ISSUE 1
                                                               JUNE 2008




•   Introduction                 Tennis Courts Building
    Standards
•
•   Statutory Approvals                  Brief
•   Disabled Users Policy
•   Contract
•   Environmental Policy
•   Design Parameters
•   Design




                            Introduction
                            The purpose of the tennis court building brief is to provide a guide to the
                            minimum standards to which new outdoor courts should be constructed.
                            This information should not be considered to be a complete building
                            brief in itself but the basis from which a full project brief, design and
                            specification can be evolved.

                            It should be noted that the dimensions contained in this document are
                            for recreational play and many require to be exceeded for specialist
                            events and tournaments. In these instances further advice should be
                            sought from the LTA.

                            Standards
                            All construction projects should conform to the requirements of all
                            relevant current building legislation, including British Standards and
                            Codes of Practice.

                            Statutory Approvals
                            The LTA requires confirmation in writing that planning approvals have
                            been obtained (where appropriate).

                            It should be noted that the Construction Regulation 2007 (CDM
                            Regulations) will apply to most projects.


    1
Disabled Users Policy
    All new tennis facilities and extensions or refurbishment works to
    existing facilities should meet or exceed the standards required by law
    (set out in the current Building Regulations). The technical, financial and
    tennis development aspects of all projects applying for LTA loans or
    grants are vetted, and access for disabled users is considered as part of
    this process. Please also refer to DTLR Building Regulations,

    When designing any tennis facility, whether indoor, outdoor or both,
    always consider the following for all potential users:

    •   Designated accessible parking.
    •   Access to all areas externally.
    •   High level bolts that cannot be reached.
    •   Matting impeding movement.
    •   Door widths that are too narrow. Sports chairs range up to a
        1000mm wheelbase.
    •   Strength of door closers.
    •   Corridor widths that do not allow passing of wheelchairs.
    •   Steps and thresholds that obstruct movement and use.
    •   Electrical sockets/switches, taps, handles, etc. are positioned to high
        to be reached.
    •   Use of colours that are inappropriate for anyone with a sight
        impairment.
    •   Ramp gradients that are steep or have no landing areas.
    •   Steps generally.
    •   Unnecessary restrictions on the use of some tennis court surfaces.
    •   Viewing - height of balustrades and fences.

    Contract
    All projects that require LTA funding should use a recognised standard
    form of building contract e.g. Joint Contracts Tribunal (JCT) standard
    forms, which are suitable for dealing with a range of project values and
    types.

    Space should be allocated on the construction site signboard for an
    “LTA Building for Tennis” sign (310mm x 1220mm).


    Environmental Policy
    The LTA embraces environmental issues in the design of tennis
    facilities. The following areas should be considered:

    • use of materials obtained from renewable sources
    • measures to minimise dependence on finite fossil fuels, emissions
      and operating costs and improve energy efficiency.




2
Design Parameters
    Tennis Court Dimensions
     Principal Playing Area (The area
     bounded by the outside of the court
     lines)
      Length                                               23.77m (78’ 0”)
      Width                                                10.97m (36’ 0”)
      Length of net (doubles)                               12.8m (42’ 0”)

      Width of play lines (white) excluding                   5cm (2”)
      base line
      included within above court size

      Base Line                                              5-10cm(4”)


      Other dimensions                          Recommended                  Min Size
                                                    Size

      Runback (i.e. clear depth behind           6.40m (21’ 0”)          5.49m (18’00”)
      baselines, at each end)
      Side-run (i.e. clear width beside each     3.66m (12’ 0”)           3.05m (10’0”)
      side)
      Side-run between courts not separately     4.27m (14’ 0”)           3.66m (12’0”)
      enclosed




    Design
    The design of the scheme should be visually pleasing and create an
    environment that will be attractive to users of all ages and abilities. It
    should be fit for its intended purpose and made attractive by the
    considered use of landscaping materials, textures and colours in
    suitable combinations.

