1
• Single-factor measures
– Output / (Single Input)
• All-factors measure
– Output / (Total Inputs)
Productivity =
Outputs
Inputs
Productivity
2
Single-factor Output Output Output Output
measures Labor Machine Capital Energy
All-factors Output
measure All inputs
Measures of Productivity
3
Single-factor Output Output Output Output
measures Labor Machine Capital Energy
If we produce only one product, the numerator can be either
the total units of the product or the total $ value of the
product. If we produce several products, the numerator is
the total $ value of all products.
The denominator can be the units of input or the total $ value
of input.
Single Factor
4
10,000 Units Produced
Sold for $10/unit
500 labor hours
Labor rate: $9/hr
What is the
labor productivity?
Example: Single Factor Productivity
5
• 10,000 units / 500hrs = 20 units/hr
• (10,000 units * $10/unit) / 500hrs = $200/hr
• 10,000 units / (500hrs * $9/hr) = 2.2 unit/$
• (10,000 units * $10/unit) / (500hrs * $9/hr) = 22.22
•The last one is unit-less
Example: Labor Productivity
6
• Labor Productivity
– Quantity (or value) of output / labor hrs
– Quantity (or value) of output / shift
• Machine Productivity
– Quantity (or value) of output / machine hrs
• Energy Productivity
– Quantity (or value of output) / kwh
• Capital Productivity
– Quantity (or value) of output / value of input
Some Single Factor Measurements
7
All-factors Goods or Services produced
measure All inputs used to produce them
If we produce only one product, the numerator can be either
the total units of product or total $ value of the product.
If we produce several products, the numerator is the total
$ value of all products.
Usually, the numerator is the total $ value of all outputs.
The denominator is total $ value of all inputs.
All Factors
8
10,000 Units Produced
Sold for $10/unit
500 labor hours
Labor rate: $9/hr
Cost of raw material: $30,000
Overhead: $15,500
Example
9
Output
Labor + Materials + Overhead
(10,000 units) * ($10)
(500)*($9) + ($30,000) + ($15,500)
AFP = 2.0
Example : All-Factor Productivity
AFP =
AFP =
10
Training Methods
Technology Management
What are the factors that affect productivity?
11
1. A company that makes shopping carts for supermarkets recently purchased
new equipment, which reduced the labor content needed to produce the
carts. Information concerning the old system (before adding the new
equipment) and the new system (after adding the new machines) includes:
Old System New System
Output/hr 80 84
Workers 5 4
Wage $/hr 10 10
Machine $/hr 40 50
a) Compute labor productivity for both the Old System and the New System.
b) Compute AFP productivity for both the Old System and the New System.
c) Suppose production with old equipment was 30 units of cart A at a price of
$100 per cart, and 50 units of cart B at a price of $120. Also suppose that
production with new equipment is 50 units of cart A, at a price of $100 per
cart, and 30 units of cart B at a price of $120. Compare all-factor productivity
for the old and the new systems.
Assignment 1.1…………….. Due at the beginning of the next class
12
Assignment 1.2…………….. Due at the beginning of the next class
2. A company has introduced a process improvement that reduces the
processing time for each unit and increases output by 25% with less
material but one additional worker.
Under the old process, five workers could produce 60 units per hour.
Labor costs are $12/hour, and material input was $16/unit.
For the new process, material input is now $10/unit and overhead is
charged at 1.6 times direct labor cost. Finished units sell for $31 each.
a) Compute single factor productivity of labor in the old system.
(Compute it in four possible ways.)
b) Compute all factor productivity for both old and new systems.
Factor Old System New System
Output 60 60(1.25) = 75
# of workers 5 6
Worker cost $12/hr $12/hr
Material $16/unit $10/unit
Overhead 1.6(labor cost) 1.6(labor cost)
Price 31 31
13
Assignment 1.3……… For your own practice
3. A milk factory seeks advice from an external consulting company concerning its
business and production processes. The final consulting report describes
several steps to increase productivity including implementation of cutting-edge
processing techniques through more powerful filtering systems.
a) Calculate the labor productivity for the existing as well as the proposed system.
b) Find the All-Factor Productivity for both systems.
c) Assume that current processing includes 700 gallons of Grade-A milk sold at
$2.40/gallon and 300 gallons of Grade-B milk at $1.90/gallon. Furthermore,
assume that under the proposed system, processing will include 600 gallons of
Grade-A milk at $2.40/gallon and 400 gallons of Grade-B milk at $1.90/gallon.
Compare all-factor productivity for both the existing and the new system.
Existing System Proposed System
Workers 12 9
Milk Output/hour 1,000 gallons 1,400 gallons
Wage Rate/hour $12 $12
Filtration Cost/hour $120 $170

