SlideShare una empresa de Scribd logo
1 de 32
Descargar para leer sin conexión
Search for Non-Standard Model Physics
Using the Transverse Muon Polarization
          in Stopped K+ Decay
                  The E06 TREK Experiment


                    Sébastien Bianchin
             TRIUMF / University of British Columbia
             on behalf of the TREK-E06 Collaboration




        PANIC 2011 (July 24th – 29th, 2001)
   Massachusetts Institute of Technology, MA, USA
             Thursday, July 28th 2011


    S. Bianchin              PANIC 2011 (July 24th – 29th 2011)   1
The TREK Program at J-PARC


Outline
 Hadron Facility at J-PARC
 TREK Program TREK = Time Reversal Experiment with Kaons
    Search for Time Reversal Symmetry Violation
    Test of Lepton Universality
    Search for Heavy Neutrinos   Lower intensity

 TREK Apparatus -- R & D
 Status & Schedule


           S. Bianchin        PANIC 2011 (July 24th – 29th 2011)   2
Stopped K+ Experiments @ K1.1BR

E06 (TREK)
 “Measurement of T-violating transverse muon
  polarization (PT) in K+→ 0   decay”
  Stage-1, 270 kW

P36 (LFU)
 “Measurement of RK = Γ(K+ →e+ν ) / Γ(K+ → + ν )
 and search for heavy sterile neutrinos”
 Stage-1 (PAC11-Jan’11); 30 kW
 (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm)


        S. Bianchin       PANIC 2011 (July 24th – 29th 2011)   3
Transverse  + Polarization in the K 3 Decay
                           http://trek.kek.jp
K →  decay
    +     0 +




 PT is T-odd, and spurious effects from final state interaction
   are small: PT (FSI) < 10-5
      Non-zero PT is a signature of T violation.
 Standard Model (SM) contribution to P : P (SM) < 10-7
-                                           T    T

        Hence PT in the range 10-3 – 10-5 is a sensitive probe of
        CP violation beyond the SM.
   There are theoretical models of new physics which allow
    a sizable PT value without conflicting with other
    experimental constraints.
        The TREK experiment aims for a sensitivity of 10-4
             S. Bianchin           PANIC 2011 (July 24th – 29th 2011)   4
Expected Sensitivity
           We are aiming for a sensitivity of δPT ~ 10-4
   δPTstat ~ 0.05 δPTstat (E246) ~ 10-4 : 1.4 x 107 sec runtime

1) Beam intensity x 30
2) Detector acceptance x 10
3) Larger analyzing power



   δPTsyst ~ 0.1 δPTsyst (E246)

          ~ 10-4


1) Precise calibration of misalignments
2) Correction of systematic effects
3) Precise fwd-bwd cancellation

           S. Bianchin             PANIC 2011 (July 24th – 29th 2011)   5
New Physics: Model Predictions for PT




          Model                            K+ → 0+                   K+ → +

■   Standard Model                        < 10-7                      < 10-7
■   Final State Interactions              < 10-5                      < 10-3
Multi-Higgs                               ≤ 10-3            ≤ 10-3
                                  PT (K+ → 0+) ≈ + 3 PT (K+ → +)

SUSY with squark mixing               ≤ 10-3             ≤ 10-3
                                    PT (K+ → 0+) ≈ − 3 PT (K+ → +)

SUSY with R-parity breaking             ≤ 4 x10-4                     ≤ 3 x10-4
Leptoquark model                           ≤ 10-2                        ≤ 5 x10-3
■   Left-Right symmetric model                 0                      < 7x10-3

        S. Bianchin              PANIC 2011 (July 24th – 29th 2011)                  6
The 3-Higgs Doublet Model



                            γ1
                      α1




                                                                           M
                                                                       ED
                                                                                  sγ




                                                                     n
                                                                     o
                                                                                b→      B→X τν




                                                                  tr
                                                               eu
•


                                                             N
    c.f. dn , b→sγ ∝ Im(α1β1*), (α1β1*)
    Im(α1β1*) _____ 2/v32 Im(γ1α1*)
               = -v2                                                             E246
               Higgs field v.e.v.
  B→Xτν and B→τν at Super-Belle                                               TREK goal
    corresponds to PT < 3 x 10-4
 c.f. TREK goal : PT ≤ 1 x 10-4                                            v2/v3 = mt / mτ

PT is most stringent constraint for Im(γ 1 α 1 *) !!
              S. Bianchin             PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                                                    (KEK/JAEA )


