Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
PANIC2011@MIT
1. Search for Non-Standard Model Physics
Using the Transverse Muon Polarization
in Stopped K+ Decay
The E06 TREK Experiment
Sébastien Bianchin
TRIUMF / University of British Columbia
on behalf of the TREK-E06 Collaboration
PANIC 2011 (July 24th – 29th, 2001)
Massachusetts Institute of Technology, MA, USA
Thursday, July 28th 2011
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 1
2. The TREK Program at J-PARC
Outline
Hadron Facility at J-PARC
TREK Program TREK = Time Reversal Experiment with Kaons
Search for Time Reversal Symmetry Violation
Test of Lepton Universality
Search for Heavy Neutrinos Lower intensity
TREK Apparatus -- R & D
Status & Schedule
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 2
3. Stopped K+ Experiments @ K1.1BR
E06 (TREK)
“Measurement of T-violating transverse muon
polarization (PT) in K+→ 0 decay”
Stage-1, 270 kW
P36 (LFU)
“Measurement of RK = Γ(K+ →e+ν ) / Γ(K+ → + ν )
and search for heavy sterile neutrinos”
Stage-1 (PAC11-Jan’11); 30 kW
(S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm)
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 3
4. Transverse + Polarization in the K 3 Decay
http://trek.kek.jp
K → decay
+ 0 +
PT is T-odd, and spurious effects from final state interaction
are small: PT (FSI) < 10-5
Non-zero PT is a signature of T violation.
Standard Model (SM) contribution to P : P (SM) < 10-7
- T T
Hence PT in the range 10-3 – 10-5 is a sensitive probe of
CP violation beyond the SM.
There are theoretical models of new physics which allow
a sizable PT value without conflicting with other
experimental constraints.
The TREK experiment aims for a sensitivity of 10-4
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 4
5. Expected Sensitivity
We are aiming for a sensitivity of δPT ~ 10-4
δPTstat ~ 0.05 δPTstat (E246) ~ 10-4 : 1.4 x 107 sec runtime
1) Beam intensity x 30
2) Detector acceptance x 10
3) Larger analyzing power
δPTsyst ~ 0.1 δPTsyst (E246)
~ 10-4
1) Precise calibration of misalignments
2) Correction of systematic effects
3) Precise fwd-bwd cancellation
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 5
6. New Physics: Model Predictions for PT
Model K+ → 0+ K+ → +
■ Standard Model < 10-7 < 10-7
■ Final State Interactions < 10-5 < 10-3
Multi-Higgs ≤ 10-3 ≤ 10-3
PT (K+ → 0+) ≈ + 3 PT (K+ → +)
SUSY with squark mixing ≤ 10-3 ≤ 10-3
PT (K+ → 0+) ≈ − 3 PT (K+ → +)
SUSY with R-parity breaking ≤ 4 x10-4 ≤ 3 x10-4
Leptoquark model ≤ 10-2 ≤ 5 x10-3
■ Left-Right symmetric model 0 < 7x10-3
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 6
7. The 3-Higgs Doublet Model
γ1
α1
M
ED
sγ
n
o
b→ B→X τν
tr
eu
•
N
c.f. dn , b→sγ ∝ Im(α1β1*), (α1β1*)
Im(α1β1*) _____ 2/v32 Im(γ1α1*)
= -v2 E246
Higgs field v.e.v.
B→Xτν and B→τν at Super-Belle TREK goal
corresponds to PT < 3 x 10-4
c.f. TREK goal : PT ≤ 1 x 10-4 v2/v3 = mt / mτ
PT is most stringent constraint for Im(γ 1 α 1 *) !!
S. Bianchin PANIC 2011 (July 24th – 29th 2011)
8. J-PARC Facility
(KEK/JAEA )
North
S. Bianchin PANIC 2011 (July 24th – 29th 2011)
10. J-PARC Facility
Linac (KEK/JAEA )
North
3 GeV
Synchrotron
Materials and Life
Experimental
50 G Facility
Syn eV
chr
otro
n
CY2007 Beams Hadron Exp.
JFY2008 Beams Facility
S. Bianchin PANIC 2011 (July 24th – 29th 2011)
11. J-PARC Facility
Linac (KEK/JAEA )
North
3 GeV
Synchrotron
Neutrino Beams
(to Kamioka)
Materials and Life
Experimental
50 G Facility
Syn eV
chr
otro
n
CY2007 Beams Hadron Exp.
