Qwik Ratio Exercise



       ©Marshall Institute, Inc
      1800 Tillery Place, Suite i
        Raleigh, NC 27604
          1-800-637-0120
          1-919-834-3722
      www.marshallinstitute.com
QWIK RATIO EXERCISE
Directions:

Step 1. Gather the Data
        Complete the data table, Page 1 of the exercise.
        Note: If you don’t have the data, provide a “best estimate” number.

Step 2. Calculate the Ratios
        Using the value in the data table (Page 1), calculate the indicated rations in
        each of the 10 boxes on Page 2.
        For example, to calculate the first ratio, Maintenance Cost, % ERV, do the arithmetic
        in the box:
        Line #6 / Line #8
        Score your result on a scale of 1-10 based on the scale shown for each ratio.
                                         <2.5%       3.0%     >3.5%
                               Points       10        5          1

        Note: If you don’t have the data, even an estimate of the data, and can’t do the calculation
        from the data, then at least estimate (or guess) the ratio and score it 1-10 on the scale.
        You now should have a 1-10 score in each of the 10 boxes.

Step 3. Plot the Radar Chart (“spider diagram”)
        Using the radial scale of 1–10 on the radial graph (page 3), plot each of the 10 box scores
        on its corresponding radial line. Connect the points. Color the diagram.

        INTERPRETATION
        This chart has been designed to plot industrial averages at about 5 points, and “world
        class” or “best of class” numbers about 10 on the chart.
        That means that to the degree that you are “world class” you will have lots of area under
        the curve, most ratios close to 10 (say 7 or better).
        To the degree that you have “opportunity” for improvement, your values will be low, and
        not much area under the curve (say 0–3); there will be lots of “white” space on the outside
        of the curve. See the example plot on Page 4.




©Marshall Institute, Inc. r1               1-800-637-0120                                  Instructions
QWIK RATIO CHART DATA ELEMENTS
1.        How many total man-hours did your maintenance operation use (do not count
          contract services or capital projects)? This would be maintenance activities for
                                                                                               effort-hours
          the year to include providing service for facilities, equipment, grounds, etc.
2.        Of the hours listed above in #1, how many man-hours were dedicated to
          Preventive Maintenance activities? PM tasks are planned and scheduled
          activities conducted a certain frequencies designed to prolong equipment life
          and provide early warning of impending problems, such as cleaning, lubricating,      effort-hours
          adjusting, inspecting, and minor repair/replacement. Does not include major
          repairs or “opportunity” repairs.
6.        What were the total maintenance expenditures for your plant (less capital
          projects or other ‘non-maintenance’ related costs)? Include the total costs to
          maintain facilities and equipment (and grounds, if appropriate) to include labor,
          parts, materials, maintenance contractors, etc. Include all maintenance
          expenditures for all maintenance departments at your site.                                      $

8.        At current prices, how much would it cost to replace you entire facility
          (Estimated Replacement Value)? This is the cost of replacing the facility and
                                                                                                          $
          equipment at today’s prices (less real estate).
10.       How many maintenance hourly craftspeople or non exempts, such as
          technicians, electricians, mechanics, pipefitters, and millwrights, did you have
          working full-time at you plant?
14.       How many full-time maintenance planners did you have? Maintenance planners
          plan, prepare and sometimes schedule maintenance activities. Planning includes
          all activities necessary to ensure the proper parts, tools, and other supplies are
          allocated and sequenced for the craftsmen at the start of a job.
15.       How many maintenance support personnel did you have working at your plant?
          Support personnel include planners, supervisors, maintenance engineers,
          maintenance clerical personnel, maintenance managers, maintenance inventory
          control personnel, etc.
17.       What was your overall average maintenance overtime percentage?
                                                                                                   %
18.       Of the total maintenance hours listed in questions #1, above, how many hours
          of work were formally planned and scheduled in advance of the job versus             effort-hours
          emergency, crisis, or unscheduled work in general.
19.       Of the total maintenance hours listed in question #1, above, how many hours
          were ‘captured’ (charged) on a work order.
23.       What was your overall inventory turn rate:? (Overall turn rate is generally
          calculated as total dollars consumed divided by average dollar inventory value, or
          storeroom dollars issued over dollars storeroom value.)
24.       What was your average service level? (Service level is generally defined as the
          percentage of time stocked parts are available when requested. Or, the number
          of issues satisfied divided by the number of issues requested.)                                %
27.       How many total man-hours of formal training did maintenance craftspeople
          receive? (Do not include OJT or other informal forms of training.)
                                                                                               effort-hours

                                ©Marshall Institute, Inc


©Marshall Institute, Inc. r1                  1-800-637-0120                                              1
QWIK RATIOs
    1. Maintenance Cost, % ERV                                                       Line #6 / Line #8
             <2.5%     3.0%    >3.5%
       Points    10               5                 1


