AL  DANA  PRECINCT 5+ Design Area Management Strategy Presentation Rev. 0 July 2008
 
 
 
 
 
 
Abu Dhabi W. T. C. Asymptote Aldar H.Q. Gateway Building 5+ Design Area
 
5+ Design Area
Lot Numbers Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604
Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 1 Project Leader : Russell Henderson Lot PC 815B : 19,135 sq/m Oberoi 5-Star Hotel Low-Rise Residential   Area 1 Basement Responsibility
Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 2 Project Leader : T.B.C. Lot PC 816 : 11,779 sq/m Lot PC 817 : 14,365 sq/m 5 No. High Rise Residential Towers Low Rise residential Area 2 Basement Responsibility
Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 3 Project Leader : T. B. C. Lot PC 606 : 8,439 sq/m Lot PC 605 : 7,475 sq/m Lot PC 604 : 9,827 sq/m Low-Rise Residential 2 No. Medium-Rise Office Buildings Area 2 Basement Responsibility
Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604
Current Status on Site
Aldar H. Q. Asymptote Big Dig Proposed Pre-cast Factory Big Dig Satellite Compounds 1 & 2 Current Geography on Site
Logistics Plan
 
AL  DANA  PRECINCT Lot PC 815B Oberoi Hotel Execution plan Rev. A August 2008
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Project Overview Podium View Tower View
Project Overview (contd.) GUEST ROOM MIX ,[object Object]
Project Overview (contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Safety – Planning SAMPLE SAMPLE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Safety – Performance Measurement Project Safety Scorecard SAMPLE Project Safety League Table SAMPLE SAMPLE SAMPLE
[object Object],[object Object],[object Object],[object Object],Safety Culture I.I.F. Site Safety Guide Take 5
Fire & Life Safety Systems In accordance with local regulations, fire fighting pump boosted water will be available during the construction phase, a storage tank and pump boosted wet riser with fire hose reels on every level will be fitted as works progress.  Sample design drawings of the system are shown below:
Fire & Life Safety Systems (contd.) In accordance with UK standards, all temporary electrical installations on the project will be 110v.  Maintained emergency lighting will be fitted in accordance with the SMS. Toilets and chilled drinking water stations will be provided at every third level as works progress. Sample design drawings of the systems are shown below:
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Design
P&T Group   Senior Personnel Organisation Technical Director-in-Charge Julian Smalley (Director) Project Client Coordination Julian Smalley (Director) Dorde Erceg (Senior Architect) Oberoi Hotel Martha Termirtsidi (Senior Architect) Nisha Chandar (Architect) Basement O.C. Gan (Architect)
ARUP DM Arup Istanbul SMEP Site Based Support (Refer to site supervision) 13 th  July 2008 815 B SMEP Office Based Support Los Angeles  Istanbul Director   Peter Evans Program & Cont  Mohammed Saleh Asst Program & Controls  TBA Document Controller  Natalia Ustimenko Secretary   Airen Fajardo Project Manager  Ian Neale Struct PM   Robert Lindsay Mech PM   TBA Elect PM   TBA Public Health PM  Reid Donovan Chief RE  Dai Lewis Senior RE  Peter Hesketh Roberts ARE (Civil)   Charles Im Elliot Ting ARE (Struct)  Joanna Bielecka (tbc) (Lines Dimensions) ARE (Mech)  TBA ARE (Elect)  Abdul Solangi Site Supervision Site Liaison & Coordination ALOR 5+ Al Raha Beach – Al Dana 5+ Design Buildings Organizational Chart for Site Liaison/Supervision Team
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Specialist Consultants
Specialist Consultants DESIGN Design Management Hotel Operator Hotel Owner JV Developer JV PMS & Contractor Design Team Lead Consultant Organisational Organogramme Developments Hotels & Hospitality
Procurement ,[object Object],[object Object],[object Object],TORP Schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Programme And Sequencing ,[object Object],32 month construction duration plus 3 months PMS contingency end float
Programme And Sequencing (contd.) ,[object Object]
Programme And Sequencing (contd.) Time Slices The following slides show schematics of the building and status of  key activities during construction at approximately 3 month intervals The first series of slides show the structure in detail The second series of slides shows the structure with fit-out and envelope interfaces
Structure Time Slices
 
 
 
 
 