JFY2008 Beams Facility
JFY2009 Beams
S. Bianchin PANIC 2011 (July 24th – 29th 2011)
12. J-PARC Hadron Hall
Beam
Dump
K1.8
KL
K1.8BR
K1.1
S-type
30~50 GeV Production
primary beam K1.1BR
target (T1)
C-type
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 9
13. K1.1BR = K0.8 Beam Line Installation
Proton beam
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 10
15. K1.1BR = K0.8 Beam Line Installation
K1.1BR completed in summer 2010 using the supplementary budget of FY09
Commissioned in Oct. 2010 by the TREK collaboration
- ESS Length of 2.0m to be increased to 2.5m
- Length Q8-FF of 3.3m to be reduced to 1.5m (remove iron shielding wall)
Q1, Q2
D2
T1 D1
Q3, Q4
IFX,
Proton beam IFY SX1 ESS
Q5, Q6
SX2
K1.1-BR SX1 MS D3
HFOC
Q7 Q8
• FF
S. Bianchin PANIC 2011 (July 24th – 29th 2011)
16. The TREK Experimental Apparatus
K+→0+ Use an upgraded E246 detector
Active Polarimeter
( Japan )
New Fibre Target
( Canada )
C0,C1 GEM
( USA )
CsI(Tl) readout ( Russia )
PT is measured as the azimuthal asymmetry Ae+ of the + decay positrons
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
18. TREK/E06 Tracking Upgrade
GEM technology --
In collaboration with
Jefferson Lab,
Hampton U. and MIT
70 µm holes
140 µm spacing
Planar GEMs (C1)
between CsI and C2
Cylindrical GEM (C0)
as replacement for old C1
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 13
19. The C0 Cylindrical GEM for TREK
300 mm
160 mm
140 mm
• Vertex tracking near target, δ < 0.1 mm
• Very high rate capability > 1 kHz/mm2
• Radiation-hardness >> 107 particles/mm2
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 14
20. R&D(1) – APD Readout for CsI(Tl)
• Improve the timing characteristics of
CsI(Tl) by replacing PIN diode with APD
• Pulse shaping and pile-up analysis
One-module energy One-module timing
new requirement too slow
• Both 1 and 9 module tests have been performed using an e+ beam at Tohoku
Univ. to check the energy resolution and high-rate performance of APD readout
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 15
21. R&D(2) – Active Muon Polarimeter
Top View
e+
μ+
μ+
Full angular acceptance for positrons – 10x higher than in E-246
Determination of decay vertex – background-free measurement
Measurement of e+ angle and approx. energy – higher analyzing power
Improved field alignment – suppressed systematic error
Full-size prototype tested at TRIUMF in Nov. 2009
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 16
22. R&D(3) – Active Scintillating Fiber Target
One element Baseline design c.f. E246 Ring counters
PSI FAST target
Cross section
3 x 3 mm
492 fibres
Light guide:
75 mm ϕ
Kuraray Y11 WLS fibre
Readout:
SiPMT (Hamamatsu MPPC)
Beam test using 130 MeV/c π’s
at TRIUMF – radiation damage
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 17
23. Upgrade Timeline
Target:
Finer segmentation of TGT scintillating fibres
Readout: MPPC (SiPMT) Hamamatsu
Particle ID:
Aerogel Cherenkov surrounding target, TOF LFU
Charged particle tracking: 30 kW
Add new element C1 between CsI(Tl) and C2 ~2013
Add cylindrical GEM (C0) (remove aerogel)
TREK
π (1&2 photon) detection:
0
270 kW
New, faster readout of CsI(Tl): APD, MAPD
Wave form analysis using FADCs >100 kW
~2014
Muon polarimeter :
Active polarimeter with increased acceptance
New muon holding field magnet with a parallel field
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 18
24. Summary
TREK at J-PARC is gaining momentum
“K1.1BR” secondary beamline has been commissioned
Measurement of the T-violating transverse muon
polarization in Kμ3 decay (~2014)
- Large potential for the discovery of New Physics
- Upgrade of existing experimental setup of KEK E-246
Measure Ke2/Kμ2 ratio to test lepton universality (~2013)
Search for heavy neutrinos
- Use E-246 apparatus with
partial upgrades
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 19
25. The TREK Collaboration
CANADA RUSSIA
University of Saskatchewan Russian Academy of Sciences (RAS)
Department of Physics and Engineering Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
JAPAN
Osaka University
Laboratoire de Physique Nucleaire
Department of Physics
University of Manitoba
National Defense Academy
Department of Physics
Department of Applied Physics
Tohoku University
USA Research Center for Electron Photon Science
High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
Institute of Particle and Nuclear Studies
University of South Carolina
Institute of Material Structure Science
Department of Physics and Astronomy
Accelerator Laboratory
Iowa State University
Kyoto University,
College of Liberal Arts & Sciences
Department of Physics
Hampton University
Tokyo Institute of Technology (TiTech)
Department of Physics
Department of Physics
Jefferson Laboratory
VIETNAM
University of Natural Sciences
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 20
26. The TREK Collaboration
CANADA RUSSIA
University of Saskatchewan Russian Academy of Sciences (RAS)
Department of Physics and Engineering Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
JAPAN
Osaka University
Laboratoire de Physique Nucleaire
Department of Physics
University of Manitoba
National Defense Academy
Department of Physics
Department of Applied Physics
Tohoku University
USA Research Center for Electron Photon Science
High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
Institute of Particle and Nuclear Studies
University of South Carolina
Institute of Material Structure Science
Department of Physics and Astronomy
Accelerator Laboratory
Iowa State University
Kyoto University,
College of Liberal Arts & Sciences
Department of Physics
Hampton University
Tokyo Institute of Technology (TiTech)
Department of Physics
Department of Physics
Jefferson Laboratory
VIETNAM
New collaborators are welcome! University of Natural Sciences
S. Bianchin PANIC 2011 (July 24th – 29th 2011) 20