About The Presentation - Thesis
• EPM solution can show positive ROI
• The source of value will differ from organization to organization.
• Yet there are clear conditions which, if satisfied, ensure EPM
system value realization.
• We would like to discuss those.
The Scale of ROI Approaches
This presentation
Calculate but with sanity check

EPM Improves
employee productivity
and projects success
rate

EPM provides ROI of
275% with payback
period of 13 months
assuming Level 2 PM
maturity of the
organization, …
„Excel” ROI approach
List all the
areas of
improvement

Estimate
current
effort, cost
and risk

Estimate
potential
improvement
• Guess
• Survey

Calculate
benefits
• ROI
• Payback period

• Logic
• We don’t need to find exact value of improvement. It’s enough to find
credible/believable assumptions
• Exact math we do with assumptions serves the purpose of giving the
reader necessary confidence
Areas Of Improvements
15
%

10
%

10
%
10
%
25
%
Improvements Quantification

Number of Project users

30

Organization size

1000

Average annual cost per employee

40.000 $
Costs
PRICE

YEARLY COST (3 year
horizon)

LICENSES

14.000 USD

Project Online

33 USD per user per month

Project Online With Project Pro

58 USD per user per month

SERVICES

12.000 USD

Implementation Cost

20k USD (one time)

Support

5k USD per year

TOTAL
Investment in internal change
management

26.000 USD
??
Total Number of Project users

30

Number of Project Pro users

5
Challenge
• Company with 30 PMs and delivery resources would deliver 23M USD worth of projects a year
• Cost for tool and training is 25k USD

Would you bet your own 25k USD in
exchange for savings that tool might
produce?
Source Of Improvements
Benefit

Synchronizing
Projects With
Highest Impact

Providing
Estimation Tools
And Best Practice
Methodologies

Providing
Workflow And
Visibility Into
Project
Performance

Providing
Portfolio
Reporting And
Analyses

Aligning Projects
With Resources
Capacity

Aligning Projects
To Strategic
Goals

Feature

Team Planner
View

Centralized
Resources with
Role and Skills

Portfolio Analyses

Resource Plan
Assigning The
Right Skills To
The Right
Projects

Resource
Levelling

Demand
Management with
Templates and
Workflow
Capturing
Planned And
Active Projects
Providing
Automated
Report
Generation And
Analysis

Rich Reporting

Centralized
Projects
Simple and
Process Driven
Status and Time
Reporting

Project Pro
Schedule
Development!
WOULD THIS HELP?
Black Swan
• The black swan theory or theory of black swan events is a
metaphor that describes an event that comes as a surprise, has
a major effect, and is often inappropriately rationalized after the
fact with the benefit of hindsight.
• The theory was developed by Nassim Nicholas Taleb
We don’t want to exhaust
ourselves in saving worthless
minutes while missing major
opportunities or risks!

Source:
What Does A Manager Do?
• A manager makes decisions and sees them through!
• What do you need to make good decisions?
•
•
•
•
•

Experience
Intuition
Guts
Data
Luck

The main value of EPM system is:
• Fresh, accurate and relevant data that can be used to make short term
steering
• Historical data that shows trends (or lack of those)
In other words – give a tool to a few the most expensive resources instead of
many with small impact.
Influence Of Company Type
Services Company
• Projects are delivered for external customer  project have a
clear price, cost and profitability attached.
• Demand for resources comes from
• External billable projects
• External non-billable projects and engagements
• Internal projects

Want to have a tight
control of those by
many dimensions

• The ultimate goal is to have the supply of projects that exactly
matches the full capacity  Resource Management is the most
important capability
• Typically, you don’t skip the sale because resources are
overloaded  portfolio selection is not that important in it’s
basic form
You don’t waist time in questioning the
value of PM tools for Services company.
It’s there! Use it!
Level of usage in Microsoft partner
companies (with licenses on hand)
shows that, considering
implementation, maintenance and
organizational change perspectives –
EPM is worth using

