SlideShare a Scribd company logo
1 of 26
Download to read offline
TECHNIQUES OF CONTROLLED BLASTING TO
          IMPROVE OVERALL ENVIRONMENTAL &
                           SAFETY STANDARD
                                          ***
        MEANS TO MITIGATE ADVERSE IMPACT OF
     BLASTING IN OPEN PITS, QUARRIES, TUNNELS,
            UG METAL MINES AND CONSTRUCTION
                                   WORKINGS


Partha Das Sharma (sharmapd1@gmail.com), website: http://miningandblasting.wordpress.com/
In both the mining and construction
industries, blasting is the predominant method
for fragmentation of consolidated mineral
deposits and rocks.
   The public relation problems of users of
explosives have increased greatly in the past
few years as explosives are being consumed in
increasing quantities.
   Increased    population  and     spread   of
urbanization near to the construction & mining
sites have affected more people by blasting.
                                              2
Controlled blasting methods are used to control
adverse impacts such as:
  Over-break
  Reduce ground vibrations
  Reduce fractures within remaining rock walls
  Reduce noise
  Reduce dilution / waste of ore etc.

                                                 3
Following are the techniques of controlled
blasting:
  Line drilling,
  Trim (Cushion) blasting,
  Smooth (contour or perimeter) blasting,
  Pre-splitting,
   Selecting and employing various parameters
of blast design, using modern technology,
  Precise and accurate timing delays,
  Muffle blasting at critical and congested areas.
                                                4
Line drilling:
   This system involves a single row of closely spaced uncharged holes
along the neat excavation line.
  This provides a plane of weakness to which the primary blast can
break.
   It also causes some of the shock waves generated by the blast to be
reflected, which reduces shattering and stressing in the finished wall of
the host rock.
  Line drill holes are generally percussive hammer holes having spaced
two to four times the hole diameter, drilled along the excavation line.
  The blast holes directly adjacent to the line drill holes (buffer holes)
are generally loaded lighter (about 50% of primary holes) and are closely
spaced (about 50 to 75 %) than primary holes.
  This technique gives maximum protection to the host rock to
preserve its original strength.
   The disadvantage of this system is high drilling cost due to closed
spacing and results are often unsatisfactory because of poor hole
alignment.                                                          5
Trim (Cushion) blasting :
  Like line drilling trim or cushion blasting involves a single
row of holes along the specified final excavation line.
  This technique generally uses 2 to 4 inch diameter holes.
  Holes are loaded with light charge, well-distributed,
completely stemmed and fired after the main excavation is
removed.
  By firing the trim holes with minimum or no delay between
holes, the detonation tend to shear the rock web between
holes and give a smooth wall with minimum over-break.
  It is better to put trim holes just before removing the final
berm.
   As compare to line drilling technique trim or cushion
blasting is simpler and economical as increased hole spacing
are used.                                                  6
Smooth (contour or perimeter) blasting:
   A technique used mostly in underground blasting, closely spaced
drill holes are loaded with decoupled charges and fired
simultaneously to produce an excavation contour without fracturing
or damaging the rock behind or adjacent to the blasted face.
  For promoting safety and economy in underground workings,
performance of blasting in headings, drivages, tunnels and stopes
becomes very important factor.
   An ideal blast results in a minimum of damage to the host rock
with minimum of over-break.
  Perimeter or contour holes are drilled along specified final
excavation limits and are lightly loaded than that of buffer holes and
production holes.
  The spacing is kept closer than buffer holes and production holes.
  As a thumb rule 10 to 12 times hole diameter in medium to tough
rock and 5 to 6 times hole diameter in poor, fragmented rock are kept
as spacing.                                                        7
Example: Blast damage and overbreak in Tunneling




Results of Controlled Blast: Smooth walls, Minimal fractures, Minimal overbreak,
                                                                            8
Less support required, Better economy & safety.
Charging for Smooth (contour or perimeter) blasting in Tunneling:




                                                                    9
Pre-splitting:
   Pre-splitting is the smooth blasting method in which cracks for the
final contour are created by blasting prior to the drilling of the rest of
the holes for the blast pattern.
   This is an effective way of restricting back-break and ground
vibration in large open pit, quarry blasting.
  Pre-splitting helps in isolating blasting area from remaining rock
mass by creating an artificial discontinuity along the final designed
excavation line / plane against which subsequent main blast breaks.
  A row of holes are drilled at the periphery (three sides) of the main
blasting block at a closer spacing, charged with lesser quantity of
explosives than the production blast and blasted prior to the main
blast in an effort to create a fractured line and a reflective plane at
the excavation limit or plane.
   Some of the shock waves from subsequent main blast are
reflected at the pre-split plane which results in arresting a
considerable portion of blast induced ground vibration generated in
the main blast to propagate.                                    10
Principle of Pre-splitting




                             11
CHARGING OF PRE-SPLIT AND PRODUCTION HOLES12
Muffle blasting:
   Fly-rock is another important adverse impact of
blasting operations, specially, when conducted in the
vicinity of dense human habitation / congested areas.
   Muffling or covering of blast holes properly before
blasting, is the common solution to prevent fly-rock from
damaging human habitants and structures.
  Generally, mat or mesh (40 mm x 40 mm size) made of
preferably of locally available steel ropes (5 to 6 mm) are
used for muffling purpose. Sand bags weighing 40 to 50
kg are kept over the mesh at an interval of 3 m.
  Efficiency of arresting of fly-rock depends mainly on
the quality of muffling system implemented.
                                                        13
Using millisecond delay sequence and use of in-hole delays in
decks:
  Delay blasting (with millisecond delays) permits to divide the
shot into smaller charges, which are detonated in a
predetermined millisecond sequence at specific time intervals.
   Millisecond delay initiation of the explosive charge is a
technique used in most open pit, quarry, tunnel and underground
rock blasting operations.
   It serves to enhance fragmentation and direct rock movement
for increasing productivity.
    The major advantages of delay blasting are: (i) Improved
fragmentation, (ii) Reduction of ground vibrations and air blast,
(iii) Reduction of over-break and fly-rock, (iv) Improved
productivity and lower cost.
  Charge weight per delay is the most important parameter for
controlling blast induced ground vibration and air-blast.
                                                              14
In-hole Delay blasting in Open-pits for reduction of Ground Vibration:




                                                                   15
Surface connection of In-hole Delay blasting in Open-pits:




                                                             16
Blasting Ring with deck & In-hole delays in UG metal mines:




                                                              17
‘Signature-Hole’ Blast Analysis for Vibration Control by using
Accurate Delay Timing Electronic Detonator System:
  Structural response to blast-induced ground vibration is a
phenomenon that has been analyzed for many years.
   Residential structure’s level of response to blast induced ground
vibration is dependent on both the peak particle velocity and the
frequency of the waveform.
  Researchers have shown that, above ground structures resonate
whenever they are excited by a vibration containing adequate energy
matching the fundamental frequency of the structure.
  The value of this frequency is mainly dependent upon the mass,
height and stiffness of the structure.
   The maximum response of a house to blast induced ground
vibration occurs whenever the frequency of the ground vibration
matches the natural resonant frequency of the house.
   When little or no energy at the resonant frequency of the
structure, the structural response to the vibration will be negligible.
                                                                      18
A method of controlling blast vibrations other than by modifying
the scaled distance came into use some time ago.
   The crucial point of the methodology is the use of a pilot-blast
signal which takes account of the seismic properties of all complex
geology between the blast and the target locations.
  Therefore,   it   does   not   require   any   geological   model   or
assumption.
  The delay interval between blast-holes can be chosen to control
and minimize the vibration energy within the structural response
band of most houses.
   Studies had indicated that blast vibration could be simulated by
detonating a “Signature Hole” with the vibration monitored at critical
locations, and then using a computer to superpose the waveforms
with varying delays.
   By choosing delay times (∆t) that create ‘destructive interference’
at frequencies that are favored by the local geology, the “ringing”
vibration that excites structural elements in structures, houses and
annoys neighbors could be reduced.                                 19
20
In this method, accurate delay times are crucial to
effective vibration control, scatter in the firing times
limited the method severely.
  Electronic   detonators   have   scatter   less   than    a
millisecond.
   In light of all these, researchers have started finding
both limitations and new potential of this new technique
of controlling blast vibration.




