Transmission
     Principles of Transmission, applied
      to the EU transmission network
1.   Line limits
2.   Principles of dispatch
3.   Role of frequency in ac lines and stability
     requirements
4.   Transmission shortage, the internal market
     and the 2050 carbon targets
Power plants
Distributors
Transmission
Industrial
                         consumers


  Transmission                            Other countries



                    Distributors

Power Plants




                 Residential consumers:
                      Households
1. Power plants
Hydro-plant
Baseload

      Large coal plants
Baseload
       Nuclear plants
Peaker
         Oil burning plants
Wind turbines



                Solar panels



      Renewable energies
Renewable energies

Concentrated solar power
Peaker
                 Gas burning plants

                                               OCGT
                                              CCGT



http://iea-etsap.org/web/Highlights%20PDF/E02-gas_fired_power-GS-AD-gct%201.pdf
Multitude of generation types
• Trade-off:
  – Economics of scale Baseload power plants
     • High fixed cost
     • Low variable costs


  – Flexibility
     • Low fixed costs       Peaker power plants
     • High variable costs
Fixed cost per   Variable cost
               MWh           per MWh
Baseload        40               0
Peaker          10               50
Peaker
60


40
                             Baseload



10
0
                                Capacity factor
                60%         100% (=8760 hours/year)


                  Fixed cost per     Variable cost
                      MWh             per MWh
     Baseload          40                  0
     Peaker            10                  50
Peaker
60


40
                                    Baseload



10
0
                                       Capacity factor
                     60%           100%



     Use peakers           Use baseload
     when capacity         when capacity
     factor < 60%          factor > 60%
PEAKER




 BASELOAD
Very expensive to built a
         plant for only 87 hours!
         Cost?
         $1050/MWH (=100*10+50)




0   1%    =87 hours
Price spike
Can price-spikes be avoided?
- Cap the price, eg at $1000/MWH
Cost is $1050/MWH
                            >
                         price cap




0       1%   =87 hours



    ?
BLACKOUT
Cost is $1050/MWH
                            >
                         price cap




0       1%   =87 hours



    ?
Can price-spikes be avoided?
- Cap the price, eg at $1000/MWH
- Capacity market
  - Pay power plants for being prepared to generate,
    even if they are not called upon
Income of a power plant:
- Price of electricity
- Capacity payments (reserve)
Setting of the wholesale
    electricity Price
Uniform price auction
$/MWH
        Baseload plants   Peaker plants
            (MC=0)




                            D        S=MC
80

        PROFITS!
Uniform price auction
$/MWH
        Baseload plants   Peaker plants
            (MC=0)




                            D        S
80
Uniform price auction
$/MWH
        Baseload plants   Peaker plants
            (MC=0)




                            D        S
80
Uniform price auction
$/MWH
        Baseload plants   Peaker plants
            (MC=0)




                            D        S
80
60
Renewables
Wind turbines



                Solar panels



      Renewable energies
Greenhouse gasses heat up the earth




         Abate CO2
2020 Targets: 20% decarbonization

2050 Targets: 80% decarbonization
Wind turbines



                Solar panels



      Renewable energies
Retire 1 coal or CCGT plant

   =(500 MW conventional)




Install over 1000 wind turbines

  =(3000-5000 MW wind or solar)
• Wind and solar needs conventional backup
• Firm capacity 10%-15%




http://ejournal.windeng.net/3/01/GGiebel-
CapCredLit_WindEngEJournal_2005_right_links.pdf
Wind generation in Germany




http://www.pnl.gov/main/publications/external/technical_reports/PNNL-19225.pdf
Feed-in tariffs
         Case of Germany

  2004                      2012
0.50 €/kWh           0.20€/kWh

                Coal or gas plant costs
                 0.04€/kWh
€/kWH   Uniform price auction




                D               S=MC


0.10
0
-0.10
€/kWH      Uniform price auction
        Negative electricity wholesale price in Germany!