Idemo delat!
Non Services Company
• Demand for projects and resources comes from business units
• Constant change in demand and project priorities is a business
fact
• Agendas other than company interest might drive the project
selection and priorities
• Effects of poor project management are not visible in a short
term
• Project resources worth managing are mostly located in IT (at
least in Financial and Telecom sector)
• There is no implementation if resource department’s management
doesn’t support it

• Business units are not interested in resource management!
Tracking costs, collaboration and transparency are typically
their main drivers.
The Discipline
• The same question asked by every customer – “How can we make
sure employees will feed the system?”
• Organization that doesn’t have a lever to make employees do their
job is not likely to have potential of making changes based on EPM
system so it cannot benefit from it
• Team member’s responsibility is not only to do the job but also to
provide necessary data for others to do theirs
• What can be done to address the “discipline issue”?
•
•
•
•

Compliance reporting
Data quality role
Employee’s individual targets
Make the system as usable as possible (“are you telling me that there is an
issue with entering 10 numbers per week in your Outlook calendar?”)
• Project assistant role
• Make EPM system data the source of other system/process dependency (e.g.
invoicing)
Scope Of Implementation
• Must cover all capabilities with
appropriate depth
• It’s impossible to manage resources
without a level of certainty in demand
• For managing the demand there must
be a filter with criteria and decision
• It’s impossible to manage resource
supply without planning and tracking
work done
• It’s impossible to track status without
planning and tracking work done
• …
The worst possible approach is: “Let’s try it on one
project”

Standardize planning

Standardize Status Reporting

Provide Project Status

Implementation
Requirements

Manage Resources

Manage Demand

Select Based on objective
criteria and capacity

Manage Supply

Dilligent Planning and Tracking
The Planning And Tracking Process
• Proficiency in developing and maintaining Project Schedule is
essential yet typically very rare
• It’s difficult to get “experienced” project manager for a basic MS Project
training  It’s the single most important “soft” implementation blocker

• If you have PS-skilful project managers  agile implementation
possible (finally found opportunity to use that popular word!)
• Years of experience in managing individual projects provides
very little competence in organizing EPM environment  it will
not happen by itself and external help is necessary

• Pleas visit 10:15 session tomorrow “It’s Not A Bug. It’s A
Feature” for discussion on possible adoption blockers
questions?
thank you.
SHAREPOINT AND PROJECT CONFERENCE ADRIATICS 2013
ZAGREB, NOVEMBER 27-28 2013

Más contenido relacionado

Similar a Project Server - Who can benefit from it and how?

PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
Jeff McClay
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...
p6academy
 
Analyzing the Business Case for System Analysis and Design
Analyzing the Business Case for System Analysis and DesignAnalyzing the Business Case for System Analysis and Design
Analyzing the Business Case for System Analysis and Design
rdelafuentetcu
 

Similar a Project Server - Who can benefit from it and how? (20)

The Role of Technology in Managing the Operations of a Nonprofit #17ntc
The Role of Technology in Managing the Operations of a Nonprofit  #17ntc The Role of Technology in Managing the Operations of a Nonprofit  #17ntc
The Role of Technology in Managing the Operations of a Nonprofit #17ntc
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
Business Process Management: An Understanding and Process
Business Process Management: An Understanding and ProcessBusiness Process Management: An Understanding and Process
Business Process Management: An Understanding and Process
 
Effective Business Analysis in a Changing World
Effective Business Analysis in a Changing WorldEffective Business Analysis in a Changing World
Effective Business Analysis in a Changing World
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...
 