    2. Planned Maintenance, %                                                       Line #18 / Line #1
             >90% 90-75% 74-60% 59-40% <40% 0
       Points   10        8                     6               4           2   0


    3. PM Effort Hours, %                                                            Line #2 / Line #1
              >50% 34%                25%           <10%
       Points   10        5           2                 0


    4. Effort Hours Charged to Work Orders, %                                       Line #19 / Line #1
               >90% 89-80% 79-70% 69% 0%
       Points   10        8                     7               5       0


    5. Inventory Turns                                                                   Line #23
              >2.0 1.0                    <.5
       Points   10        5                0


    6. Service Level                                                                     Line #24
              >98%        95%              92%          <92%
       Points   10        5                2                0


    7. Maintenance Overtime, %                                                           Line #17
             <5% 10% 15%                                >15%
       Points        10       5                 2               0


    8. MTCE Planners / MTCE Hourly                                                  Line #14 / Line #10
             1/<25 1/30 1/>35 No Planners
       Points   10            5                2                    0


    9. MTCE Support / MTCE Hourly                                                   Line #15 / Line #10
             1/<3.5 1/4 1/5 1/>10
       Points   10        5                2            0

10. Training Hours / Craftsperson (per yr)                                          Line #27 / Line #10
           >100     50     0
       Points   10        5           0




2                                                           1-800-637-0120          www.marshallinstitute.com
QWIK RATIO CHART
                                                10
                                 TRNG           9         ERV
                                                8
                                                7
                                                6
           SRATIO                               5                      PLAN
                                                4
                                                3
                                                2
                                                1

   PRATIO                                                                   PM




                 OT                                                    WO



                                  SERV                    INV




                       1        ERV       $, % ERV
                       2        PLAN      % PLANNED MAINTENANCE
                       3        PM        % PREVENTIVE MAINTENANCE
                       4        WO        % HRS CHARGED TO WOs
                       5        INV       INVENTORY TURNS
                       6        SERV      INVENTORY SERVICE LEVEL, %
                       7        OT        OVERTIME, %
                       8        PRATIO    PLANNED/HOURLY RATIO
                       9        SRATIO    SUPPORT/HOURLY RATIO
                      10        TRNG      TRAINING HRS/CRAFTSPERSON




©Marshall Institute, Inc. r1             1-800-637-0120                          3
Example Qwik Ratio Plot 




4      1-800-637-0120          www.marshallinstitute.com

Más contenido relacionado

Similar a Qwikratio marshall

Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_indi7257
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingramuaa126
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingyearstart2
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo06
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)eshwaryyyy
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsMohammed Hamed Ahmed Soliman
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelramuaa129
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
Activity based costing
Activity based costingActivity based costing
Activity based costingRahul Kumar
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)ramuaa130
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...ramuaa128
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingramuaa128
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemramuaa130
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsjohann11371
 

Similar a Qwikratio marshall (20)

Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Kpi
KpiKpi
Kpi
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory model
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp system
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 

