Digital Marketing Training Institute in Mohali, India
Final major project production diary by james fox 08.4.13
1. BTEC Extended Diploma in Creative Media Production
IG4 Final Major Project
Production Diary
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including Possible
Contingency Plans If Problems Anticipated)
Mon W/B 07/01/13
(Detailed Weekly Summary)
Mon W/B 14/01/13
(Detailed Weekly Summary)
Mon W/B 21/01/13
(Detailed Weekly Summary)
Firstly I created my blog, then exceeding in completing my
production schedule and idea’s generation. I gave it a thought and
started researching on the topic I chose which was a double page
spread of a fashion based magazine. This focus will enhance into
more advanced information to the reader.
Surpass completion on Ideas generation and proceed in
keeping my production schedule up to date. The 28.1.13
will consist of producing a proposal so preparation is
sufficient.
Mon W/B 28/01/13
(Detailed Weekly Summary)
My production is running smoothly considering into initiation my
research and proposal which are coming to exceed in completion.
Pre-production for my proposal is now being submitted.
Top on completing my proposal and providing more
research information on my final major project.
Mon W/B 04/02/13
(Detailed Weekly Summary)
My week’s pre-production has consisted of completion of my
proposal which didn’t take along as set out. This accomplishment
has surpassed me to start comparing both idea’s generation and
my proposal to depict on what ideas I’ve chosen.
Complete work on comparing idea’s generation to
proposal and have an evaluation finished.
Mon W/B 11/02/13
(Detailed Weekly Summary)
Mon W/B 18/02/13
(Detailed Weekly Summary)
Completion of set objectives are of enhanced detail and I’m happy
with the standard of work I’ve produced. To forward this
progression I’ve lightened the idea of starting my pitch within an
earlier date.
To complete pre-production for my pitch which is set to
be performed within the next 2-3 weeks.
Mon W/B 25/02/13
(Detailed Weekly Summary)
Pre-Production is in order and is exceeding in completion. The
pitch script is going through conclusion throughout today’s lesson.
Hopefully concluding this success through will prove completion of
Pre-production for my pitch.
To complete pre-production for my pitch which is set to
be performed within the next 2-3 weeks. Moving onto
pre-production for my final major project.
2. BTEC Extended Diploma in Creative Media Production
IG4 Final Major Project
Production Diary
Mon W/B 04/03/13
(Detailed Weekly Summary)
Pre-production for my pitch is now completed and in the coming
weeks I just exceed in perfecting my presentation.
Completed
Mon W/B 11/03/13
(Detailed Weekly Summary)
Pre-production for my pitch is now completed and in the coming
weeks I just exceed in perfecting my presentation.
Completed
Mon W/B 18/03/13
(Detailed Weekly Summary)
Pre-production for my pitch is now completed and in the coming
weeks I just exceed in perfecting my presentation.
Completed
Mon W/B 01/04/13
(Detailed Weekly Summary)
Throughout completing my pitch on the 25.03.13, progression has
been running smoothly.
The main outlet now is to produce my final major
project a little pre-production is still needed but I will
exceed in completion.
Mon W/B 08/04/13
(Detailed Weekly Summary)
Everything is now completed Everything is now completed
Mon W/B 15/04/13
(Detailed Weekly Summary)
Everything is now completed Everything is now completed
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible
Contingency Plans)