PRODUCTION & MATERIALS MANAGEMENT




PRODUCTLAYOUT & PROCESS LAYOUT




PROJECT BY:
 • JAIN SEJAL SURESHKUMAR            13
 • ABHISHEK KAMBLI                  14
 • PRIYANKA KANEKAR                 15
 • NIKITA KANKEKAR                  16
 • KARAN KARAMCHANDANI                17
 • AMREEN KHAN                      18
PRODUCT LAYOUT:
In such type of layout, all the machines and processes concerned with the manufacturers of the same product
and the same product and the same range of grouped together .There machines are arranged according to the
sequence of operations. Product layout efficiency is often enhanced through the use of line balancing. Line
balancing is the assignment of tasks to workstations in such a way that workstations have approximately equal
time requirements. This minimizes the amount of time that some workstations are idle, due to waiting on parts
from an upstream process or to avoid building up an inventory queue in front of a downstream process.




  Advantages of product layout are as follows:

  1. Production planning and control becomes easier due to fixed sequence of operations.
  2.   This layout results in less material handling due to shorter distance to be travelled between two
       consecutive workstations and it does not involve any material backtracking.
  3. Maximum use floor space.
  4.   Total manufacturing cycles time is lesser due to smoother flow of work.
  5. Lower work in process inventory.
  6.   Lesser time lost in machine setting.
  7. It is easier to train workers on this layout due to single product flow.
  8.   Nature of job on the machines being highly repetitive, lesser skilled workmen can carry out such job thus,
       there is saving in labour cost.

Disadvantage of product layout are as follows:

  • Capital investment is very high due to under utilization and duplication of machines at many workstations
  •    Machine breakdown at any one workstation is likely to shut the whole production line.
  •    The layout being designed for catering to one type of product, any product change will make all the
       machines     obsolete.
  • Utilization. Equipment utilization rates in process layout are frequently very low, because machine usage
       is dependent upon a variety of output requirements.
  • Cost. If batch processing is used, in-process inventory costs could be high. Lower volume means higher
       per-unit costs. More specialized attention is necessary for both products and customers. Setups are more
       frequent, hence higher setup costs. Material handling is slower and more inefficient. The span of
       supervision is small due to job complexities (routing, setups, etc.), so supervisory costs are higher.
       Additionally, in this type of layout accounting, inventory control, and purchasing usually are highly
       involved.
  • Confusion. Constantly changing schedules and routings make juggling process requirements more
       difficult.




  For example in the automobile industry Since a machine is assigned for each operation, the number of
equipment in a product layout is much more as compared to the Product layout is much more as compared to
the Process layout .Therefore ,the utilization of the equipment has to be sufficiently high to justify the higher
level of capital investment necessary in a Product layout .This means ,the volume of production should be large
    and the variety of products should be low so that there is a very little time lost in setting up the machinery
    .However ,if two types of products are to be made .It may call for two separate layouts .Doing multiple job on
    the same equipment with the same. To save time is usually not the characteristic of a product layout .Each Line
    layout caters only to one product.

             The principles of minimum distance moved (each operation adjacent to the previous operation )and of
    congruence of flow of materials and sequence of equipment , are very well satisfied in a line layout .But this can
    only be true when there is only one standard product to be made ,day in and day out .If there is another type of
    product to be made ,then the present line-up of equipment may not correspond with the flow of this new product
    ,resulting in high costs due to excessive material movement and excessive idle-times of machinery and
    manpower.

      So, when continuous production is possible due to high volume of production over a long run of time of a
    standard product with the assurance of a continuous supply of raw material, Product layout is preferred .When
    the production is of job-shop type ,each product being unique in terms of the number and type of operations to
    be performed ,and the setting of the machinery required, thus involving a high degree of change with low
    production volume ,Process layout is preferred .The major requirement in a job-shop type production is
    flexibility:

       A. product-design, and therefore machine-setting flexibility;
       B. flexibility of types of processes operating or in other words, routing flexibility;
       C.   Flexibility regarding the number of similar items manufactured, i.e. volume flexibility.




