STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 1
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 2
1. INTRODUCTION
2. AIR FLOW LEAKAGE
3. PERFORATED TILES: NUMBER AND OPENING FACTOR
4. PERFORATED TILES: WITH ADJUSTABLE DAMPER
5. PERFORATED TILES: PLACEMENT
6. CLOSE UNUSED UNITS IN THE RACKS WITH BLANKING PANELS TO
AVOID AIRFLOW SHORT CIRCUIT INSIDE THE RACK
7. AIRFLOW PHILOSOPHIES
8. RAISED FLOOR HEIGHT
9. RETURN AIR CONDITIONS
10. CHILLED WATER SYSTEM WATER CONDITIONS
11. STANDBY UNIT OPERATION
12. USE CRAC UNITS WITH STATE-OF-THE-ART COMPRESSOR AND FAN
TECHNOLOGY
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 3
1. Introduction
This presentation summarises today´s „Best Practise“ for data-centre cooling
systems.
It will give you a rough overview about all concerned parts of the data-centre.
This list is not exhaustive, but it will impart the most important matters how to
design, build and run an as energy efficient as possible data-centre.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 4
2. Airflow Leakage
Airflow leakages (short air circuit) leads to dramatic inefficiencies
due to air circulation back to the CRAC unit without taking heat from
the computer equipment.
• Close all unwanted openings in the raised floor
• Close all unwanted openings below the racks
• Close all cable cut outs – use cable sealings
• All gaps (near walls and CRAC units) have to be sealed
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 5
2. Airflow Leakage
The target is to create an overpressure under the raised floor to
realize an even air supply to all areas of the data-centre.
This overpressure can only be achieved with an as low as possible
amount of unwanted airflow leakage.
A maximum loss of 2 – 6% of the total
airflow of the data-centre is acceptable.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 6
3. Perforated Tiles: Number and Opening Factor
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Tile number
Example (Data-centre):
Design airflow: 50.000 m³/h, ESP 20Pa
Chosen tile: airflow: 500m³/h, 20Pa
⇒ 100 tiles are required
Actual aiflow: 30.000 m³/h,
⇒ Tile number to be reduced to 60
Only a raised floor with sufficient
height and perforated tiles
with limited openings allow an
even air distribution !!!
The number of perforated tiles must be in line with:
A) the design
b) the actual / real airflow
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 7
4. Perforated Tiles: With Adjustable Damper
Perforated tiles with integral adjustable
dampers can be used to avoid having to
replace perforated tiles with solid tiles.
In this case the number of perforated
tiles can remain unchanged but all tiles
need to be adjusted according to the
actual requirements in the room.
It is also possible to work with different adjustments to vary the amount of
air in different areas of the data-centre.
In any case the static pressure under the raised floor has to be kept at the
design level.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 8
5. Perforated Tiles: Placement
Perforated tiles should only be
placed at positions, where cold
air is really required to cool
equipment.
Do not place perforated tiles directly near the CRAC unit; a distance of minimum
2m has to be kept. Perforated tiles near CRAC units can induce warm room air into
the raised floor (negative airflow).
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 9
6. Close Unused Units in the Racks with Blanking Panels
Recirculation of cooling air
inside the rack leads to
overheating of servers.
Blanking panels installed
in unused areas or slots of
a rack eliminate a possible
internal recirculation of the
hot air.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 10
7. Airflow philosophies
A) The „old/traditional“ way:
• Uncontrolled placement of
perforated supply air tiles
anywhere in the room
• Cold air is supplied in an
uncontrolled way to the low
density equipment
• Uncontrolled recirculation
• Supply and return air mixing
takes place
• NOT RECOMMMENDED
ANYMORE
• Very inefficient
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 11
7. Airflow philosophies
B) Hot Aisle, Cold Aisle Concept:
Hot/Cold Aisle
Concept
• Cold supply air distribution only in the cold aisles
• Warm return air only in the hot aisles
• Open tiles only in the cold aisle
• Risk of mixing cold and hot air is high