Qwikratio marshall

  • 1. Qwik Ratio Exercise ©Marshall Institute, Inc 1800 Tillery Place, Suite i Raleigh, NC 27604 1-800-637-0120 1-919-834-3722 www.marshallinstitute.com
  • 2. QWIK RATIO EXERCISE Directions: Step 1. Gather the Data Complete the data table, Page 1 of the exercise. Note: If you don’t have the data, provide a “best estimate” number. Step 2. Calculate the Ratios Using the value in the data table (Page 1), calculate the indicated rations in each of the 10 boxes on Page 2. For example, to calculate the first ratio, Maintenance Cost, % ERV, do the arithmetic in the box: Line #6 / Line #8 Score your result on a scale of 1-10 based on the scale shown for each ratio. <2.5% 3.0% >3.5% Points 10 5 1 Note: If you don’t have the data, even an estimate of the data, and can’t do the calculation from the data, then at least estimate (or guess) the ratio and score it 1-10 on the scale. You now should have a 1-10 score in each of the 10 boxes. Step 3. Plot the Radar Chart (“spider diagram”) Using the radial scale of 1–10 on the radial graph (page 3), plot each of the 10 box scores on its corresponding radial line. Connect the points. Color the diagram. INTERPRETATION This chart has been designed to plot industrial averages at about 5 points, and “world class” or “best of class” numbers about 10 on the chart. That means that to the degree that you are “world class” you will have lots of area under the curve, most ratios close to 10 (say 7 or better). To the degree that you have “opportunity” for improvement, your values will be low, and not much area under the curve (say 0–3); there will be lots of “white” space on the outside of the curve. See the example plot on Page 4. ©Marshall Institute, Inc. r1 1-800-637-0120 Instructions
  • 3. QWIK RATIO CHART DATA ELEMENTS 1. How many total man-hours did your maintenance operation use (do not count contract services or capital projects)? This would be maintenance activities for effort-hours the year to include providing service for facilities, equipment, grounds, etc. 2. Of the hours listed above in #1, how many man-hours were dedicated to Preventive Maintenance activities? PM tasks are planned and scheduled activities conducted a certain frequencies designed to prolong equipment life and provide early warning of impending problems, such as cleaning, lubricating, effort-hours adjusting, inspecting, and minor repair/replacement. Does not include major repairs or “opportunity” repairs. 6. What were the total maintenance expenditures for your plant (less capital projects or other ‘non-maintenance’ related costs)? Include the total costs to maintain facilities and equipment (and grounds, if appropriate) to include labor, parts, materials, maintenance contractors, etc. Include all maintenance expenditures for all maintenance departments at your site. $ 8. At current prices, how much would it cost to replace you entire facility (Estimated Replacement Value)? This is the cost of replacing the facility and $ equipment at today’s prices (less real estate). 10. How many maintenance hourly craftspeople or non exempts, such as technicians, electricians, mechanics, pipefitters, and millwrights, did you have working full-time at you plant? 14. How many full-time maintenance planners did you have? Maintenance planners plan, prepare and sometimes schedule maintenance activities. Planning includes all activities necessary to ensure the proper parts, tools, and other supplies are allocated and sequenced for the craftsmen at the start of a job. 15. How many maintenance support personnel did you have working at your plant? Support personnel include planners, supervisors, maintenance engineers, maintenance clerical personnel, maintenance managers, maintenance inventory control personnel, etc. 17. What was your overall average maintenance overtime percentage? % 18. Of the total maintenance hours listed in questions #1, above, how many hours of work were formally planned and scheduled in advance of the job versus effort-hours emergency, crisis, or unscheduled work in general. 19. Of the total maintenance hours listed in question #1, above, how many hours were ‘captured’ (charged) on a work order. 23. What was your overall inventory turn rate:? (Overall turn rate is generally calculated as total dollars consumed divided by average dollar inventory value, or storeroom dollars issued over dollars storeroom value.) 24. What was your average service level? (Service level is generally defined as the percentage of time stocked parts are available when requested. Or, the number of issues satisfied divided by the number of issues requested.) % 27. How many total man-hours of formal training did maintenance craftspeople receive? (Do not include OJT or other informal forms of training.) effort-hours ©Marshall Institute, Inc ©Marshall Institute, Inc. r1 1-800-637-0120 1
  • 4. QWIK RATIOs 1. Maintenance Cost, % ERV Line #6 / Line #8 <2.5% 3.0% >3.5% Points 10 5 1 2. Planned Maintenance, % Line #18 / Line #1 >90% 90-75% 74-60% 59-40% <40% 0 Points 10 8 6 4 2 0 3. PM Effort Hours, % Line #2 / Line #1 >50% 34% 25% <10% Points 10 5 2 0 4. Effort Hours Charged to Work Orders, % Line #19 / Line #1 >90% 89-80% 79-70% 69% 0% Points 10 8 7 5 0 5. Inventory Turns Line #23 >2.0 1.0 <.5 Points 10 5 0 6. Service Level Line #24 >98% 95% 92% <92% Points 10 5 2 0 7. Maintenance Overtime, % Line #17 <5% 10% 15% >15% Points 10 5 2 0 8. MTCE Planners / MTCE Hourly Line #14 / Line #10 1/<25 1/30 1/>35 No Planners Points 10 5 2 0 9. MTCE Support / MTCE Hourly Line #15 / Line #10 1/<3.5 1/4 1/5 1/>10 Points 10 5 2 0 10. Training Hours / Craftsperson (per yr) Line #27 / Line #10 >100 50 0 Points 10 5 0 2 1-800-637-0120 www.marshallinstitute.com
  • 5. QWIK RATIO CHART 10 TRNG 9 ERV 8 7 6 SRATIO 5 PLAN 4 3 2 1 PRATIO PM OT WO SERV INV 1 ERV $, % ERV 2 PLAN % PLANNED MAINTENANCE 3 PM % PREVENTIVE MAINTENANCE 4 WO % HRS CHARGED TO WOs 5 INV INVENTORY TURNS 6 SERV INVENTORY SERVICE LEVEL, % 7 OT OVERTIME, % 8 PRATIO PLANNED/HOURLY RATIO 9 SRATIO SUPPORT/HOURLY RATIO 10 TRNG TRAINING HRS/CRAFTSPERSON ©Marshall Institute, Inc. r1 1-800-637-0120 3