                                                 Product layout
                                         A simple sketch of product layout is as follows:

A




B




    For each product there are different die boxes ,machines required for production process sequence. Such
    machines include lathe ,grinder ,painting, milling. The assembling of each product will be done separate on the
    production line beginning with receiving of raw material near the first machine. The material will then move from
    machine to machine till the final product is ready in all respects.

    Problem:
Sales forecast =72000 units of product per year. The product is manufactured through three operations
A, B, & C taking 5, 10 & 15 minutes respectively. Find out machinery requirements of operation A, B &
C.

     Solution:

     Total machining hours available per day= 8*250 = 2000hrs per year.

     Production rate required =      total production during year

                                  Total machining hrs per day

                            =     72000 / 2000

                            =      36 units per hr

Machine output at operations A, B & C will be

 A      60 min/hr        = 12 pcs /hr

         5 min /hr

 B 60 min/hr            = 6pcs /hr

        10 min /hr

 C 60 min /hr            = 4 pcs /hr

        15min/hr




                  STANDARD TIME PER UNIT /           NUMBER OF MACHINES
OPERATION IN MINS                                REQUIRED


          A                       5.0                       36 /12 = 3

              B              10.0                          36 / 6 =6

              C              15.0                          36 / 4 = 9
PROCESS LAYOUT:
Process layout also called “layout by function” is generally associated with batch production. The factory is
divided into process units (or departments), and within these process units (or departments) all similar facilities
are grouped together. Presses, for example, are kept at one place; milling machines are placed at another
place; drilling machines are kept at third place; gear cutting machines are located at fourth place; and so on and
so forth.

    Here, the layout should provide tremendous flexibility in the sequence of operations because; the sequence
of operation for one job is different from that of another job.

   Process layout is suitable when,

     i.     The products are non- standard, or
    ii.     There is a wide variation in the processing times of individual operations.

   Example:

   A machine shop generally has separate departments where general-purpose machines are grouped
together by function (e.g., milling, grinding, drilling, hydraulic presses, and lathes). Therefore, facilities that are
configured according to individual functions or processes have a process layout. This type of layout gives the
firm the flexibility needed to handle a variety of routes and process requirements. Services that utilize process
layouts include hospitals, banks, auto repair, libraries, and universities.

   Improving process layouts involves the minimization of transportation cost, distance, or time. To accomplish
this some firms use what is known as a Muther grid, where subjective information is summarized on a grid
displaying various combinations of department, work group, or machine pairs. Each combination (pair),
represented by an intersection on the grid, is assigned a letter indicating the importance of the closeness of the
two (A = absolutely necessary; E = very important; I = important; O = ordinary importance; U = unimportant; X =
undesirable). Importance generally is based on the shared use of facilities, equipment, workers or records, work
flow, communication requirements, or safety requirements. The departments and other elements are then
assigned to clusters in order of importance.

   To illustrate ,a factory in which all the products manufactured have to pass through such processes as
turning ,milling ,treating and grinding will arrange all its lathes in the turning department ,all milling machines in
the milling machine department and all grinding machines in the grinding department . Thus, in process layout,
machines of identical functions are grouped together kept in one department. These machines are used for
production purposes by workers from different skills as per their requirements. All operations of similar nature
are grouped together in the same department.
Lathe dept      Drilling                 Milling              Assembly dept Painting dept




Cutting dept         Shaping dept                  Heat treatment        Packing dept



                   Product A


                   Product B


  Process layout for medical clinics:


                                                     Gynerology          Laboratory
                      Neurology
                                                                         tests



                     Restroom                                              X -Rays


                                                                        Plastic &

                    Reception room                 Patient waiting      reconstruction
                                                                        surgery
                                                   room


                    Pediatrics



                       Pharmacy




                   Patient exit clinic
Advantages of process layouts include:
  •   Flexibility. The firm has the ability to handle a variety of processing requirements.
  •   Cost. Sometimes, the general-purpose equipment utilized may be less costly to purchase and less costly
      and easier to maintain than specialized equipment.
  •   Motivation. Employees in this type of layout will probably be able to perform a variety of tasks on multiple
      machines, as opposed to the boredom of performing a repetitive task on an assembly line. A process
      layout also allows the employer to use some type of individual incentive system.
  •   System protection. Since there are multiple machines available, process layouts are not particularly
      vulnerable to equipment failures.


