Enviar búsqueda
Cargar
Siemens - Power Generation Power Plants
•
Descargar como PPT, PDF
•
54 recomendaciones
•
16,165 vistas
Siemens
Seguir
Siemens Power Generation Power Plants
Leer menos
Leer más
Tecnología
Empresariales
Denunciar
Compartir
Denunciar
Compartir
1 de 25
Descargar ahora
Recomendados
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
AmericanMillwright
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Shaun West
236407565 gas-turbine-notes
236407565 gas-turbine-notes
manojg1990
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
Manohar Tatwawadi
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln system
Faisal Nadeem
Basic ccpp overview Power plant
Basic ccpp overview Power plant
MARLON RAMIREZ
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
SreekanthMylavarapu1
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power Plant
S.Vijaya Bhaskar
Recomendados
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
AmericanMillwright
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Shaun West
236407565 gas-turbine-notes
236407565 gas-turbine-notes
manojg1990
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
Manohar Tatwawadi
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln system
Faisal Nadeem
Basic ccpp overview Power plant
Basic ccpp overview Power plant
MARLON RAMIREZ
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
SreekanthMylavarapu1
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power Plant
S.Vijaya Bhaskar
Closed feed water heaters :)
Closed feed water heaters :)
JhePoi Santos
Coal and Ash Handling Power Plant Engineering
Coal and Ash Handling Power Plant Engineering
Ajaypalsinh Barad
FAQ on Turbines Part 2
FAQ on Turbines Part 2
Manohar Tatwawadi
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
Manohar Tatwawadi
Hrsg book
Hrsg book
Habudin Hassan
Steam Turbines
Steam Turbines
Amir Ayad
Flarenet
Flarenet
Gautham Sankaraselvam
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
Manohar Tatwawadi
Gas turbine
Gas turbine
Manu Khurana
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
Abdelrhman Uossef
boiler turbine emergency
boiler turbine emergency
mitravanu mishra
Air draft system
Air draft system
shubhanshu47
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
Manohar Tatwawadi
steam turbine.pptx
steam turbine.pptx
poonamChaudhary60
Fans in thermal power plants
Fans in thermal power plants
SHIVAJI CHOUDHURY
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
Ashvani Shukla
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
Manohar Tatwawadi
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
Vudugundla Kodandapani
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater Company
Tanveer Singh
Level of measurement by slsmls
Level of measurement by slsmls
Ravi Kumudesh
Industrial Level Instrument Selection Guide
Industrial Level Instrument Selection Guide
Ives Equipment
Más contenido relacionado
La actualidad más candente
Closed feed water heaters :)
Closed feed water heaters :)
JhePoi Santos
Coal and Ash Handling Power Plant Engineering
Coal and Ash Handling Power Plant Engineering
Ajaypalsinh Barad
FAQ on Turbines Part 2
FAQ on Turbines Part 2
Manohar Tatwawadi
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
Manohar Tatwawadi
Hrsg book
Hrsg book
Habudin Hassan
Steam Turbines
Steam Turbines
Amir Ayad
Flarenet
Flarenet
Gautham Sankaraselvam
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
Manohar Tatwawadi
Gas turbine
Gas turbine
Manu Khurana
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
Abdelrhman Uossef
boiler turbine emergency
boiler turbine emergency
mitravanu mishra
Air draft system
Air draft system
shubhanshu47
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
Manohar Tatwawadi
steam turbine.pptx
steam turbine.pptx
poonamChaudhary60
Fans in thermal power plants
Fans in thermal power plants
SHIVAJI CHOUDHURY
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
Ashvani Shukla
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
Manohar Tatwawadi
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
Vudugundla Kodandapani
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater Company
Tanveer Singh
La actualidad más candente
(20)
Closed feed water heaters :)
Closed feed water heaters :)
Coal and Ash Handling Power Plant Engineering
Coal and Ash Handling Power Plant Engineering
FAQ on Turbines Part 2
FAQ on Turbines Part 2
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
Hrsg book
Hrsg book
Steam Turbines
Steam Turbines
Flarenet
Flarenet
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
Gas turbine
Gas turbine
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
GAS TURBINES IN SIMPLE CYCLE & COMBINED CYCLE APPLICATIONS
boiler turbine emergency
boiler turbine emergency
Air draft system
Air draft system
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
steam turbine.pptx
steam turbine.pptx
Fans in thermal power plants
Fans in thermal power plants
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater Company
Destacado
Level of measurement by slsmls
Level of measurement by slsmls
Ravi Kumudesh
Industrial Level Instrument Selection Guide
Industrial Level Instrument Selection Guide
Ives Equipment
Exploring thousands of configurations: Find the best design out of infinite v...