PM Tool Meetup
PM Tool MeetupPM Tool Meetup
PM Tool Meetup
 
PM Tool Meetup
PM Tool MeetupPM Tool Meetup
PM Tool Meetup
 
PM Tool Meetup
PM Tool MeetupPM Tool Meetup
PM Tool Meetup
 
Pm Tool Meetup
Pm Tool MeetupPm Tool Meetup
Pm Tool Meetup
 
Welingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLikeWelingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLike
 
Analyzing the Business Case for System Analysis and Design
Analyzing the Business Case for System Analysis and DesignAnalyzing the Business Case for System Analysis and Design
Analyzing the Business Case for System Analysis and Design
 
Ba process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTDBa process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTD
 
UCISA Project and Change Management Group Toolkits
UCISA Project and Change Management Group Toolkits  UCISA Project and Change Management Group Toolkits
UCISA Project and Change Management Group Toolkits
 
Project and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptxProject and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptx
 
Agile 101
Agile 101Agile 101
Agile 101
 
Simplifying Financial Performance Management Systems
Simplifying Financial Performance Management SystemsSimplifying Financial Performance Management Systems
Simplifying Financial Performance Management Systems
 
Analytics offerings
Analytics offeringsAnalytics offerings
Analytics offerings
 
Benefits of EPM
Benefits of EPMBenefits of EPM
Benefits of EPM
 
The Modern ERP Landscape
The Modern ERP LandscapeThe Modern ERP Landscape
The Modern ERP Landscape
 
14.1 features
14.1 features14.1 features
14.1 features
 

Más de SPC Adriatics

Más de SPC Adriatics (20)

How to secure your data in Office 365
How to secure your data in Office 365 How to secure your data in Office 365
How to secure your data in Office 365
 
Do you know, where your sensitive data is?
Do you know, where your sensitive data is?Do you know, where your sensitive data is?
Do you know, where your sensitive data is?
 
Securing Intellectual Property using Azure Rights Management Services
Securing Intellectual Property using Azure Rights Management ServicesSecuring Intellectual Property using Azure Rights Management Services
Securing Intellectual Property using Azure Rights Management Services
 
Creating Workflows in Project Online
Creating Workflows in Project OnlineCreating Workflows in Project Online
Creating Workflows in Project Online
 
Faster than a flash behind the scenes of patching SharePoint Online
Faster than a flash   behind the scenes of patching SharePoint OnlineFaster than a flash   behind the scenes of patching SharePoint Online
Faster than a flash behind the scenes of patching SharePoint Online
 
Role based views in Project and Resource Center
Role based views in Project and Resource CenterRole based views in Project and Resource Center
Role based views in Project and Resource Center
 
OneDrive, TwoDrive, Whiterive, BlueDrive (hahaha)
OneDrive, TwoDrive, Whiterive, BlueDrive (hahaha)OneDrive, TwoDrive, Whiterive, BlueDrive (hahaha)
OneDrive, TwoDrive, Whiterive, BlueDrive (hahaha)
 
SharePoint Governance and Compliance
SharePoint Governance and ComplianceSharePoint Governance and Compliance
SharePoint Governance and Compliance
 
From analyses to successful Implementation
From analyses to successful ImplementationFrom analyses to successful Implementation
From analyses to successful Implementation
 
The key to a successful Office 365 implementation is adoption
The key to a successful Office 365 implementation is adoptionThe key to a successful Office 365 implementation is adoption
The key to a successful Office 365 implementation is adoption
 
Office 365 Video
Office 365 VideoOffice 365 Video
Office 365 Video
 
10 Steps to be Successful with Enterprise Search
10 Steps to be Successful with Enterprise Search10 Steps to be Successful with Enterprise Search
10 Steps to be Successful with Enterprise Search
 
How the Cloud Changes Business Solution Design and Delivery
How the Cloud Changes Business Solution Design and DeliveryHow the Cloud Changes Business Solution Design and Delivery
How the Cloud Changes Business Solution Design and Delivery
 
Scaling SharePoint 2016 Farms with MinRole & Other Tools
Scaling SharePoint 2016 Farms with MinRole & Other ToolsScaling SharePoint 2016 Farms with MinRole & Other Tools
Scaling SharePoint 2016 Farms with MinRole & Other Tools
 
SharePoint 2013 Search Operations
SharePoint 2013 Search OperationsSharePoint 2013 Search Operations
SharePoint 2013 Search Operations
 
Office Online Server 2016 - a must for on-premises installation for SharePoin...
Office Online Server 2016 - a must for on-premises installation for SharePoin...Office Online Server 2016 - a must for on-premises installation for SharePoin...
Office Online Server 2016 - a must for on-premises installation for SharePoin...
 