Overall Time Slices
AUG 08 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
NOV 08 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
FEB 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
MAY 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
OCT 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
JAN 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
APR 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
SEP 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
COMPLETION FEB 11 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Construction Manager 5 Back of House T.B.C. Senior Construction Manager Scott Campbell Construction Manager 2 815B Envelopes T.B.C. Support Teams Health & Safety Quality Assurance Document Control Admin/IT Section Manager 2 1 st /2 nd  Fix 30 th  June 2008 Construction Manager 4 Serviced Apartments T.B.C. Construction Manager 3 Guest Rooms T.B.C. Section Manager 3 Finishes Gen Foreman 3 Day Shift Gen Foreman 4 Back Shift Gen Foreman 5 Day Shift Gen Foreman 6 Back Shift FF&E Manager T.B.C. Construction Manager 1 815B M E & P T.B.C. FF&E Coordinator 1 Senior Commercial Manager Nicholas Watts Procurement Manager Andrew Nelson Commercial Manager Fahrettin Mert Gucuyener Lot 815b Project Leader Russell Henderson Commissioning Engineer Logistics Manager Logistics Manager Senior Logistics Manager T.B.C. Plot 815b Oberoi Hotel Team Organogramme  Issue 07 Planner T.B.C. Design Coordinator T.B.C. Procurement Officer T.B.C. Quantity Surveyor T.B.C. Quantity Surveyor T.B.C. Quantity Surveyor T.B.C. Assistant Quantity Surveyor T.B.C. Assistant Quantity Surveyor T.B.C. Section Manager 4 1 st /2 nd  Fix Project Manager Front of House George McVey Section Manager 5 Finishes Gen Foreman 7 Day Shift Gen Foreman 8 Back Shift Gen Foreman 9 Day Shift Gen Foreman 10 Back Shift Section Manager 6 Finishes Gen Foreman 11 Day Shift Gen Foreman 12 Back Shift Section Manager 7 Finishes Gen Foreman 13 Day Shift Gen Foreman 14 Back Shift Section Manager 1 Envelope Gen Foreman 1 Day Shift Gen Foreman 2 Back Shift ME & P Coordinator M & P Supervisor Electrical Supervisor Senior Quantity Surveyor T.B.C. Senior Quantity Surveyor Hong Hoang Senior ME&P Quantity Surveyor T.B.C. FF&E Coordinator 2 FF&E Coordinator 3 Senior Engineer (TWC) T.B.C. Construction Manager 6 815B Externals T.B.C. Section Manager 8 Externals Gen Foreman 1 Day Shift Gen Foreman 2 Back Shift Structures Project Manager Brian Kirby Structures Construction Manager Fraser Baird Responsibilities PC815B lot-wide Responsibilities 5+ Design area-wide Senior Planner Isam Salbad Design Manager Simon Barber
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Structure
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Formwork Strategy ,[object Object],[object Object],[object Object]
P02 to L02 – Soffit Construction ,[object Object],[object Object],[object Object],[object Object]
[object Object],Tower Slab Construction
Tower - Overall Construction
Edge Protection ,[object Object],[object Object],Proposed Screens Proposed Sureguard
[object Object],Access
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Craneage ,[object Object],Hotel Footprint PC 815B Footprint
Hook Time Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],Hook time analysis chart
Asymptote Compound Aldar H. Q. Compound RAMP Lot PC 815B – Logistics Areas Rev 2 Gate 1 Gate 3 Legend Vehicle Route 815B Fence “ D” Wall Vehicle Gate Twin Cage Hoist HOTEL TOWER Asymptote Compound Proposed 815B/606 Satellite Camp Proposed 815B crane yard Gate 2 Note: LAAR permissions from logistics granted for these areas Proposed 815B crane yard and lay-down 55 m 60 m 60 m 60 m 70 m
Envelope ,[object Object],[object Object],[object Object]
Envelope (contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. DELIVERY 2. SLINGING 3. CRANEAGE/HOISTAGE 4. ERECTION 5. SEALANT 6. MAINTENANCE Envelope (contd.)
Core Cladding ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Baguettes Positions of solid walls
Building Hoists ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],People, waste bins, small tools small plant/MEWPS, Bathroom pods, curtain walling units, palletised plasterboard, ceiling/wall  metal, door-sets, palletised ceramic tiles/adhesive, pre-fabbed M&E etc. Bespoke engineer-designed cantilevered loading platforms 6 tonnes SWL minimum
Asymptote Compound Aldar H. Q. Compound RAMP Lot PC 815B – Hoistage Plan Rev 0 Gate 1 Gate 3 Legend Vehicle Route 815B Fence “ D” Wall Vehicle Gate Pod lifter Twin Cage Hoist HOTEL TOWER 2 Asymptote Compound Proposed 815B/606 Satellite Camp Proposed 815B crane yard Proposed 815B crane yard and lay-down Gate 2
Passenger/Goods Hoist - Configuration ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],Bathroom Pods Bathroom pod delivery to slab at Atlantis Dubai Interior of bathroom pod at Atlantis Dubai
Level L03-L13 Level L14-L15 Legend Marina Std Room RH Marina Std Room LH Canal Std Room RH Canal Std Room LH Suite WC LH Suite WC RH Bathroom Pods (contd.)
Marina Std Room LH Canal Std Room RH Approximate Pod Dimensions 3.5m x 3.5m on plan 9’ clear floor to ceiling Open-ended at bath tub 2.6m x 5.0m on plan 9’ clear floor to ceiling Open-ended at bath tub Note, these bathroom layouts are superseded and are used for dimensional purposes only, although tub position will not change Bathroom Pods (contd.)
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Modern Methods Of Construction
Commercial ,[object Object],[object Object],Commercial Manager Commercial Manager
Commercial (contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Commercial (contd.) ,[object Object]
The  current gateway 4 submission that is with EC Harris is based on a shell and core only.  It is anticipated that the gateway process  will progress with two  sets of gateway documents as shown in the appended programme.  This allows us  to track and progress the structure and shell works in advance of the fit out as this is dependant on the input from the specialist consultants namely interior design, F&B , kitchen and Laundry, Spa, and FF&E. Gateway Strategy
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Quality
Quality – Defect Management Sample field data capture sheet Sample report generated by data capture sheet SAMPLE SAMPLE ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
 