Exploring thousands of configurations: Find the best design out of infinite v...
Siemens PLM Software
Radar vs ultrasonic level calibration points
Radar vs ultrasonic level calibration points
Vohinh Ngo
Siemens PPT (97 2003)
Siemens PPT (97 2003)
sethuraman_arvind
Level measurement
Level measurement
gujjubharat
Destacado
(6)
Level of measurement by slsmls
Level of measurement by slsmls
Industrial Level Instrument Selection Guide
Industrial Level Instrument Selection Guide
Exploring thousands of configurations: Find the best design out of infinite v...
Exploring thousands of configurations: Find the best design out of infinite v...
Radar vs ultrasonic level calibration points
Radar vs ultrasonic level calibration points
Siemens PPT (97 2003)
Siemens PPT (97 2003)
Level measurement
Level measurement
Similar a Siemens - Power Generation Power Plants
Voith_Small_Hydro(2)
Voith_Small_Hydro(2)
Mario Alberto Carbajal Mercado
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
Power System Operation
Qsk95 genset overview
Qsk95 genset overview
Barış Çoban
Steam turbines solutions
Steam turbines solutions
Farid Nazri
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
Raja Ratnam
AMSC D-SVC™ Product Catalog
AMSC D-SVC™ Product Catalog
Paul Chang
Small hydro solutions
Small hydro solutions
Schneider Electric
30rap 3pdchillers
30rap 3pdchillers
Jorge Castañeda
DC Drive Selection Guide
DC Drive Selection Guide
KB Electronics, Inc
CustomDrives
CustomDrives
Tyce Shelburn
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft Starter
Paul Plavicheanu
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
CatalinGabrielDincan
Power factor corrector
Power factor corrector
JoeChueng
OPAL-RT & Hydro-Quebec - HYPERSIM
OPAL-RT & Hydro-Quebec - HYPERSIM
OPAL-RT TECHNOLOGIES
Tolomatic icm smart actuator motor brochure
Tolomatic icm smart actuator motor brochure
Electromate
Fairchild solving design problems in motion control
Fairchild solving design problems in motion control
Fairchild Semiconductor
Catalog vacon
Catalog vacon
Елгруп Плевен
Cm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalog
Roberto Ortega
Energy Initiative
Energy Initiative
TinaAllen
Nidec asi electric power solutions for pipeline applications
Nidec asi electric power solutions for pipeline applications
Nidec Corporation
Similar a Siemens - Power Generation Power Plants
(20)
Voith_Small_Hydro(2)
Voith_Small_Hydro(2)
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
Qsk95 genset overview
Qsk95 genset overview
Steam turbines solutions
Steam turbines solutions
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
AMSC D-SVC™ Product Catalog
AMSC D-SVC™ Product Catalog
Small hydro solutions
Small hydro solutions
30rap 3pdchillers
30rap 3pdchillers
DC Drive Selection Guide
DC Drive Selection Guide
CustomDrives
CustomDrives
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft Starter
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
Power factor corrector
Power factor corrector
OPAL-RT & Hydro-Quebec - HYPERSIM
OPAL-RT & Hydro-Quebec - HYPERSIM
Tolomatic icm smart actuator motor brochure
Tolomatic icm smart actuator motor brochure
Fairchild solving design problems in motion control
Fairchild solving design problems in motion control
Catalog vacon
Catalog vacon
Cm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalog
Energy Initiative
Energy Initiative
Nidec asi electric power solutions for pipeline applications
Nidec asi electric power solutions for pipeline applications
Último
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
sudhanshuwaghmare1
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
The Digital Insurer
🐬 The future of MySQL is Postgres 🐘
🐬 The future of MySQL is Postgres 🐘
RTylerCroy
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Drew Madelung
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
Principled Technologies
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc
How to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
naman860154
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
Michael W. Hawkins
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
ThousandEyes
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
wesley chun
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
Pixlogix Infotech
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Neo4j
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
Delhi Call girls
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Katpro Technologies
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
Puma Security, LLC
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
Malak Abu Hammad
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
hans926745
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
Maria Levchenko
Último
(20)
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
🐬 The future of MySQL is Postgres 🐘
🐬 The future of MySQL is Postgres 🐘
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
How to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
Siemens - Power Generation Power Plants
1.
