1. Sandeep Singh Sisodia, (Industrial Excellence Project management-PMI, Operations
Excellence)
sandeepsinghindore@gmail.com
+91 9669931440, 09803633095
Objective: To embark upon a career, which gives me opportunities to continuously learn, innovate and
evolve into a responsible corporate leader & visionary.
Professional Summary
• 10 years of total experience on Operations management, Project management, process & industrial
engineering domain , plant modification, layout planning, line balancing, time study new line setup
, Ratio Delay & DILOs for men study, Manpower calculation & Inventory Analysis.
Experience in working various manufacturing improvements & Improvement projects, fuel savings
projects, training & development, Value Stream Mapping, simulation& craft.
Experience in process improvement & machine qualification, process cost reduction, waste/muda
reduction, Yield & quality improvement, KAIZEN, 5s, System ISO documentation, Health & Safety.
Team leader in Industrial Operations excellence in Hero cycle Ltd and Cipla, Meinhardt & working
on building a lean manufacturing culture & Capability building (Skill progression) of employee.
Self-starter with strong leadership , Analytical, Interpersonal, Writing, Communication Skills
Capability Experience
CAPM-PMI (Project Management)
Operations management/Excellence
Line balancing & Simulation Craft
Value stream mapping & Creation of factory layouts, Ergonomics
Time & Motion study, Capacity enhancement
Production support-Control & Defect Analysis
Training and Project documentation
Well versed with MS-Word, Excel, PowerPoint and Internet Applications. Operating System : Window 98/
Window XP
Organizational Experience
RSPL ltd 25 th 2016 to till date As AGM (BPE Dept)
Product manpower planning, line balancing & workload leveling
Plant 5S and Visual Factory Management
Plant Manpower Evaluation and Proposal
Material Flow Minimisation - Proposal & Implementation
Develop and maintain the IE succession plan for site
Identifying the bottleneck processes & reorganizing the work flow.
Automation & Robotic
Production Organisation Structure Development Plant Wise
Plan and Implement One Man Multi Machine Operation To Improve Productivity
Improvement projects like Low Cost Automation, reduction in product/waste handling
Support and maintain all essential IE duties and responsibility. Function scope /coverage
Production, Warehouse, storage, Plant Layout & Setup
Page 1 of 5
2. Cycle time, UPH line balancing, workload leveling, Labor efficiency
Standardization & Visual management
Hero Cycles Ltd 4th
June 2014 – 21th June 2016 As DGM (Industrial engineer)
Product manpower planning, line balancing & workload leveling
Plant 5S and Visual Factory Management
Develop and maintain the IE succession plan for site
Identifying the bottleneck processes & reorganizing the work flow.
Automation & Robotic
Improvement projects like Low Cost Automation, reduction in product/waste handling
Support and maintain all essential IE duties and responsibility. Function scope /coverage
Production, Warehouse, storage, Plant Layout & Setup
Cycle time, UPH line balancing, workload leveling, Labor efficiency
Standardization & Visual management
Facilities layout planning and design.
Capex and Asset management
Trolley, Small Tools Management & Preventive Maintenance,
Optimum Utilization of Resources Man, Machine, Material, Land & Building, Equipment’s
Exposure to 5S and OEE & VSM, KAIZEN, for Wastage Elimination
Strategy plan - Strategize quarterly capacity resources plan, floor plan and projection on Operation
performance & capital investment.
Project management - Lead cross functional teams & contractors to setup new plant production
line, plant transfer, new product production line setup.
1. Project Title: Induction brazing Fork & Frame ( Sep ,14 –July 2015)
Responsibilities: As a Process engineer my main responsibilities are:
• Handling a team of 2 engineers working on solution & changes the conventional method of
bicycle fork brazing.