Más contenido relacionado

La actualidad más candente

Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...
Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...
Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...Manager.it
 
Process costing
Process costingProcess costing
Process costingsigh_baba
 
Process Costing- Chapter Four
Process Costing- Chapter FourProcess Costing- Chapter Four
Process Costing- Chapter FourEmily Bauer
 
process costing ppt
process  costing pptprocess  costing ppt
process costing pptstudent
 
Application of Functions in Business and Economics
Application of Functions in Business and EconomicsApplication of Functions in Business and Economics
Application of Functions in Business and EconomicsNorth South University
 
Process Costing
Process CostingProcess Costing
Process Costingusmanuddin
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semestersachin kumar sharma
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explainedSam zain
 

La actualidad más candente (15)

Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...
Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...
Costi per commessa: 5.Caso aziendale: flussi documentali e contabilità distin...
 
Process costing
Process costingProcess costing
Process costing
 
Application of maxima
Application of maximaApplication of maxima
Application of maxima
 
test
testtest
test
 
Process Costing- Chapter Four
Process Costing- Chapter FourProcess Costing- Chapter Four
Process Costing- Chapter Four
 
process costing ppt
process  costing pptprocess  costing ppt
process costing ppt
 
Application of Functions in Business and Economics
Application of Functions in Business and EconomicsApplication of Functions in Business and Economics
Application of Functions in Business and Economics
 
Process Costing
Process CostingProcess Costing
Process Costing
 
Job costing slides
Job costing slidesJob costing slides
Job costing slides
 
Job order costing
Job order costingJob order costing
Job order costing
 
Process costing
Process costingProcess costing
Process costing
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
 
Topic 11(short)
Topic 11(short)Topic 11(short)
Topic 11(short)
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
 

Destacado

Chapter 18.2 growing up
Chapter 18.2   growing upChapter 18.2   growing up
Chapter 18.2 growing upDireWidget
 
Williams project
Williams projectWilliams project
Williams project23pizzaguy
 
Estadísticas de evaluación a los docentes de educación media
Estadísticas de evaluación a los docentes de educación media Estadísticas de evaluación a los docentes de educación media
Estadísticas de evaluación a los docentes de educación media ruthguachichulca
 
Ata de eleição e posse 2014
Ata de eleição e posse 2014Ata de eleição e posse 2014
Ata de eleição e posse 2014Nova Liecam
 
Prezentacja PIT w Krakowie 2015
Prezentacja PIT w Krakowie 2015Prezentacja PIT w Krakowie 2015
Prezentacja PIT w Krakowie 2015MadMuflon
 
Prime Auto Social Media Campaign 2016
Prime Auto Social Media Campaign 2016Prime Auto Social Media Campaign 2016
Prime Auto Social Media Campaign 2016Nicholas Morciglio
 
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...Chris Kotsifas
 

Destacado (12)

Century Sale Student Flier
Century Sale Student FlierCentury Sale Student Flier
Century Sale Student Flier
 
Chapter 18.2 growing up
Chapter 18.2   growing upChapter 18.2   growing up
Chapter 18.2 growing up
 
NESHEP Feb12
NESHEP Feb12NESHEP Feb12
NESHEP Feb12
 
Susana
SusanaSusana
Susana
 
Williams project
Williams projectWilliams project
Williams project
 
Estadísticas de evaluación a los docentes de educación media
Estadísticas de evaluación a los docentes de educación media Estadísticas de evaluación a los docentes de educación media
Estadísticas de evaluación a los docentes de educación media
 