Combined Cycle Power
Plants back © Siemens AG 2009 Energy Sector
2.
Combined Cycle Power
Plants Combined Cycle Power Plants Key factors for competitiveness Comprehensive solutions 50 Hz Operating costs Plant performance Financials - SCC5-4000F 1S - SCC5-4000F 1S Electricity price Power output Investment volume (SST5-5000) Fuel price Efficiency Payment schedule - SCC5-4000F 2x1 Personnel costs Availability Project lead time 60 Hz Consumables Load regime Debt / equity ratio - SCC6-5000F 2x1 Flex-Plant™30 Insurance Interest rate - SCC6-5000F 1x1 Maintenance Taxes Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable 50 Hz Our goal is to optimize key factors that are within our sphere of influence - 60 Hz Standardization addresses all of these ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 2 Energy Sector © Siemens AG 2009
3.
Combined Cycle Power
Plants Combined Cycle Power Plants The reference power plant – Solving your power puzzle with Comprehensive solutions proven modular base design and options to meet your needs 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Modular base design (SST5-5000) - SCC5-4000F 2x1 HRSG type, 60 Hz e.g. BENSON - SCC6-5000F 2x1 or Drum Flex-Plant™30 Customer- The Siemens reference power plant - SCC6-5000F 1x1 Back-up Service Flex-Plant™30 specific options concept is an innovative synthesis of fuel packages (examples) standardization and flexibility. The - SCC6-5000F 1x1 Flex-Plant™10 Base combination of a pre-engineered design design with modular add-ons provides Fast start-up development the ideal basis for a successful project. Water Site-specific This approach helps to keep life-cycle Cooling Proven and reliable treatment options 50 Hz variants systems costs low while providing the flexibility (examples) 60 Hz to meet individual plant needs. Grid ■ Steam Power Plants connection ■ References 50 Hz ■ References 60 Hz Slide 3 Energy Sector © Siemens AG 2009
4.
Combined Cycle Power
Plants Combined Cycle Power Plants Advantages of reference power plant Comprehensive solutions 50 Hz - SCC5-4000F 1S Advantages of an integrated reference power plant program - SCC5-4000F 1S (SST5-5000) Lead time reduction - SCC5-4000F 2x1 60 Hz Availability and plant efficiency increase - SCC6-5000F 2x1 Flex-Plant™30 High operational flexibility - SCC6-5000F 1x1 Flex-Plant™30 Optimized operations and service effort - SCC6-5000F 1x1 Flex-Plant™10 Detailed information to support project conceptual / Fast start-up development permitting phase Proven and reliable 50 Hz Standardized components 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 4 Energy Sector © Siemens AG 2009
5.
Combined Cycle Power
Plants Combined Cycle Power Plants Lead time reduction Comprehensive solutions 50 Hz - SCC5-4000F 1S Reference power plant designs facilitate implementation due to: - SCC5-4000F 1S (SST5-5000) Pre-configured modular components - SCC5-4000F 2x1 60 Hz Schedule-driven project planning and - SCC6-5000F 2x1 Flex-Plant™30 management - SCC6-5000F 1x1 Flex-Plant™30 The use of experienced proven suppliers - SCC6-5000F 1x1 and equipment Flex-Plant™10 Fast start-up Highly trained personnel development Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 5 Energy Sector © Siemens AG 2009
6.
Combined Cycle Power
Plants Combined Cycle Power Plants Reference power plant program scope Comprehensive solutions optimization – Single Shaft 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S (SST5-5000) SCC Power Train SCC Power Island SCC Power Block SCC Turnkey - SCC5-4000F 2x1 § SGT-PAC § SCC Power Train §SCC Power Island §SCC Power Block • SST-PAC w/o § HRSG • Detailed design of Turbine building, • Additional fuel supply systems 60 Hz condenser § Condenser incl. air removal foundation and structures and cooling systems - SCC6-5000F 2x1 • Steam turbine • HVAC inside Power Block area • Water treatment system Flex-Plant™30 incl. auxiliaries • Cranes inside turbine building • Raw water system w/o piping § Boiler feed pumps • Water/ Steam cycle • Waste water system - SCC6-5000F 1x1 • Generator incl. § Condensate pumps • Cooling water system with wet • Tanks Flex-Plant™30 auxiliaries § Critical valves cooling tower and circulating water • Additional pumps - buildings/structures • SSS Clutch § Fuel pre-heater with filter, - cranes/hoists - SCC6-5000F 1x1 • Service- and closed cooling water • ST electrical and metering station etc. system Flex-Plant™10 • Electrical equipment - fire protection/fighting I&C § Power Island controls - plant piping/ Fast start-up • Power Block controls • Options § Options valves - electrical • Fire Fighting inside Power Block plant development • Options • Erection/Commissioning • Further options Proven and reliable 50 Hz Power Train equipment System integration / Replication of standardized Total EPC plant wrap 60 Hz performance / delivery Optimized operability components ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Modularization with options for flexibility standardization to reduce risk and project schedule Slide 6 Energy Sector © Siemens AG 2009
7.