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Resume 2014 without cover letter short
Resume 2014 without cover letter shortResume 2014 without cover letter short
Resume 2014 without cover letter short
 
Capital Needs Assessment Example
Capital Needs Assessment ExampleCapital Needs Assessment Example
Capital Needs Assessment Example
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CV
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
RESUME-M. WILLIAMS
RESUME-M. WILLIAMSRESUME-M. WILLIAMS
RESUME-M. WILLIAMS
 
William T Moore 2016 resume
William T Moore 2016 resumeWilliam T Moore 2016 resume
William T Moore 2016 resume
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
2016 07 cau-cv
2016 07 cau-cv2016 07 cau-cv
2016 07 cau-cv
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Khaled Naguib
Khaled NaguibKhaled Naguib
Khaled Naguib
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 

Destacado

introduction to hk_dept.
introduction to hk_dept.introduction to hk_dept.
introduction to hk_dept.Dr. Sunil Kumar
 
Aldar hq - Dubhai
Aldar hq - DubhaiAldar hq - Dubhai
Aldar hq - DubhaiMaele Bueno
 
Ge -itlp eid在线访谈资料
Ge -itlp eid在线访谈资料Ge -itlp eid在线访谈资料
Ge -itlp eid在线访谈资料zcyxm
 
Up Selling at the Banyan Resort
Up Selling at the Banyan ResortUp Selling at the Banyan Resort
Up Selling at the Banyan Resorthawaiiscott
 
Social media strategy for hotel
Social media strategy for hotelSocial media strategy for hotel
Social media strategy for hotelYoas Nathan
 
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십GE코리아
 
GE RailConnect™ 360
GE RailConnect™ 360GE RailConnect™ 360
GE RailConnect™ 360GE코리아
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GEAkash Jauhari
 
SlideShare Zeitgeist 2013
SlideShare Zeitgeist 2013SlideShare Zeitgeist 2013
SlideShare Zeitgeist 2013SlideShare
 
Alternaty - Hotel Pre-opening Service
Alternaty - Hotel Pre-opening ServiceAlternaty - Hotel Pre-opening Service
Alternaty - Hotel Pre-opening ServiceAlternaty
 
