Nuts and Bolts of Restoration Implementation:
Lessons from the
Cape Cod Water Resources Restoration Project

Martha Craig Rheinhardt
Coastal Wetland Restoration Project Manager
Cape Cod Conservation District
Buzzards Bay Coalition Restoration Workshop
April 5, 2012
Restoration Implementation
•
•
•
•
•
•
•

Cape Cod Water Resources Restoration Project
Planning and Design
Partnerships
Funding Sources
Permitting
Monitoring
Construction and
Construction Management
Project Inception
Restore anadromous fish runs

Replace failing fish ladders
Improve water quality for
shellfish growing areas

Install stormwater BMPs
Restore tidal flows to restricted
salt marshes

Remove tidal restrictions
Cape Cod Water Resources
Restoration Project
• 26 Tidal marsh projects
– 1,500 acres of marsh
– $ 15 million

• 24 Fish passage projects
– 4,200 acres of spawning habitat
– $ 5 million

• 26 Stormwater projects
– 7,300 acres of shellfishing areas
– $ 8 million
Partners and Stakeholders
•Cape Cod Conservation District
•Natural Resources Conservation
Service

•Barnstable County Commissioners
•Coastal Resources Committee
•15 Towns of Cape Cod

•Mashpee Wampanoag Tribe

• Commonwealth of Massachusetts
• MA Dept. Fish and Game
•Division of Ecological Restoration
•Division of Marine Fisheries
• MassDOT
• National Oceanic and Atmospheric
Adm.
• National Park Service
• U.S. Fish and Wildlife Service
• U.S. Environmental Protection Agency
Coalition Support Members
Association to Preserve Cape Cod
Cape Cod Chamber of Commerce

Cape Cod Commercial Hook Fishermen’s Association
Cape Cod Salties
Ducks Unlimited
Massachusetts Audubon Society
Trout Unlimited
Planning and Design
•
•
•
•
•
•
•
•

Feasibility Studies
Topographic Survey
Low-Property Assessments
Tide Monitoring
Hydraulic/Hydrologic Modeling
Alternatives Analyses
Public Outreach
Design Stages and Review
Monitoring
•
•
•
•
•
•
•

Association to Preserve Cape Cod
Pre-construction: Baseline Data
Vegetation
Neckton
Salinity
Post-construction: Changes
Phragmites
Funding
•
•
•
•
•
•
•
•

Funding needed every step of the way
Partner Sources: NRCS, DER, NOAA, USFWS
Corporate Wetland Restoration Partnership
State and Federal grants
Foundation grants
Be clear about tasks, match
Priority Status
Keep asking
Implementation–PL 83-566
(Small Watersheds Program)
• Planning and design costs:
100 percent federal

• Permits and land rights:
100 percent sponsor
• Construction costs:
75 percent federal
25 percent sponsor
Permitting
•
•
•
•
•
•
•
•
•
•

Order of Conditions
401 Water Quality Certification
Chapter 91
U.S. Army Corps of Engineers
MA Environmental Policy Act
CZM Federal Consistency
MA Endangered Species Act
MA Historical Commission
MassDOT
Other Reviewers: EPA, NMFS, DMF, Wampanoag Tribe
Preparing for Construction
•
•
•
•
•
•
•
•

Final Plans and Specs
Cost Estimates/Budget
Bidding: Materials, Labor
Ordering Materials
Shop Drawings
Engineer Review and Sign-off
Permit Notifications
Ready to Go!
Construction
•
•
•
•
•
•

Pre-construction Meeting
Site Preparation/Limits of Work
Dewatering (Coffer dams, pumps, flow diversion)
Culvert Removal/Installation
Open flow and close-up site (Paving, planting)
Engineering Oversight: Check grades, inverts;
Reporting; Sign-offs
• Permit compliance/notifications
What happens after construction?
•
•
•
•
•
•

Restoration Begins!
Monitoring
Operations and Maintenance
Plantings
Check for erosion/slumping
Permit compliance and close-out
Sunken Meadow, Eastham
Sunken Meadow
•
•
•
•
•
•
•
•