    Court Layout and Orientation
    Courts should be positioned with the centre-line of the courts running in
    a generally north/south orientation, although conditions may prevent this
    arrangement. This is to avoid problems of serving into the during the
    summer months. Courts should not preferably exceed three in a row.
    Consideration should be given for access to each court, without
    interrupting play on adjoining courts.

    If adjacent to an indoor centre the outdoor courts should have access to
    the ancillary accommodation of the centre. The court layout should
    preferably ensure a view of all outdoor courts from reception in order to
    control their use, allow viewing from the social areas and have some
    visual relationship with any indoor courts.

    Paths and Lighting
    Paths must be provided to all court access doors and to allow
    movement around the site. Paths must have a suitable camber to shed
    water and be constructed from a suitable low slip material. Paths should
    be at least 1.50m wide where space permits for sports wheelchair
    access.




3
Shelters
    On court shelters should be considered as an amenity for tennis
    court users and to enhance the environment.

    Playing Surface
    The choice of surface needs careful study and can be complicated by
    the use many trade names for similar surfaces. Refer to your Facility
    Project Manager for general guidance on appropriate surfaces for your
    club.

    Construction
    Bases for courts will be macadam on granular fill a thickness
    suitable for the site conditions and in accordance with the court
    surface installers instructions and specifications. Extensive repairs,
    patching or grinding of surfaces will not be permitted.

    Special attention is to be paid to the junction between the court
    construction and the edge detail to ensure separation and lifting
    does not occur at the perimeters due to moisture penetration or frost
    heave.

    Gradient
    Non-porous courts should be laid to a gradient to assist the removal of
    surface water. The gradient should be across the court or lengthways
    depending upon site conditions and the fall must be in a single plane.
    The gradient for non-porous courts shall be min. 1:120 and max 1:100.

    Porous courts should be laid to a maximum gradient of 1:120 and a
    minimum of 1:200. Porous court may be laid flat if a gradient is
    incorporated to the formation level.

    Court Fencing
    It is suggested that all courts are to be fenced in green or black chain
    link fencing to BS1722 Part 13. Angle section fence posts 50x50 are
    commonly adopted, however a 60mm diameter tubular or rolled hollow
    section, plastic coated coloured black or green post is preferred.
    Careful attention should be paid to fixings, to ensure that there are no
    sharp edges that would cause injury to either players or spectators.

    The base of the fencing should be constructed so that the tennis balls
    cannot get underneath the fencing and the edge of the court
    construction. This can take the form of a horizontal bracing bar.

    Generally the fencing should be 2.75m high, however, lowered sections
    should be considered for viewing. The fencing should then be 2.75m
    behind the base line and return two bays full height, the second of
    which should slope down to height of 1.2m above the court surface for
    the reminder of the side elevations. Where it can be achieved fencing
    dividing multiple court enclosures should be min.1.2m high with one bay
    from the surround fencing brought into the court at full height.

    The gate provision should allow for maintenance access for batch court
    surface and floodlighting

    Windbreaks
    Wind screening maybe provided either in the form of landscaped earth
    mounds, planting or porous windbreak screens mounted on the court
    fencing. The design of the fencing must take due consideration of the
    additional wind loads applied by the windbreaks with additional or

4
strengthened supports whether or not windbreaks are included in the
    scheme. Windbreaks should not be left up all year.

    Fixtures and Fittings
    Equipment provided per court should include the following:
    • Net and Posts
    • Centre band and anchor
    • Brushes and other maintenance equipment necessary to maintain
       specialist surfaces, including suitable means to move water away
       from the surface.
    • Waste Bins

    Services
    Where necessary provision should be considered to enable adequate
    water, electrical and public address supplies to each court. These shall
    be terminated in secure and safe boxes conforming with the relevant
    regulations. Where not required service ducts should be provided to aid
    future installations.

    Adequate drainage should be provided for each court as appropriate for
    the surface.

    Floodlighting
    The floodlights are to be designed to meet LTA guidelines for
    illumination and to ensure that routine maintenance such as changing of
    bulbs, can be accomplished simply. The floodlight columns should
    preferably not be positioned inside court enclosures.