• This risk can be reduced by using suspended
ceilings
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 12
7. Airflow philosophies
C) Hot Aisle Containment:
Hot Aisle
Containment
• Hot Aisle between the racks will be covered on the top and the end of
rack rows
• Cold supply will be delivered into the room
• Open tiles only in the room
• Full separation between supply and return air
• The room itself will be at low temperature level
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 13
7. Airflow philosophies
D) Cold Aisle Containment:
Cold Aisle
Containment
• Cold supply air distribution only in the cold aisles
• The cold aisle is separated from the hot aisle
• Warm return air only in the hot aisles
• Open tiles only in the cold aisle
• No risk of mixing cold and hot air
• The room itself will be at high temperatures
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 14
7. Airflow philosophies
Debate: Hot aisle or cold aisle containment ???
Keeps the hot air in a confined area.
The room outside is cold.
Servers are stable and can be operated
for an extended period in case of loss
of airflow.
Hot Spots in the cold aisle disappear.
Overall stability can be increased.
Disadavantage:
CRAC´s have to be calculated carefully
to deal with the high return air
temperatures.
Keeps the cold air in a confined area, no need
to cool the entire space.
Floor space around the cold aisle is warm.
Disadvantages:
Air balancing can be difficult if CRAC´s are
sequencing and the raised floor pressure is
changing.
In case of power outage the cold aisle is
exposed to high threat due to loss of airflow .
Control of supply air temperature with DX-units
only possible to a certain extend.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 15
7. Airflow philosophies
E) Room Supply, Direct Rack-Out Return Concept:
Room supply,
Ducted return air
• Cold supply air enters the rack through the room
• Open tiles only in the cold aisle
• Warm return air leaves the rack through a duct and suspended ceiling
• Full seperation of hot and cold air
• The room itself will be at low temperature level
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 16
7. Airflow philosophies
F) Close Coupling of CRAC units and Racks on Supply and Return Side:
Ducted Supply and
Return Air Concept
• Cold supply air into ducts fitted to the supply air side of the racks
• Warm return air through ducts fitted to the exhaust side of the racks
• Open tiles only in the area of supply air ducts
• No risk of mixing cold and hot air
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 17
7. Airflow philosophies
Summary:
• Target of all these various possibilities is the complete separation of warm
return air and cold supply air
• This separation leads to an increased temperature difference between
return and supply air temperature of the CRAC unit
• A high temperature difference increases the efficiency of the CRAC unit
and therefore the efficiency of the data-centre in general
• What kind of separation can be used in a data-centre is depending on the
situation and used equipment
• The highest level of efficiency is reached if each m³ of circulating air takes
the design amount of heat from the IT-euipment
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 18
8. Raised floor height
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Tile number
Rule of thumb:
The higher, the better !
The raised floor height has got a
major influence on the efficiency
of the whole data-centre !
The required free height is
depending on room size, heat
density and number and position
of instaled CRAC units.
A certain obstacle free area is
required for a proper supply of
cold air to any area of the room !
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 19
The leading and most important temperature
is the air entering the IT equipment (server).
According to the new ASHRAE environmental
envelope supply air temperatures up to 27°C
are possible. That would lead to return air
temperatures of approx. 37°C.
Please note: A low return air set-point does not
„cure“ problems with heat load. It is the other
way around: The lower the return air set-point
the lower the usable cooling capacity of the
unit. Furthermore the operating costs are
increasing.
High return air temperatures and lower return
air humidity do not change the content of