                                                           21
In other words, “Signature Hole Analysis” is a modeling
technique, to help control adverse effects of blast induced
vibrations.
  The process involves controlling the frequency content by
adjusting delay times within a blast containing several
explosive charges.
  The risk to adjacent structures is thereby mitigated.
  Thus, with the growing adoption rate of electronic initiation
systems as a tool to control nuisance of vibrations, the
modeling techniques are becoming more popular.

   M/s Instantel has recently developed and launched a
‘Signature Hole Analysis’ software tool, which allows users to
simulate a large number of charge delay times very quickly.
  The software, in fact, is a modeling technique used to help
predict and control blast induced vibrations.             22
Advantages of the technique, ‘Signature Hole Blast Analysis’, for
Vibration Control:
   This technique provides optimum electronic timing while
maintaining high level of production with efficiency by raising
quantity of explosives per delay (kg/delay) and provide overall
structural safety of blast surroundings.
  Blast with shorted duration results in mitigating effects of blast
induced vibration.
   Therefore, as post-blast vibrations are reduced by raising
frequencies, much larger blasts can be undertaken with better
operational performance, without compromising stringent safety
standards of environment.
  Thus, Signature Hole Analysis software tool available can be
used to help optimize and improve overall operational efficiency.
   It has also been observed that this vibration control method is
feasible for underground mining ring blasts as well.
                                                                 23
By adopting these precautions
  The ground vibration is restricted to ease
the public relation problem,
  The mines’ / construction’s techno-
economics are improved,
  Preservation of host rock strength and
safety standard are improved to a
considerable level

                                           24
As far as possible modern
techniques and equipments are also
to be used in order to mitigate the
adverse blast effects
  Regular monitoring is needed
   Training    to    the    blasting
supervisors on controlled blasting
techniques is very much essential.
                                   25
THANK
 YOU


        26

More Related Content

What's hot

Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)Safdar Ali
 
Rock Blasting Fundamentals
Rock Blasting FundamentalsRock Blasting Fundamentals
Rock Blasting FundamentalsUmer Khayam
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blastingParth Desani
 
Drilling in Surface Mine.pdf
Drilling in Surface Mine.pdfDrilling in Surface Mine.pdf
Drilling in Surface Mine.pdfBIT Sindri
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesaashutosh chhirolya
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drillpavan kumar
 
Explosives, Theory Of Breakage And Blasting Operations
Explosives, Theory Of Breakage And Blasting OperationsExplosives, Theory Of Breakage And Blasting Operations
Explosives, Theory Of Breakage And Blasting Operationspartha sharma
 
Blasting accessories (2)
Blasting accessories (2)Blasting accessories (2)
Blasting accessories (2)chemistrya40
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesAnurag Jha
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 

What's hot (20)

Basic blasting
Basic  blastingBasic  blasting
Basic blasting
 
Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)
 
Rock Blasting Fundamentals
Rock Blasting FundamentalsRock Blasting Fundamentals
Rock Blasting Fundamentals
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Drilling in Surface Mine.pdf
Drilling in Surface Mine.pdfDrilling in Surface Mine.pdf
Drilling in Surface Mine.pdf
 
Mechanics of blasting
Mechanics of blasting Mechanics of blasting
Mechanics of blasting
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Mine planning
Mine planning Mine planning
Mine planning
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
K controlled blasting
K controlled blastingK controlled blasting
K controlled blasting
 