Removal of 610’ earthen berm and culvert
No culvert replacement/No hydrologic modeling
Pre- and Post-construction monitoring
Town DPW did work (25% match)
Funding Partners: DER, USFWS
Permitting: 3 months (no Chapter 91!)
Construction Timeline: 5 days
Costs: Construction: $57,000
Engineering/Design: $32,000
Permitting: $18,000
Red River Beach, Harwich
Red River Beach, Harwich
• Replace 2 24” pipes with 3’x4’ and 4’x8’ culverts
• Low property: Tide gate needed on upstream
culvert
• Town Highway Dept. doing construction (25%
match)
• Funding Partners: DER
• Permitting: 7 months
• Timing of Construction/Arrival of materials
• Costs: Construction: $354,000;
Engineering/Design: $94,500
Permitting: $30,000
Rushy Marsh, Cotuit (Barnstable)
Rushy Marsh
• Reconnect tidal flow with new 5’x10’ culvert
and channel
• Town initiated design and permitting
• Permitting adjustments and O&M plan
• Bid Range: $149,000-$424,000
Freemans Pond, Brewster
Freeman’s Pond
•
•
•
•
•
•

Replace 36” diameter pipe with 6’x10’ culvert
Restore tidal flow to salt pond
TOY restrictions for herring
Safety requirements
Funding Partners: DER, NOAA, CWRP
Costs: Construction:$400,000
Engineering/Design: $62,250
Permitting: $30,000
Lessons Learned: Planning and Design
•
•
•
•
•
•
•
•

Technical Expertise Important
Property Ownership
Low Properties
Culvert Selection: Safety; Constructability; CostEffectiveness
Every site is different!
Don’t get “over-engineered”
If something doesn’t seem right, it probably isn’t
Don’t be afraid to ask questions
Lessons Learned: Permitting
• Pre-application meeting VERY helpful
• Know your regulators (and have them know
you)
• Definitions are important
• Pay attention to permit conditions
• Think about timing
• Expensive and often grueling
Lessons Learned: Construction
•
•
•
•
•
•
•

Dewatering is KEY
Experience of contractor critical
Order materials well ahead of time
Get easements/entry agreements in place
Coordinate utilities
Give yourself plenty of room to work
Timing: TOY restrictions, fish, plantings, summer
season
• Troubleshooting: Expect the unexpected!
Project/Construction Management
•
•
•
•
•
•
•
•

Define roles as early as possible
Strong local support important
Remember your partners and experts
Ask questions
Document everything
Work with a comfortable budget
Understand invoicing, billing, etc.
Have cell phone and phone numbers handy
Questions?
Martha Craig Rheinhardt
Coastal Wetland Restoration Project Manager
martha.rheinhardt@ma.usda.gov

Questions

Más contenido relacionado

La actualidad más candente

E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 Revised
Eugene Piekenbrock
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
Mike Bisland
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
Travis Both
 
petroleum-development-geology
 petroleum-development-geology petroleum-development-geology
petroleum-development-geology
Shahnawaz Mustafa
 
wcs_presentation
wcs_presentationwcs_presentation
wcs_presentation
Alex Kappel
 

La actualidad más candente (20)

E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 Revised
 
James River Partnership 2013
James River Partnership 2013James River Partnership 2013
James River Partnership 2013
 
February 9, 2012
February 9, 2012February 9, 2012
February 9, 2012
 
March 14, 2013
March 14, 2013March 14, 2013
March 14, 2013
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 
Creating a Worldwide Unconventional Revolution Through a Technically Driven S...
Creating a Worldwide Unconventional Revolution Through a Technically Driven S...Creating a Worldwide Unconventional Revolution Through a Technically Driven S...
Creating a Worldwide Unconventional Revolution Through a Technically Driven S...
 
Woodford Liquids Rich Horizontal Targets Congress 2015
Woodford Liquids Rich Horizontal Targets Congress 2015Woodford Liquids Rich Horizontal Targets Congress 2015
Woodford Liquids Rich Horizontal Targets Congress 2015
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
Viod Mitigation with the BCCP
Viod Mitigation with the BCCPViod Mitigation with the BCCP
Viod Mitigation with the BCCP
 
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
 
Co-Op Summary Revised
Co-Op Summary RevisedCo-Op Summary Revised
Co-Op Summary Revised
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
EOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERC
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
petroleum-development-geology
 petroleum-development-geology petroleum-development-geology
petroleum-development-geology
 
wcs_presentation
wcs_presentationwcs_presentation
wcs_presentation
 
Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 

Destacado

Uasb water treatment process
Uasb water treatment processUasb water treatment process
Uasb water treatment process
Sakil Ahmed
 