water in the room. The risk of ESD is as low.
8K
35°C
27°C
9. Return Air Conditions
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 20
Advantages of high return air temperatures:
(1) CW-units: High return air temperatures are leading towards higher
water temperatures (with same sensible cooling capacity). The
starting temperature of the free-cooling is much higher.
(2) CW-units: To get the same cooling capacity with high return air
temperatures and high water temperatures the airflow of the unit can
be reduced. Lower airflow leads to lower fan power consumption and
a lower noise level.
(3) DX-units: Higher return air temperatures are leading towards higher
evaporating pressure. With constant condensing pressure the delta
between evaporating and condensation pressure is reduced. The
compressor power consumption is decreasing. Furthermore the fan
speed also can be reduced.
But please be aware that too high evaporating pressure can damage
the compressor.
9. Return Air Conditions
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 21
10. Chilled Water System Water Conditions
Heat loads in data-centres are nearly all
sensible cooling load with only a small latent
cooling load due to fresh air ventilation.
In accordance to the increased return air
temperatures the chilled water temperatures
can be increased as well.
• Chiller efficiency will be increased due to increased evaporating temperature.
• The higher the chilled water temperature the earlier the starting temperature
of the chiller free-cooling.
• The balance between cooling capacity of the CRAC unit and chiller efficiency
has to be evaluated.
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 22
11. Standby Unit Operation
Fan laws dictate that air volume is directly proportional to fan speed and that fan
power is a cube of the fan speed.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Airflow Absorbed Power
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Airflow Absorbed Power
1/2
Airflow
1/8
Absorbed
Power
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 23
4x ASD1900CW at 26°C/40%
Water 10/15°C
Standby
4x 114,6 kW = 458,6 kW net sensible
Airflow: 3x 39.000 m³/h
Fan power = 3x 12,6 kW = 37,8 kW
Lpa,2m = 3x 71,6 dB(A) = 76,4 db(A)
3x 146,8 kW = 440,4 kW net sensible
Airflow: 4x 29.000 m³/h
Fan power = 4x 5,3 kW = 21,2 kW
Lpa,2m = 4x 62,7 dB(A) = 68,7 db(A)
=> Energy savings:
16,6 kW x 8760h x 0,13 = 18.904 €/year @ 0,13 €/kWh
11. Standby Unit Operation
Therefore, by running the stand-by CRAC–unit at reduced air volume the overall
fan power is greatly reduced.
Example:
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 24
4x 110,3 kW = 441,2 kW net sensible
• Reduction of fan power consumption
• Reduction of noise level
• Increase of net sensible cooling capacity
• And: even more energy can be saved if net sensible cooling
capacity is kept constant:
Advantages of Standby-Management:
Airflow: 4x 27.800 m³/h
Fan power = 4x 4,7 kW = 18,8 kW
Lpa,2m = 4x 61,5 dB(A) = 67,5 db(A)
=> Energy savings:
19,0 kW x 8760h x 0,13 = 21.637 €/year @ 0,13 €/kWh
11. Standby Unit Operation
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 25
12. Use CRAC Units with state-of-the-art Technology
EC fan technology:
Advantages:
1. Lower power consumption due to better overall degree of efficiency
2. No in-rush current, speed is ramped up, never draws more than full load amps
3. Low vibration – reduced sound level
4. Long maintanance free operation due to direct drive technology
5. Scalable air flow – easy adaptation on requirements on site
STULZ – THE NATURAL CHOICE
01/2010
Best Practice - Data Centre Cooling 26
Example:
Munich airport data centre, source:
• 600 m³ data centre, 75 server cabinets arranged in 3 rows
• 5 CRAC units (4+1), each 32 kW cooling capacity
Changes („Best practise only“):
• installation of hot aisle/cold aisle containment
• re-routing cables inside the racks
• reconfiguring of floor tile layout, sealing of raised floor
• installation of 1U blanking panels at the front of the racks
• installation of ventilated front doors
• increasing of room temperature to 28°C (supply air = 22°C)
=> Due to these changes the power consumption of the CRAC units are reduced by 35%.
=> Cabinet temperatures are reduced by 4°C – extended lifetime of servers and more reliability.