Advanced Drilling & Blasting
Advanced Drilling & Blasting Advanced Drilling & Blasting
Advanced Drilling & Blasting
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
 
Explosives, Theory Of Breakage And Blasting Operations
Explosives, Theory Of Breakage And Blasting OperationsExplosives, Theory Of Breakage And Blasting Operations
Explosives, Theory Of Breakage And Blasting Operations
 
Blasting accessories (2)
Blasting accessories (2)Blasting accessories (2)
Blasting accessories (2)
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 

Viewers also liked

Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology PresentationThames Global Consultants
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATAbhinav Rawat
 
Wells and West Mexico Presentation
Wells and West Mexico PresentationWells and West Mexico Presentation
Wells and West Mexico PresentationJason Hunter
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequenceRanjith Kumar
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesMohamed Elnagar
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Turbine Fundamentals
Turbine FundamentalsTurbine Fundamentals
Turbine FundamentalsChoong KW
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac PresentationChoong KW
 

Viewers also liked (11)

Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology Presentation
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
 
Wells and West Mexico Presentation
Wells and West Mexico PresentationWells and West Mexico Presentation
Wells and West Mexico Presentation
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Demolition of building
Demolition of building Demolition of building
Demolition of building
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Turbine Fundamentals
Turbine FundamentalsTurbine Fundamentals
Turbine Fundamentals
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 

Similar to Techniques of Controlled Blasting

Controlled Blasting_082055.pdf
Controlled Blasting_082055.pdfControlled Blasting_082055.pdf
Controlled Blasting_082055.pdfmaxwellantwi255
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blastingpartha sharma
 
Surface Blast Design_082519.pdf
Surface Blast Design_082519.pdfSurface Blast Design_082519.pdf
Surface Blast Design_082519.pdfmaxwellantwi255
 
Research on mean partical size after drilling & blasting by Abhijit pal
Research on mean partical size after drilling & blasting by Abhijit  palResearch on mean partical size after drilling & blasting by Abhijit  pal
Research on mean partical size after drilling & blasting by Abhijit palAbhijit Pal
 
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...Control and Prediction of Blast Fragmentation and It's effect on the Comminut...
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...James Dunford
 
New burn cut blast design in drives enhances drilling blasting efficiency wit...
New burn cut blast design in drives enhances drilling blasting efficiency wit...New burn cut blast design in drives enhances drilling blasting efficiency wit...
New burn cut blast design in drives enhances drilling blasting efficiency wit...partha sharma
 
Grouting Technology - Guntur Chapter.ppt
Grouting Technology - Guntur Chapter.pptGrouting Technology - Guntur Chapter.ppt
Grouting Technology - Guntur Chapter.pptDhananjayShah9
 
Elemdsadrface Misdad
Elemdsadrface MisdadElemdsadrface Misdad
Elemdsadrface MisdadTomson24
 
Chapter 16 Of Rock Engineering
Chapter 16 Of  Rock  EngineeringChapter 16 Of  Rock  Engineering
Chapter 16 Of Rock EngineeringNgo Hung Long
 
Principles of rock_blasting
Principles of rock_blastingPrinciples of rock_blasting
Principles of rock_blastingSaurabh Jain
 
IRJET - Enhancing Productivity in Opencast Mines – A Quantified Approach
IRJET -  	  Enhancing Productivity in Opencast Mines – A Quantified ApproachIRJET -  	  Enhancing Productivity in Opencast Mines – A Quantified Approach
IRJET - Enhancing Productivity in Opencast Mines – A Quantified ApproachIRJET Journal
 
Mine 305
Mine 305Mine 305
Mine 305MK Musa
 
2010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug20102010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug2010Matt Stockwell
 
ACoRCE 2015 Paper number 004 - for merge
ACoRCE 2015 Paper number 004 - for mergeACoRCE 2015 Paper number 004 - for merge
ACoRCE 2015 Paper number 004 - for mergeMark Maina
 