                       D                     S=MC


0.10
0
-0.10
German electricity wholesale market
Electricity prices 2001-2012

                                                   €24 billion deficit




        Czech                  Germany              Spain
        Republic
http://epp.eurostat.ec.europa.eu/portal/page/portal/energy/data/main_tables
EU Electricity industry Association
Need for long-distance transmission
Hydro-plant and pumped storage
Hydro-plant and pumped storage
Hydro potential
Need for long-distance transmission
Need for long-distance transmission
2. Transmission lines
Industrial
                         consumers


  Transmission                            Other countries



                    Distributors

Power Plants




                 Residential consumers:
                      Households
September 28th, 2003

Huge blackout cripples Italy!
Rome’s “white night”
110 trains stopped night”
      Rome’s “white



Thousands of people stuck
Sils-Soazza
     Tree
  flashover!
                     “Cross-border
                  transmission lines”


Mettlen-         “Interconnectors”
Lavorgo


               03:01
Sils-Soazza
      Tree
   flashover!




Mettlen-
Lavorgo


                03:01
Sils-Soazza




Mettlen-
Lavorgo


           03:01
           03:01-03.16
The Swiss TSO operator asks the
Italian TSO for countermeasures




TSO= Transmission System Operator




               03:11
Sils-Soazza

               Tree
            flashover!



Mettlen-
             Italy reduces
Lavorgo    import by -300 MW



           03:25
           03:21
Sils-Soazza

               Tree
            flashover!



Mettlen-
Lavorgo


           03:25
All interconnectors are
automatically disconnected




              03:26
1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity

4. Transmission shortage in the EU
Transmission lines limits

                        Sils-Soazza
      Tree
   flashover!




Mettlen-
Lavorgo


                     03:01
Transmission lines limits


    flashover
High voltage
Transmission lines limits



                 High load



Sagging of the line
1. Transmission lines limits

2. Dispatch
Dispatch

                  Sils-Soazza




Mettlen-
Lavorgo


               03:01
Dispatch




Net Injection:
 Injection:
   50MW
  100MW                             Injection:
                                      20MW
                            ?

             A                  B
 Withdrawal:                            Net
                                    Withdrawal:
   50MW                             Withdrawal:
                                       70MW
                                      50MW
Dispatch




Net Injection:
   50MW
                 Physical flow: 50MW

             A                         B
                                               Net
                                           Withdrawal:
                                             50MW
Dispatch



             ∆-10MW
Net Injection:
   50MW
  40MW                   ∆ -10MW

                  Physical flow: 50MW
                                  40MW

             A                           B
                                                 ∆ -10MW

                                                 Net
                                             Withdrawal:
                                               40MW
                                               50MW
Dispatch




Net Injection:
   40MW
                   Physical flow: 40MW

             A                           B
  Electricity cannot just be “send”
              somewhere                          Net
                                             Withdrawal:
    Any flow is the RESULT of the              40MW
     injection and withdrawals
The Swiss TSO operator asks the
Italian TSO for countermeasures




Dispatch is done by national TSOs




              03:11
Dispatch

                  Sils-Soazza




Mettlen-
                  Italy reduces
Lavorgo         import by -300 MW



               03:25
               03:21
1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity
Frequency and Synchronicity




Direct Current (DC)

             Alternating Current (AC)
Frequency and Synchronicity




                50 Hertz




 Alternating
Current (AC)
Frequency and Synchronicity




Does a lamp in your house receive zero energy 100 times a second
and is thus blinking?

Raise your hand if you think that this is indeed the case.
Frequency and Synchronicity




50 Herz is the frequency in Europe
Frequency and Synchronicity




A shortage of generation
makes the frequency fall




     Slight shortage
Frequency and Synchronicity




A surplus of generation
makes the frequency rise

                            Slight surplus
Frequency and Synchronicity




http://www.dynamicdemand.co.uk/grid.htm
Frequency and Synchronicity




http://www.dynamicdemand.co.uk/grid.htm
Russian frequency
All generators are synchronized




                                    UCTE =
                                   Continental
                                  Synchronous
                                      Area
UCTE =
 Continental
Synchronous
    Area
•Azerbaijan, Belarus, Georgia, Kazakhstan, Moldova, Mongolia, Ukraine
•Armenia
•Latvia, Lithuania, Estonia
•Uzbekistan, Tajikistan
•Kazakhstan, Kyrgyzstan?




    http://so-ups.ru/index.php?id=ees
Frequency and Synchronicity

  All interconnectors are
automatically disconnected




         03:26
Frequency and Synchronicity

Mini circuit breakers
Frequency and Synchronicity


High voltage circuit breakers
1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity

4. Transmission shortage in the EU
The future of the EU transmission network

Interconnectors very high loaded at night!