Más contenido relacionado

La actualidad más candente

Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationGreg Stover
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsMarcHourican1
 
Trane design chiller.pdf
Trane design chiller.pdfTrane design chiller.pdf
Trane design chiller.pdfbui thequan
 
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroommarlisaclark
 
Gaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementGaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementUpsite Technologies
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastAli Shoaee
 
Thermal and airflow modeling methodology for Desktop PC
Thermal and airflow modeling methodology for Desktop PCThermal and airflow modeling methodology for Desktop PC
Thermal and airflow modeling methodology for Desktop PCJeehoon Choi
 
Data center design 2
Data center design 2Data center design 2
Data center design 2Aditya Gupta
 
Datacenter101
Datacenter101Datacenter101
Datacenter101tarundua
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementationAnton An
 
Apc cooling solutions
Apc cooling solutionsApc cooling solutions
Apc cooling solutionspeperoca
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF John Chavez
 

La actualidad más candente (20)

Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure Optimization
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five Questions
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
 
VRF system presentation !
VRF system presentation !VRF system presentation !
VRF system presentation !
 
Trane design chiller.pdf
Trane design chiller.pdfTrane design chiller.pdf
Trane design chiller.pdf
 
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroom
 
Data center hvac
Data center hvacData center hvac
Data center hvac
 
AIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGINGAIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGING
 
Gaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementGaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow Management
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 
Thermal and airflow modeling methodology for Desktop PC
Thermal and airflow modeling methodology for Desktop PCThermal and airflow modeling methodology for Desktop PC
Thermal and airflow modeling methodology for Desktop PC
 
Data center design 2
Data center design 2Data center design 2
Data center design 2
 
Datacenter101
Datacenter101Datacenter101
Datacenter101
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementation
 
Hvac systems
Hvac systemsHvac systems
Hvac systems
 
Apc cooling solutions
Apc cooling solutionsApc cooling solutions
Apc cooling solutions
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Data center m&e
Data center  m&eData center  m&e
Data center m&e
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 

Similar a Stulz datacentre cooling

Topic 04 chilled beam system note version small
Topic 04 chilled beam system note version smallTopic 04 chilled beam system note version small
Topic 04 chilled beam system note version smallpnnazz
 
DADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSDADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSbostjanpeterman
 
General Sales Brochure 2016
General Sales Brochure 2016General Sales Brochure 2016
General Sales Brochure 2016Alan Beresford
 
General Sales Brochure 2016
General Sales Brochure 2016General Sales Brochure 2016
General Sales Brochure 2016Emma Beresford
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation stacygriggs
 
Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...IAEME Publication
 
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdf
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdfPresentation Hydrogen Technology Expo Bremen Oct 2022.pdf
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdfRoy Niekerk
 
IT cooling for Data Center
IT cooling for Data Center IT cooling for Data Center
IT cooling for Data Center Henry Soong
 
Air Condtioning Systems HVAC
Air Condtioning Systems HVACAir Condtioning Systems HVAC
Air Condtioning Systems HVACPrashanth Dommeti
 
HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptxCollege
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewStatybos Akademija
 
LECTURE 6 ZONING IN HVAC.ppt
LECTURE  6 ZONING IN HVAC.pptLECTURE  6 ZONING IN HVAC.ppt
LECTURE 6 ZONING IN HVAC.pptBhaskarBhatia2
 
Airius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low ResAirius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low ResAlan Baker
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case studySona Rawat
 

Similar a Stulz datacentre cooling (20)

Topic 04 chilled beam system note version small
Topic 04 chilled beam system note version smallTopic 04 chilled beam system note version small
Topic 04 chilled beam system note version small
 
DADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSDADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMS
 
General Sales Brochure 2016
General Sales Brochure 2016General Sales Brochure 2016
General Sales Brochure 2016
 
General Sales Brochure 2016
General Sales Brochure 2016General Sales Brochure 2016
General Sales Brochure 2016
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...
 
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdf
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdfPresentation Hydrogen Technology Expo Bremen Oct 2022.pdf
Presentation Hydrogen Technology Expo Bremen Oct 2022.pdf
 
Datacenters
DatacentersDatacenters
Datacenters
 
IT cooling for Data Center
IT cooling for Data Center IT cooling for Data Center
IT cooling for Data Center
 
Energy Efficiency in Offices
Energy Efficiency in OfficesEnergy Efficiency in Offices
Energy Efficiency in Offices
 
Air Condtioning Systems HVAC
Air Condtioning Systems HVACAir Condtioning Systems HVAC
Air Condtioning Systems HVAC
 
HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptx
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
 
HVAC Systems.ppt
HVAC Systems.pptHVAC Systems.ppt
HVAC Systems.ppt
 
LECTURE 6 ZONING IN HVAC.ppt
LECTURE  6 ZONING IN HVAC.pptLECTURE  6 ZONING IN HVAC.ppt
LECTURE 6 ZONING IN HVAC.ppt
 
Air Conditioner
Air ConditionerAir Conditioner
Air Conditioner
 
Airius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low ResAirius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low Res
 
Airconditioning ppt
Airconditioning pptAirconditioning ppt
Airconditioning ppt
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case study
 

Más de Nick Turunov

Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Nick Turunov
 
Huawei smart grid rus
Huawei smart grid rusHuawei smart grid rus
Huawei smart grid rusNick Turunov
 
