THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
1.
2. Solar / Wind energy a boon and a gift have taken instant
replacement to fulfill the demand and, shortage of conventional
energy.
The usage of various conventional fossil fuels to meet the Crisis has
become an element of pollution and an anti element for the eco
friendly environment.
The Emergency need to reduce the dependency on DG set and
diesel oil is understood by and it has taken step to
install ROOF TOP SOLAR / WIND / HYBRID POWER
SYSTEM to one and all with its Head quarters situated at
Arakkonam, Execution offices at Vellore.
2
3. We the Sakthi Groups, Who are done Research and development since 2009, in
the field of SOLAR PHOTOVOLTAIC, DOMASTIC AERO GENARATOR
(WINDMILL), DC FAN AND SOLAR THERMAL SYSTEM. Have been we
start our marketing now.
Our office is founded on the principle technological excellence and we produce
our products, with qualified technical and trained persons, with ISO 9001:2008
Quality system.
3
4. As a professional firm of 9th year, SAKTHI GROUPS inspire as well as slogan is:
“The Power” is Infinity
(Power = Sakthi = The Sun)
No compromise in our quality
No compromise in our customer’s need
4
5. A Natural Resource is a Renewable Resource when its
replaced by natural processes and if replenished with the
passage of time. Renewable resources are parts of our
natural environment and from our Eco-system.
5
7. The Three P’s that Renewable Energy Promotes:
People : Promoting the well being of the buildings and our worlds occupants through
the integration of energy efficient roof membranes, low VOC adhesives, recycled content
building materials, and natural day lighting technologies.
Profit : Provide renewable energy products with a positive financial return while not
compromising Eco Integrator's core values and vision.
Planet : Providing environmental stewardship to our world by turning unavoidable
needs and expenses (roofs, light, energy) into avenues of opportunity to better our earth
and our future generations world.
[ PEOPLE : PROFIT : PLANET]
7
8. Solar Energy is the generation of electricity from
sunlight. We get most of our energy from the sun. The
Sun will keep making energy for millions of year. Its
free and clean. There is enough for everyone
Why don’t we use the sun for all our energy needs?
8
9. To Whom So ever
Hotels Shopping complex
Colleges Cinema Theaters
Schools Hospitals
Small Office Banks
Petrol Pumps NGO’s / Trust
Government Office, Ect.,
9
10. Proposed For : Solar PV Power
Proposed Type : Off Grid
Proposed Capacity : 5 KVA
Battery Backup : 3 - 4 Hours
Power Saving : 750 Units / Month*
Subsidy : 30% + 5% of project value
(MNRE + Carbon Credit)
Tax Benefits : 100 % Eligible
10
11. Model Number : SGE-Economy SPV
Capacity : 5KWp
Solar Panel : 125W x 40 No’s
Controller Type : MPPT
Inverter : 5KVA or 7KVA Pure Sine wave
Battery : 12V 100Ah x 16
Battery Type : Industrial Tall Tubular
Cabling : 4Sq.mm or 6Sq.mm FRP Cable
Structure : MS Tube with Angle Combination
Water proof Corrosion Free Powder
coated
11
12. The Solar panels Convert the sunlight to DC Electricity.
This solar module arranged in series and parallel
Combination as per system voltage requirement.
This generated DC Power feed into Solar Inverter
controller This is the main second system. This system
converter DC power –AC power for appliance. The Solar
inverter detect solar power first then battery power if
both fail bypass the EB power to load same time it charge
the battery.
12
13. SOLAR PANEL
CONTROLLER
BATTERY
To Load
220V AC
INVERTER
GRID 220V AC
13
22. Solar Power Provide uninterrupted Power for your
existing electrical appliance like fan, lights, fridge, TV,
PC, Electronic Equipments and ect…
You are the roll model for Solar Power in your area (if
college your students learn about solar technology)
Your Premises becoming a Green Environmental
You save your monthly Electrical bill
You Save your country and World from carbon
22
23. Sl.No. DESCRIPATION Amount
Project Cost
1 5KWp Solar PV Power plant Rs. 13,50,000
2 VAT @ 5% Rs. 67,500
3 Testing & Installation Charger Rs. 13500
4 Total Project Cost Pay Out Rs. 14,31,000
Benefits
5 Subsidy from MNRE Rs. 4,05,000
6 International Subsidy* Rs. 67,500
After Subsidy Rs. 9,58,500
st
7 Income Tax benefits 1 year 80% Rs. 2,30,040
st
8 Income Tax benefits 1 year 20% Rs. 57,510
Net Investment Rs. 6,70,950
* Carbon Credit from Denmark
23
24. 1) Solar Panel
2) Solar Panel Mounting Structures
3) UL Approved DC FRP Cable for interconnect
Panels to Inverter
4) Inverter with MPPT Charger controller (DC-AC)
5) Battery for Backup
6) SUMS (Sakthi Utility monitoring device)
7) Controlling DB Box
24
25. Project Capacity in
Customer Name & Location Project Type
KWp
To Whom So Ever Off Grid Solar PV POWER 5
Sl.No. DESCRIPATION Value's
1 Daily Production (Approx 5.5Hr*) 27.5KW (Units)
2 TNEB Rate for Commercial* Rs. 9.00 Rs. 6.5 Rs. 5.00
3 Production Per Day Rs. 248 Rs. 179 Rs. 138
4 Production Per Month Rs. 7,440 Rs. 5,370 Rs. 4,140
5 Production Per Year (320 Days)* Rs. 79,360 Rs. 57,280 Rs. 44,160
6 Production for 25 Year Rs. 19,84,000 Rs. 14,32,000 Rs. 11,04,000
* 320 days are considered and remaining days as climatic berried days.
25
26. 1. Required a conformation of interest to install this system in your
Premises.
2. As per your conformation, We will Study your detailed electrical
needs your premises at free of cost.
3. We will Process the subsidy from TEDA and MNRE.
4. If you required banker loan & interest subsidy. We will follow
your banker on receipt of Subsidy sanction letter from TEDA /
MNRE.
5. On receipt of the subsidy and Loan sanction you should pay
balance of advance to the execution.
6. This System will be installed within 3 weeks from the date of
receipt
26
27. This offer as been announced under JNNSM from MNRE to
be served on first come first basis
Along with your conformation within a week Rs.1 Lakhs
advance as a token of interest
Further balance payment from you will be issue after
conformation of MNRE subsidy and Bank loan if avail
All formalities for subsidy and bank loan will be done by our
end. You should provide all supporting documents for the
same
27