Combined Cycle Power
Plants Combined Cycle Power Plants Reference power plant program scope Comprehensive solutions optimization – Multi Shaft 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S SCC SCC (SST5-5000) SCC Power Island SCC Turnkey SGT PAC Thermal Equipment - SCC5-4000F 2x1 • Gas turbines for fuel gas § SGT-PAC § SCC Thermal Equipment §SCC Power Island incl. auxiliaries 60 Hz • Air intake / exhaust • SST-PAC w/o condenser § Condenser incl. air removal • Buildings/structures system • Steam turbine incl. system • Cranes and HVAC (Turbine hall) - SCC6-5000F 2x1 • Plant Cooling systems • Fuel gas system auxiliaries w/o piping § Boiler feed pumps Flex-Plant™30 • Water treatment - skids • Generator incl. § Condensate pumps • Raw water system - SCC6-5000F 1x1 - connecting pipes auxiliaries § Critical valves • Waste water system Flex-Plant™30 • Gas turbine generators • ST electrical and I&C • Tanks incl. auxiliaries § Fuel pre-heater with filter, • § HRSG Plant piping/valves - SCC6-5000F 1x1 • Fire protection GT metering station etc. • Electrical equipment § Options Flex-Plant™10 • GT electrical and I&C § Power Island controls • Plant control system • Options § Options • Additional fire protection/fighting Fast start-up • Erection/Commissioning • Further Options development Proven and reliable 50 Hz Performance/Delivery Cycle optimization / System integration / Total EPC plant wrap 60 Hz Performance wrap Optimized operability ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Modularization with options for flexibility Standardization to enhance implementation of project schedule Slide 7 Energy Sector © Siemens AG 2009
8.
Combined Cycle Power
Plants Combined Cycle Power Plants Reference power plants – Combined cycle plant portfolio Comprehensive solutions 50 Hz - SCC5-4000F 1S Single Shaft - SCC5-4000F 1S 50 Hz: SCC5-1000F 1S (SST5-5000) SCC5-4000F 1S - SCC5-4000F 2x1 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Multi Shaft Proven and reliable 50 Hz: SCC5-4000F 2x1 50 Hz 60 Hz 60 Hz: SCC6-5000F 1x1 Flex-Plant™10 SCC6-5000F 1x1 Flex-Plant™30 ■ Steam Power Plants SCC6-5000F 2x1 Flex-Plant™30 ■ References 50 Hz ■ References 60 Hz Slide 8 Energy Sector © Siemens AG 2009
9.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC5-4000F 1S (SST5-3000) for warm climate conditions Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-3000 Power: 416 MW 15°C (59°F), 1013 mbar, - SCC5-4000F 2x1 60% humidity Generator: SGen5-2000H Efficiency: 58.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 50 mbar (1.5” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal type Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1022°F, 72.5 psi/455°F Proven and reliable Cold end: Cooling tower, induced draft, 8 cells 50 Hz 60 Hz (ACC and once-through cooling options) Fuel system: Natural gas with preheating/fuel oil backup (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 2x 100% Circulating water: 2x 50% ■ References 60 Hz Feedwater: 2x 100% Closed cooling water: 2x 100% Service cooling water: 1x 100% Slide 9 Energy Sector © Siemens AG 2009
10.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC5-4000F 1S (SST5-5000) for cold climate conditions Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F Design ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-5000 Power: 427 MW 416 MW 10°C (50°F), 1013 mbar, - SCC5-4000F 2x1 77% humidity Efficiency: 58.7 % 58.2% 60 Hz Generator: SGen5-2000H Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 25 mbar (0.7” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F Proven and reliable Cold end: Once-through cooling 50 Hz 60 Hz Fuel system: Natural gas with preheating/fuel oil backup (option) Pump redundancies: ■ Steam Power Plants Condensate: 2x 100% or 1x 100% Circulating water: 2x 50% ■ References 50 Hz Feedwater: 2x 100% or 1x 100% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water: 1x 100% Slide 10 Energy Sector © Siemens AG 2009