Siemens Hr Strategy
Siemens Hr StrategySiemens Hr Strategy
Siemens Hr Strategyjttaylo
 
Digital strategy to transform GE into digital industrial leader
Digital strategy to transform GE into digital industrial leaderDigital strategy to transform GE into digital industrial leader
Digital strategy to transform GE into digital industrial leaderYouji Zhang
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrestnainadesh
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel designhebasayeed
 
Siemens builds a strategy oriented hr system
Siemens builds a strategy oriented hr systemSiemens builds a strategy oriented hr system
Siemens builds a strategy oriented hr systemDuyen Cao
 

Destacado (20)

Hamilton International brochure
Hamilton International brochureHamilton International brochure
Hamilton International brochure
 
introduction to hk_dept.
introduction to hk_dept.introduction to hk_dept.
introduction to hk_dept.
 
Aldar hq - Dubhai
Aldar hq - DubhaiAldar hq - Dubhai
Aldar hq - Dubhai
 
Ge -itlp eid在线访谈资料
Ge -itlp eid在线访谈资料Ge -itlp eid在线访谈资料
Ge -itlp eid在线访谈资料
 
Up Selling at the Banyan Resort
Up Selling at the Banyan ResortUp Selling at the Banyan Resort
Up Selling at the Banyan Resort
 
Operations manual
Operations manualOperations manual
Operations manual
 
Social media strategy for hotel
Social media strategy for hotelSocial media strategy for hotel
Social media strategy for hotel
 
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십
리더십 사관학교 GE크로톤빌 원장이 전하는 새로운 리더십
 
GE RailConnect™ 360
GE RailConnect™ 360GE RailConnect™ 360
GE RailConnect™ 360
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GE
 
SlideShare Zeitgeist 2013
SlideShare Zeitgeist 2013SlideShare Zeitgeist 2013
SlideShare Zeitgeist 2013
 
Alternaty - Hotel Pre-opening Service
Alternaty - Hotel Pre-opening ServiceAlternaty - Hotel Pre-opening Service
Alternaty - Hotel Pre-opening Service
 
Presentation Mip 22 Jan. 2011 Picconi (4)
Presentation Mip 22 Jan. 2011 Picconi (4)Presentation Mip 22 Jan. 2011 Picconi (4)
Presentation Mip 22 Jan. 2011 Picconi (4)
 
Siemens Hr Strategy
Siemens Hr StrategySiemens Hr Strategy
Siemens Hr Strategy
 
Digital strategy to transform GE into digital industrial leader
Digital strategy to transform GE into digital industrial leaderDigital strategy to transform GE into digital industrial leader
Digital strategy to transform GE into digital industrial leader
 
Ge matrix
Ge matrixGe matrix
Ge matrix
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrest
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel design
 
Siemens builds a strategy oriented hr system
Siemens builds a strategy oriented hr systemSiemens builds a strategy oriented hr system
Siemens builds a strategy oriented hr system
 

Similar a Oberoi Hotel

Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam HarbyEssam Harby
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingDEVELOP
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxZiyad Zaidi
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic
 
Project management plan
Project management planProject management plan
Project management planDonny Olson
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Sustainable Architecture: Design Green with the Client in Mind.pdf
Sustainable Architecture: Design Green with the Client in Mind.pdfSustainable Architecture: Design Green with the Client in Mind.pdf
Sustainable Architecture: Design Green with the Client in Mind.pdfAggregage
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016Frank Burton
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Albitar
 

Similar a Oberoi Hotel (20)

Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docx
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
Mep manager surendra yadav 26112016
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
 
Project management plan
Project management planProject management plan
Project management plan
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Sustainable Architecture: Design Green with the Client in Mind.pdf
Sustainable Architecture: Design Green with the Client in Mind.pdfSustainable Architecture: Design Green with the Client in Mind.pdf
Sustainable Architecture: Design Green with the Client in Mind.pdf
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 

Último

Vietnam presentation for intercultural communications class
Vietnam presentation for intercultural communications classVietnam presentation for intercultural communications class
Vietnam presentation for intercultural communications classseijibrown2
 
Culture and Identity through English as a Lingua Franca (1).pdf
Culture and Identity through English as a Lingua Franca (1).pdfCulture and Identity through English as a Lingua Franca (1).pdf
Culture and Identity through English as a Lingua Franca (1).pdfseijibrown2
 