Huawei smart grid rus
Huawei smart grid rusHuawei smart grid rus
Huawei smart grid rusNick Turunov
 
2011 ukraine channel sales business report
2011 ukraine channel sales business report2011 ukraine channel sales business report
2011 ukraine channel sales business reportNick Turunov
 
Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Nick Turunov
 
Megatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодMegatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодNick Turunov
 
Aflex distribution
Aflex distributionAflex distribution
Aflex distributionNick Turunov
 
решения Eaton вадим харитонов
решения Eaton вадим харитоноврешения Eaton вадим харитонов
решения Eaton вадим харитоновNick Turunov
 
лаборатория касперского киберпреступность
лаборатория касперского киберпреступностьлаборатория касперского киберпреступность
лаборатория касперского киберпреступностьNick Turunov
 
комплексные решения по гарантированному электропитанию харитонов мегатрейд
комплексные решения по гарантированному электропитанию харитонов мегатрейдкомплексные решения по гарантированному электропитанию харитонов мегатрейд
комплексные решения по гарантированному электропитанию харитонов мегатрейдNick Turunov
 
генераторные установки нового поколения Ipt в.дюбанов
генераторные установки нового поколения Ipt в.дюбановгенераторные установки нового поколения Ipt в.дюбанов
генераторные установки нового поколения Ipt в.дюбановNick Turunov
 
блинов 2010 aten lcd_kvm_and over ip
блинов 2010 aten lcd_kvm_and over ipблинов 2010 aten lcd_kvm_and over ip
блинов 2010 aten lcd_kvm_and over ipNick Turunov
 
Stulz mission energy
Stulz mission energyStulz mission energy
Stulz mission energyNick Turunov
 
Saa s microsoft spla_kalachova
Saa s microsoft spla_kalachovaSaa s microsoft spla_kalachova
Saa s microsoft spla_kalachovaNick Turunov
 
Oracle exa2 biz_summit
Oracle exa2 biz_summitOracle exa2 biz_summit
Oracle exa2 biz_summitNick Turunov
 
Megatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодMegatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодNick Turunov
 
Ibm megatrade шиндак xiv v3.0
Ibm megatrade шиндак xiv v3.0Ibm megatrade шиндак xiv v3.0
Ibm megatrade шиндак xiv v3.0Nick Turunov
 
Conteg юрий шульга
Conteg юрий шульгаConteg юрий шульга
Conteg юрий шульгаNick Turunov
 
Cisco solutions for dc whiteboarding
Cisco solutions for dc whiteboardingCisco solutions for dc whiteboarding
Cisco solutions for dc whiteboardingNick Turunov
 
Bas consulting for_it_conference_(by_po)
Bas consulting for_it_conference_(by_po)Bas consulting for_it_conference_(by_po)
Bas consulting for_it_conference_(by_po)Nick Turunov
 

Más de Nick Turunov (20)

Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.
 
Huawei smart grid rus
Huawei smart grid rusHuawei smart grid rus
Huawei smart grid rus
 
Huawei smart grid rus
Huawei smart grid rusHuawei smart grid rus
Huawei smart grid rus
 
2011 ukraine channel sales business report
2011 ukraine channel sales business report2011 ukraine channel sales business report
2011 ukraine channel sales business report
 
Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.Kharkov conference 2011 q4 odrov s.
Kharkov conference 2011 q4 odrov s.
 
Megatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодMegatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цод
 
Aflex distribution
Aflex distributionAflex distribution
Aflex distribution
 
решения Eaton вадим харитонов
решения Eaton вадим харитоноврешения Eaton вадим харитонов
решения Eaton вадим харитонов
 
лаборатория касперского киберпреступность
лаборатория касперского киберпреступностьлаборатория касперского киберпреступность
лаборатория касперского киберпреступность
 
комплексные решения по гарантированному электропитанию харитонов мегатрейд
комплексные решения по гарантированному электропитанию харитонов мегатрейдкомплексные решения по гарантированному электропитанию харитонов мегатрейд
комплексные решения по гарантированному электропитанию харитонов мегатрейд
 
генераторные установки нового поколения Ipt в.дюбанов
генераторные установки нового поколения Ipt в.дюбановгенераторные установки нового поколения Ipt в.дюбанов
генераторные установки нового поколения Ipt в.дюбанов
 
