PROJECT GOAL

UTILIZE AVAILABLE GROUNDWATER DISCHARGES TO
      MEET ALL INDUSTRIAL WATER NEEDS OF
 NASA AMES ARC JET COMPLEX AND UNITARY PLAN
                 WIND TUNNELS
ARC JET COMPLEX




UTILIZES 110,000 GALLONS PER DAY* OF POTABLE WATER
       TO OPERATE THE STEAM VACUUM SYSTEM

*OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
UNITARY PLAN WIND TUNNELS




UTILIZES 60,000 GALLONS PER DAY* OF POTABLE WATER TO
         MEET FACILITY COOLING REQUIREMENTS

  *OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
ACTIVE PUMP AND TREAT FACILITIES AT AMES
                                 NASA RGRP
                                 Sept. 2001




                                 WATS
                                 Nov. 1998




                                 MEW N.101
                                 Oct. 1998
PRELIMINARY ENGINEERING PHASE


• ASSESS WATER QUALITY AND QUANTITY

• ASSESS EXISTING SOURCE INFRASTRUCTURE

• DEFINE NPDES REQUIREMENTS
IN SITU SDI (SILT DENSITY INDEX) TESTING AT
           TREATMENT FACILITIES
CURRENT DISCHARGE RATE
FACILITY        AVERAGE FLOW          DESTINATION            REMARKS
                 (gallons per day)


N 101 (MEW)          179,000         STEVENS CREEK        VIA 6” DIA. PIPE,
                                                       PARTIAL RE-USE AT N271



NASA RGRP            22,000          STEVENS CREEK        JOINS N 101 PIPE



   WATS              95,000           STORM WATER       VIA STORM WATER
                                     RETENTION BASIN   CONVEYANCE SYSTEM



 TOTAL FLOW = 296,000 GALLONS PER DAY OR OVER 108 MILLION
        GALLONS PER YEAR IS AVAILABLE FOR RE-USE
          CURRENTLY, LESS THAN 10% IS RE-USED
DAILY PEAK DEMAND
                  WATER FLOW DIAGRAM
                                 53,000 GAL
296,000 GAL                 UNUSED GROUNDWATER                 126,000 GAL

CONSOLIDATED                                            COMBINED DISCHARGE TO
GROUNDWATER                                                STEVENS CREEK
                       243,000 GAL
                                        R.O.
                                      FACILITY
                                                  73,000 GAL
                            170,000 GAL          CONCENTRATE
                            PERMEATE

                                       0.85 MG
                                     PERMEATE
                                      STORAGE

              110,000 GAL                            60,000 GAL
               ARC JET                              UNITARY PLAN
               COMPLEX                              WIND TUNNELS
ANNUAL WATER FLOW DIAGRAM
                         (MG = MILLION GALLONS)


                                 66 MG
   108 MG                UNUSED GROUNDWATER                      79 MG

CONSOLIDATED                                           COMBINED DISCHARGE TO
GROUNDWATER                                               STEVENS CREEK

                     42 MG
                                   R.O.
                                 FACILITY
                                               13 MG
                           29 MG            CONCENTRATE
                         PERMEATE

                                 0.85 MG
                               PERMEATE
                                STORAGE
                                                    10 MG
                19 MG
               ARC JET                            UNITARY PLAN
               COMPLEX                            WIND TUNNELS
EXISTING DISCHARGE AND DISTRIBUTION FLOW DIRECTION
ASSESS EXISTING TREATMENT FACILITY
                2002 - 2006




                            EXISTING REVERSE OSMOSIS
                                     VESSELS


CONSERVED APPROXIMATELY 7 MGAL/YEAR OF POTABLE WATER
MODEL EXISTING AND PROPOSED PIPING SYSTEM
WORK WITH THE STATE WATERBOARD




 • NOTIFY THE BOARD OF NASA’S INTENT

 • SUBMIT APPLICATION FOR NPDES PERMIT
PROJECT SCHEDULE


•PRELIMINARY ENGINEERING   SEPT 2009 – MAR 2010

•FINAL DESIGN              APRIL 2010 – OCT 2010

•CONSTRUCTION              FEB 2011 – OCT 2011
QUESTIONS?