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsx
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsxDa Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsx
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsxChung Yen Chang
 
What Are The Best Locations In Aruba For A Thrilling Kayak Adventure
What Are The Best Locations In Aruba For A Thrilling Kayak AdventureWhat Are The Best Locations In Aruba For A Thrilling Kayak Adventure
What Are The Best Locations In Aruba For A Thrilling Kayak AdventureDelphi Watersports
 
The West Coast Trail Presentation for SAIT international students
The West Coast Trail Presentation for SAIT international studentsThe West Coast Trail Presentation for SAIT international students
The West Coast Trail Presentation for SAIT international studentsseijibrown2
 
Reflective Essay.pdf for Global Compentency
Reflective Essay.pdf for Global CompentencyReflective Essay.pdf for Global Compentency
Reflective Essay.pdf for Global Compentencyseijibrown2
 
Nanbokucho-period, Historical Origins of Modern Japan
Nanbokucho-period, Historical Origins of Modern JapanNanbokucho-period, Historical Origins of Modern Japan
Nanbokucho-period, Historical Origins of Modern Japanseijibrown2
 
Traveling by Train in Sicily: A New Era of Comfort and Convenience
Traveling by Train in Sicily: A New Era of Comfort and ConvenienceTraveling by Train in Sicily: A New Era of Comfort and Convenience
Traveling by Train in Sicily: A New Era of Comfort and ConvenienceTime for Sicily
 
pics from luxembourg exchange program 2016
pics from luxembourg exchange program 2016pics from luxembourg exchange program 2016
pics from luxembourg exchange program 2016seijibrown2
 
How To Prepare For An Unforgettable Blackwater Dive In Kona
How To Prepare For An Unforgettable Blackwater Dive In KonaHow To Prepare For An Unforgettable Blackwater Dive In Kona
How To Prepare For An Unforgettable Blackwater Dive In KonaKona Ocean Adventures
 
Culture and Identity through English as a Lingua Franca.pdf
Culture and Identity through English as a Lingua Franca.pdfCulture and Identity through English as a Lingua Franca.pdf
Culture and Identity through English as a Lingua Franca.pdfseijibrown2
 
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On Maui
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On MauiExploring Uncharted Waters Your Guide To Private Sunset Cruise On Maui
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On MauiMakena Coast Charters
 
A Presentation of Braga. It was made by students of school
A Presentation of Braga. It was made by students of schoolA Presentation of Braga. It was made by students of school
A Presentation of Braga. It was made by students of schoolApostolos Syropoulos
 
Reflective Essay for global competency certificate
Reflective Essay for global competency certificateReflective Essay for global competency certificate
Reflective Essay for global competency certificateseijibrown2
 
2024 Annual Meeting: Visit Portland, Maine
2024 Annual Meeting: Visit Portland, Maine2024 Annual Meeting: Visit Portland, Maine
2024 Annual Meeting: Visit Portland, MaineVisit Portland
 
TOURIST & ITS TYPE &MOTIVETIONAL FACTORS & BEHAVIOR .pptx
TOURIST & ITS TYPE &MOTIVETIONAL  FACTORS & BEHAVIOR .pptxTOURIST & ITS TYPE &MOTIVETIONAL  FACTORS & BEHAVIOR .pptx
TOURIST & ITS TYPE &MOTIVETIONAL FACTORS & BEHAVIOR .pptxkittustudy7
 
My presentation on vietnam for Intercultural Communications
My presentation on vietnam for Intercultural CommunicationsMy presentation on vietnam for Intercultural Communications
My presentation on vietnam for Intercultural Communicationsseijibrown2
 

Último (17)

Vietnam presentation for intercultural communications class
Vietnam presentation for intercultural communications classVietnam presentation for intercultural communications class
Vietnam presentation for intercultural communications class
 
Culture and Identity through English as a Lingua Franca (1).pdf
Culture and Identity through English as a Lingua Franca (1).pdfCulture and Identity through English as a Lingua Franca (1).pdf
Culture and Identity through English as a Lingua Franca (1).pdf
 
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsx
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsxDa Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsx
Da Nang Tourist Attractions, VN (越南 峴港旅遊景點).ppsx
 