• Gap analysis, different composition of brass and development coordination
• Cost vs savings calculations
• Develop 2 Fork models from dip to Inductions
• Develop 3 Frame models from dip to Inductions
2. Project Title: Replacement of Liquid paint to Powder coating
Responsibilities: As a Process engineer my main responsibilities are:
• Handling a team of 15 engineers working on solution & changes the conventional method of
bicycle frame & HAC components
• Gap analysis, different composition of brass and development coordination
• Cost vs savings calculations
3. Project Title: Rejection & Re-work ( Scrap Reduction:- Jan 15 to May ‘15)
Responsibilities: As CI-Engineer and Team Leader my main responsibilities are:
Root cause analysis and Kaizen approach.
Worked on autonomous and taking corrective and preventive action helps to save
Rs.100000 / month savings. Target is Zero waste reduction.
4. Project Title: JUST IN TIME Approach on packaging Material (Aug 15 to Oct ‘15)
Responsibilities: As CI-Engineer and Project Leader my main responsibilities are:
Page 2 of 5
3. Value stream mapping tools for Gap & data analysis and understand the
conventional system and implementing the JIT system.
Implemented the kanban system and made the material flow smooth.
Reduced the warehouse inventory by 50 %.
Using Six sigma tools and Lean methodology carry out continuous improvement.
5. Project Title: Finishing & packaging improvement
Responsibilities: As a Project leader (Operations management, MS project, Industrial
engineering), my main responsibilities were:
• Improve the packaging system and focus on reduction the customer complaints.
• Analysis on alternatives to reduce the impact of automation in packaging.
• Do the time and motion study to remove the bottleneck and match the production level.
6. Project Title: Develop new unloading area for truck material unloading
Responsibilities: As a Project leader (Operations management, MS project, Industrial
engineering), my main responsibilities were:
• Improve the material unloading system and focus on reduction the customer complaints.
• Analysis on alternatives to reduce the impact of automation in packaging.
• Do the time and motion study to remove the bottleneck and match the production level.
• Plan 7 X lift for smother operations
7. Project Title: Reduce tyre inventory by over head conveyor concept
Responsibilities: As a Project leader (Operations management, MS project, Industrial
engineering), my main responsibilities were:
• Improve the material unloading system and focus on reduction the customer complaints.
• Analysis on alternatives to reduce the impact of automation in packaging.
• Do the time and motion study to remove the bottleneck and match the production level.
• Reduce 1 lac inventory to 30 k
•
Ultratech cement Jan 2014 -May 2014– Till date As (Sr Industrial engineer)
Capacity Management
Preparation of BSR and Darker,
Plant 5S and Visual Factory Management.
Capex and Asset management
Working over SAP and maintain Darker manpower calculation BY BSR way
Plant Facilities layout design & planning
Floor space management.
Warehouse Layout & Storage System
OEE, Line balancing, time & motion study
Efficiency & Productivity
Plant Redesign & modifications
Cipla Ltd May 2012 –Nov 2013– Till date As (Sr Industrial engineer)
Conducting Time and Motion study for all the analysis in Quality Control (FFS)-(Tablet unit)
and reduce the standard time by removing all the non Value added activity
Creation of factory layouts, Ergonomics
Working in (PFS-)eye or nasal line drop for calculating OEE in Hours wise concept with speed
versus speed
-Qualification of work benches and process(work study)
Process documentation like work instructions, Process flow & failure mode and effect
analysis documents
Minimizing bottlenecks for high productivity with maximization of men, material & machine.
with the help of Dilo and time or motion study with FTE concept
-Doing FTE and DILO activity over nasal /eye drop line for packing regards kaizen or 5s
Page 3 of 5
4. concept
Waste management project undergone at CDC (whole Cipla units ) through R4 concept
Measuring OEE/DILO/FTE for all HPLC and minimize the downtime by addressing the
problem and making it visible to al shop floor employee.
Conducting training programs time-to-time to enhance the skills of the staff & workforce
and as a result gain improved productivity
Meinhardt Singapore pte ltd July 2008 –Feb 2012– Till date As (Sr Industrial engineer)
Warehouse Layout & Storage System
Automation & Robotic
Define product Man-Machine requirement, standard time, line balancing and workload
leveling.
Plant 5S and Visual Factory Management.