Destacado (7)

Cape Cod Heating Options
Cape Cod Heating OptionsCape Cod Heating Options
Cape Cod Heating Options
 
chemical oxygen demand - akash
chemical oxygen demand - akash chemical oxygen demand - akash
chemical oxygen demand - akash
 
Uasb water treatment process
Uasb water treatment processUasb water treatment process
Uasb water treatment process
 
Chemical oxygen demand
Chemical oxygen demandChemical oxygen demand
Chemical oxygen demand
 
Biochemical oxygen demand (BOD) AND Chemical Oxygen Demand PDF
Biochemical oxygen demand (BOD) AND Chemical Oxygen Demand PDFBiochemical oxygen demand (BOD) AND Chemical Oxygen Demand PDF
Biochemical oxygen demand (BOD) AND Chemical Oxygen Demand PDF
 
DO, BOD and COD
DO, BOD and CODDO, BOD and COD
DO, BOD and COD
 
chemical oxygen demand -analysis using APHA manual
chemical oxygen demand -analysis using APHA manualchemical oxygen demand -analysis using APHA manual
chemical oxygen demand -analysis using APHA manual
 

Similar a Nuts and Bolts of Restoration Implementation

Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
AbdulmuqtadetrAhmadi
 
Planning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in CaliforniaPlanning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in California
Laura Rinaldi
 

Similar a Nuts and Bolts of Restoration Implementation (20)

Planning for Watershed Restoration by Neil Stichert
Planning for Watershed Restoration by Neil StichertPlanning for Watershed Restoration by Neil Stichert
Planning for Watershed Restoration by Neil Stichert
 
Stream rehabilitation seminar june 11 2014
Stream rehabilitation seminar june 11 2014Stream rehabilitation seminar june 11 2014
Stream rehabilitation seminar june 11 2014
 
Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020
 
Presentation to Charles County, MD Commisioners on Environmental Consideratio...
Presentation to Charles County, MD Commisioners on Environmental Consideratio...Presentation to Charles County, MD Commisioners on Environmental Consideratio...
Presentation to Charles County, MD Commisioners on Environmental Consideratio...
 
Rabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration ProjectRabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration Project
 
Commercial and Utility Solar Energy
Commercial and Utility Solar EnergyCommercial and Utility Solar Energy
Commercial and Utility Solar Energy
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA Presentation
 
Design-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTPDesign-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTP
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Metz Lateral Conservation Project
Metz Lateral Conservation ProjectMetz Lateral Conservation Project
Metz Lateral Conservation Project
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13
 
W02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanenW02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanen
 
Crook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream RestorationCrook Branch at Mantua Elementary School Stream Restoration
Crook Branch at Mantua Elementary School Stream Restoration
 
Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021
 
Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
Presentations-Dam-Management-Webinar-Operations-and-Management-Manuals-for-Da...
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Planning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in CaliforniaPlanning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in California
 

Más de Buzzards Bay Coalition

Buzzards Bay Coalition 2014 Annual Report
Buzzards Bay Coalition 2014 Annual ReportBuzzards Bay Coalition 2014 Annual Report
Buzzards Bay Coalition 2014 Annual Report
Buzzards Bay Coalition
 
Solutions to Nitrogen Pollution: Solving the Cranberry Puzzle
Solutions to Nitrogen Pollution: Solving the Cranberry PuzzleSolutions to Nitrogen Pollution: Solving the Cranberry Puzzle
Solutions to Nitrogen Pollution: Solving the Cranberry Puzzle
Buzzards Bay Coalition
 

Más de Buzzards Bay Coalition (20)

Onset Bay Center Community Update - March 2018
Onset Bay Center Community Update - March 2018Onset Bay Center Community Update - March 2018
Onset Bay Center Community Update - March 2018
 
Salt Marsh Loss in the Westport Rivers - March 2017
Salt Marsh Loss in the Westport Rivers - March 2017Salt Marsh Loss in the Westport Rivers - March 2017
Salt Marsh Loss in the Westport Rivers - March 2017
 
West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...
West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...
West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...
 