блинов 2010 aten lcd_kvm_and over ip
блинов 2010 aten lcd_kvm_and over ipблинов 2010 aten lcd_kvm_and over ip
блинов 2010 aten lcd_kvm_and over ip
 
Stulz mission energy
Stulz mission energyStulz mission energy
Stulz mission energy
 
Saa s microsoft spla_kalachova
Saa s microsoft spla_kalachovaSaa s microsoft spla_kalachova
Saa s microsoft spla_kalachova
 
Oracle exa2 biz_summit
Oracle exa2 biz_summitOracle exa2 biz_summit
Oracle exa2 biz_summit
 
Megatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цодMegatrade артем вижуткин академия цод
Megatrade артем вижуткин академия цод
 
Ibm megatrade шиндак xiv v3.0
Ibm megatrade шиндак xiv v3.0Ibm megatrade шиндак xiv v3.0
Ibm megatrade шиндак xiv v3.0
 
Conteg юрий шульга
Conteg юрий шульгаConteg юрий шульга
Conteg юрий шульга
 
Cisco solutions for dc whiteboarding
Cisco solutions for dc whiteboardingCisco solutions for dc whiteboarding
Cisco solutions for dc whiteboarding
 
Bas consulting for_it_conference_(by_po)
Bas consulting for_it_conference_(by_po)Bas consulting for_it_conference_(by_po)
Bas consulting for_it_conference_(by_po)
 