Ata de eleição e posse 2014
Ata de eleição e posse 2014Ata de eleição e posse 2014
Ata de eleição e posse 2014
 
Prezentacja PIT w Krakowie 2015
Prezentacja PIT w Krakowie 2015Prezentacja PIT w Krakowie 2015
Prezentacja PIT w Krakowie 2015
 
Prime Auto Social Media Campaign 2016
Prime Auto Social Media Campaign 2016Prime Auto Social Media Campaign 2016
Prime Auto Social Media Campaign 2016
 
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...
SWIFT and STP Consulting Solutions Jointly Provide Corporate Actions Business...
 
Bahaya ananiyah
Bahaya ananiyahBahaya ananiyah
Bahaya ananiyah
 
Job Searching 101 Sharpening Your Interview Skills
Job Searching 101 Sharpening Your Interview SkillsJob Searching 101 Sharpening Your Interview Skills
Job Searching 101 Sharpening Your Interview Skills
 

Similar a Productivity

Productivity management
Productivity management Productivity management
Productivity management NsbmUcd
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategyRaffaelChristopherCa
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivityANSHUL AHUJA
 
Contoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas ManufakturContoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas ManufakturMahros Darsin
 
Activity based costing approach
Activity based costing approachActivity based costing approach
Activity based costing approachMarina Uryasyeva
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resourcesSelva Prakash
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringashaby
 
Standard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures AndStandard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures Andafiali
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designBeaDelaPenia1
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point showMaliha Jahan
 
THEORY OF PRODUCTION AND COST
THEORY OF PRODUCTION AND COSTTHEORY OF PRODUCTION AND COST
THEORY OF PRODUCTION AND COSTSAURAV DAYAL SING
 
Akaun Chapter 11
Akaun Chapter 11Akaun Chapter 11
Akaun Chapter 11WanBK Leo
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxObsaKamil
 
Production &business organization
Production &business organizationProduction &business organization
Production &business organizationfaculty of commerce
 
Production ch ppt
Production ch ppt Production ch ppt
Production ch ppt Sweta Sharma
 
Productivity - Personnel Management
Productivity - Personnel ManagementProductivity - Personnel Management
Productivity - Personnel ManagementMANNU KUMAR
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planningnickoleaaronlinog
 

Similar a Productivity (20)

Productivity management
Productivity management Productivity management
Productivity management
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategy
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
Contoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas ManufakturContoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas Manufaktur
 
Activity based costing approach
Activity based costing approachActivity based costing approach
Activity based costing approach
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resources
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
 
5. productivity
5. productivity5. productivity
5. productivity
 
Standard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures AndStandard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures And
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service design
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point show
 
Production & productivity
Production & productivityProduction & productivity
Production & productivity
 
THEORY OF PRODUCTION AND COST
THEORY OF PRODUCTION AND COSTTHEORY OF PRODUCTION AND COST
THEORY OF PRODUCTION AND COST
 
Production Concepts
Production ConceptsProduction Concepts
Production Concepts
 
Akaun Chapter 11
Akaun Chapter 11Akaun Chapter 11
Akaun Chapter 11
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 
Production &business organization
Production &business organizationProduction &business organization
Production &business organization
 
Production ch ppt
Production ch ppt Production ch ppt
Production ch ppt
 
Productivity - Personnel Management
Productivity - Personnel ManagementProductivity - Personnel Management
Productivity - Personnel Management
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 