What Are The Best Locations In Aruba For A Thrilling Kayak Adventure
What Are The Best Locations In Aruba For A Thrilling Kayak AdventureWhat Are The Best Locations In Aruba For A Thrilling Kayak Adventure
What Are The Best Locations In Aruba For A Thrilling Kayak Adventure
 
The West Coast Trail Presentation for SAIT international students
The West Coast Trail Presentation for SAIT international studentsThe West Coast Trail Presentation for SAIT international students
The West Coast Trail Presentation for SAIT international students
 
Reflective Essay.pdf for Global Compentency
Reflective Essay.pdf for Global CompentencyReflective Essay.pdf for Global Compentency
Reflective Essay.pdf for Global Compentency
 
Nanbokucho-period, Historical Origins of Modern Japan
Nanbokucho-period, Historical Origins of Modern JapanNanbokucho-period, Historical Origins of Modern Japan
Nanbokucho-period, Historical Origins of Modern Japan
 
Traveling by Train in Sicily: A New Era of Comfort and Convenience
Traveling by Train in Sicily: A New Era of Comfort and ConvenienceTraveling by Train in Sicily: A New Era of Comfort and Convenience
Traveling by Train in Sicily: A New Era of Comfort and Convenience
 
pics from luxembourg exchange program 2016
pics from luxembourg exchange program 2016pics from luxembourg exchange program 2016
pics from luxembourg exchange program 2016
 
How To Prepare For An Unforgettable Blackwater Dive In Kona
How To Prepare For An Unforgettable Blackwater Dive In KonaHow To Prepare For An Unforgettable Blackwater Dive In Kona
How To Prepare For An Unforgettable Blackwater Dive In Kona
 
Culture and Identity through English as a Lingua Franca.pdf
Culture and Identity through English as a Lingua Franca.pdfCulture and Identity through English as a Lingua Franca.pdf
Culture and Identity through English as a Lingua Franca.pdf
 
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On Maui
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On MauiExploring Uncharted Waters Your Guide To Private Sunset Cruise On Maui
Exploring Uncharted Waters Your Guide To Private Sunset Cruise On Maui
 
A Presentation of Braga. It was made by students of school
A Presentation of Braga. It was made by students of schoolA Presentation of Braga. It was made by students of school
A Presentation of Braga. It was made by students of school
 
Reflective Essay for global competency certificate
Reflective Essay for global competency certificateReflective Essay for global competency certificate
Reflective Essay for global competency certificate
 
2024 Annual Meeting: Visit Portland, Maine
2024 Annual Meeting: Visit Portland, Maine2024 Annual Meeting: Visit Portland, Maine
2024 Annual Meeting: Visit Portland, Maine
 
TOURIST & ITS TYPE &MOTIVETIONAL FACTORS & BEHAVIOR .pptx
TOURIST & ITS TYPE &MOTIVETIONAL  FACTORS & BEHAVIOR .pptxTOURIST & ITS TYPE &MOTIVETIONAL  FACTORS & BEHAVIOR .pptx
TOURIST & ITS TYPE &MOTIVETIONAL FACTORS & BEHAVIOR .pptx
 
My presentation on vietnam for Intercultural Communications
My presentation on vietnam for Intercultural CommunicationsMy presentation on vietnam for Intercultural Communications
My presentation on vietnam for Intercultural Communications
 