11.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC5-4000F 2x1 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-5000 Power: 832 MW 32°C (90°F), 1013 mbar, - SCC5-4000F 2x1 80% humidity Generator: SGen5-1000A Efficiency: 58.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 100 mbar (3.0” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F Proven and reliable Cold end: Cooling tower, induced draft 50 Hz 60 Hz (ACC and once-through cooling options) Fuel system: Natural gas with preheating/fuel oil backup (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 3x 50% or 2x 50%Circulating water: 2x 50% ■ References 60 Hz Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100% Service cooling water:1x 100% Slide 11 Energy Sector © Siemens AG 2009
12.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC6-5000F 2x1 Flex-Plant™30 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F ISO Ambient conditions: (SST5-5000) 59 °F (15°C), 1013 mbar, Steam turbine: SST-5000 Power: 590 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 57.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 1.5” HgA (50 mbar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F 128 bar/565°C, 26 bar/565°C, 3.8 bar/282°C Proven and reliable Cold end: Cooling tower, induced draft 50 Hz 60 Hz Fuel system: Natural gas with preheating/fuel oil backup (option) Pump redundancies: ■ Steam Power Plants Condensate: 3x 50% or 2x 50%Circulating water: 2x 50% ■ References 50 Hz Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water:2x 100% Condenser: Wet surface/2-pass/nondivided water box Slide 12 Energy Sector © Siemens AG 2009
13.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™30 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F ISO Ambient conditions: (SST5-5000) 85 °F (29°C), 1013 mbar, Steam turbine: SST-900 Power: 295 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 57% 60 Hz Condenser pressure: - SCC6-5000F 2x1 30.5” HgA (1.034 bar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up Steam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F development 128 bar/565°C, 26 bar/565°C, 3.8 bar/282°C Proven and reliable Cold end: Cooling tower, induced draft 50 Hz Fuel system: Natural gas / fuel oil backup 60 Hz (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 1x 100% or 2x 100% Circulating water: 2x 50% Feedwater: 1x 100% or 2x 100% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water: 2x 100% Condenser: Wet surface/2-pass/nondivided water box Slide 13 Energy Sector © Siemens AG 2009
14.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™10 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F 85°F Ambient conditions: (SST5-5000) 1013 mbar, Steam turbine: SST-800 Power: 250 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 48% 60 Hz Condenser pressure: - SCC6-5000F 2x1 30.5” HgA (1.034 bar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 1P, non-reheat, horizontal arrangement Fast start-up development Steam parameters: 1450 psi / 930°F (100 bar / 500°C) Cold end: Fin-fan condenser Proven and reliable 50 Hz Fuel system: Natural gas / fuel oil backup 60 Hz (option) Pump redundancies: ■ Steam Power Plants Condensate: 1x 100% or 2x 100% ■ References 50 Hz Feedwater: 1x 100% or 2x 100% ■ References 60 Hz SCR: Conventional SCR Slide 14 Energy Sector © Siemens AG 2009
15.
Combined Cycle Power
Plants Combined Cycle Power Plants Economic benefits for fast start-up plants Comprehensive solutions 50 Hz - SCC5-4000F 1S Operating benefits Ancillary services Market environment - SCC5-4000F 1S Fuel savings Capacity payments Uncertain Markets (SST5-5000) - SCC5-4000F 2x1 Higher efficiency KWh price for Seasonal electricity 60 Hz ancillary Energy demand Less emissions - SCC6-5000F 2x1 Spinning reserve Developing wind Flex-Plant™30 Flexible operation credits energy - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Additional earnings Higher profit through Fast start-up Fast start-up Lower start-up costs through new products usage of high price development development in liberalized markets markets Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz Fast start-up capability enhances your plant profitability ■ References 60 Hz Slide 15 Energy Sector © Siemens AG 2009
16.
