Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Watertaxi-3rd project presentation-BUET
1. BANGLADESH UNIVERSITY OF ENGINEERING & TECHNOLOGY NAME 338 SHIP DESIGN PROJECT & PRESENTATION-3 DATE-18 ,April,2011
2. DESIGN OF A WATER TAXI FOR 100 PASSENGERS in SADARGHAT-ASHULIA ROUTE Project Supervisor KhabirulHaqueChowdhury Professor Department of Naval Architecture & Marine Engineering,BUET Presented By- Hasib-Ul-Haque (0712014) Ahmad ShibliSaleheen (0712018)
3. OBJECTIVES To use the circular water ways around Dhaka city To ease the water way communication with comfortable service To reduce the pressure on land transport. To safe people from horrible traffic jam.
4. PRINCIPAL PARTICULARS LENGTH: OVERALL : 24.90 meter Load water line : 24.122 meter L.B.P : 22.95 meter BREADTH: MAXIMUM : 6.5 meter MOULDED : 6.3 meter DEPTH(MLD) : 2.0 meter DRAFT(MLD) : 1.1 meter
5. PRESENTATION TOPICS 1.Rudder design. 2.Engine selection and foundation. 3.GA and Lines plan update 4.Weight calculation update 5.Hydrostatic calculation update 6. Trim and Stability update
20. Why we select Yanmar type 4JH4-HTE?? The Yanmar type 4JH4-HTE Engine is designed for high performance. The innovative fuel injection technology enables an excellent torque and speed range. Service Life-this engine is manufactured using high alloy materials to provide enduring longevity for all running components. Comfort-The patented 2-stage UNIT Injector fuel injection technology provides for a worldwide approped and smooth operation noise Exhaust Emissions-The trend-setting UNIT INJECTOR system enables us already today to conform with the valid emission regulations. Transmission-this engine allow the installation with different driving system in our boat.
21. Power Yanmar type 4JH4-HTE Steyr Motor Engines-M0114K33
33. MODIFICATION OF GENERAL ARRANGEMENT 1.Canteen facility has been cancelled 2.Number of Bulkhead is reduced 4.Seating arrangement has been renovated and updated 5.Change in Cabin type,size and position
37. DEADWEIGHT CALCULATION No of person on board: No of passenger = 100 No of crew = 6 Total = 106 Weight allowance per person: Weight per person = 75 kg Luggage per person = 5 kg Total = 80 kg Total weight for persons = 80× 106 = 8.48 tons
48. So,the total lightweight of the vessel is = (9.47+47.93) tons = 57.4 tons Therefore, the displacement of the vessel= Lightweight+Deadweight = 57.4 + 17.48 = 74.88 tons Which was previously 123.48 tons
73. Draft = 1.1 m[The value of LCB,MCT1m,C.F. are taken from the Hydrostatic Calculations earlier in the design procedure]
74. TRIM UPDATE Now, Amount of Trim={(0.93-0.72)*74.68}/141.16 = 0.1111 m by stern So, Change in Trim aft= 0.05 m Change in Trim Forward= 0.061 m Therefore, resulting Draft Forward= 1.1-0.061 = 1.039 m Draft Aft= 1.1+0.05 = 1.15 m