Oberoi Hotel

  • 1.  
  • 2. AL DANA PRECINCT 5+ Design Area Management Strategy Presentation Rev. 0 July 2008
  • 3.  
  • 4.  
  • 5.  
  • 6.  
  • 7.  
  • 8.  
  • 9. Abu Dhabi W. T. C. Asymptote Aldar H.Q. Gateway Building 5+ Design Area
  • 10.  
  • 12. Lot Numbers Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604
  • 13. Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 1 Project Leader : Russell Henderson Lot PC 815B : 19,135 sq/m Oberoi 5-Star Hotel Low-Rise Residential Area 1 Basement Responsibility
  • 14. Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 2 Project Leader : T.B.C. Lot PC 816 : 11,779 sq/m Lot PC 817 : 14,365 sq/m 5 No. High Rise Residential Towers Low Rise residential Area 2 Basement Responsibility
  • 15. Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604 Area 3 Project Leader : T. B. C. Lot PC 606 : 8,439 sq/m Lot PC 605 : 7,475 sq/m Lot PC 604 : 9,827 sq/m Low-Rise Residential 2 No. Medium-Rise Office Buildings Area 2 Basement Responsibility
  • 16. Organisational Responsibilities Lot PC 815B Lot PC 606 Lot PC 605 Lot PC 816 Lot PC 817 Lot PC 604
  • 18. Aldar H. Q. Asymptote Big Dig Proposed Pre-cast Factory Big Dig Satellite Compounds 1 & 2 Current Geography on Site
  • 20.  
  • 21. AL DANA PRECINCT Lot PC 815B Oberoi Hotel Execution plan Rev. A August 2008
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Safety – Performance Measurement Project Safety Scorecard SAMPLE Project Safety League Table SAMPLE SAMPLE SAMPLE
  • 28.
  • 29. Fire & Life Safety Systems In accordance with local regulations, fire fighting pump boosted water will be available during the construction phase, a storage tank and pump boosted wet riser with fire hose reels on every level will be fitted as works progress. Sample design drawings of the system are shown below:
  • 30. Fire & Life Safety Systems (contd.) In accordance with UK standards, all temporary electrical installations on the project will be 110v. Maintained emergency lighting will be fitted in accordance with the SMS. Toilets and chilled drinking water stations will be provided at every third level as works progress. Sample design drawings of the systems are shown below:
  • 31.
  • 32. P&T Group Senior Personnel Organisation Technical Director-in-Charge Julian Smalley (Director) Project Client Coordination Julian Smalley (Director) Dorde Erceg (Senior Architect) Oberoi Hotel Martha Termirtsidi (Senior Architect) Nisha Chandar (Architect) Basement O.C. Gan (Architect)
  • 33. ARUP DM Arup Istanbul SMEP Site Based Support (Refer to site supervision) 13 th July 2008 815 B SMEP Office Based Support Los Angeles Istanbul Director Peter Evans Program & Cont Mohammed Saleh Asst Program & Controls TBA Document Controller Natalia Ustimenko Secretary Airen Fajardo Project Manager Ian Neale Struct PM Robert Lindsay Mech PM TBA Elect PM TBA Public Health PM Reid Donovan Chief RE Dai Lewis Senior RE Peter Hesketh Roberts ARE (Civil) Charles Im Elliot Ting ARE (Struct) Joanna Bielecka (tbc) (Lines Dimensions) ARE (Mech) TBA ARE (Elect) Abdul Solangi Site Supervision Site Liaison & Coordination ALOR 5+ Al Raha Beach – Al Dana 5+ Design Buildings Organizational Chart for Site Liaison/Supervision Team
  • 34.
  • 35. Specialist Consultants DESIGN Design Management Hotel Operator Hotel Owner JV Developer JV PMS & Contractor Design Team Lead Consultant Organisational Organogramme Developments Hotels & Hospitality
  • 36.
  • 37.
  • 38.
  • 39.
  • 40. Programme And Sequencing (contd.) Time Slices The following slides show schematics of the building and status of key activities during construction at approximately 3 month intervals The first series of slides show the structure in detail The second series of slides shows the structure with fit-out and envelope interfaces
  • 42.  
  • 43.  
  • 44.  
  • 45.  
  • 46.  
  • 48. AUG 08 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 49. NOV 08 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 50. FEB 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 51. MAY 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 52. OCT 09 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 53. JAN 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 54. APR 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 55. SEP 10 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 56. COMPLETION FEB 11 PILING STRUCTURE FIT OUT START ENVELOPE LEGEND MAIN CORE
