 16-13 caltrain strategic plan overview
12 16-13 caltrain strategic plan overview12 16-13 caltrain strategic plan overview
12 16-13 caltrain strategic plan overview
 
Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...
 

Más de RPO America

Más de RPO America (20)

PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptx
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL Overview
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural Mobility
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MI
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital Infrastructure
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go Vanpool
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia Region
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for Success
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development Districts
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping Resilience
 
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
 
CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase
 
CEDS 101 and Best Practices
CEDS 101 and Best Practices CEDS 101 and Best Practices
CEDS 101 and Best Practices
 
EDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionEDD Speed Networking and Listening Session
EDD Speed Networking and Listening Session
 

Último

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 

Performance Measurement in Rural California

  • 1. Nevada County CA 60 miles from Sacramento 150 miles from San Francisco
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. Bridgeport Covered Bridge, Nevada County CA Longest single span covered bridge in the U.S. (251 feet)
  • 10.
  • 11.
  • 13. History & Future of Performance Measures • The Past: Safety, LOS, Community input & Common Sense. • The Present: Federal/State regulatory requirements: MAP 21, SB 375, State Transportation Improvement Program Guidelines. • The Future: Cost effective expenditure of public funding on infrastructure that achieves State, Regional, & Community goals
  • 14. Definitions & Applications Performance measures are tools that help us to determine existing conditions across the transportation system and to evaluate the effectiveness of proposed investments by using a "measure" to evaluate anticipated and/or actual progress toward achieving a specific benchmark or "target" that is tied to an overarching goal. Amador County Transportation Commission, 2014 RTP Update
  • 15. • Performance measures can be either quantitative (data: e.g. LOS) or qualitative (values: (e.g. historic character). • A State-level quantitative performance measure may be very different than one that is based on regional data and goals. • Performance measures are used differently at plan-level, program-level, and project level.
  • 16. • Plan-level – selecting a plan alternative • Program-level – establishing project priorities in a Capital Improvement Program (CIP) • Project-level – screening project alternatives and measuring refined design features. • The level of analysis needed & data available are not the same at each step.
  • 17. In California, rural agencies are concerned that performance measures developed by, and for, urban areas of the state will skew the prioritization of funding toward those urban areas.
  • 18. Rural Counties Task Force Local Roads Needs Assessment Draft Report RCTF Committee November 21, 2014
  • 19. Project Objectives Compare revenues vs. pavement needs Perform three funding scenarios – Existing Funding (preventive maintenance first) – Existing Funding (worst first) – $$ to reach specific PCI goals Review other performance measures
  • 20. Performance Measures Must be: – Meaningful – Repeatable & reproducible – Economical Pavement distress (PCI) – Widespread use nationally and in California – Well known, historical data available Roughness (IRI) – Not common on local roads – Not appropriate for rural roads e.g. chip seals
  • 21. Some Facts and Figures
  • 23. Average PCI 66 (Statewide) 58 (Rural Counties)
  • 24. This is what 58 looks like …
  • 25. How Bad is 58? 100 70 PCI 58 50 25 0 Time (years) $3.85/sy $17.50/sy $27.50/sy $57/sy
  • 26. Needs Per Capita Comparisons 10 Year Needs 10 Year Needs Per Capita
  • 27. Funding Shortfall Pavement Needs* ($ million) Funding Available ($ million) Shortfall ($ million) Local Roads $ 7,275 $3,080 $ 4,195 State Highways $ 732** Unknown * Target PCI di ffers by county. Average i s 68. ** State highways are 10 year needs
  • 28. 1. Existing Budget (Prev. Maintenance) Nevada County
  • 29. 2. Existing Budget (Worst First) Nevada County
  • 30. 3. Reach PCI = 75 Nevada County
  • 31. Projected Conditions in 2034 Nevada County
  • 32. 1. Existing Budget (Prev. Maintenance) Alpine County
  • 33. 2. Existing Budget (Worst First) Alpine County
  • 34. Conclusions Average PCI for rural roads = 58 20 year analysis to reach target PCI – Impacts of existing funding ($3.08 billion) • Average PCI drops to 42 • Deferred maintenance = $6.7 to $8.1 billion – Funding to reach target (PCI = 68) is $7.3 billion – Shortfall = $4.2 billion State highways = $732 million (10 years)
  • 35. Performance Monitoring Indicators for Transportation Planning Purpose: –Standardized, common set of transportation indicators –California MPOs and State Agencies Completed: June 2013
  • 36. 200 + Indicators Most Commonly Used by MPOs and State Agencies Methods and Data Sources Input from MPOs Input from State Agencies Set of 10 Indicators
  • 37. MAP-21 Performance Measurement Goals •Congestion Reduction •Infrastructure Condition •System Reliability •Safety •Economic Vitality •Environmental Sustainability
  • 38. Proposed Performance Monitoring Indicators 1. Vehicle Miles Traveled 5. Fatalities/Serious Injuries 2. Mode Share – travel to work 6. Transit accessibility 3. State of good repair 7. Travel time to jobs a. Highways 8. Change in agricultural b. Local streets land c. Bridges 9. CO2 Emissions reductions d. Transit Assets 4. Freeway/Highway Travel Time Reliability (Buffer Index)
  • 39. Next Steps for Rural California Complete “Performance Monitoring Indicators for Small Urban and Rural Transportation Planning” Review and analyze the applicability of the nine performance monitoring indicators identified in the SANDAG study for implementation in small urban and rural areas.
  • 40. The results of this study will be provided to CALTRANS to inform participation in the MAP 21 process, to the California Transportatiion Commission for inclusion in the 2016 STIP Guidelines and will give guidance to small urban and rural agencies RTP and RTIP processes.