Similar to Techniques of Controlled Blasting (20)

Controlled Blasting_082055.pdf
Controlled Blasting_082055.pdfControlled Blasting_082055.pdf
Controlled Blasting_082055.pdf
 
Blast Design-2.pdf
Blast Design-2.pdfBlast Design-2.pdf
Blast Design-2.pdf
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
 
Surface Blast Design_082519.pdf
Surface Blast Design_082519.pdfSurface Blast Design_082519.pdf
Surface Blast Design_082519.pdf
 
05 chapter 3_rock_excavation_methods
05 chapter 3_rock_excavation_methods05 chapter 3_rock_excavation_methods
05 chapter 3_rock_excavation_methods
 
Research on mean partical size after drilling & blasting by Abhijit pal
Research on mean partical size after drilling & blasting by Abhijit  palResearch on mean partical size after drilling & blasting by Abhijit  pal
Research on mean partical size after drilling & blasting by Abhijit pal
 
MINING AND HARD ROCK
MINING AND HARD ROCKMINING AND HARD ROCK
MINING AND HARD ROCK
 
Explosives Today S4 Nr15
Explosives Today S4 Nr15Explosives Today S4 Nr15
Explosives Today S4 Nr15
 
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...Control and Prediction of Blast Fragmentation and It's effect on the Comminut...
Control and Prediction of Blast Fragmentation and It's effect on the Comminut...
 
New burn cut blast design in drives enhances drilling blasting efficiency wit...
New burn cut blast design in drives enhances drilling blasting efficiency wit...New burn cut blast design in drives enhances drilling blasting efficiency wit...
New burn cut blast design in drives enhances drilling blasting efficiency wit...
 
Grouting Technology - Guntur Chapter.ppt
Grouting Technology - Guntur Chapter.pptGrouting Technology - Guntur Chapter.ppt
Grouting Technology - Guntur Chapter.ppt
 
Elemdsadrface Misdad
Elemdsadrface MisdadElemdsadrface Misdad
Elemdsadrface Misdad
 
Chapter 16 Of Rock Engineering
Chapter 16 Of  Rock  EngineeringChapter 16 Of  Rock  Engineering
Chapter 16 Of Rock Engineering
 
Principles of rock_blasting
Principles of rock_blastingPrinciples of rock_blasting
Principles of rock_blasting
 
IRJET - Enhancing Productivity in Opencast Mines – A Quantified Approach
IRJET -  	  Enhancing Productivity in Opencast Mines – A Quantified ApproachIRJET -  	  Enhancing Productivity in Opencast Mines – A Quantified Approach
IRJET - Enhancing Productivity in Opencast Mines – A Quantified Approach
 
Mine 305
Mine 305Mine 305
Mine 305
 
2010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug20102010 Blast Hole Slotting Conference Paper_Aug2010
2010 Blast Hole Slotting Conference Paper_Aug2010
 
Types of Drilling
Types of Drilling Types of Drilling
Types of Drilling
 
ACoRCE 2015 Paper number 004 - for merge
ACoRCE 2015 Paper number 004 - for mergeACoRCE 2015 Paper number 004 - for merge
ACoRCE 2015 Paper number 004 - for merge
 
Blast design.pptx
Blast design.pptxBlast design.pptx
Blast design.pptx
 

More from partha sharma

Drop raising in underground mines
Drop raising in underground minesDrop raising in underground mines
Drop raising in underground minespartha sharma
 
Mining and workplace safety
Mining and workplace safetyMining and workplace safety
Mining and workplace safetypartha sharma
 
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...partha sharma
 
Coastal Erosion And Its Control
Coastal Erosion And Its ControlCoastal Erosion And Its Control
Coastal Erosion And Its Controlpartha sharma
 
Rain Water Harvesting And Artificial Recharge Of Groundwater
Rain Water Harvesting And Artificial Recharge Of GroundwaterRain Water Harvesting And Artificial Recharge Of Groundwater
Rain Water Harvesting And Artificial Recharge Of Groundwaterpartha sharma
 