Efficiency & Productivity
OEE, Line balancing, time & motion study
Capex and Asset management
Plant Facilities layout design & planning
Shree laxmi Engg Company July 2006 June 2008– Till date As (Industrial engineer)
Determine which plant location has the best combination of raw material
availability, transportation and costs
Using Time and Motion study, Manpower is calculated and set for all the plant as
per product flow and Load is equally distributed between Manpower using Line
Balancing.
Setting up daily production target based on available resources as per the
production requirement.
Monitoring of Capacity planning , capacity utilization ,material requirement
planning
Arrange awareness training on ISO series 9000-9001-9002-9003-90004
Optimum utilization of resources man machine material.
Professional Achievement
• Got best performance award in October 2012 for execution and implementation of production
linked bonus in the factory (Cipla)
• Awarded with Meinhardt Excellence Award 2011” in the Social Consciousness category.
• Awarded for the outstanding performance in 2012 by Cipla for completing 500 Time study
• Got 3 months Early confirmation in Cipla against good performance
• Got 4 months Early confirmation in Hero Motor group against good performance
• Saved 9 cores rupees against plant redesign and modification by craft technique for hero cycles
• Appreciation by Cipla India Ltd for reducing(50000) hours in unit operation through Study of Overall
Equipment Effectiveness (OEE)./Dilo/FTE in –May 2012 –august 2013
• Appreciation by hero cycles ltd (MD & President) for Relayout new plant for SKD bikes
• Within 6 month completed project for induction brazing frame from dip induction & save 4.2 cores/annum
• Within 4 month completed project for induction brazing fork from dip induction & save 3 cores/annum
• Appreciation by hero cycles ltd (MD & President) for completing 58 project within 6 month time for
company growth
• Appreciation by Hero group for installing the new powder coating plant to increase the productivity from
12000 to 45000 pieces/day
• Appreciate By Hods For preparation 65 Nos of Mech/TPP BSR within 10 days (Adityabirla group
• Prepared and modified 180 test standard time for activity performed for analyst
• Appreciation for creating Fishbone diagram for solve RCA and Do & DO not way for HPLC section
Page 4 of 5
5. • Successfully started Theory of 8D Problem solving PD Points of Discussion In The Section and The 8 Types
of ‘Waste’ R4 & T6 or 5S for the entire Product to reduce bottleneck and achieved possible Capacity.
Projects Undertaken/Internships:
• Major Project - Attachment of MILLING on LATHE M/C
• Minor Projects - Study of Marking Block & Study of SSI
Certification:
• Six Sigma Initial stage concept
Academic Qualifications:
B.Tech in Industrial & Production engineering from SRCEM Gwalior in 2002-2006 scoring 73.23 %.
Senior Secondary in Non-medical from MP Board scoring 2 Division
Matriculation from MP Board scoring 59.23 %
Personal Details:
Gender : Male
Marital Status : Married
Date of Birth : 04th
June, 1984
Language Proficiency : English, Hindi, Rajasthani
Permanent Address : 8 shantibihar near darpan colony thatipur
Gwalior –MP-474011
Place: ; Gwalior
Sandeep Sisodia
Page 5 of 5
6. • Successfully started Theory of 8D Problem solving PD Points of Discussion In The Section and The 8 Types
of ‘Waste’ R4 & T6 or 5S for the entire Product to reduce bottleneck and achieved possible Capacity.
Projects Undertaken/Internships:
• Major Project - Attachment of MILLING on LATHE M/C
• Minor Projects - Study of Marking Block & Study of SSI
Certification:
• Six Sigma Initial stage concept
Academic Qualifications:
B.Tech in Industrial & Production engineering from SRCEM Gwalior in 2002-2006 scoring 73.23 %.
Senior Secondary in Non-medical from MP Board scoring 2 Division
Matriculation from MP Board scoring 59.23 %
Personal Details:
Gender : Male
Marital Status : Married
Date of Birth : 04th
June, 1984
Language Proficiency : English, Hindi, Rajasthani
Permanent Address : 8 shantibihar near darpan colony thatipur
Gwalior –MP-474011
Place: ; Gwalior
Sandeep Sisodia
Page 5 of 5