  • 57.
  • 58. Construction Manager 5 Back of House T.B.C. Senior Construction Manager Scott Campbell Construction Manager 2 815B Envelopes T.B.C. Support Teams Health & Safety Quality Assurance Document Control Admin/IT Section Manager 2 1 st /2 nd Fix 30 th June 2008 Construction Manager 4 Serviced Apartments T.B.C. Construction Manager 3 Guest Rooms T.B.C. Section Manager 3 Finishes Gen Foreman 3 Day Shift Gen Foreman 4 Back Shift Gen Foreman 5 Day Shift Gen Foreman 6 Back Shift FF&E Manager T.B.C. Construction Manager 1 815B M E & P T.B.C. FF&E Coordinator 1 Senior Commercial Manager Nicholas Watts Procurement Manager Andrew Nelson Commercial Manager Fahrettin Mert Gucuyener Lot 815b Project Leader Russell Henderson Commissioning Engineer Logistics Manager Logistics Manager Senior Logistics Manager T.B.C. Plot 815b Oberoi Hotel Team Organogramme Issue 07 Planner T.B.C. Design Coordinator T.B.C. Procurement Officer T.B.C. Quantity Surveyor T.B.C. Quantity Surveyor T.B.C. Quantity Surveyor T.B.C. Assistant Quantity Surveyor T.B.C. Assistant Quantity Surveyor T.B.C. Section Manager 4 1 st /2 nd Fix Project Manager Front of House George McVey Section Manager 5 Finishes Gen Foreman 7 Day Shift Gen Foreman 8 Back Shift Gen Foreman 9 Day Shift Gen Foreman 10 Back Shift Section Manager 6 Finishes Gen Foreman 11 Day Shift Gen Foreman 12 Back Shift Section Manager 7 Finishes Gen Foreman 13 Day Shift Gen Foreman 14 Back Shift Section Manager 1 Envelope Gen Foreman 1 Day Shift Gen Foreman 2 Back Shift ME & P Coordinator M & P Supervisor Electrical Supervisor Senior Quantity Surveyor T.B.C. Senior Quantity Surveyor Hong Hoang Senior ME&P Quantity Surveyor T.B.C. FF&E Coordinator 2 FF&E Coordinator 3 Senior Engineer (TWC) T.B.C. Construction Manager 6 815B Externals T.B.C. Section Manager 8 Externals Gen Foreman 1 Day Shift Gen Foreman 2 Back Shift Structures Project Manager Brian Kirby Structures Construction Manager Fraser Baird Responsibilities PC815B lot-wide Responsibilities 5+ Design area-wide Senior Planner Isam Salbad Design Manager Simon Barber
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66. Tower - Overall Construction
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72. Asymptote Compound Aldar H. Q. Compound RAMP Lot PC 815B – Logistics Areas Rev 2 Gate 1 Gate 3 Legend Vehicle Route 815B Fence “ D” Wall Vehicle Gate Twin Cage Hoist HOTEL TOWER Asymptote Compound Proposed 815B/606 Satellite Camp Proposed 815B crane yard Gate 2 Note: LAAR permissions from logistics granted for these areas Proposed 815B crane yard and lay-down 55 m 60 m 60 m 60 m 70 m
  • 73.
  • 74.
  • 75. 1. DELIVERY 2. SLINGING 3. CRANEAGE/HOISTAGE 4. ERECTION 5. SEALANT 6. MAINTENANCE Envelope (contd.)
  • 76.
  • 77.
  • 78. Asymptote Compound Aldar H. Q. Compound RAMP Lot PC 815B – Hoistage Plan Rev 0 Gate 1 Gate 3 Legend Vehicle Route 815B Fence “ D” Wall Vehicle Gate Pod lifter Twin Cage Hoist HOTEL TOWER 2 Asymptote Compound Proposed 815B/606 Satellite Camp Proposed 815B crane yard Proposed 815B crane yard and lay-down Gate 2
  • 79.
  • 80.
  • 81. Level L03-L13 Level L14-L15 Legend Marina Std Room RH Marina Std Room LH Canal Std Room RH Canal Std Room LH Suite WC LH Suite WC RH Bathroom Pods (contd.)
  • 82. Marina Std Room LH Canal Std Room RH Approximate Pod Dimensions 3.5m x 3.5m on plan 9’ clear floor to ceiling Open-ended at bath tub 2.6m x 5.0m on plan 9’ clear floor to ceiling Open-ended at bath tub Note, these bathroom layouts are superseded and are used for dimensional purposes only, although tub position will not change Bathroom Pods (contd.)
  • 83.
  • 84.
  • 85.
  • 86.
  • 87. The  current gateway 4 submission that is with EC Harris is based on a shell and core only. It is anticipated that the gateway process  will progress with two sets of gateway documents as shown in the appended programme. This allows us to track and progress the structure and shell works in advance of the fit out as this is dependant on the input from the specialist consultants namely interior design, F&B , kitchen and Laundry, Spa, and FF&E. Gateway Strategy