                                                         North




S. Bianchin   PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                        Linac                                 (KEK/JAEA )


                                                                   North
                3 GeV
                Synchrotron




CY2007 Beams

  S. Bianchin           PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                            Linac                                 (KEK/JAEA )


                                                                       North
                    3 GeV
                    Synchrotron




                        Materials and Life
                         Experimental
 50 G                        Facility
Syn eV
    chr
       otro
           n

   CY2007 Beams                                                  Hadron Exp.
  JFY2008 Beams                                                    Facility
      S. Bianchin           PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                            Linac                                 (KEK/JAEA )


                                                                       North
                   3 GeV
                   Synchrotron
Neutrino Beams
  (to Kamioka)


                        Materials and Life
                         Experimental
     50 G                    Facility
    Syn eV
        chr
           otro
               n

        CY2007 Beams                                             Hadron Exp.
       JFY2008 Beams                                               Facility
       JFY2009 Beams
          S. Bianchin       PANIC 2011 (July 24th – 29th 2011)
J-PARC Hadron Hall


                                                                      Beam
                                                                      Dump
                               K1.8

                                                                KL
                      K1.8BR

                                                         K1.1
                                                         S-type
 30~50 GeV            Production
primary beam                            K1.1BR
                      target (T1)
                                        C-type



        S. Bianchin              PANIC 2011 (July 24th – 29th 2011)          9
K1.1BR = K0.8 Beam Line Installation




Proton beam




              S. Bianchin   PANIC 2011 (July 24th – 29th 2011)   10
K1.1BR = K0.8 Beam Line Installation




                                                       Q1, Q2
                                                            D2
                                      T1      D1
                                                                   Q3, Q4
                                                 IFX,
Proton beam                                      IFY         SX1        ESS
                                                                            Q5, Q6
                                                                  SX2

                   K1.1-BR                        SX1               MS            D3
                                                                                  HFOC
                                                                                  Q7 Q8



                                                                              •   FF
              S. Bianchin    PANIC 2011 (July 24th – 29th 2011)
K1.1BR = K0.8 Beam Line Installation
 K1.1BR completed in summer 2010 using the supplementary budget of FY09
 Commissioned in Oct. 2010 by the TREK collaboration
   - ESS Length of 2.0m to be increased to 2.5m
   - Length Q8-FF of 3.3m to be reduced to 1.5m (remove iron shielding wall)


                                                             Q1, Q2
                                                                  D2
                                            T1      D1
                                                                         Q3, Q4
                                                       IFX,
Proton beam                                            IFY         SX1        ESS
                                                                                  Q5, Q6
                                                                        SX2

                   K1.1-BR                              SX1               MS            D3
                                                                                        HFOC
                                                                                        Q7 Q8



                                                                                    •   FF
              S. Bianchin          PANIC 2011 (July 24th – 29th 2011)
The TREK Experimental Apparatus
   K+→0+                Use an upgraded E246 detector
                            Active Polarimeter
                               ( Japan )


                                New Fibre Target
                                 ( Canada )




                                     C0,C1 GEM
                                      ( USA )



                                                                     CsI(Tl) readout ( Russia )

PT is measured as the azimuthal asymmetry Ae+ of the + decay positrons
           S. Bianchin          PANIC 2011 (July 24th – 29th 2011)                       11
The Stopped Beam Method K+→ 0  + 
Double ratio experiment
AT = (Afwd - Abwd ) / 2
                   Ncw - Nccw
Afwd(bwd) =
                   Ncw + Nccw
PT = AT / {α <cosθT>}
        α      : analyzing power
    <cosθT> : attenuation factor
Imξ = PT / KF : physics parameter
       KF     : kinematic factor

Current limit from KEK--E246                            bwd -  0 (γ )   fwd -  0 (γ )
PT = - 0.0017 ± 0.0023(stat) ± 0.0011(syst)
         |PT | < 0.005 : 90% C.L.
Imξ = - 0.0053 ± 0.0071(stat) ± 0.0036(syst)
        |Imξ | < 0.016 : 90% C.L
                             Statistical error dominates
              S. Bianchin           PANIC 2011 (July 24th – 29th 2011)            12
TREK/E06 Tracking Upgrade
                                                           GEM technology --
                                                           In collaboration with
                                                           Jefferson Lab,
                                                           Hampton U. and MIT


                                                            70 µm holes

                                                            140 µm spacing




 Planar GEMs (C1)
  between CsI and C2
 Cylindrical GEM (C0)
 as replacement for old C1
           S. Bianchin       PANIC 2011 (July 24th – 29th 2011)              13
The C0 Cylindrical GEM for TREK