Stulz datacentre cooling

  • 1. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 1
  • 2. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 2 1. INTRODUCTION 2. AIR FLOW LEAKAGE 3. PERFORATED TILES: NUMBER AND OPENING FACTOR 4. PERFORATED TILES: WITH ADJUSTABLE DAMPER 5. PERFORATED TILES: PLACEMENT 6. CLOSE UNUSED UNITS IN THE RACKS WITH BLANKING PANELS TO AVOID AIRFLOW SHORT CIRCUIT INSIDE THE RACK 7. AIRFLOW PHILOSOPHIES 8. RAISED FLOOR HEIGHT 9. RETURN AIR CONDITIONS 10. CHILLED WATER SYSTEM WATER CONDITIONS 11. STANDBY UNIT OPERATION 12. USE CRAC UNITS WITH STATE-OF-THE-ART COMPRESSOR AND FAN TECHNOLOGY
  • 3. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 3 1. Introduction This presentation summarises today´s „Best Practise“ for data-centre cooling systems. It will give you a rough overview about all concerned parts of the data-centre. This list is not exhaustive, but it will impart the most important matters how to design, build and run an as energy efficient as possible data-centre.
  • 4. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 4 2. Airflow Leakage Airflow leakages (short air circuit) leads to dramatic inefficiencies due to air circulation back to the CRAC unit without taking heat from the computer equipment. • Close all unwanted openings in the raised floor • Close all unwanted openings below the racks • Close all cable cut outs – use cable sealings • All gaps (near walls and CRAC units) have to be sealed
  • 5. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 5 2. Airflow Leakage The target is to create an overpressure under the raised floor to realize an even air supply to all areas of the data-centre. This overpressure can only be achieved with an as low as possible amount of unwanted airflow leakage. A maximum loss of 2 – 6% of the total airflow of the data-centre is acceptable.
  • 6. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 6 3. Perforated Tiles: Number and Opening Factor 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Tile number Example (Data-centre): Design airflow: 50.000 m³/h, ESP 20Pa Chosen tile: airflow: 500m³/h, 20Pa ⇒ 100 tiles are required Actual aiflow: 30.000 m³/h, ⇒ Tile number to be reduced to 60 Only a raised floor with sufficient height and perforated tiles with limited openings allow an even air distribution !!! The number of perforated tiles must be in line with: A) the design b) the actual / real airflow
  • 7. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 7 4. Perforated Tiles: With Adjustable Damper Perforated tiles with integral adjustable dampers can be used to avoid having to replace perforated tiles with solid tiles. In this case the number of perforated tiles can remain unchanged but all tiles need to be adjusted according to the actual requirements in the room. It is also possible to work with different adjustments to vary the amount of air in different areas of the data-centre. In any case the static pressure under the raised floor has to be kept at the design level.
  • 8. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 8 5. Perforated Tiles: Placement Perforated tiles should only be placed at positions, where cold air is really required to cool equipment. Do not place perforated tiles directly near the CRAC unit; a distance of minimum 2m has to be kept. Perforated tiles near CRAC units can induce warm room air into the raised floor (negative airflow).
  • 9. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 9 6. Close Unused Units in the Racks with Blanking Panels Recirculation of cooling air inside the rack leads to overheating of servers. Blanking panels installed in unused areas or slots of a rack eliminate a possible internal recirculation of the hot air.
  • 10. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 10 7. Airflow philosophies A) The „old/traditional“ way: • Uncontrolled placement of perforated supply air tiles anywhere in the room • Cold air is supplied in an uncontrolled way to the low density equipment • Uncontrolled recirculation • Supply and return air mixing takes place • NOT RECOMMMENDED ANYMORE • Very inefficient
  • 11. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 11 7. Airflow philosophies B) Hot Aisle, Cold Aisle Concept: Hot/Cold Aisle Concept • Cold supply air distribution only in the cold aisles • Warm return air only in the hot aisles • Open tiles only in the cold aisle • Risk of mixing cold and hot air is high • This risk can be reduced by using suspended ceilings
  • 12. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 12 7. Airflow philosophies C) Hot Aisle Containment: Hot Aisle Containment • Hot Aisle between the racks will be covered on the top and the end of rack rows • Cold supply will be delivered into the room • Open tiles only in the room • Full separation between supply and return air • The room itself will be at low temperature level
  • 13. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 13 7. Airflow philosophies D) Cold Aisle Containment: Cold Aisle Containment • Cold supply air distribution only in the cold aisles • The cold aisle is separated from the hot aisle • Warm return air only in the hot aisles • Open tiles only in the cold aisle • No risk of mixing cold and hot air • The room itself will be at high temperatures
  • 14. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 14 7. Airflow philosophies Debate: Hot aisle or cold aisle containment ??? Keeps the hot air in a confined area. The room outside is cold. Servers are stable and can be operated for an extended period in case of loss of airflow. Hot Spots in the cold aisle disappear. Overall stability can be increased. Disadavantage: CRAC´s have to be calculated carefully to deal with the high return air temperatures. Keeps the cold air in a confined area, no need to cool the entire space. Floor space around the cold aisle is warm. Disadvantages: Air balancing can be difficult if CRAC´s are sequencing and the raised floor pressure is changing. In case of power outage the cold aisle is exposed to high threat due to loss of airflow . Control of supply air temperature with DX-units only possible to a certain extend.
  • 15. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 15 7. Airflow philosophies E) Room Supply, Direct Rack-Out Return Concept: Room supply, Ducted return air • Cold supply air enters the rack through the room • Open tiles only in the cold aisle • Warm return air leaves the rack through a duct and suspended ceiling • Full seperation of hot and cold air • The room itself will be at low temperature level
