1. TEXAS STaR CHART Aligned with the Long Range Plan for Technology, 2006-2020
2.
3.
4. STaR CHART ANALYSIS Very substantial improvement in the three year period. INF5 improved from Early Technology to Target Technology . 2008-09: Trg Tech 2007-08: Adv. Tech 2006-07: Adv. Tech 2008-09: 21 2007-08: 17 2006-07: 15 Infrastructure for Technology L1 & L2 saw no change and remained in the developing technology phase during the three year period. 2008-09: Adv. Tech 2007-08: Dev. Tech 2006-07: Dev. Tech 2008-09: 18 2007-08: 14 2006-07: 13 Leadership, Administration, & Instructional Support Their was significant improvement in 2008-2009, but EP3 & EP6 did not show much improvement as a result. 2008-09: Adv. Tech 2007-08: Dev. Tech 2006-07: Dev. Tech 2008-09: 16 2007-08: 10 2006-07: 10 Educator Preparation & Development TL1 & TL6 received little improvement over the three year period. 2008-09: Adv. Tech 2007-08: Dev. Tech 2006-07: Dev. Tech 2008-09: 17 2007-08: 12 2006-07: 12 Teaching & Learning Trends Key Area STaR Classifications Key Area Totals Summary Area School District: Whitesboro Campus: High School