                                  300 mm
160 mm

         140 mm




         • Vertex tracking near target, δ < 0.1 mm
         • Very high rate capability > 1 kHz/mm2
         • Radiation-hardness >> 107 particles/mm2

                   S. Bianchin   PANIC 2011 (July 24th – 29th 2011)   14
R&D(1) – APD Readout for CsI(Tl)
                                 • Improve the timing characteristics of
                                   CsI(Tl) by replacing PIN diode with APD
                                 • Pulse shaping and pile-up analysis
                                 One-module energy                        One-module timing




                                           new requirement         too slow
• Both 1 and 9 module tests have been performed using an e+ beam at Tohoku
  Univ. to check the energy resolution and high-rate performance of APD readout
             S. Bianchin             PANIC 2011 (July 24th – 29th 2011)                  15
R&D(2) – Active Muon Polarimeter

                              Top View



                                          e+


μ+

                                  μ+

   Full angular acceptance for positrons – 10x higher than in E-246
   Determination of decay vertex – background-free measurement
   Measurement of e+ angle and approx. energy – higher analyzing power
   Improved field alignment – suppressed systematic error

 Full-size prototype tested at TRIUMF in Nov. 2009
              S. Bianchin          PANIC 2011 (July 24th – 29th 2011)     16
R&D(3) – Active Scintillating Fiber Target

One element        Baseline design                                        c.f. E246 Ring counters
                                                                               PSI FAST target




Cross section
                         3 x 3 mm
                         492 fibres
                                       Light     guide:
                         75 mm ϕ
                                         Kuraray Y11 WLS fibre
                                       Readout:
                                         SiPMT (Hamamatsu MPPC)
                                       Beam test using 130 MeV/c π’s
                                       at TRIUMF – radiation damage
           S. Bianchin                   PANIC 2011 (July 24th – 29th 2011)                17
Upgrade Timeline
 Target:
       Finer segmentation of TGT scintillating fibres
        Readout: MPPC (SiPMT) Hamamatsu
 Particle ID:
       Aerogel Cherenkov surrounding target, TOF                      LFU
 Charged particle tracking:                                           30 kW
       Add new element C1 between CsI(Tl) and C2                      ~2013
       Add cylindrical GEM (C0) (remove aerogel)
                                                                       TREK
 π (1&2 photon) detection:
    0
                                                                       270 kW
    New, faster readout of CsI(Tl): APD, MAPD
    Wave form analysis using FADCs                                    >100 kW
                                                                       ~2014
 Muon polarimeter :
    Active polarimeter with increased acceptance
    New muon holding field magnet with a parallel field

             S. Bianchin          PANIC 2011 (July 24th – 29th 2011)      18
Summary
 TREK at J-PARC is gaining momentum
 “K1.1BR” secondary beamline has been commissioned
 Measurement of the T-violating transverse muon
  polarization in Kμ3 decay (~2014)
  - Large potential for the discovery of New Physics
  - Upgrade of existing experimental setup of KEK E-246
 Measure Ke2/Kμ2 ratio to test lepton universality (~2013)
 Search for heavy neutrinos
  - Use E-246 apparatus with
    partial upgrades




           S. Bianchin       PANIC 2011 (July 24th – 29th 2011)   19
The TREK Collaboration
CANADA                                                  RUSSIA
University of Saskatchewan                              Russian Academy of Sciences (RAS)
Department of Physics and Engineering                   Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
                                                        JAPAN
                                                        Osaka University
Laboratoire de Physique Nucleaire
                                                        Department of Physics
University of Manitoba
                                                        National Defense Academy
Department of Physics
                                                        Department of Applied Physics
                                                        Tohoku University
USA                                                     Research Center for Electron Photon Science
                                                        High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
                                                        Institute of Particle and Nuclear Studies
University of South Carolina
                                                        Institute of Material Structure Science
Department of Physics and Astronomy
                                                        Accelerator Laboratory
Iowa State University
                                                        Kyoto University,
College of Liberal Arts & Sciences
                                                        Department of Physics
Hampton University
                                                        Tokyo Institute of Technology (TiTech)
Department of Physics
                                                        Department of Physics
Jefferson Laboratory

                                                        VIETNAM
                                                        University of Natural Sciences