Notas del editor

  1. Nevada County is northeast of Sacramento, stretching from the eastern edge of the Sacramento Valley across the Sierra Nevada to the Nevada state border.
  2. The world's first long-distance telephone call was made from Nevada City, California to Washington, California. The Pelton wheel, designed to power gold mines, still drives hydro-electric generators today. Nevada City and Grass Valley were among the first California towns with electric lights. Lyman Gilmore, a contemporary of the Wright Brothers, developed early powered aircraft and operated the world's first commercial air field in Grass Valley. There is also evidence he may have flown before the Wright brothers. Charles Litton Sr., a resident and entrepreneur of Nevada County, assisted Raytheon in the development of the magnetron tube. Atari developed its first home computer video games in Nevada County. The Nevada County Narrow Gauge Railroad was built in 1876, and was the only railroad in the West that was never robbed, even though its primary freight was gold. (Builder-owner John Flint Kidder's reputation made it clear that he would personally hunt down and kill anyone who tried.) The rail line closed in 1942 and was torn up for scrap. The Olympics, NASA, and virtually every television station around the country utilizes video/broadcasting equipment designed and manufactured by Grass Valley Group, founded in Grass Valley. Electronic medical dosing equipment was first developed and manufactured in Nevada County. The first commercially viable picture-phone was developed in Nevada City. Over 50 high tech and applied tech companies, and more than 1,000 hardware and software design and development professionals call Nevada County home. The county is sometimes referred to as the "Silicon Valley of the Sierras".
  3. The western portion of the County in the Sierra foothills including the cities of Grass Valley (pop. 12,958 ), Nevada City (pop. 3,079). The largest municipality is the Town of Truckee (pop. 16,000), lies just east of the Sierra crest and a few miles from the Nevada border. The population in the unincorporated area of the County is approximately (pop. 67,000) . As of the 2010 census, the population was 98,764. The county has a total area of 974 square miles
  4. Town of Truckee: Summer vs Winter
  5. Looking east from the Sierra crest at Donner Lake, with the Town of Truckee in the distance.
  6. Donner Summit
  7. The natural beauty and historic character of the area causes many residents to express concern over the type and amount development occurring.
  8. Broad St. (Downtown) Nevada City
  9. Mill St. (Historic Downtown area) Grass Valley Ca
  10. Twenty years ago, system monitoring and Maintenance and some operational improvements were left to Public Works and State DOTs. Smart Land Use strategies were funded by mitigation impact fees and local sales tax initiatives, System completion and expansion were the purview of funding controlled by RTPAs. The shrinking transportation revenues have forced agencies to work together without regard to color of $. This is one of the basic premises of performance based planning. If the system is in decay, it doesn’t make sense to add capacity that can’t be maintained. “New lanes on old roads”.
  11. After a year of inserting myself into every discussion that I could find on Performance Based Planning, I think everyone is at the same place: We are just getting started.
  12. As of 2013, all 26 rural RTPAs have included performance measures in their RTP documents. However, in nearly all cases these are related to attainment of RTP goals and not to project prioritization. Our next step is to help our decision-makers understand the performance based planning concept.
  13. The California Rural Counties Task Force identified system preservation as an issue that we all share and a utilized state planning grant to establish pavement condition as a performance measure that can be included in our RTPs. This report is a “next step” for many RTPAs.
  14. We understand that IRI is being considered for use as a performance measure in MAP 21 implementation. One of our goals for this study is to inform the MAP 21 discussions that PCI is more appropriate for Rural situations.
  15. Lane miles = 45,553 lane miles Statewide = 320,669
  16. Mariposa-Water St, PCI=58
  17. Unit costs are 7 to 27% lower than statewide, but…..
  18. ($million Needs per 1000 people) even with lower unit costs, per capita needs are generally higher than our urban neighbors.
  19. Bottom line is that we need an adequate revenue source to maintain our rural state/regional road system.
  20. A review of rural California RTPs in 2013, showed that 26 of 26 included Mobility/Reliability/Accessibilty as performance outcome areas, but none listed “congestion reduction”.
  21. VMT: Mode shift is a leading strategy in reducing VMT, however, it isn’t a strategy that fits rural application. Mode Share: Again, alternative modes are not economically competitive in rural areas. State of Good Repair: 24 of 26 Rural RTPs included System Preservation as a performance outcome area. Freeway/Highway Travel Time: In general not a good rural performance metric. Geographic distance cannot be reduced Fatalities/Serious injuries: FHWA states that rural roads experience approximately 54 percent of the nation’s fatalities each year while approximately 20 percent of the population lives in rural areas (http://ruraltransportation.org/safety-webinar-on-1120/) Transit accessibility Travel time to jobs: in urban areas, this is a function of congestion, in rural areas it is more a function of distance. Change in agricultural land: CO2 emission reductions: While many look at mode shift and congestion reduction to achieve this goal, changing the fuel source may achieve the goal more effectively.
  22. Nevada County Transportation Commission is embarking on the development of a performance-based RTP. The Performance Monitoring Indicators for Small Urban and Rural Transportation Planning study will provide us and the other rural RTPAs with Performance Measures that fit the rural context.