Disadvantages of process layouts include:
  •   Utilization. Equipment utilization rates in process layout are frequently very low, because machine usage
      is dependent upon a variety of output requirements.
  •   Cost. If batch processing is used, in-process inventory costs could be high. Lower volume means higher
      per-unit costs. More specialized attention is necessary for both products and customers. Setups are more
      frequent, hence higher setup costs. Material handling is slower and more inefficient. The span of
      supervision is small due to job complexities (routing, setups, etc.), so supervisory costs are higher.
      Additionally, in this type of layout accounting, inventory control, and purchasing usually are highly
      involved.
  •   Confusion. Constantly changing schedules and routings make juggling process requirements more
      difficult.




PROBLEM:
  Data for certain operation of 3 products to be carried out on one type of machine is as follows
TIME IN MINUTES

                      Sales forecast per                                                 No. of setups per
                            week                                                                wk
      product                                      Setting up           machining
         A                   1200                         15.0             1.00                 1

         B                   2000                          30.0              0.45                   2

         C                       4000
                                                           45.5              0.30                   3


  FIND OUT NUMBER OF MACHINES REQUIRED.




  SOLUTION :

  Total setup time per week =Setup time in mins * no .of setups /week

                                                  60mins/hr


  
   Product A       15 * 1 / 60          = 0.25 hrs /week
  Product B        30 * 2 /60           =1.00 hr / week
  Product C        45 *4 /60             =3.00 hr /week

  Production time / week            =   std time /unit *prodn rate
                                                        60 min /hr

Product A          1 * 1200 /60           =   20hrs /week

PRODUCT B          2000 *0.45 /60        =     15 hrs /wk

PRODUCT C          4000 * 0.30 /60       =     20 hrs / wk

Therefore, total machine hrs required =       setting up line per week + prodn time per week.

                                         =     ( 0.25 )               (20.0)
                                              +( 1.00)            +   (15.0)
                                              + ( 3.00)                 (20.0)

                                             (4.25)                  (55.0)
                                          = 59.25 hrs /wk (on the basis one shift working)

Therefore, machine hrs available per week = 6 * 8 = 48 hrs


  Therefore, no. of machines required = 2
Comparison between product layout & process layout
  The relative characteristics of product & process layout are:

 1.   MACHINE UTILIZATION:

      In the process layout, similar machines or processes being grouped together, machine utilization is
      higher.

      In the product layout, even the machine is utilized for 10% of time; it must be installed to perform
      operations on same type of product. In some other division of the company manufacturing similar product
      may have same machine utilized for 20% of time but that second machine is also required at its position
      to cater the needs of that second product. Thus, the overall machine utilization is lesser in product layout.

 2. PLANT INVESTMENT:

           Product layout requires higher initial investment than process layout as special purpose machines
         are costly and at times require to be duplicated to balance the production line.

 3. TYPE OF MACHINES USED:

                Since same machines are used for different products, a general purpose machine can be used for
            process layout. However, since only one type of product is manufactured on machines in product
            layout, a special type of machine is used

 4.   REQUIREMENT OF SPACE :

            Process layout requires comparatively more space than product layout since additional space is
         required to

                • Keep the jobs which queue up before each machine.
                • Accumulate jobs until they are moved to next work station.

                   This is because unlike in product layout material flow is discontinuous.

 5. MANUFACTURING TIME :
Under the process layout, it takes comparatively more time in manufacturing goods. Higher
         manufacturing time results on account of formation of queues at different machines due to different
         cycle times, batch sizes and sequence of operations.