               S. Bianchin                PANIC 2011 (July 24th – 29th 2011)                    20
The TREK Collaboration
CANADA                                                  RUSSIA
University of Saskatchewan                              Russian Academy of Sciences (RAS)
Department of Physics and Engineering                   Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
                                                        JAPAN
                                                        Osaka University
Laboratoire de Physique Nucleaire
                                                        Department of Physics
University of Manitoba
                                                        National Defense Academy
Department of Physics
                                                        Department of Applied Physics
                                                        Tohoku University
USA                                                     Research Center for Electron Photon Science
                                                        High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
                                                        Institute of Particle and Nuclear Studies
University of South Carolina
                                                        Institute of Material Structure Science
Department of Physics and Astronomy
                                                        Accelerator Laboratory
Iowa State University
                                                        Kyoto University,
College of Liberal Arts & Sciences
                                                        Department of Physics
Hampton University
                                                        Tokyo Institute of Technology (TiTech)
Department of Physics
                                                        Department of Physics
Jefferson Laboratory

                                                        VIETNAM
New collaborators are welcome!                          University of Natural Sciences


               S. Bianchin                PANIC 2011 (July 24th – 29th 2011)                    20
Thank You



S. Bianchin   PANIC 2011 (July 24th – 29th 2011)   21
J-PARC March11 Earthquake Damage




   S. Bianchin   PANIC 2011 (July 24th – 29th 2011)
S. Bianchin   PANIC 2011 (July 24th – 29th 2011)
Lepton Universality in Kl2 and  l2 Decays



 Highly precise SM values
  RKSM = ( 2.477 ± 0.001) x 10−5
  RSM = (12.352 ± 0.004) x 10−5
 High sensitivity to LFV beyond SM
  e.g. MSSM with charged-Higgs SUSY-LFV

                                                            RKLFV~ RKSM(1 ± 0.013)
 Current experimental precision ( NA62, KLOE )
RK = (2.488 ± 0.012) x 10−5, 1.1σ dev., RK/RK = 0.5%                      0.4%
   Improve precision to ~ 0.2%, presentation to PAC11
           S. Bianchin          PANIC 2011 (July 24th – 29th 2011)
Lepton Flavour Universality
                                                 MSSM with charged-Higgs SUSY--LFV
            N2 / Ne2 ~ 40,000 / 1


              σp ~ 1 MeV/c

             σt ~ 100 psec




New Pseudoscalar Interaction --

 RK/RK = 0.2%


 ΛeP ~ 750 TeV
           S. Bianchin               PANIC 2011 (July 24th – 29th 2011)
e/ Identification – LFU
 Momentum measurement of e+, μ+
 TOF measurement between TOF1 and TOF2
 e+ trigger by aerogel Cherenkov detector.
  β(e+ from Ke2) ~1
  β(µ+ from K2) ~ 0.92 = 1 / 1.087
  Estimated efficiency = 99.2 ± 0.2%
    Fresnel mirror                                                         ⊗
                                                                           beam
                             n=1.05


    beam            Target

  PID performance and detector efficiency will be
  measured & controlled using Ke3 and Kμ3 data.
           S. Bianchin                PANIC 2011 (July 24th – 29th 2011)

Más contenido relacionado

La actualidad más candente

Correlative level coding
Correlative level codingCorrelative level coding
Correlative level coding
srkrishna341
 
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdfAnalysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
grssieee
 

La actualidad más candente (8)

Correlative level coding
Correlative level codingCorrelative level coding
Correlative level coding
 
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdfAnalysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
Analysis of SST images by Weighted Ensemble Transform Kalman Filter1.pdf
 
Algorithm to remove spectral leakage
Algorithm to remove spectral leakageAlgorithm to remove spectral leakage
Algorithm to remove spectral leakage
 
Awg waveform compensation by maximum entropy method
Awg waveform compensation by maximum entropy methodAwg waveform compensation by maximum entropy method
Awg waveform compensation by maximum entropy method
 
The all-electron GW method based on WIEN2k: Implementation and applications.
The all-electron GW method based on WIEN2k: Implementation and applications.The all-electron GW method based on WIEN2k: Implementation and applications.
The all-electron GW method based on WIEN2k: Implementation and applications.
 
Calculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracyCalculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracy
 
Wasserstein GAN
Wasserstein GANWasserstein GAN
Wasserstein GAN
 
Lecture2
Lecture2Lecture2
Lecture2
 

Destacado (7)

POEME_DE_VICTOR_HUGO_MFS
POEME_DE_VICTOR_HUGO_MFSPOEME_DE_VICTOR_HUGO_MFS
POEME_DE_VICTOR_HUGO_MFS
 
CV_Bianchin
CV_BianchinCV_Bianchin
CV_Bianchin
 
China pestl analysis
China pestl analysisChina pestl analysis
China pestl analysis
 
Pestel analysis of china
Pestel analysis of chinaPestel analysis of china
Pestel analysis of china
 
Pestel analysis of china
Pestel analysis of chinaPestel analysis of china
Pestel analysis of china
 
International Business -notes-complete
International Business -notes-completeInternational Business -notes-complete
International Business -notes-complete
 
PEST ANALYSIS OF IT SECTOR IN INDIA
PEST ANALYSIS OF IT SECTOR IN INDIAPEST ANALYSIS OF IT SECTOR IN INDIA
PEST ANALYSIS OF IT SECTOR IN INDIA
 

Similar a PANIC2011@MIT

Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011
sbianchin
 
Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011
sbianchin
 
ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1
Carlo Fanara
 
The Evolution of Elliptical Galaxies in Rich Clusters
The Evolution of Elliptical Galaxies in Rich ClustersThe Evolution of Elliptical Galaxies in Rich Clusters
The Evolution of Elliptical Galaxies in Rich Clusters
Robert Berrington
 
Polarization, strain induced phase transitions and dielectric response in ult...
Polarization, strain induced phase transitions and dielectric response in ult...Polarization, strain induced phase transitions and dielectric response in ult...
Polarization, strain induced phase transitions and dielectric response in ult...
Ghanshyam Pilania
 

Similar a PANIC2011@MIT (20)

PANIC2011_Final
PANIC2011_FinalPANIC2011_Final
PANIC2011_Final
 
Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011
 
Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011
 
EXO_DBD07
EXO_DBD07EXO_DBD07
EXO_DBD07
 
Formation of Helium Lines in Prominences
Formation of Helium Lines in ProminencesFormation of Helium Lines in Prominences
Formation of Helium Lines in Prominences
 
The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)
 
Non linear electron dynamics in solids
Non linear electron dynamics in solidsNon linear electron dynamics in solids
Non linear electron dynamics in solids
 
Graphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronicsGraphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronics
 
Nucleating Nematic Droplets
Nucleating Nematic DropletsNucleating Nematic Droplets
Nucleating Nematic Droplets
 
Search for Neutron Electric Dipole Moment
Search for Neutron Electric Dipole MomentSearch for Neutron Electric Dipole Moment
Search for Neutron Electric Dipole Moment
 
YSchutz_PPTWin
YSchutz_PPTWinYSchutz_PPTWin
YSchutz_PPTWin
 
ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1
 
Sabin Stoica "Double beta decay and neutrino properties"
Sabin Stoica "Double beta decay and neutrino properties"Sabin Stoica "Double beta decay and neutrino properties"
Sabin Stoica "Double beta decay and neutrino properties"
 
The Evolution of Elliptical Galaxies in Rich Clusters
The Evolution of Elliptical Galaxies in Rich ClustersThe Evolution of Elliptical Galaxies in Rich Clusters
The Evolution of Elliptical Galaxies in Rich Clusters
 
Jan2010 Triumf1
Jan2010 Triumf1Jan2010 Triumf1
Jan2010 Triumf1
 
Nx calrics2019 yano-presentation
Nx calrics2019 yano-presentationNx calrics2019 yano-presentation
Nx calrics2019 yano-presentation
 
VPrasad_DAEBRNSHEPDec2014talk
VPrasad_DAEBRNSHEPDec2014talkVPrasad_DAEBRNSHEPDec2014talk
VPrasad_DAEBRNSHEPDec2014talk
 
My presentation Jose M. Escalante Fernandez
My presentation Jose M. Escalante FernandezMy presentation Jose M. Escalante Fernandez
My presentation Jose M. Escalante Fernandez
 
T. Kono (ATLAS) - Latest Results on Searches for Dark Matter Candidates with ...
T. Kono (ATLAS) - Latest Results on Searches for Dark Matter Candidates with ...T. Kono (ATLAS) - Latest Results on Searches for Dark Matter Candidates with ...
T. Kono (ATLAS) - Latest Results on Searches for Dark Matter Candidates with ...
 
