Merik PowerPoint
1. 4/22/2011 1 Merik Building Construction Consultants Merik – Roofing, Waterproofing and Exterior Wall Problem Solving
2. Merik Commitment to Successful Projects The impact to the building occupants and operations will be minimized A successful project will be completed on time and in budget The construction process will strictly adhere to the Client’s procedures and requirements Merik will keep the facility representatives up to date throughout the work 4/22/2011 Merik Building Construction Consultants 2
3. Our People The Firm Merik Structured Approach to Successful Projects Client References Project Profiles 4/22/2011 3 Merik Building Construction Consultants Merik Professional Capabilities
4. Our People Patrick L. Downey, RRC, CCCA Eric B. Downey, RRO, CDT Terry Hale, RRO, Field Technical Rep Rosanna Rennie, Architectural Designer, LEED AP 4/22/2011 Merik Building Construction Consultants 4
5. Professional Association Certifications RCI, the institute of roof, wall and building envelope professionals Registered Roof Consultant Registered Roof Observer CSI, the construction specifications institute Certified Construction Contract Administrator LEED integrated sustainable design and energy efficiency 4/22/2011 Merik Building Construction Consultants 5
6. Service to the Industry Patrick L. Downey RCI Institute Past President CSI Atlanta Chapter Past President RCI Georgia Chapter Past President Eric B. Downey RCI Georgia Chapter Past President Rosanna Rennie LEED AP 4/22/2011 Merik Building Construction Consultants 6
7. CSI Citation 2005, “One Park Place Reroof”, first place specification manual. CSI Citation 2000, “Reroof of Woodland Middle School”, first place specification manual. RCI National First Place Roof Report 1999, “Sparks Hall Moisture Survey”. CSI Citation 1998, “Art & Music Building Reroof”, first place specification manual. 4/22/2011 7 Merik Building Construction Consultants Award Winning Documents
8. The Firm Established in 1985 Specializes in renovation of existing structures Focused in roofing, walls and plaza deck waterproofing Our area of operations is Georgia Design team includes Structural and Mechanical Engineers 4/22/2011 Merik Building Construction Consultants 8
9. A Structured Process Leading to Successful Projects Due Diligence Stage Specification Development Bid Stage Construction Stage Project Close-out 4/22/2011 Merik Building Construction Consultants 9
10. Interviews with the Facility Engineer or Building Rep Study “As Built” drawings Satellite imaging of roof areas 3 Types of Building Surveys: Level I – Observational Level II – Investigative Level III - Moisture Scans Asbestos and lead testing 4/22/2011 10 Merik Building Construction Consultants The Due Diligence Stage
11. CSI MasterSpec format for all Merik specification sections Client front end includes OO Sections, General Conditions, Supplementary Conditions, Special Conditions Construction drawings in AutoCAD format Project Manual review by Client Documents prepared in electronic format – Project Manual in Adobe PDF format for internet posting and download 4/22/2011 11 Merik Building Construction Consultants Specification Development
12. Pre-bid Conference Addendum Bid Opening Submittals Preconstruction Conference 4/22/2011 12 Merik Building Construction Consultants Bid Stage
13. Construction Contract Administration Submittals, Pay Requests, Change Orders, Progress Meetings, Non-Conforming Work Notices Construction Observation Daily Reports Weekly Summary Reports Final Inspection Punchlist Report Project Close-out Documents 4/22/2011 13 Merik Building Construction Consultants Construction Stage
14. Partial Client References List University of Georgia – 128 Georgia State University – 66 Carmax Auto Dealerships – 43 Haverty Furniture Company – 28 TCSG (Technical Colleges) - 42 Archdiocese of Atlanta – 16 Fulton County Schools – 17 Georgia Building Authority - 13 4/22/2011 Merik Building Construction Consultants 14
30. Fenestration Commissioning New Construction and Renovation Projects Independent Third Party Testing Test Storefront Systems, Curtainwalls, Individual Windows, and Doors before the project is closed-out. Test mockups for performance and random test installed units to validate mockup standards have been maintained. 4/22/2011 30 Merik Building Construction Consultants
31. Simulate Wind Driven Rain Events Calibrated Spray Rack certified to meet test standards. AAMA 502.9 A or B ASTM E331 ASTM E1105 4/22/2011 Merik Building Construction Consultants 31
32. Identify Failures and Retest Repairs 4/22/2011 Merik Building Construction Consultants 32
33. Merik’s Commitment to our Clients We understand the work must be done in a manner that does not impact building operations. We have 25 years of experience dealing with complicated renovation projects. We have the technical credentials of proven training and knowledge. We commit ourselves to providing the highest level of professional service. 4/22/2011 Merik Building Construction Consultants 33