                  03:26
The future of the EU transmission network




Internal EU market induces increase
        in cross-border trading
The future of the EU transmission network


Massive deployment of wind and solar energy
The future of the EU transmission network

 European                                       2050
  Climate
                                          Increase from
Foundation
                                           34 GW to 127
                                               GW

                                                Increase
                                                of almost
                                                  400%
Industrial
                         consumers


  Transmission                            Other countries



                    Distributors

Power Plants




                 Residential consumers:
                      Households
Market organization and regulation


                                   Industrial
                                  consumers


                                                       Other countries
    Transmission




                       Distributors


Power Plants




                   Residential consumers: Households
3. Market organization
    and regulation
Transmission: large returns to scale


                   Natural monopoly


                        State monopoly
Vertically
                integrated
 Power Plants   electricity
                  Utility


                 State
Transmission    monopoly




Distributors
Vertically
                integrated
 Power Plants   electricity
                  Utility


                 State
Transmission    monopoly




Distributors
Competitive
                 Open to the
 Power Plants      market!


                  Remains a
                  monopoly
Transmission

                Needs regulation:
                • Cost+
                • Tariff
                • Benchmarking
Distributors
2003 and 2009 Electricity laws
               (2003/54/EC and 2009/72/EC)



• Separation from networks and generator
  activities
• Non-discriminatory access of generators to
  networks
• “EU regulator”: ACER
Most EU consumers no longer
 protected by electricity price
         regulation!
How is the electricity price
     then determined?

        Competition

But… Competition must work
Concentration Generators
Well-developed financial electricity
              market
- Exchanges and OTC
- risk management
Financial market manipulation
•   US hedge fund, Amaranth Advisors LLC held
    1. gas derivates at ICE and OTC markets
    2. Gas futures on NYMEX
•   Then sold the gas futures on NYMEX to
    affect the settlement price at ICE and OTC
    markets
•   Profit: $60m-$170m
REMIT
•   Regulation on Energy Market Integrity and
    Transparency
•   Forbids:
    –   Market abuse
    –   Insider trading
•   Monitoring task for National Regulaturs and
    “EU regulator” ACER
2003 and 2009 Electricity laws
               (2003/54/EC and 2009/72/EC)



• Separation from networks and generator
  activities
• Non-discriminatory access of generators to
  networks
• “EU regulator”: ACER
• 2020 goals: 20% renewable energy in 2020
  – Feed-in tariffs
  – Emission Trading Scheme
Greenhouse gasses heat up the earth