                 Manufacturing cycle time under product layout is small since machine capacities are balanced
         and intermediate activities like travel, storage and inspection are reduced. Product for continuous or
         process production may be looked upon as one large machine wherein raw materials enter at one end
         and emerge as finished product at other end.




6. MATERIAL HANDLING :

         Process type of layout results in more handling than the product type of layout because:

     •   Flow of materials between different stages of manufacture is highly discontinuous due to imbalance in
         operation wise work content while flow of material in a product layout is continuous and there is little or
         no queuing at any stage of processing
     • Distance between the departments in process layout is large which increases transport distance and
         raises the cost of materials handling. On the contrary, in the product layout materials move through a
         short distance between stages.
     • Materials, components and parts in a process layout are handled either singly or are placed in trolleys
         or in bins and are transported as unit loads by fork lift trucks. Material handling in a product is highly
         mechanized. Conveyor system and automatic transfer machines move materials from one stage to
         another.




7. FLEXIBILITY:

         •   Process layout offers a very high flexibility as alterations in operation sequence can be made when
             they are     required. Also, new jobs, each having different routine than other and varying work
             content can be taken up without difficult.
         •   However, such flexibility does not exist in a product layout. Only jobs having the same routing and
             equal work content can be accommodated. It is also rather difficult to adjust proportionately in
             accordance with the change in demand.




8.   ADAPTIBILITY DUE TO BREAKDOWN /SHORTAGESETC:

     •   Process layout offers flexibility in production schedules since disturbances due to machine breakdown,
         absenteeism of key operators and non-availability of raw materials do not seriously affect production
         as another machine can be taken up.
     •   Flexibility in production schedules in case of product layout is seriously affected due to interruptions
         due to breakdowns & absenteeism as stoppage of one machine usually disturbs the working of other
         machines. Storage of materials also affects the production line. “Systematic maintenance “and
         “provisioning of standby operators “are therefore two major management functions.
9.    IN PROCESS INVENTORY:

         Since the parts or materials of a product have to wait for their turn to get processed in case of process
      layout, the in process inventory is relatively higher. However, in case of product layout, same product is
      processed on all machines, waiting time at every location is less and thus in process inventory is less.




10.   LABOUR TRAINING :

          As the type of product is manufactured on any machine is the same in the product layout, training of
 labour force is easier and cheaper in this case.




11.   LABOUR UTILIZATION: since machine utilization is higher in process layout, therefore labour utilization is
      also higher.

Más contenido relacionado

La actualidad más candente

Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technologyHitendrasinh Zala
 
Group Technology
Group TechnologyGroup Technology
Group Technologysgrsoni45
 
Group technology ppt @ bec doms
Group technology ppt @ bec domsGroup technology ppt @ bec doms
Group technology ppt @ bec domsBabasab Patil
 
Plant layout for paper cup manufacturing
Plant layout for paper cup manufacturingPlant layout for paper cup manufacturing
Plant layout for paper cup manufacturingNavdeep Sharma
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process LayoutsDhrumil Shah
 
Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing sgrsoni45
 
Product and Process Layout
Product and Process LayoutProduct and Process Layout
Product and Process LayoutDhwani Ojha
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular ManufacturingSagar Kurde
 
Iterature Review Cellular Manufacturing And Group Technology
Iterature Review Cellular Manufacturing And Group TechnologyIterature Review Cellular Manufacturing And Group Technology
Iterature Review Cellular Manufacturing And Group Technologysandeepbags2004
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec domsBabasab Patil
 
Plant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPPlant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPEr Harshrajsinh Kher
 
Group technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementGroup technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementPankaj Kumar
 

La actualidad más candente (20)

Group technology and cellular manufacturing
Group technology and cellular manufacturingGroup technology and cellular manufacturing
Group technology and cellular manufacturing
 
Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technology
 
group technology
group technologygroup technology
group technology
 
CELLULAR MANUFACTURING
CELLULAR MANUFACTURINGCELLULAR MANUFACTURING
CELLULAR MANUFACTURING
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Group technology ppt @ bec doms
Group technology ppt @ bec domsGroup technology ppt @ bec doms
Group technology ppt @ bec doms
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
Plant layout for paper cup manufacturing
Plant layout for paper cup manufacturingPlant layout for paper cup manufacturing
Plant layout for paper cup manufacturing
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process Layouts
 
Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing
 
Product and Process Layout
Product and Process LayoutProduct and Process Layout
Product and Process Layout
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular Manufacturing
 
Iterature Review Cellular Manufacturing And Group Technology
Iterature Review Cellular Manufacturing And Group TechnologyIterature Review Cellular Manufacturing And Group Technology
Iterature Review Cellular Manufacturing And Group Technology
 
Types of layout
Types of layoutTypes of layout
Types of layout
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec doms
 
Plant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPPlant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLP
 
Group technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementGroup technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain management
 
Types of layouts
Types of layoutsTypes of layouts
Types of layouts
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 

Similar a Pmm

3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptx3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptxsheetalip
 
Facility Capacity & Layout Planning
Facility Capacity & Layout PlanningFacility Capacity & Layout Planning
Facility Capacity & Layout PlanningNishant Agrawal
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesKritika Garg
 
Meenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.pptMeenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.ppttommychauhan
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by meAnkit Walia
 
plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research ) Arpit gupta
 
Plantlayout
PlantlayoutPlantlayout
Plantlayoutgiyana
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.pptSandipanMaji3
 
Industiral engineering (ie)
Industiral engineering (ie)Industiral engineering (ie)
Industiral engineering (ie)vishal parmar
 

Similar a Pmm (20)

plant layout
plant layoutplant layout
plant layout
 
Types of Layout.pptx
Types of Layout.pptxTypes of Layout.pptx
Types of Layout.pptx
 
Plant layout
Plant layoutPlant layout
Plant layout
 
3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptx3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptx
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Facility Capacity & Layout Planning
Facility Capacity & Layout PlanningFacility Capacity & Layout Planning
Facility Capacity & Layout Planning
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Meenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.pptMeenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.ppt
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research )
 
Plantlayout
PlantlayoutPlantlayout
Plantlayout
 
Lay out
Lay outLay out
Lay out
 
Iepm
IepmIepm
Iepm
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
 
POM- PLANT LAYOUT.pptx
POM- PLANT LAYOUT.pptxPOM- PLANT LAYOUT.pptx
POM- PLANT LAYOUT.pptx
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
Industiral engineering (ie)
Industiral engineering (ie)Industiral engineering (ie)
Industiral engineering (ie)
 