Water Pollution and Its Solution
Water Pollution and Its SolutionWater Pollution and Its Solution
Water Pollution and Its Solutionpartha sharma
 
Environmental Literacy for Administrators and Educators - Environmental Issues
Environmental Literacy for Administrators and Educators - Environmental IssuesEnvironmental Literacy for Administrators and Educators - Environmental Issues
Environmental Literacy for Administrators and Educators - Environmental Issuespartha sharma
 
Mining Practices With Objective Of Sustainability
Mining Practices With Objective Of SustainabilityMining Practices With Objective Of Sustainability
Mining Practices With Objective Of Sustainabilitypartha sharma
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 

More from partha sharma (10)

Drop raising in underground mines
Drop raising in underground minesDrop raising in underground mines
Drop raising in underground mines
 
Mining and workplace safety
Mining and workplace safetyMining and workplace safety
Mining and workplace safety
 
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...
ANFO, Emulsion and Heavy ANFO blends - Useful explosive and blasting agent fo...
 
Coastal Erosion And Its Control
Coastal Erosion And Its ControlCoastal Erosion And Its Control
Coastal Erosion And Its Control
 
Water Pictures
Water PicturesWater Pictures
Water Pictures
 
Rain Water Harvesting And Artificial Recharge Of Groundwater
Rain Water Harvesting And Artificial Recharge Of GroundwaterRain Water Harvesting And Artificial Recharge Of Groundwater
Rain Water Harvesting And Artificial Recharge Of Groundwater
 
Water Pollution and Its Solution
Water Pollution and Its SolutionWater Pollution and Its Solution
Water Pollution and Its Solution
 
Environmental Literacy for Administrators and Educators - Environmental Issues
Environmental Literacy for Administrators and Educators - Environmental IssuesEnvironmental Literacy for Administrators and Educators - Environmental Issues
Environmental Literacy for Administrators and Educators - Environmental Issues
 
Mining Practices With Objective Of Sustainability
Mining Practices With Objective Of SustainabilityMining Practices With Objective Of Sustainability
Mining Practices With Objective Of Sustainability
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 

Recently uploaded

Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 

Recently uploaded (20)

Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 

Techniques of Controlled Blasting

  • 1. TECHNIQUES OF CONTROLLED BLASTING TO IMPROVE OVERALL ENVIRONMENTAL & SAFETY STANDARD *** MEANS TO MITIGATE ADVERSE IMPACT OF BLASTING IN OPEN PITS, QUARRIES, TUNNELS, UG METAL MINES AND CONSTRUCTION WORKINGS Partha Das Sharma (sharmapd1@gmail.com), website: http://miningandblasting.wordpress.com/
  • 2. In both the mining and construction industries, blasting is the predominant method for fragmentation of consolidated mineral deposits and rocks. The public relation problems of users of explosives have increased greatly in the past few years as explosives are being consumed in increasing quantities. Increased population and spread of urbanization near to the construction & mining sites have affected more people by blasting. 2
  • 3. Controlled blasting methods are used to control adverse impacts such as: Over-break Reduce ground vibrations Reduce fractures within remaining rock walls Reduce noise Reduce dilution / waste of ore etc. 3
  • 4. Following are the techniques of controlled blasting: Line drilling, Trim (Cushion) blasting, Smooth (contour or perimeter) blasting, Pre-splitting, Selecting and employing various parameters of blast design, using modern technology, Precise and accurate timing delays, Muffle blasting at critical and congested areas. 4
  • 5. Line drilling: This system involves a single row of closely spaced uncharged holes along the neat excavation line. This provides a plane of weakness to which the primary blast can break. It also causes some of the shock waves generated by the blast to be reflected, which reduces shattering and stressing in the finished wall of the host rock. Line drill holes are generally percussive hammer holes having spaced two to four times the hole diameter, drilled along the excavation line. The blast holes directly adjacent to the line drill holes (buffer holes) are generally loaded lighter (about 50% of primary holes) and are closely spaced (about 50 to 75 %) than primary holes. This technique gives maximum protection to the host rock to preserve its original strength. The disadvantage of this system is high drilling cost due to closed spacing and results are often unsatisfactory because of poor hole alignment. 5
  • 6. Trim (Cushion) blasting : Like line drilling trim or cushion blasting involves a single row of holes along the specified final excavation line. This technique generally uses 2 to 4 inch diameter holes. Holes are loaded with light charge, well-distributed, completely stemmed and fired after the main excavation is removed. By firing the trim holes with minimum or no delay between holes, the detonation tend to shear the rock web between holes and give a smooth wall with minimum over-break. It is better to put trim holes just before removing the final berm. As compare to line drilling technique trim or cushion blasting is simpler and economical as increased hole spacing are used. 6
  • 7. Smooth (contour or perimeter) blasting: A technique used mostly in underground blasting, closely spaced drill holes are loaded with decoupled charges and fired simultaneously to produce an excavation contour without fracturing or damaging the rock behind or adjacent to the blasted face. For promoting safety and economy in underground workings, performance of blasting in headings, drivages, tunnels and stopes becomes very important factor. An ideal blast results in a minimum of damage to the host rock with minimum of over-break. Perimeter or contour holes are drilled along specified final excavation limits and are lightly loaded than that of buffer holes and production holes. The spacing is kept closer than buffer holes and production holes. As a thumb rule 10 to 12 times hole diameter in medium to tough rock and 5 to 6 times hole diameter in poor, fragmented rock are kept as spacing. 7
  • 8. Example: Blast damage and overbreak in Tunneling Results of Controlled Blast: Smooth walls, Minimal fractures, Minimal overbreak, 8 Less support required, Better economy & safety.
  • 9. Charging for Smooth (contour or perimeter) blasting in Tunneling: 9
  • 10. Pre-splitting: Pre-splitting is the smooth blasting method in which cracks for the final contour are created by blasting prior to the drilling of the rest of the holes for the blast pattern. This is an effective way of restricting back-break and ground vibration in large open pit, quarry blasting. Pre-splitting helps in isolating blasting area from remaining rock mass by creating an artificial discontinuity along the final designed excavation line / plane against which subsequent main blast breaks. A row of holes are drilled at the periphery (three sides) of the main blasting block at a closer spacing, charged with lesser quantity of explosives than the production blast and blasted prior to the main blast in an effort to create a fractured line and a reflective plane at the excavation limit or plane. Some of the shock waves from subsequent main blast are reflected at the pre-split plane which results in arresting a considerable portion of blast induced ground vibration generated in the main blast to propagate. 10
  • 12. CHARGING OF PRE-SPLIT AND PRODUCTION HOLES12
  • 13. Muffle blasting: Fly-rock is another important adverse impact of blasting operations, specially, when conducted in the vicinity of dense human habitation / congested areas. Muffling or covering of blast holes properly before blasting, is the common solution to prevent fly-rock from damaging human habitants and structures. Generally, mat or mesh (40 mm x 40 mm size) made of preferably of locally available steel ropes (5 to 6 mm) are used for muffling purpose. Sand bags weighing 40 to 50 kg are kept over the mesh at an interval of 3 m. Efficiency of arresting of fly-rock depends mainly on the quality of muffling system implemented. 13