         Abate CO2
EMISSION PERMIT
               MARKET




Competition
    for
  permits

Decisions on
 abatement


               A       B         C
• United Power System (UPS): 4-th largest
  electricity market in the World.
• 700 generating plants Installed generating
  capacity 220 GW
Electricity generation Russia, 2006
Reform of the system 1992-2015
• 1992 United Energy Systems of Russia (RAO-
  UES) replaces soviet ministerial units
• 1998 Anatoly Chubais president of RAO-UES.
• 2003–2011
  – restructuring and private ownership
  – Partial price deregulation
• 2011 full competition in generation
• 2015 price deregulation for retail conconsumers
RAO UES split up in 2008
•   OGK 1: http://www.ogk1.com/en/       •   TGK 7: http://en.votgk.com/
•   OGK 2:                               •   TGK 8: http://www.tgk-8.ru/
    http://www.ogk2.ru/eng/index.wbp
                                         •   TGK 9: http://www.tgk9.ru
•   OGK 3: http://www.ogk3.ru/en-
    main/                                •   TGK 10: http://www.fortum.ru/company/
•                                        •   TGK 11: http://eng.tgk11.com/about/
    OGK 4: http://eng.ogk-4.ru/
                                         •   TGK 12: http://www.kuzbassenergo.ru/eng/
•   OGK 5: http://www.ogk-5.com/en/
                                         •   TGK 13: http://eng.tgk13.ru/
•   OGK 6: http://www.ogk6.ru/en/
                                         •   TGK 14: http://www.tgk-14.com/
•   GidroOGK:
    http://www.eng.rushydro.ru/          •   IDGC North-West: http://eng.mrsksevzap.ru/
•   TGK 1:                               •   IDGC Ural: http://www.mrsk-
    http://www.tgc1.ru/en/home/              ural.ru/eng/company/
•                                        •   IDGC South: http://www.mrsk-yuga.ru/
    TGK 2: http://www.tgc-
    2.ru:8101/en/index.shtml             •   IDGC Center: http://www.mrsk-1.ru/
•   TGK 3:                               •   IDGC Center and Volga Region:
    http://www.mosenergo.ru/Eng/Defa         http://www.mrsk-cp.ru/
    ult.aspx                             •   Manager of the unified transport network:
•   TGK 4: http://www.quadra.ru/             http://www.fsk-ees.ru/
•   TGK 5: http://www.tgc5.ru/rus.html   •   Rosenergoatom: http://www.rosenergoatom.ru/
•   TGK 6:
    http://www.tgc6.ru/index.php?
    id=news&L=1
Largest 3 foreign investors:
• E.ON (Germany)
• Enel (Italy)
• Fortum (Finland)
Need for new investment
• Most power stations built in 1960-1970
   – Low efficiency ratio of 33-35% instead of 40-52%
• Ministry of Energy: modernization program for
  generators of 10 trillion rubles up till 2030
   – Increase in demand for equipment
• Russian technology behind western standards
   –   heavy duty gas turbines
   –   ultra supercritical steam turbines
   –   gasification
   –   process control systems
Electricity consumption Russia, 2007


                     Gigantic losses
Growth of electricity demand
Competition problems
• No working retail markets yet
• Fair access to gas for fair and equal prices
  – Gas fired generators 40% of production
  – Newcomers often CCGT
  – Gazprom (75% share) seems to favor its own
    subsidiary generators
• Financial energy market not developed
  – Risk management
Regulation
• regulatory authority: the Market Council
• But not independent, government:
  – control over most pricing issues
  – Veto over Market Council decisions
Industrial
                         consumers


  Transmission                            Other countries



                    Distributors

Power Plants




                 Residential consumers:
                      Households
Electricity Economics

Más contenido relacionado

La actualidad más candente

3-Phase AC Motor Model(PSpice Model)
3-Phase AC Motor Model(PSpice Model)3-Phase AC Motor Model(PSpice Model)
3-Phase AC Motor Model(PSpice Model)Tsuyoshi Horigome
 
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)Tsuyoshi Horigome
 
Hybridisatie van mijn_machine_07-06-2012_crane
Hybridisatie van mijn_machine_07-06-2012_craneHybridisatie van mijn_machine_07-06-2012_crane
Hybridisatie van mijn_machine_07-06-2012_craneSirris
 
Jacob Klimstra - Smart Power Generation
Jacob Klimstra - Smart Power GenerationJacob Klimstra - Smart Power Generation
Jacob Klimstra - Smart Power GenerationSmart Power Generation
 
Modulation and its basic types
Modulation and its basic types Modulation and its basic types
Modulation and its basic types OsamaMunawar1
 
Master thesis presentation
Master thesis presentationMaster thesis presentation
Master thesis presentationMayur Sarode
 
Univ Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of FlashoverUniv Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of Flashovercorinne rocherieux
 
SPICE MODEL of MSE-3000 in SPICE PARK
SPICE MODEL of MSE-3000 in SPICE PARKSPICE MODEL of MSE-3000 in SPICE PARK
SPICE MODEL of MSE-3000 in SPICE PARKTsuyoshi Horigome
 
Lect2 up300 (100328)
Lect2 up300 (100328)Lect2 up300 (100328)
Lect2 up300 (100328)aicdesign
 
SPICE MODEL of MSE-1500 in SPICE PARK
SPICE MODEL of MSE-1500 in SPICE PARKSPICE MODEL of MSE-1500 in SPICE PARK
SPICE MODEL of MSE-1500 in SPICE PARKTsuyoshi Horigome
 
Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12solpowerpeople
 
eWAVE2108 long span application
eWAVE2108 long span application eWAVE2108 long span application
eWAVE2108 long span application Sam Lo
 