Último

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 

Último (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 

Pmm

  • 1. PRODUCTION & MATERIALS MANAGEMENT PRODUCTLAYOUT & PROCESS LAYOUT PROJECT BY: • JAIN SEJAL SURESHKUMAR 13 • ABHISHEK KAMBLI 14 • PRIYANKA KANEKAR 15 • NIKITA KANKEKAR 16 • KARAN KARAMCHANDANI 17 • AMREEN KHAN 18
  • 2. PRODUCT LAYOUT: In such type of layout, all the machines and processes concerned with the manufacturers of the same product and the same product and the same range of grouped together .There machines are arranged according to the sequence of operations. Product layout efficiency is often enhanced through the use of line balancing. Line balancing is the assignment of tasks to workstations in such a way that workstations have approximately equal time requirements. This minimizes the amount of time that some workstations are idle, due to waiting on parts from an upstream process or to avoid building up an inventory queue in front of a downstream process. Advantages of product layout are as follows: 1. Production planning and control becomes easier due to fixed sequence of operations. 2. This layout results in less material handling due to shorter distance to be travelled between two consecutive workstations and it does not involve any material backtracking. 3. Maximum use floor space. 4. Total manufacturing cycles time is lesser due to smoother flow of work. 5. Lower work in process inventory. 6. Lesser time lost in machine setting. 7. It is easier to train workers on this layout due to single product flow. 8. Nature of job on the machines being highly repetitive, lesser skilled workmen can carry out such job thus, there is saving in labour cost. Disadvantage of product layout are as follows: • Capital investment is very high due to under utilization and duplication of machines at many workstations • Machine breakdown at any one workstation is likely to shut the whole production line. • The layout being designed for catering to one type of product, any product change will make all the machines obsolete. • Utilization. Equipment utilization rates in process layout are frequently very low, because machine usage is dependent upon a variety of output requirements. • Cost. If batch processing is used, in-process inventory costs could be high. Lower volume means higher per-unit costs. More specialized attention is necessary for both products and customers. Setups are more frequent, hence higher setup costs. Material handling is slower and more inefficient. The span of supervision is small due to job complexities (routing, setups, etc.), so supervisory costs are higher. Additionally, in this type of layout accounting, inventory control, and purchasing usually are highly involved. • Confusion. Constantly changing schedules and routings make juggling process requirements more difficult. For example in the automobile industry Since a machine is assigned for each operation, the number of equipment in a product layout is much more as compared to the Product layout is much more as compared to the Process layout .Therefore ,the utilization of the equipment has to be sufficiently high to justify the higher
  • 3. level of capital investment necessary in a Product layout .This means ,the volume of production should be large and the variety of products should be low so that there is a very little time lost in setting up the machinery .However ,if two types of products are to be made .It may call for two separate layouts .Doing multiple job on the same equipment with the same. To save time is usually not the characteristic of a product layout .Each Line layout caters only to one product. The principles of minimum distance moved (each operation adjacent to the previous operation )and of congruence of flow of materials and sequence of equipment , are very well satisfied in a line layout .But this can only be true when there is only one standard product to be made ,day in and day out .If there is another type of product to be made ,then the present line-up of equipment may not correspond with the flow of this new product ,resulting in high costs due to excessive material movement and excessive idle-times of machinery and manpower. So, when continuous production is possible due to high volume of production over a long run of time of a standard product with the assurance of a continuous supply of raw material, Product layout is preferred .When the production is of job-shop type ,each product being unique in terms of the number and type of operations to be performed ,and the setting of the machinery required, thus involving a high degree of change with low production volume ,Process layout is preferred .The major requirement in a job-shop type production is flexibility: A. product-design, and therefore machine-setting flexibility; B. flexibility of types of processes operating or in other words, routing flexibility; C. Flexibility regarding the number of similar items manufactured, i.e. volume flexibility. Product layout A simple sketch of product layout is as follows: A B For each product there are different die boxes ,machines required for production process sequence. Such machines include lathe ,grinder ,painting, milling. The assembling of each product will be done separate on the production line beginning with receiving of raw material near the first machine. The material will then move from machine to machine till the final product is ready in all respects. Problem:
  • 4. Sales forecast =72000 units of product per year. The product is manufactured through three operations A, B, & C taking 5, 10 & 15 minutes respectively. Find out machinery requirements of operation A, B & C. Solution: Total machining hours available per day= 8*250 = 2000hrs per year. Production rate required = total production during year Total machining hrs per day = 72000 / 2000 = 36 units per hr Machine output at operations A, B & C will be A 60 min/hr = 12 pcs /hr 5 min /hr B 60 min/hr = 6pcs /hr 10 min /hr C 60 min /hr = 4 pcs /hr 15min/hr STANDARD TIME PER UNIT / NUMBER OF MACHINES OPERATION IN MINS REQUIRED A 5.0 36 /12 = 3 B 10.0 36 / 6 =6 C 15.0 36 / 4 = 9
  • 5. PROCESS LAYOUT: Process layout also called “layout by function” is generally associated with batch production. The factory is divided into process units (or departments), and within these process units (or departments) all similar facilities are grouped together. Presses, for example, are kept at one place; milling machines are placed at another place; drilling machines are kept at third place; gear cutting machines are located at fourth place; and so on and so forth. Here, the layout should provide tremendous flexibility in the sequence of operations because; the sequence of operation for one job is different from that of another job. Process layout is suitable when, i. The products are non- standard, or ii. There is a wide variation in the processing times of individual operations. Example: A machine shop generally has separate departments where general-purpose machines are grouped together by function (e.g., milling, grinding, drilling, hydraulic presses, and lathes). Therefore, facilities that are configured according to individual functions or processes have a process layout. This type of layout gives the firm the flexibility needed to handle a variety of routes and process requirements. Services that utilize process layouts include hospitals, banks, auto repair, libraries, and universities. Improving process layouts involves the minimization of transportation cost, distance, or time. To accomplish this some firms use what is known as a Muther grid, where subjective information is summarized on a grid displaying various combinations of department, work group, or machine pairs. Each combination (pair), represented by an intersection on the grid, is assigned a letter indicating the importance of the closeness of the two (A = absolutely necessary; E = very important; I = important; O = ordinary importance; U = unimportant; X = undesirable). Importance generally is based on the shared use of facilities, equipment, workers or records, work flow, communication requirements, or safety requirements. The departments and other elements are then assigned to clusters in order of importance. To illustrate ,a factory in which all the products manufactured have to pass through such processes as turning ,milling ,treating and grinding will arrange all its lathes in the turning department ,all milling machines in the milling machine department and all grinding machines in the grinding department . Thus, in process layout, machines of identical functions are grouped together kept in one department. These machines are used for production purposes by workers from different skills as per their requirements. All operations of similar nature are grouped together in the same department.
  • 6. Lathe dept Drilling Milling Assembly dept Painting dept Cutting dept Shaping dept Heat treatment Packing dept Product A Product B Process layout for medical clinics: Gynerology Laboratory Neurology tests Restroom X -Rays Plastic & Reception room Patient waiting reconstruction surgery room Pediatrics Pharmacy Patient exit clinic
  • 7. Advantages of process layouts include: • Flexibility. The firm has the ability to handle a variety of processing requirements. • Cost. Sometimes, the general-purpose equipment utilized may be less costly to purchase and less costly and easier to maintain than specialized equipment. • Motivation. Employees in this type of layout will probably be able to perform a variety of tasks on multiple machines, as opposed to the boredom of performing a repetitive task on an assembly line. A process layout also allows the employer to use some type of individual incentive system. • System protection. Since there are multiple machines available, process layouts are not particularly vulnerable to equipment failures. Disadvantages of process layouts include: • Utilization. Equipment utilization rates in process layout are frequently very low, because machine usage is dependent upon a variety of output requirements. • Cost. If batch processing is used, in-process inventory costs could be high. Lower volume means higher per-unit costs. More specialized attention is necessary for both products and customers. Setups are more frequent, hence higher setup costs. Material handling is slower and more inefficient. The span of supervision is small due to job complexities (routing, setups, etc.), so supervisory costs are higher. Additionally, in this type of layout accounting, inventory control, and purchasing usually are highly involved. • Confusion. Constantly changing schedules and routings make juggling process requirements more difficult. PROBLEM: Data for certain operation of 3 products to be carried out on one type of machine is as follows