  • 14. Using millisecond delay sequence and use of in-hole delays in decks: Delay blasting (with millisecond delays) permits to divide the shot into smaller charges, which are detonated in a predetermined millisecond sequence at specific time intervals. Millisecond delay initiation of the explosive charge is a technique used in most open pit, quarry, tunnel and underground rock blasting operations. It serves to enhance fragmentation and direct rock movement for increasing productivity. The major advantages of delay blasting are: (i) Improved fragmentation, (ii) Reduction of ground vibrations and air blast, (iii) Reduction of over-break and fly-rock, (iv) Improved productivity and lower cost. Charge weight per delay is the most important parameter for controlling blast induced ground vibration and air-blast. 14
  • 15. In-hole Delay blasting in Open-pits for reduction of Ground Vibration: 15
  • 16. Surface connection of In-hole Delay blasting in Open-pits: 16
  • 17. Blasting Ring with deck & In-hole delays in UG metal mines: 17
  • 18. ‘Signature-Hole’ Blast Analysis for Vibration Control by using Accurate Delay Timing Electronic Detonator System: Structural response to blast-induced ground vibration is a phenomenon that has been analyzed for many years. Residential structure’s level of response to blast induced ground vibration is dependent on both the peak particle velocity and the frequency of the waveform. Researchers have shown that, above ground structures resonate whenever they are excited by a vibration containing adequate energy matching the fundamental frequency of the structure. The value of this frequency is mainly dependent upon the mass, height and stiffness of the structure. The maximum response of a house to blast induced ground vibration occurs whenever the frequency of the ground vibration matches the natural resonant frequency of the house. When little or no energy at the resonant frequency of the structure, the structural response to the vibration will be negligible. 18
  • 19. A method of controlling blast vibrations other than by modifying the scaled distance came into use some time ago. The crucial point of the methodology is the use of a pilot-blast signal which takes account of the seismic properties of all complex geology between the blast and the target locations. Therefore, it does not require any geological model or assumption. The delay interval between blast-holes can be chosen to control and minimize the vibration energy within the structural response band of most houses. Studies had indicated that blast vibration could be simulated by detonating a “Signature Hole” with the vibration monitored at critical locations, and then using a computer to superpose the waveforms with varying delays. By choosing delay times (∆t) that create ‘destructive interference’ at frequencies that are favored by the local geology, the “ringing” vibration that excites structural elements in structures, houses and annoys neighbors could be reduced. 19
  • 20. 20
  • 21. In this method, accurate delay times are crucial to effective vibration control, scatter in the firing times limited the method severely. Electronic detonators have scatter less than a millisecond. In light of all these, researchers have started finding both limitations and new potential of this new technique of controlling blast vibration. 21
  • 22. In other words, “Signature Hole Analysis” is a modeling technique, to help control adverse effects of blast induced vibrations. The process involves controlling the frequency content by adjusting delay times within a blast containing several explosive charges. The risk to adjacent structures is thereby mitigated. Thus, with the growing adoption rate of electronic initiation systems as a tool to control nuisance of vibrations, the modeling techniques are becoming more popular. M/s Instantel has recently developed and launched a ‘Signature Hole Analysis’ software tool, which allows users to simulate a large number of charge delay times very quickly. The software, in fact, is a modeling technique used to help predict and control blast induced vibrations. 22
  • 23. Advantages of the technique, ‘Signature Hole Blast Analysis’, for Vibration Control: This technique provides optimum electronic timing while maintaining high level of production with efficiency by raising quantity of explosives per delay (kg/delay) and provide overall structural safety of blast surroundings. Blast with shorted duration results in mitigating effects of blast induced vibration. Therefore, as post-blast vibrations are reduced by raising frequencies, much larger blasts can be undertaken with better operational performance, without compromising stringent safety standards of environment. Thus, Signature Hole Analysis software tool available can be used to help optimize and improve overall operational efficiency. It has also been observed that this vibration control method is feasible for underground mining ring blasts as well. 23
  • 24. By adopting these precautions The ground vibration is restricted to ease the public relation problem, The mines’ / construction’s techno- economics are improved, Preservation of host rock strength and safety standard are improved to a considerable level 24
  • 25. As far as possible modern techniques and equipments are also to be used in order to mitigate the adverse blast effects Regular monitoring is needed Training to the blasting supervisors on controlled blasting techniques is very much essential. 25
  • 26. THANK YOU 26