17b transformer class exercise solution_r13
17b transformer class exercise solution_r1317b transformer class exercise solution_r13
17b transformer class exercise solution_r13MecmedMomod
 
SPICE MODEL of MSE-1000 in SPICE PARK
SPICE MODEL of MSE-1000 in SPICE PARKSPICE MODEL of MSE-1000 in SPICE PARK
SPICE MODEL of MSE-1000 in SPICE PARKTsuyoshi Horigome
 
Exp amplitude modulation (6)
Exp amplitude modulation (6)Exp amplitude modulation (6)
Exp amplitude modulation (6)Sarah Krystelle
 

La actualidad más candente (19)

3-Phase AC Motor Model(PSpice Model)
3-Phase AC Motor Model(PSpice Model)3-Phase AC Motor Model(PSpice Model)
3-Phase AC Motor Model(PSpice Model)
 
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)
Concept Kit 3-Phase AC Motor Drive Simulation (PSpice Version)
 
Hybridisatie van mijn_machine_07-06-2012_crane
Hybridisatie van mijn_machine_07-06-2012_craneHybridisatie van mijn_machine_07-06-2012_crane
Hybridisatie van mijn_machine_07-06-2012_crane
 
Kam Hybrid System RTGC
Kam Hybrid System RTGCKam Hybrid System RTGC
Kam Hybrid System RTGC
 
Jacob Klimstra - Smart Power Generation
Jacob Klimstra - Smart Power GenerationJacob Klimstra - Smart Power Generation
Jacob Klimstra - Smart Power Generation
 
Modulation and its basic types
Modulation and its basic types Modulation and its basic types
Modulation and its basic types
 
Master thesis presentation
Master thesis presentationMaster thesis presentation
Master thesis presentation
 
Univ Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of FlashoverUniv Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of Flashover
 
SPICE MODEL of MSE-3000 in SPICE PARK
SPICE MODEL of MSE-3000 in SPICE PARKSPICE MODEL of MSE-3000 in SPICE PARK
SPICE MODEL of MSE-3000 in SPICE PARK
 
Lect2 up300 (100328)
Lect2 up300 (100328)Lect2 up300 (100328)
Lect2 up300 (100328)
 
Eeng 3810 chapter 4
Eeng 3810 chapter 4Eeng 3810 chapter 4
Eeng 3810 chapter 4
 
SPICE MODEL of MSE-1500 in SPICE PARK
SPICE MODEL of MSE-1500 in SPICE PARKSPICE MODEL of MSE-1500 in SPICE PARK
SPICE MODEL of MSE-1500 in SPICE PARK
 
Amplitude modulation
Amplitude modulationAmplitude modulation
Amplitude modulation
 
Dsb lc,sc
Dsb lc,scDsb lc,sc
Dsb lc,sc
 
Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12
 
eWAVE2108 long span application
eWAVE2108 long span application eWAVE2108 long span application
eWAVE2108 long span application
 
17b transformer class exercise solution_r13
17b transformer class exercise solution_r1317b transformer class exercise solution_r13
17b transformer class exercise solution_r13
 
SPICE MODEL of MSE-1000 in SPICE PARK
SPICE MODEL of MSE-1000 in SPICE PARKSPICE MODEL of MSE-1000 in SPICE PARK
SPICE MODEL of MSE-1000 in SPICE PARK
 
Exp amplitude modulation (6)
Exp amplitude modulation (6)Exp amplitude modulation (6)
Exp amplitude modulation (6)
 

Destacado

E Merchant Presentation
E Merchant PresentationE Merchant Presentation
E Merchant PresentationHouang PingKi
 
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Société Française d'Energie Nucléaire
 
Principles of Price Regulation
Principles of Price RegulationPrinciples of Price Regulation
Principles of Price RegulationLeonardo ENERGY
 
Electricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingElectricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingLeonardo ENERGY
 
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...European University Institute
 
Regulating Electricity Market
Regulating Electricity MarketRegulating Electricity Market
Regulating Electricity MarketJustinas Pagirys
 
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationDr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationEconomist
 
Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...ARERA
 

Destacado (11)

Merchant power plants
Merchant power plantsMerchant power plants
Merchant power plants
 
E Merchant Presentation
E Merchant PresentationE Merchant Presentation
E Merchant Presentation
 
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
 
Principles of Price Regulation
Principles of Price RegulationPrinciples of Price Regulation
Principles of Price Regulation
 
Electricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingElectricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - Pricing
 
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
 
Regulating Electricity Market
Regulating Electricity MarketRegulating Electricity Market
Regulating Electricity Market
 
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
 
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationDr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...
 