Custom Code-The Missing Piece of the SharePoint Governance Puzzle
Custom Code-The Missing Piece of the SharePoint Governance PuzzleCustom Code-The Missing Piece of the SharePoint Governance Puzzle
Custom Code-The Missing Piece of the SharePoint Governance Puzzle
 
SharePoint 2016 Hybrid Sites Inside Out
SharePoint 2016 Hybrid Sites Inside OutSharePoint 2016 Hybrid Sites Inside Out
SharePoint 2016 Hybrid Sites Inside Out
 
Microsoft BI demystified: SharePoint 2016 BI or for PowerBI v2?
Microsoft BI demystified: SharePoint 2016 BI or for PowerBI v2?Microsoft BI demystified: SharePoint 2016 BI or for PowerBI v2?
Microsoft BI demystified: SharePoint 2016 BI or for PowerBI v2?
 
What's New for the BI workload in SharePoint 2016 and SQL Server 2016
What's New for the BI workload in SharePoint 2016 and SQL Server 2016What's New for the BI workload in SharePoint 2016 and SQL Server 2016
What's New for the BI workload in SharePoint 2016 and SQL Server 2016
 

Último

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Último (20)

Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 

Project Server - Who can benefit from it and how?

  • 1. Project Server – Who Can Benefit From It And How? IGOR SLIŠKOVIĆ, PROTERON CONSULTING SHAREPOINT AND PROJECT CONFERENCE ADRIATICS 2013 ZAGREB, NOVEMBER 27-28 2013
  • 3. About The Presentation - Thesis • EPM solution can show positive ROI • The source of value will differ from organization to organization. • Yet there are clear conditions which, if satisfied, ensure EPM system value realization. • We would like to discuss those.
  • 4. The Scale of ROI Approaches This presentation Calculate but with sanity check EPM Improves employee productivity and projects success rate EPM provides ROI of 275% with payback period of 13 months assuming Level 2 PM maturity of the organization, …
  • 5. „Excel” ROI approach List all the areas of improvement Estimate current effort, cost and risk Estimate potential improvement • Guess • Survey Calculate benefits • ROI • Payback period • Logic • We don’t need to find exact value of improvement. It’s enough to find credible/believable assumptions • Exact math we do with assumptions serves the purpose of giving the reader necessary confidence
  • 7. Improvements Quantification Number of Project users 30 Organization size 1000 Average annual cost per employee 40.000 $
  • 8. Costs PRICE YEARLY COST (3 year horizon) LICENSES 14.000 USD Project Online 33 USD per user per month Project Online With Project Pro 58 USD per user per month SERVICES 12.000 USD Implementation Cost 20k USD (one time) Support 5k USD per year TOTAL Investment in internal change management 26.000 USD ?? Total Number of Project users 30 Number of Project Pro users 5
  • 9. Challenge • Company with 30 PMs and delivery resources would deliver 23M USD worth of projects a year • Cost for tool and training is 25k USD Would you bet your own 25k USD in exchange for savings that tool might produce?
  • 10. Source Of Improvements Benefit Synchronizing Projects With Highest Impact Providing Estimation Tools And Best Practice Methodologies Providing Workflow And Visibility Into Project Performance Providing Portfolio Reporting And Analyses Aligning Projects With Resources Capacity Aligning Projects To Strategic Goals Feature Team Planner View Centralized Resources with Role and Skills Portfolio Analyses Resource Plan Assigning The Right Skills To The Right Projects Resource Levelling Demand Management with Templates and Workflow Capturing Planned And Active Projects Providing Automated Report Generation And Analysis Rich Reporting Centralized Projects Simple and Process Driven Status and Time Reporting Project Pro Schedule Development!
  • 12. Black Swan • The black swan theory or theory of black swan events is a metaphor that describes an event that comes as a surprise, has a major effect, and is often inappropriately rationalized after the fact with the benefit of hindsight. • The theory was developed by Nassim Nicholas Taleb We don’t want to exhaust ourselves in saving worthless minutes while missing major opportunities or risks! Source:
  • 13. What Does A Manager Do? • A manager makes decisions and sees them through! • What do you need to make good decisions? • • • • • Experience Intuition Guts Data Luck The main value of EPM system is: • Fresh, accurate and relevant data that can be used to make short term steering • Historical data that shows trends (or lack of those) In other words – give a tool to a few the most expensive resources instead of many with small impact.
  • 15. Services Company • Projects are delivered for external customer  project have a clear price, cost and profitability attached. • Demand for resources comes from • External billable projects • External non-billable projects and engagements • Internal projects Want to have a tight control of those by many dimensions • The ultimate goal is to have the supply of projects that exactly matches the full capacity  Resource Management is the most important capability • Typically, you don’t skip the sale because resources are overloaded  portfolio selection is not that important in it’s basic form
  • 16. You don’t waist time in questioning the value of PM tools for Services company. It’s there! Use it! Level of usage in Microsoft partner companies (with licenses on hand) shows that, considering implementation, maintenance and organizational change perspectives – EPM is worth using Idemo delat!
  • 17. Non Services Company • Demand for projects and resources comes from business units • Constant change in demand and project priorities is a business fact • Agendas other than company interest might drive the project selection and priorities • Effects of poor project management are not visible in a short term • Project resources worth managing are mostly located in IT (at least in Financial and Telecom sector) • There is no implementation if resource department’s management doesn’t support it • Business units are not interested in resource management! Tracking costs, collaboration and transparency are typically their main drivers.
  • 18. The Discipline • The same question asked by every customer – “How can we make sure employees will feed the system?” • Organization that doesn’t have a lever to make employees do their job is not likely to have potential of making changes based on EPM system so it cannot benefit from it • Team member’s responsibility is not only to do the job but also to provide necessary data for others to do theirs • What can be done to address the “discipline issue”? • • • • Compliance reporting Data quality role Employee’s individual targets Make the system as usable as possible (“are you telling me that there is an issue with entering 10 numbers per week in your Outlook calendar?”) • Project assistant role • Make EPM system data the source of other system/process dependency (e.g. invoicing)
  • 19. Scope Of Implementation • Must cover all capabilities with appropriate depth • It’s impossible to manage resources without a level of certainty in demand • For managing the demand there must be a filter with criteria and decision • It’s impossible to manage resource supply without planning and tracking work done • It’s impossible to track status without planning and tracking work done • … The worst possible approach is: “Let’s try it on one project” Standardize planning Standardize Status Reporting Provide Project Status Implementation Requirements Manage Resources Manage Demand Select Based on objective criteria and capacity Manage Supply Dilligent Planning and Tracking
  • 20. The Planning And Tracking Process • Proficiency in developing and maintaining Project Schedule is essential yet typically very rare • It’s difficult to get “experienced” project manager for a basic MS Project training  It’s the single most important “soft” implementation blocker • If you have PS-skilful project managers  agile implementation possible (finally found opportunity to use that popular word!) • Years of experience in managing individual projects provides very little competence in organizing EPM environment  it will not happen by itself and external help is necessary • Pleas visit 10:15 session tomorrow “It’s Not A Bug. It’s A Feature” for discussion on possible adoption blockers
  • 22. thank you. SHAREPOINT AND PROJECT CONFERENCE ADRIATICS 2013 ZAGREB, NOVEMBER 27-28 2013