Combined Cycle Power
Plants Combined Cycle Power Plants Reference power plants with fast-start technology Comprehensive solutions 50 Hz - SCC5-4000F 1S Plant start-up time reduction development - SCC5-4000F 1S Challenges: (SST5-5000) - SCC5-4000F 2x1 HRSG pressure ramp rate capability 60 Hz Steam turbine ramp rate capability - SCC6-5000F 2x1 Piping warm up time Flex-Plant™30 Steam Chemistry - SCC6-5000F 1x1 Flex-Plant™30 Steam turbine back pressure limitations - SCC6-5000F 1x1 Flex-Plant™10 Findings: Fast start-up Fast start-up Plants designed for exclusive base load development development operation had excessive start times due Proven and reliable to equipment restrictions 100 90 50 Hz 60 Hz Solutions: 80 70 Develop integrated plant technology to 60 ■ Steam Power Plants increase operating flexibility and fast-start 50 ■ References 50 Hz capability 40 ■ References 60 Hz 30 20 10 Slide 16 Energy Sector © Siemens AG 2009
17.
Combined Cycle Power
Plants Combined Cycle Power Plants Integrated plant technology for fast-start capabilities Comprehensive solutions 50 Hz - SCC5-4000F 1S BENSON once High-capacity ST stress - SCC5-4000F 1S through in HP section Desuperheater controller (SST5-5000) - SCC5-4000F 2x1 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Optimize GT Funnel load ramp - SCC6-5000F 1x1 Flex-Plant™10 Damper Fast start-up Fast start-up development development Proven and reliable 50 Hz 60 Hz Automated ■ Steam Power Plants Auxiliary Boiler drains and vents Condensate ■ References 50 Hz polishing ■ References 60 Hz plant An integration of proven technologies Slide 17 Energy Sector © Siemens AG 2009
18.
Combined Cycle Power
Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™10 Comprehensive solutions 50 Hz Benefits Include: - SCC5-4000F 1S - SCC5-4000F 1S (SST5-5000) Integration of proven technology and components - SCC5-4000F 2x1 Application of the high reliability of the SGT6-5000F 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Combined cycle performance for peaking application - SCC6-5000F 1x1 Fast ramp of the gas turbine (150MW in 10 Minutes) Flex-Plant™30 - SCC6-5000F 1x1 Improved start-up efficiency Flex-Plant™10 Fast start-up Fast start-up Very low start-up emissions development development Very low water consumption Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 18 Energy Sector © Siemens AG 2009
19.
Combined Cycle Power
Plants Combined Cycle Power Plants Ribatejo EDP, Portugal Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in spring 2004 (SST5-5000) - SCC5-4000F 2x1 and 2006 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Net output 1,180 MW - SCC6-5000F 1x1 Flex-Plant™30 3x Single Shaft CC 1S.V94.3A - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 19 Energy Sector © Siemens AG 2009
20.
Combined Cycle Power
Plants Combined Cycle Power Plants Panglima Power Sdn, Malaysia Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in spring 2004 (SST5-5000) - SCC5-4000F 2x1 Net output 720 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.V94.3A - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 20 Energy Sector © Siemens AG 2009
21.
Combined Cycle Power
Plants Combined Cycle Power Plants Shuweihat, Abu Dhabi, United Arab Emirates Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in (SST5-5000) summer 2004 - SCC5-4000F 2x1 60 Hz Net output 1,500 MW - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Multi Shaft CC 5.V94.3A + 2 steam turbines Flex-Plant™30 with sea water desalination - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz For more information click here Video Slide 21 Energy Sector © Siemens AG 2009
22.
Combined Cycle Power
Plants Combined Cycle Power Plants Santa Rita 1-4, San Lorenzo 1-2, Philippines Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2000 and 2002 (SST5-5000) - SCC5-4000F 2x1 Net output 1,500 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 6x Single Shaft CC 1S.V84.3A - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz The most fuel flexible plant worldwide. Fuels: Natural Gas, Distillate, Naphtha, Condensate, Mixtures Slide 22 Energy Sector © Siemens AG 2009
23.
Combined Cycle Power
Plants Combined Cycle Power Plants Merida, Mexico Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2000 (SST5-5000) - SCC5-4000F 2x1 Net output 480 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.W501F - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 23 Energy Sector © Siemens AG 2009
24.
Combined Cycle Power
Plants Combined Cycle Power Plants Ironwood, Pennsylvania Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2001 (SST5-5000) - SCC5-4000F 2x1 Net output 700 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.W501G - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 24 Energy Sector © Siemens AG 2009
25.
Combined Cycle Power
Plants Combined Cycle Power Plants Lakeside, Utah Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2007 (SST5-5000) - SCC5-4000F 2x1 Net output 560 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.SCC6-5000F - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 25 Energy Sector © Siemens AG 2009
Descargar ahora