  • 8. TIME IN MINUTES Sales forecast per No. of setups per week wk product Setting up machining A 1200 15.0 1.00 1 B 2000 30.0 0.45 2 C 4000 45.5 0.30 3 FIND OUT NUMBER OF MACHINES REQUIRED. SOLUTION : Total setup time per week =Setup time in mins * no .of setups /week 60mins/hr Product A 15 * 1 / 60 = 0.25 hrs /week Product B 30 * 2 /60 =1.00 hr / week Product C 45 *4 /60 =3.00 hr /week Production time / week = std time /unit *prodn rate 60 min /hr Product A 1 * 1200 /60 = 20hrs /week PRODUCT B 2000 *0.45 /60 = 15 hrs /wk PRODUCT C 4000 * 0.30 /60 = 20 hrs / wk Therefore, total machine hrs required = setting up line per week + prodn time per week. = ( 0.25 ) (20.0) +( 1.00) + (15.0) + ( 3.00) (20.0) (4.25) (55.0) = 59.25 hrs /wk (on the basis one shift working) Therefore, machine hrs available per week = 6 * 8 = 48 hrs Therefore, no. of machines required = 2
  • 9. Comparison between product layout & process layout The relative characteristics of product & process layout are: 1. MACHINE UTILIZATION: In the process layout, similar machines or processes being grouped together, machine utilization is higher. In the product layout, even the machine is utilized for 10% of time; it must be installed to perform operations on same type of product. In some other division of the company manufacturing similar product may have same machine utilized for 20% of time but that second machine is also required at its position to cater the needs of that second product. Thus, the overall machine utilization is lesser in product layout. 2. PLANT INVESTMENT: Product layout requires higher initial investment than process layout as special purpose machines are costly and at times require to be duplicated to balance the production line. 3. TYPE OF MACHINES USED: Since same machines are used for different products, a general purpose machine can be used for process layout. However, since only one type of product is manufactured on machines in product layout, a special type of machine is used 4. REQUIREMENT OF SPACE : Process layout requires comparatively more space than product layout since additional space is required to • Keep the jobs which queue up before each machine. • Accumulate jobs until they are moved to next work station. This is because unlike in product layout material flow is discontinuous. 5. MANUFACTURING TIME :
  • 10. Under the process layout, it takes comparatively more time in manufacturing goods. Higher manufacturing time results on account of formation of queues at different machines due to different cycle times, batch sizes and sequence of operations. Manufacturing cycle time under product layout is small since machine capacities are balanced and intermediate activities like travel, storage and inspection are reduced. Product for continuous or process production may be looked upon as one large machine wherein raw materials enter at one end and emerge as finished product at other end. 6. MATERIAL HANDLING : Process type of layout results in more handling than the product type of layout because: • Flow of materials between different stages of manufacture is highly discontinuous due to imbalance in operation wise work content while flow of material in a product layout is continuous and there is little or no queuing at any stage of processing • Distance between the departments in process layout is large which increases transport distance and raises the cost of materials handling. On the contrary, in the product layout materials move through a short distance between stages. • Materials, components and parts in a process layout are handled either singly or are placed in trolleys or in bins and are transported as unit loads by fork lift trucks. Material handling in a product is highly mechanized. Conveyor system and automatic transfer machines move materials from one stage to another. 7. FLEXIBILITY: • Process layout offers a very high flexibility as alterations in operation sequence can be made when they are required. Also, new jobs, each having different routine than other and varying work content can be taken up without difficult. • However, such flexibility does not exist in a product layout. Only jobs having the same routing and equal work content can be accommodated. It is also rather difficult to adjust proportionately in accordance with the change in demand. 8. ADAPTIBILITY DUE TO BREAKDOWN /SHORTAGESETC: • Process layout offers flexibility in production schedules since disturbances due to machine breakdown, absenteeism of key operators and non-availability of raw materials do not seriously affect production as another machine can be taken up. • Flexibility in production schedules in case of product layout is seriously affected due to interruptions due to breakdowns & absenteeism as stoppage of one machine usually disturbs the working of other machines. Storage of materials also affects the production line. “Systematic maintenance “and “provisioning of standby operators “are therefore two major management functions.
  • 11. 9. IN PROCESS INVENTORY: Since the parts or materials of a product have to wait for their turn to get processed in case of process layout, the in process inventory is relatively higher. However, in case of product layout, same product is processed on all machines, waiting time at every location is less and thus in process inventory is less. 10. LABOUR TRAINING : As the type of product is manufactured on any machine is the same in the product layout, training of labour force is easier and cheaper in this case. 11. LABOUR UTILIZATION: since machine utilization is higher in process layout, therefore labour utilization is also higher.