Productivity

  • 1. 1 • Single-factor measures – Output / (Single Input) • All-factors measure – Output / (Total Inputs) Productivity = Outputs Inputs Productivity
  • 2. 2 Single-factor Output Output Output Output measures Labor Machine Capital Energy All-factors Output measure All inputs Measures of Productivity
  • 3. 3 Single-factor Output Output Output Output measures Labor Machine Capital Energy If we produce only one product, the numerator can be either the total units of the product or the total $ value of the product. If we produce several products, the numerator is the total $ value of all products. The denominator can be the units of input or the total $ value of input. Single Factor
  • 4. 4 10,000 Units Produced Sold for $10/unit 500 labor hours Labor rate: $9/hr What is the labor productivity? Example: Single Factor Productivity
  • 5. 5 • 10,000 units / 500hrs = 20 units/hr • (10,000 units * $10/unit) / 500hrs = $200/hr • 10,000 units / (500hrs * $9/hr) = 2.2 unit/$ • (10,000 units * $10/unit) / (500hrs * $9/hr) = 22.22 •The last one is unit-less Example: Labor Productivity
  • 6. 6 • Labor Productivity – Quantity (or value) of output / labor hrs – Quantity (or value) of output / shift • Machine Productivity – Quantity (or value) of output / machine hrs • Energy Productivity – Quantity (or value of output) / kwh • Capital Productivity – Quantity (or value) of output / value of input Some Single Factor Measurements
  • 7. 7 All-factors Goods or Services produced measure All inputs used to produce them If we produce only one product, the numerator can be either the total units of product or total $ value of the product. If we produce several products, the numerator is the total $ value of all products. Usually, the numerator is the total $ value of all outputs. The denominator is total $ value of all inputs. All Factors
  • 8. 8 10,000 Units Produced Sold for $10/unit 500 labor hours Labor rate: $9/hr Cost of raw material: $30,000 Overhead: $15,500 Example
  • 9. 9 Output Labor + Materials + Overhead (10,000 units) * ($10) (500)*($9) + ($30,000) + ($15,500) AFP = 2.0 Example : All-Factor Productivity AFP = AFP =
  • 10. 10 Training Methods Technology Management What are the factors that affect productivity?
  • 11. 11 1. A company that makes shopping carts for supermarkets recently purchased new equipment, which reduced the labor content needed to produce the carts. Information concerning the old system (before adding the new equipment) and the new system (after adding the new machines) includes: Old System New System Output/hr 80 84 Workers 5 4 Wage $/hr 10 10 Machine $/hr 40 50 a) Compute labor productivity for both the Old System and the New System. b) Compute AFP productivity for both the Old System and the New System. c) Suppose production with old equipment was 30 units of cart A at a price of $100 per cart, and 50 units of cart B at a price of $120. Also suppose that production with new equipment is 50 units of cart A, at a price of $100 per cart, and 30 units of cart B at a price of $120. Compare all-factor productivity for the old and the new systems. Assignment 1.1…………….. Due at the beginning of the next class
  • 12. 12 Assignment 1.2…………….. Due at the beginning of the next class 2. A company has introduced a process improvement that reduces the processing time for each unit and increases output by 25% with less material but one additional worker. Under the old process, five workers could produce 60 units per hour. Labor costs are $12/hour, and material input was $16/unit. For the new process, material input is now $10/unit and overhead is charged at 1.6 times direct labor cost. Finished units sell for $31 each. a) Compute single factor productivity of labor in the old system. (Compute it in four possible ways.) b) Compute all factor productivity for both old and new systems. Factor Old System New System Output 60 60(1.25) = 75 # of workers 5 6 Worker cost $12/hr $12/hr Material $16/unit $10/unit Overhead 1.6(labor cost) 1.6(labor cost) Price 31 31
  • 13. 13 Assignment 1.3……… For your own practice 3. A milk factory seeks advice from an external consulting company concerning its business and production processes. The final consulting report describes several steps to increase productivity including implementation of cutting-edge processing techniques through more powerful filtering systems. a) Calculate the labor productivity for the existing as well as the proposed system. b) Find the All-Factor Productivity for both systems. c) Assume that current processing includes 700 gallons of Grade-A milk sold at $2.40/gallon and 300 gallons of Grade-B milk at $1.90/gallon. Furthermore, assume that under the proposed system, processing will include 600 gallons of Grade-A milk at $2.40/gallon and 400 gallons of Grade-B milk at $1.90/gallon. Compare all-factor productivity for both the existing and the new system. Existing System Proposed System Workers 12 9 Milk Output/hour 1,000 gallons 1,400 gallons Wage Rate/hour $12 $12 Filtration Cost/hour $120 $170