Polarization, strain induced phase transitions and dielectric response in ult...
Polarization, strain induced phase transitions and dielectric response in ult...Polarization, strain induced phase transitions and dielectric response in ult...
Polarization, strain induced phase transitions and dielectric response in ult...
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 

PANIC2011@MIT

  • 1. Search for Non-Standard Model Physics Using the Transverse Muon Polarization in Stopped K+ Decay The E06 TREK Experiment Sébastien Bianchin TRIUMF / University of British Columbia on behalf of the TREK-E06 Collaboration PANIC 2011 (July 24th – 29th, 2001) Massachusetts Institute of Technology, MA, USA Thursday, July 28th 2011 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 1
  • 2. The TREK Program at J-PARC Outline  Hadron Facility at J-PARC  TREK Program TREK = Time Reversal Experiment with Kaons  Search for Time Reversal Symmetry Violation  Test of Lepton Universality  Search for Heavy Neutrinos Lower intensity  TREK Apparatus -- R & D  Status & Schedule S. Bianchin PANIC 2011 (July 24th – 29th 2011) 2
  • 3. Stopped K+ Experiments @ K1.1BR E06 (TREK) “Measurement of T-violating transverse muon polarization (PT) in K+→ 0   decay” Stage-1, 270 kW P36 (LFU) “Measurement of RK = Γ(K+ →e+ν ) / Γ(K+ → + ν ) and search for heavy sterile neutrinos” Stage-1 (PAC11-Jan’11); 30 kW (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm) S. Bianchin PANIC 2011 (July 24th – 29th 2011) 3
  • 4. Transverse  + Polarization in the K 3 Decay http://trek.kek.jp K →  decay + 0 +  PT is T-odd, and spurious effects from final state interaction are small: PT (FSI) < 10-5 Non-zero PT is a signature of T violation.  Standard Model (SM) contribution to P : P (SM) < 10-7 - T T Hence PT in the range 10-3 – 10-5 is a sensitive probe of CP violation beyond the SM.  There are theoretical models of new physics which allow a sizable PT value without conflicting with other experimental constraints. The TREK experiment aims for a sensitivity of 10-4 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 4
  • 5. Expected Sensitivity We are aiming for a sensitivity of δPT ~ 10-4  δPTstat ~ 0.05 δPTstat (E246) ~ 10-4 : 1.4 x 107 sec runtime 1) Beam intensity x 30 2) Detector acceptance x 10 3) Larger analyzing power  δPTsyst ~ 0.1 δPTsyst (E246) ~ 10-4 1) Precise calibration of misalignments 2) Correction of systematic effects 3) Precise fwd-bwd cancellation S. Bianchin PANIC 2011 (July 24th – 29th 2011) 5
  • 6. New Physics: Model Predictions for PT Model K+ → 0+ K+ → + ■ Standard Model < 10-7 < 10-7 ■ Final State Interactions < 10-5 < 10-3 Multi-Higgs ≤ 10-3 ≤ 10-3 PT (K+ → 0+) ≈ + 3 PT (K+ → +) SUSY with squark mixing ≤ 10-3 ≤ 10-3 PT (K+ → 0+) ≈ − 3 PT (K+ → +) SUSY with R-parity breaking ≤ 4 x10-4 ≤ 3 x10-4 Leptoquark model ≤ 10-2 ≤ 5 x10-3 ■ Left-Right symmetric model 0 < 7x10-3 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 6
  • 7. The 3-Higgs Doublet Model γ1 α1 M ED sγ n o b→ B→X τν tr eu • N c.f. dn , b→sγ ∝ Im(α1β1*), (α1β1*) Im(α1β1*) _____ 2/v32 Im(γ1α1*) = -v2 E246 Higgs field v.e.v.  B→Xτν and B→τν at Super-Belle TREK goal corresponds to PT < 3 x 10-4 c.f. TREK goal : PT ≤ 1 x 10-4 v2/v3 = mt / mτ PT is most stringent constraint for Im(γ 1 α 1 *) !! S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 8. J-PARC Facility (KEK/JAEA ) North S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 9. J-PARC Facility Linac (KEK/JAEA ) North 3 GeV Synchrotron CY2007 Beams S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 10. J-PARC Facility Linac (KEK/JAEA ) North 3 GeV Synchrotron Materials and Life Experimental 50 G Facility Syn eV chr otro n CY2007 Beams Hadron Exp. JFY2008 Beams Facility S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 11. J-PARC Facility Linac (KEK/JAEA ) North 3 GeV Synchrotron Neutrino Beams   (to Kamioka) Materials and Life Experimental 50 G Facility Syn eV chr otro n CY2007 Beams Hadron Exp. JFY2008 Beams Facility JFY2009 Beams S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 12. J-PARC Hadron Hall Beam Dump K1.8 KL K1.8BR K1.1 S-type 30~50 GeV Production primary beam K1.1BR target (T1) C-type S. Bianchin PANIC 2011 (July 24th – 29th 2011) 9