Similar a Electricity Economics

Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings RCREEE
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power PlantIvec01
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)FunExplode
 
Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...Jean Fang
 
Ibeko Eging Series
Ibeko Eging SeriesIbeko Eging Series
Ibeko Eging Seriesarturveloso
 
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...Silvester Van Koten
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...NSW Environment and Planning
 
Trans european saving-presentation_feb21_2006
Trans european saving-presentation_feb21_2006Trans european saving-presentation_feb21_2006
Trans european saving-presentation_feb21_2006Chibuzo Obikwelu
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network designManikandan Mani
 
Ee w09.2 w_ nodal and zonal, coupling
Ee  w09.2 w_ nodal and zonal, couplingEe  w09.2 w_ nodal and zonal, coupling
Ee w09.2 w_ nodal and zonal, couplingSilvester Van Koten
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalStaco Energy
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Blake Morgan
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers ratingLeonardo ENERGY
 
21st Century Coal Power Plants
21st Century Coal Power Plants21st Century Coal Power Plants
21st Century Coal Power PlantsJeffrey Phillips
 

Similar a Electricity Economics (20)

Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power Plant
 
PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009
 
Transformers
TransformersTransformers
Transformers
 
46584589 substation-design-data
46584589 substation-design-data46584589 substation-design-data
46584589 substation-design-data
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...
 
Ibeko Eging Series
Ibeko Eging SeriesIbeko Eging Series
Ibeko Eging Series
 
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...
 
Trans european saving-presentation_feb21_2006
Trans european saving-presentation_feb21_2006Trans european saving-presentation_feb21_2006
Trans european saving-presentation_feb21_2006
 
Power Factor
Power FactorPower Factor
Power Factor
 
European Grid Codes
European Grid CodesEuropean Grid Codes
European Grid Codes
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network design
 
Ee w09.2 w_ nodal and zonal, coupling
Ee  w09.2 w_ nodal and zonal, couplingEe  w09.2 w_ nodal and zonal, coupling
Ee w09.2 w_ nodal and zonal, coupling
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
21st Century Coal Power Plants
21st Century Coal Power Plants21st Century Coal Power Plants
21st Century Coal Power Plants
 
Transformers
TransformersTransformers
Transformers
 

Más de Silvester Van Koten

5 ie454 l1_ sustainability & externalities
5 ie454  l1_ sustainability & externalities5 ie454  l1_ sustainability & externalities
5 ie454 l1_ sustainability & externalitiesSilvester Van Koten
 
The bully, the wimp and the tough man
The bully, the wimp and the tough manThe bully, the wimp and the tough man
The bully, the wimp and the tough manSilvester Van Koten
 
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Silvester Van Koten
 
Ee w08.2 w_ 4. renewables and the electricity industry (climate change)
Ee  w08.2 w_ 4. renewables and the electricity industry (climate change)Ee  w08.2 w_ 4. renewables and the electricity industry (climate change)
Ee w08.2 w_ 4. renewables and the electricity industry (climate change)Silvester Van Koten
 
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)Silvester Van Koten
 
Ee w07.2 f_ 3. renewables and the electricity industry (climate change)b
Ee  w07.2 f_ 3. renewables and the electricity industry (climate change)bEe  w07.2 f_ 3. renewables and the electricity industry (climate change)b
Ee w07.2 f_ 3. renewables and the electricity industry (climate change)bSilvester Van Koten
 
Ee w05.1 m_ 2. electricity generation _ part 4 (generation technologies)
Ee  w05.1 m_ 2. electricity generation _ part 4 (generation technologies)Ee  w05.1 m_ 2. electricity generation _ part 4 (generation technologies)
Ee w05.1 m_ 2. electricity generation _ part 4 (generation technologies)Silvester Van Koten
 