Buzzards Bay Coalition 2016 Annual Report
Buzzards Bay Coalition 2016 Annual ReportBuzzards Bay Coalition 2016 Annual Report
Buzzards Bay Coalition 2016 Annual Report
 
Bay Current - Fall 2016
Bay Current - Fall 2016Bay Current - Fall 2016
Bay Current - Fall 2016
 
2015 State of Buzzards Bay
2015 State of Buzzards Bay2015 State of Buzzards Bay
2015 State of Buzzards Bay
 
Buzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual ReportBuzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual Report
 
2011 State of Buzzards Bay
2011 State of Buzzards Bay2011 State of Buzzards Bay
2011 State of Buzzards Bay
 
2015 Bay Current
2015 Bay Current2015 Bay Current
2015 Bay Current
 
Buzzards Bay Coalition 2014 Annual Report
Buzzards Bay Coalition 2014 Annual ReportBuzzards Bay Coalition 2014 Annual Report
Buzzards Bay Coalition 2014 Annual Report
 
Solutions to Nitrogen Pollution: Solving the Cranberry Puzzle
Solutions to Nitrogen Pollution: Solving the Cranberry PuzzleSolutions to Nitrogen Pollution: Solving the Cranberry Puzzle
Solutions to Nitrogen Pollution: Solving the Cranberry Puzzle
 
2014 Bay Current
2014 Bay Current2014 Bay Current
2014 Bay Current
 
Red Brook Harborview
Red Brook HarborviewRed Brook Harborview
Red Brook Harborview
 
Case Study: Educating Residents about Nitrogen Pollution
Case Study: Educating Residents about Nitrogen PollutionCase Study: Educating Residents about Nitrogen Pollution
Case Study: Educating Residents about Nitrogen Pollution
 
Cape Cod 208 Plan Summary
Cape Cod 208 Plan SummaryCape Cod 208 Plan Summary
Cape Cod 208 Plan Summary
 
Buzzards Bay Coalition 2013 Annual Report
Buzzards Bay Coalition 2013 Annual ReportBuzzards Bay Coalition 2013 Annual Report
Buzzards Bay Coalition 2013 Annual Report
 
Water Quality and Shellfish Areas
Water Quality and Shellfish AreasWater Quality and Shellfish Areas
Water Quality and Shellfish Areas
 
Solving the Stormwater Management Puzzle
Solving the Stormwater Management PuzzleSolving the Stormwater Management Puzzle
Solving the Stormwater Management Puzzle
 
Clean Water Landscaping
Clean Water LandscapingClean Water Landscaping
Clean Water Landscaping
 
Case Study of a Shared Septic System
Case Study of a Shared Septic SystemCase Study of a Shared Septic System
Case Study of a Shared Septic System
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 

Último (20)

Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 

Nuts and Bolts of Restoration Implementation

  • 1. Nuts and Bolts of Restoration Implementation: Lessons from the Cape Cod Water Resources Restoration Project Martha Craig Rheinhardt Coastal Wetland Restoration Project Manager Cape Cod Conservation District Buzzards Bay Coalition Restoration Workshop April 5, 2012
  • 2. Restoration Implementation • • • • • • • Cape Cod Water Resources Restoration Project Planning and Design Partnerships Funding Sources Permitting Monitoring Construction and Construction Management
  • 4. Restore anadromous fish runs Replace failing fish ladders
  • 5. Improve water quality for shellfish growing areas Install stormwater BMPs
  • 6. Restore tidal flows to restricted salt marshes Remove tidal restrictions
  • 7. Cape Cod Water Resources Restoration Project • 26 Tidal marsh projects – 1,500 acres of marsh – $ 15 million • 24 Fish passage projects – 4,200 acres of spawning habitat – $ 5 million • 26 Stormwater projects – 7,300 acres of shellfishing areas – $ 8 million
  • 8.
  • 9. Partners and Stakeholders •Cape Cod Conservation District •Natural Resources Conservation Service •Barnstable County Commissioners •Coastal Resources Committee •15 Towns of Cape Cod •Mashpee Wampanoag Tribe • Commonwealth of Massachusetts • MA Dept. Fish and Game •Division of Ecological Restoration •Division of Marine Fisheries • MassDOT • National Oceanic and Atmospheric Adm. • National Park Service • U.S. Fish and Wildlife Service • U.S. Environmental Protection Agency
  • 10. Coalition Support Members Association to Preserve Cape Cod Cape Cod Chamber of Commerce Cape Cod Commercial Hook Fishermen’s Association Cape Cod Salties Ducks Unlimited Massachusetts Audubon Society Trout Unlimited
  • 11. Planning and Design • • • • • • • • Feasibility Studies Topographic Survey Low-Property Assessments Tide Monitoring Hydraulic/Hydrologic Modeling Alternatives Analyses Public Outreach Design Stages and Review
  • 12. Monitoring • • • • • • • Association to Preserve Cape Cod Pre-construction: Baseline Data Vegetation Neckton Salinity Post-construction: Changes Phragmites
  • 13. Funding • • • • • • • • Funding needed every step of the way Partner Sources: NRCS, DER, NOAA, USFWS Corporate Wetland Restoration Partnership State and Federal grants Foundation grants Be clear about tasks, match Priority Status Keep asking
  • 14. Implementation–PL 83-566 (Small Watersheds Program) • Planning and design costs: 100 percent federal • Permits and land rights: 100 percent sponsor • Construction costs: 75 percent federal 25 percent sponsor
  • 15. Permitting • • • • • • • • • • Order of Conditions 401 Water Quality Certification Chapter 91 U.S. Army Corps of Engineers MA Environmental Policy Act CZM Federal Consistency MA Endangered Species Act MA Historical Commission MassDOT Other Reviewers: EPA, NMFS, DMF, Wampanoag Tribe
  • 16. Preparing for Construction • • • • • • • • Final Plans and Specs Cost Estimates/Budget Bidding: Materials, Labor Ordering Materials Shop Drawings Engineer Review and Sign-off Permit Notifications Ready to Go!
  • 17. Construction • • • • • • Pre-construction Meeting Site Preparation/Limits of Work Dewatering (Coffer dams, pumps, flow diversion) Culvert Removal/Installation Open flow and close-up site (Paving, planting) Engineering Oversight: Check grades, inverts; Reporting; Sign-offs • Permit compliance/notifications
  • 18. What happens after construction? • • • • • • Restoration Begins! Monitoring Operations and Maintenance Plantings Check for erosion/slumping Permit compliance and close-out
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. Sunken Meadow • • • • • • • • Removal of 610’ earthen berm and culvert No culvert replacement/No hydrologic modeling Pre- and Post-construction monitoring Town DPW did work (25% match) Funding Partners: DER, USFWS Permitting: 3 months (no Chapter 91!) Construction Timeline: 5 days Costs: Construction: $57,000 Engineering/Design: $32,000 Permitting: $18,000
  • 25. Red River Beach, Harwich
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Red River Beach, Harwich • Replace 2 24” pipes with 3’x4’ and 4’x8’ culverts • Low property: Tide gate needed on upstream culvert • Town Highway Dept. doing construction (25% match) • Funding Partners: DER • Permitting: 7 months • Timing of Construction/Arrival of materials • Costs: Construction: $354,000; Engineering/Design: $94,500 Permitting: $30,000
  • 31. Rushy Marsh, Cotuit (Barnstable)
  • 32. Rushy Marsh • Reconnect tidal flow with new 5’x10’ culvert and channel • Town initiated design and permitting • Permitting adjustments and O&M plan • Bid Range: $149,000-$424,000
  • 34. Freeman’s Pond • • • • • • Replace 36” diameter pipe with 6’x10’ culvert Restore tidal flow to salt pond TOY restrictions for herring Safety requirements Funding Partners: DER, NOAA, CWRP Costs: Construction:$400,000 Engineering/Design: $62,250 Permitting: $30,000
  • 35. Lessons Learned: Planning and Design • • • • • • • • Technical Expertise Important Property Ownership Low Properties Culvert Selection: Safety; Constructability; CostEffectiveness Every site is different! Don’t get “over-engineered” If something doesn’t seem right, it probably isn’t Don’t be afraid to ask questions
  • 36. Lessons Learned: Permitting • Pre-application meeting VERY helpful • Know your regulators (and have them know you) • Definitions are important • Pay attention to permit conditions • Think about timing • Expensive and often grueling
  • 37. Lessons Learned: Construction • • • • • • • Dewatering is KEY Experience of contractor critical Order materials well ahead of time Get easements/entry agreements in place Coordinate utilities Give yourself plenty of room to work Timing: TOY restrictions, fish, plantings, summer season • Troubleshooting: Expect the unexpected!
  • 38. Project/Construction Management • • • • • • • • Define roles as early as possible Strong local support important Remember your partners and experts Ask questions Document everything Work with a comfortable budget Understand invoicing, billing, etc. Have cell phone and phone numbers handy