  • 16. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 16 7. Airflow philosophies F) Close Coupling of CRAC units and Racks on Supply and Return Side: Ducted Supply and Return Air Concept • Cold supply air into ducts fitted to the supply air side of the racks • Warm return air through ducts fitted to the exhaust side of the racks • Open tiles only in the area of supply air ducts • No risk of mixing cold and hot air
  • 17. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 17 7. Airflow philosophies Summary: • Target of all these various possibilities is the complete separation of warm return air and cold supply air • This separation leads to an increased temperature difference between return and supply air temperature of the CRAC unit • A high temperature difference increases the efficiency of the CRAC unit and therefore the efficiency of the data-centre in general • What kind of separation can be used in a data-centre is depending on the situation and used equipment • The highest level of efficiency is reached if each m³ of circulating air takes the design amount of heat from the IT-euipment
  • 18. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 18 8. Raised floor height 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Tile number Rule of thumb: The higher, the better ! The raised floor height has got a major influence on the efficiency of the whole data-centre ! The required free height is depending on room size, heat density and number and position of instaled CRAC units. A certain obstacle free area is required for a proper supply of cold air to any area of the room !
  • 19. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 19 The leading and most important temperature is the air entering the IT equipment (server). According to the new ASHRAE environmental envelope supply air temperatures up to 27°C are possible. That would lead to return air temperatures of approx. 37°C. Please note: A low return air set-point does not „cure“ problems with heat load. It is the other way around: The lower the return air set-point the lower the usable cooling capacity of the unit. Furthermore the operating costs are increasing. High return air temperatures and lower return air humidity do not change the content of water in the room. The risk of ESD is as low. 8K 35°C 27°C 9. Return Air Conditions
  • 20. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 20 Advantages of high return air temperatures: (1) CW-units: High return air temperatures are leading towards higher water temperatures (with same sensible cooling capacity). The starting temperature of the free-cooling is much higher. (2) CW-units: To get the same cooling capacity with high return air temperatures and high water temperatures the airflow of the unit can be reduced. Lower airflow leads to lower fan power consumption and a lower noise level. (3) DX-units: Higher return air temperatures are leading towards higher evaporating pressure. With constant condensing pressure the delta between evaporating and condensation pressure is reduced. The compressor power consumption is decreasing. Furthermore the fan speed also can be reduced. But please be aware that too high evaporating pressure can damage the compressor. 9. Return Air Conditions
  • 21. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 21 10. Chilled Water System Water Conditions Heat loads in data-centres are nearly all sensible cooling load with only a small latent cooling load due to fresh air ventilation. In accordance to the increased return air temperatures the chilled water temperatures can be increased as well. • Chiller efficiency will be increased due to increased evaporating temperature. • The higher the chilled water temperature the earlier the starting temperature of the chiller free-cooling. • The balance between cooling capacity of the CRAC unit and chiller efficiency has to be evaluated.
  • 22. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 22 11. Standby Unit Operation Fan laws dictate that air volume is directly proportional to fan speed and that fan power is a cube of the fan speed. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Airflow Absorbed Power 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Airflow Absorbed Power 1/2 Airflow 1/8 Absorbed Power
  • 23. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 23 4x ASD1900CW at 26°C/40% Water 10/15°C Standby 4x 114,6 kW = 458,6 kW net sensible Airflow: 3x 39.000 m³/h Fan power = 3x 12,6 kW = 37,8 kW Lpa,2m = 3x 71,6 dB(A) = 76,4 db(A) 3x 146,8 kW = 440,4 kW net sensible Airflow: 4x 29.000 m³/h Fan power = 4x 5,3 kW = 21,2 kW Lpa,2m = 4x 62,7 dB(A) = 68,7 db(A) => Energy savings: 16,6 kW x 8760h x 0,13 = 18.904 €/year @ 0,13 €/kWh 11. Standby Unit Operation Therefore, by running the stand-by CRAC–unit at reduced air volume the overall fan power is greatly reduced. Example:
  • 24. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 24 4x 110,3 kW = 441,2 kW net sensible • Reduction of fan power consumption • Reduction of noise level • Increase of net sensible cooling capacity • And: even more energy can be saved if net sensible cooling capacity is kept constant: Advantages of Standby-Management: Airflow: 4x 27.800 m³/h Fan power = 4x 4,7 kW = 18,8 kW Lpa,2m = 4x 61,5 dB(A) = 67,5 db(A) => Energy savings: 19,0 kW x 8760h x 0,13 = 21.637 €/year @ 0,13 €/kWh 11. Standby Unit Operation
  • 25. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 25 12. Use CRAC Units with state-of-the-art Technology EC fan technology: Advantages: 1. Lower power consumption due to better overall degree of efficiency 2. No in-rush current, speed is ramped up, never draws more than full load amps 3. Low vibration – reduced sound level 4. Long maintanance free operation due to direct drive technology 5. Scalable air flow – easy adaptation on requirements on site
  • 26. STULZ – THE NATURAL CHOICE 01/2010 Best Practice - Data Centre Cooling 26 Example: Munich airport data centre, source: • 600 m³ data centre, 75 server cabinets arranged in 3 rows • 5 CRAC units (4+1), each 32 kW cooling capacity Changes („Best practise only“): • installation of hot aisle/cold aisle containment • re-routing cables inside the racks • reconfiguring of floor tile layout, sealing of raised floor • installation of 1U blanking panels at the front of the racks • installation of ventilated front doors • increasing of room temperature to 28°C (supply air = 22°C) => Due to these changes the power consumption of the CRAC units are reduced by 35%. => Cabinet temperatures are reduced by 4°C – extended lifetime of servers and more reliability.