  • 13. K1.1BR = K0.8 Beam Line Installation Proton beam S. Bianchin PANIC 2011 (July 24th – 29th 2011) 10
  • 14. K1.1BR = K0.8 Beam Line Installation Q1, Q2 D2 T1 D1 Q3, Q4 IFX, Proton beam IFY SX1 ESS Q5, Q6 SX2 K1.1-BR SX1 MS D3 HFOC Q7 Q8 • FF S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 15. K1.1BR = K0.8 Beam Line Installation  K1.1BR completed in summer 2010 using the supplementary budget of FY09  Commissioned in Oct. 2010 by the TREK collaboration - ESS Length of 2.0m to be increased to 2.5m - Length Q8-FF of 3.3m to be reduced to 1.5m (remove iron shielding wall) Q1, Q2 D2 T1 D1 Q3, Q4 IFX, Proton beam IFY SX1 ESS Q5, Q6 SX2 K1.1-BR SX1 MS D3 HFOC Q7 Q8 • FF S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 16. The TREK Experimental Apparatus K+→0+ Use an upgraded E246 detector Active Polarimeter ( Japan ) New Fibre Target ( Canada ) C0,C1 GEM ( USA ) CsI(Tl) readout ( Russia ) PT is measured as the azimuthal asymmetry Ae+ of the + decay positrons S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 17. The Stopped Beam Method K+→ 0  +  Double ratio experiment AT = (Afwd - Abwd ) / 2 Ncw - Nccw Afwd(bwd) = Ncw + Nccw PT = AT / {α <cosθT>} α : analyzing power <cosθT> : attenuation factor Imξ = PT / KF : physics parameter KF : kinematic factor Current limit from KEK--E246 bwd -  0 (γ ) fwd -  0 (γ ) PT = - 0.0017 ± 0.0023(stat) ± 0.0011(syst) |PT | < 0.005 : 90% C.L. Imξ = - 0.0053 ± 0.0071(stat) ± 0.0036(syst) |Imξ | < 0.016 : 90% C.L Statistical error dominates S. Bianchin PANIC 2011 (July 24th – 29th 2011) 12
  • 18. TREK/E06 Tracking Upgrade GEM technology -- In collaboration with Jefferson Lab, Hampton U. and MIT 70 µm holes 140 µm spacing  Planar GEMs (C1) between CsI and C2  Cylindrical GEM (C0) as replacement for old C1 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 13
  • 19. The C0 Cylindrical GEM for TREK 300 mm 160 mm 140 mm • Vertex tracking near target, δ < 0.1 mm • Very high rate capability > 1 kHz/mm2 • Radiation-hardness >> 107 particles/mm2 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 14
  • 20. R&D(1) – APD Readout for CsI(Tl) • Improve the timing characteristics of CsI(Tl) by replacing PIN diode with APD • Pulse shaping and pile-up analysis One-module energy One-module timing new requirement too slow • Both 1 and 9 module tests have been performed using an e+ beam at Tohoku Univ. to check the energy resolution and high-rate performance of APD readout S. Bianchin PANIC 2011 (July 24th – 29th 2011) 15
  • 21. R&D(2) – Active Muon Polarimeter Top View e+ μ+ μ+  Full angular acceptance for positrons – 10x higher than in E-246  Determination of decay vertex – background-free measurement  Measurement of e+ angle and approx. energy – higher analyzing power  Improved field alignment – suppressed systematic error  Full-size prototype tested at TRIUMF in Nov. 2009 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 16
  • 22. R&D(3) – Active Scintillating Fiber Target One element Baseline design c.f. E246 Ring counters PSI FAST target Cross section 3 x 3 mm 492 fibres  Light guide: 75 mm ϕ Kuraray Y11 WLS fibre  Readout: SiPMT (Hamamatsu MPPC)  Beam test using 130 MeV/c π’s at TRIUMF – radiation damage S. Bianchin PANIC 2011 (July 24th – 29th 2011) 17
  • 23. Upgrade Timeline  Target:  Finer segmentation of TGT scintillating fibres Readout: MPPC (SiPMT) Hamamatsu  Particle ID:  Aerogel Cherenkov surrounding target, TOF LFU  Charged particle tracking: 30 kW  Add new element C1 between CsI(Tl) and C2 ~2013  Add cylindrical GEM (C0) (remove aerogel) TREK  π (1&2 photon) detection: 0 270 kW  New, faster readout of CsI(Tl): APD, MAPD  Wave form analysis using FADCs >100 kW ~2014  Muon polarimeter :  Active polarimeter with increased acceptance  New muon holding field magnet with a parallel field S. Bianchin PANIC 2011 (July 24th – 29th 2011) 18