Más contenido relacionado

Destacado (7)

Culinária alex
Culinária alexCulinária alex
Culinária alex
 
Eh ko pertsonaiak
Eh ko pertsonaiakEh ko pertsonaiak
Eh ko pertsonaiak
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 Update
 
Nom Eleia Ekeila
Nom Eleia EkeilaNom Eleia Ekeila
Nom Eleia Ekeila
 
Success 2.0 - Social Media Einführung im Unternehmen
Success 2.0 - Social Media Einführung im UnternehmenSuccess 2.0 - Social Media Einführung im Unternehmen
Success 2.0 - Social Media Einführung im Unternehmen
 
Legislative Brief The Right To Education Bill 2008
Legislative Brief  The Right To Education Bill 2008Legislative Brief  The Right To Education Bill 2008
Legislative Brief The Right To Education Bill 2008
 
Digital Storytelling
Digital StorytellingDigital Storytelling
Digital Storytelling
 

Similar a FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade (6)

Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAMMANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
 
Project memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water useProject memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water use
 
Dr. David Dzombak - Need and Challenge of Alternative Water Sources for use i...
Dr. David Dzombak - Need and Challenge of Alternative Water Sources for use i...Dr. David Dzombak - Need and Challenge of Alternative Water Sources for use i...
Dr. David Dzombak - Need and Challenge of Alternative Water Sources for use i...
 
Gomti action plan
Gomti action planGomti action plan
Gomti action plan
 
Praire creek
Praire creekPraire creek
Praire creek
 

Más de Steve Williams

Más de Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 

FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade

  • 1. FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade (Groundwater Reuse Project) Ken Kono, Project Manager NASA Ames Research Center March 11, 2010
  • 2. PROJECT GOAL UTILIZE AVAILABLE GROUNDWATER DISCHARGES TO MEET ALL INDUSTRIAL WATER NEEDS OF NASA AMES ARC JET COMPLEX AND UNITARY PLAN WIND TUNNELS
  • 3. ARC JET COMPLEX UTILIZES 110,000 GALLONS PER DAY* OF POTABLE WATER TO OPERATE THE STEAM VACUUM SYSTEM *OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
  • 4. UNITARY PLAN WIND TUNNELS UTILIZES 60,000 GALLONS PER DAY* OF POTABLE WATER TO MEET FACILITY COOLING REQUIREMENTS *OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
  • 5. ACTIVE PUMP AND TREAT FACILITIES AT AMES NASA RGRP Sept. 2001 WATS Nov. 1998 MEW N.101 Oct. 1998
  • 6. PRELIMINARY ENGINEERING PHASE • ASSESS WATER QUALITY AND QUANTITY • ASSESS EXISTING SOURCE INFRASTRUCTURE • DEFINE NPDES REQUIREMENTS
  • 7. IN SITU SDI (SILT DENSITY INDEX) TESTING AT TREATMENT FACILITIES
  • 8. CURRENT DISCHARGE RATE FACILITY AVERAGE FLOW DESTINATION REMARKS (gallons per day) N 101 (MEW) 179,000 STEVENS CREEK VIA 6” DIA. PIPE, PARTIAL RE-USE AT N271 NASA RGRP 22,000 STEVENS CREEK JOINS N 101 PIPE WATS 95,000 STORM WATER VIA STORM WATER RETENTION BASIN CONVEYANCE SYSTEM TOTAL FLOW = 296,000 GALLONS PER DAY OR OVER 108 MILLION GALLONS PER YEAR IS AVAILABLE FOR RE-USE CURRENTLY, LESS THAN 10% IS RE-USED
  • 9. DAILY PEAK DEMAND WATER FLOW DIAGRAM 53,000 GAL 296,000 GAL UNUSED GROUNDWATER 126,000 GAL CONSOLIDATED COMBINED DISCHARGE TO GROUNDWATER STEVENS CREEK 243,000 GAL R.O. FACILITY 73,000 GAL 170,000 GAL CONCENTRATE PERMEATE 0.85 MG PERMEATE STORAGE 110,000 GAL 60,000 GAL ARC JET UNITARY PLAN COMPLEX WIND TUNNELS
  • 10. ANNUAL WATER FLOW DIAGRAM (MG = MILLION GALLONS) 66 MG 108 MG UNUSED GROUNDWATER 79 MG CONSOLIDATED COMBINED DISCHARGE TO GROUNDWATER STEVENS CREEK 42 MG R.O. FACILITY 13 MG 29 MG CONCENTRATE PERMEATE 0.85 MG PERMEATE STORAGE 10 MG 19 MG ARC JET UNITARY PLAN COMPLEX WIND TUNNELS
  • 11. EXISTING DISCHARGE AND DISTRIBUTION FLOW DIRECTION
  • 12. ASSESS EXISTING TREATMENT FACILITY 2002 - 2006 EXISTING REVERSE OSMOSIS VESSELS CONSERVED APPROXIMATELY 7 MGAL/YEAR OF POTABLE WATER
  • 13. MODEL EXISTING AND PROPOSED PIPING SYSTEM
  • 14. WORK WITH THE STATE WATERBOARD • NOTIFY THE BOARD OF NASA’S INTENT • SUBMIT APPLICATION FOR NPDES PERMIT
  • 15. PROJECT SCHEDULE •PRELIMINARY ENGINEERING SEPT 2009 – MAR 2010 •FINAL DESIGN APRIL 2010 – OCT 2010 •CONSTRUCTION FEB 2011 – OCT 2011