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Silvester Van Koten
 
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)Silvester Van Koten
 
Ee w03.2 w_ 1. the system (transmission) part 2 & electricity generation pa...
Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation pa...Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation pa...
Ee w03.2 w_ 1. the system (transmission) part 2 & electricity generation pa...Silvester Van Koten
 
Ee w03.1 m_ 1. the system (transmission) part 1
Ee  w03.1 m_ 1. the system (transmission) part 1Ee  w03.1 m_ 1. the system (transmission) part 1
Ee w03.1 m_ 1. the system (transmission) part 1Silvester Van Koten
 
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...Silvester Van Koten
 
True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)Silvester Van Koten
 
Make your presentations compelling
Make your presentations compellingMake your presentations compelling
Make your presentations compellingSilvester Van Koten
 
Van koten economics experiments_ 2013.02.27
Van koten  economics experiments_ 2013.02.27Van koten  economics experiments_ 2013.02.27
Van koten economics experiments_ 2013.02.27Silvester Van Koten
 
2. competition, markets, ets & renewables final
2. competition, markets, ets & renewables  final2. competition, markets, ets & renewables  final
2. competition, markets, ets & renewables finalSilvester Van Koten
 
1. electricity markets_ Transmission
1. electricity markets_ Transmission1. electricity markets_ Transmission
1. electricity markets_ TransmissionSilvester Van Koten
 

Más de Silvester Van Koten (20)

5 ie454 l1_ sustainability & externalities
5 ie454  l1_ sustainability & externalities5 ie454  l1_ sustainability & externalities
5 ie454 l1_ sustainability & externalities
 
The bully, the wimp and the tough man
The bully, the wimp and the tough manThe bully, the wimp and the tough man
The bully, the wimp and the tough man
 
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
 
Ee w08.2 w_ 4. renewables and the electricity industry (climate change)
Ee  w08.2 w_ 4. renewables and the electricity industry (climate change)Ee  w08.2 w_ 4. renewables and the electricity industry (climate change)
Ee w08.2 w_ 4. renewables and the electricity industry (climate change)
 
Ee w08.1 m_ trading game
Ee  w08.1 m_ trading gameEe  w08.1 m_ trading game
Ee w08.1 m_ trading game
 
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
 
Ee w07.2 f_ 3. renewables and the electricity industry (climate change)b
Ee  w07.2 f_ 3. renewables and the electricity industry (climate change)bEe  w07.2 f_ 3. renewables and the electricity industry (climate change)b
Ee w07.2 f_ 3. renewables and the electricity industry (climate change)b
 
Ee w05.1 m_ 2. electricity generation _ part 4 (generation technologies)
Ee  w05.1 m_ 2. electricity generation _ part 4 (generation technologies)Ee  w05.1 m_ 2. electricity generation _ part 4 (generation technologies)
Ee w05.1 m_ 2. electricity generation _ part 4 (generation technologies)
 
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
 
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
 
Ee w03.2 w_ 1. the system (transmission) part 2 & electricity generation pa...
Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation pa...Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation pa...
Ee w03.2 w_ 1. the system (transmission) part 2 & electricity generation pa...
 
Ee w03.1 m_ 1. the system (transmission) part 1
Ee  w03.1 m_ 1. the system (transmission) part 1Ee  w03.1 m_ 1. the system (transmission) part 1
Ee w03.1 m_ 1. the system (transmission) part 1
 
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
 
True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)
 
Make change easier!
Make change easier!Make change easier!
Make change easier!
 
Make your presentations compelling
Make your presentations compellingMake your presentations compelling
Make your presentations compelling
 
Van koten economics experiments_ 2013.02.27
Van koten  economics experiments_ 2013.02.27Van koten  economics experiments_ 2013.02.27
Van koten economics experiments_ 2013.02.27
 
2. competition, markets, ets & renewables final
2. competition, markets, ets & renewables  final2. competition, markets, ets & renewables  final
2. competition, markets, ets & renewables final
 
1. electricity markets_ Transmission
1. electricity markets_ Transmission1. electricity markets_ Transmission
1. electricity markets_ Transmission
 
Slvstr eee pricing_carbon
Slvstr  eee  pricing_carbonSlvstr  eee  pricing_carbon
Slvstr eee pricing_carbon
 

Electricity Economics