  • 24. Summary  TREK at J-PARC is gaining momentum  “K1.1BR” secondary beamline has been commissioned  Measurement of the T-violating transverse muon polarization in Kμ3 decay (~2014) - Large potential for the discovery of New Physics - Upgrade of existing experimental setup of KEK E-246  Measure Ke2/Kμ2 ratio to test lepton universality (~2013)  Search for heavy neutrinos - Use E-246 apparatus with partial upgrades S. Bianchin PANIC 2011 (July 24th – 29th 2011) 19
  • 25. The TREK Collaboration CANADA RUSSIA University of Saskatchewan Russian Academy of Sciences (RAS) Department of Physics and Engineering Institute for Nuclear Research (INR) University of British Columbia Department of Physics and Astronomy TRIUMF Universite de Montreal JAPAN Osaka University Laboratoire de Physique Nucleaire Department of Physics University of Manitoba National Defense Academy Department of Physics Department of Applied Physics Tohoku University USA Research Center for Electron Photon Science High Energy Accel. Research Org. (KEK) Massachusetts Inst. of Technology (MIT) Institute of Particle and Nuclear Studies University of South Carolina Institute of Material Structure Science Department of Physics and Astronomy Accelerator Laboratory Iowa State University Kyoto University, College of Liberal Arts & Sciences Department of Physics Hampton University Tokyo Institute of Technology (TiTech) Department of Physics Department of Physics Jefferson Laboratory VIETNAM University of Natural Sciences S. Bianchin PANIC 2011 (July 24th – 29th 2011) 20
  • 26. The TREK Collaboration CANADA RUSSIA University of Saskatchewan Russian Academy of Sciences (RAS) Department of Physics and Engineering Institute for Nuclear Research (INR) University of British Columbia Department of Physics and Astronomy TRIUMF Universite de Montreal JAPAN Osaka University Laboratoire de Physique Nucleaire Department of Physics University of Manitoba National Defense Academy Department of Physics Department of Applied Physics Tohoku University USA Research Center for Electron Photon Science High Energy Accel. Research Org. (KEK) Massachusetts Inst. of Technology (MIT) Institute of Particle and Nuclear Studies University of South Carolina Institute of Material Structure Science Department of Physics and Astronomy Accelerator Laboratory Iowa State University Kyoto University, College of Liberal Arts & Sciences Department of Physics Hampton University Tokyo Institute of Technology (TiTech) Department of Physics Department of Physics Jefferson Laboratory VIETNAM New collaborators are welcome! University of Natural Sciences S. Bianchin PANIC 2011 (July 24th – 29th 2011) 20
  • 27. Thank You S. Bianchin PANIC 2011 (July 24th – 29th 2011) 21
  • 28. J-PARC March11 Earthquake Damage S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 29. S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 30. Lepton Universality in Kl2 and  l2 Decays  Highly precise SM values RKSM = ( 2.477 ± 0.001) x 10−5 RSM = (12.352 ± 0.004) x 10−5  High sensitivity to LFV beyond SM e.g. MSSM with charged-Higgs SUSY-LFV RKLFV~ RKSM(1 ± 0.013)  Current experimental precision ( NA62, KLOE ) RK = (2.488 ± 0.012) x 10−5, 1.1σ dev., RK/RK = 0.5% 0.4% Improve precision to ~ 0.2%, presentation to PAC11 S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 31. Lepton Flavour Universality MSSM with charged-Higgs SUSY--LFV N2 / Ne2 ~ 40,000 / 1 σp ~ 1 MeV/c σt ~ 100 psec New Pseudoscalar Interaction -- RK/RK = 0.2% ΛeP ~ 750 TeV S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 32. e/ Identification – LFU  Momentum measurement of e+, μ+  TOF measurement between TOF1 and TOF2  e+ trigger by aerogel Cherenkov detector. β(e+ from Ke2) ~1 β(µ+ from K2) ~ 0.92 = 1 / 1.087 Estimated efficiency = 99.2 ± 0.2% Fresnel mirror ⊗ beam n=1.05 beam Target PID performance and detector efficiency will be measured & controlled using Ke3 and Kμ3 data. S. Bianchin PANIC 2011 (July 24th – 29th 2011)