    The electrical installation should conform to the IEE regulations current
    at the date of installation. Controls should enable individual courts to be
    illuminated and controlled from a central point.

    If show courts are to be included in the facilities, their special
    requirements must be taken into consideration in the floodlighting
    scheme design installation.

    Where floodlights are not to be provided then the installation of the
    necessary ducting etc., should be considered to enable floodlights to be
    fitted at a latter date. Consideration should be given to the layout of the
    ducting to enable central columns between courts to be accommodated.

    For more detailed information in respect of floodlighting installation
    please refer to our floodlighting guidance note.




5

More Related Content

Similar to Disability Policy Audit Research Final Report

Wheelchair Tennis: Clubhouses And Pavillions
Wheelchair Tennis: Clubhouses And PavillionsWheelchair Tennis: Clubhouses And Pavillions
Wheelchair Tennis: Clubhouses And PavillionsScott Rains
 
Badminton design-guide-dec-2011
Badminton design-guide-dec-2011Badminton design-guide-dec-2011
Badminton design-guide-dec-2011Jonathan Li
 
Notts Sport Cricket
Notts Sport CricketNotts Sport Cricket
Notts Sport CricketNotts Sport
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium Kathmandu Engineering College
 
Ppt of multipurpose indoor wall
Ppt of multipurpose indoor wallPpt of multipurpose indoor wall
Ppt of multipurpose indoor wallDevanshumangal1
 
Notts Sport Multi-use
Notts Sport Multi-useNotts Sport Multi-use
Notts Sport Multi-useNotts Sport
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 
Scottish home improvement denver application instructions
Scottish home improvement denver application instructionsScottish home improvement denver application instructions
Scottish home improvement denver application instructionsScottish Home Improvements
 
Scottish home improvement denver application lp smartside
Scottish home improvement denver application lp smartsideScottish home improvement denver application lp smartside
Scottish home improvement denver application lp smartsideScottish Home Improvements
 
Tips For Recified Tile
Tips For Recified Tile Tips For Recified Tile
Tips For Recified Tile DaveGobis
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudoskudousa
 

Similar to Disability Policy Audit Research Final Report (20)

Wheelchair Tennis: Clubhouses And Pavillions
Wheelchair Tennis: Clubhouses And PavillionsWheelchair Tennis: Clubhouses And Pavillions
Wheelchair Tennis: Clubhouses And Pavillions
 
Badminton design-guide-dec-2011
Badminton design-guide-dec-2011Badminton design-guide-dec-2011
Badminton design-guide-dec-2011
 
Notts Sport Cricket
Notts Sport CricketNotts Sport Cricket
Notts Sport Cricket
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium
 
Ppt of multipurpose indoor wall
Ppt of multipurpose indoor wallPpt of multipurpose indoor wall
Ppt of multipurpose indoor wall
 
Notts Sport Multi-use
Notts Sport Multi-useNotts Sport Multi-use
Notts Sport Multi-use
 
Designing with Tile
Designing with TileDesigning with Tile
Designing with Tile
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 
Tennis Surface Construction Basics
Tennis Surface Construction BasicsTennis Surface Construction Basics
Tennis Surface Construction Basics
 
lp-smartside.pdf
lp-smartside.pdflp-smartside.pdf
lp-smartside.pdf
 
Scottish home improvement denver application instructions
Scottish home improvement denver application instructionsScottish home improvement denver application instructions
Scottish home improvement denver application instructions
 
Scottish home improvement denver application lp smartside
Scottish home improvement denver application lp smartsideScottish home improvement denver application lp smartside
Scottish home improvement denver application lp smartside
 
Delhi bye
Delhi bye Delhi bye
Delhi bye
 
Internship review
Internship reviewInternship review
Internship review
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Tips For Recified Tile
Tips For Recified Tile Tips For Recified Tile
Tips For Recified Tile
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudo
 
Site report
Site reportSite report
Site report
 
SAR JUNE 2014
SAR JUNE 2014SAR JUNE 2014
SAR JUNE 2014
 

More from Scott Rains

Numérisé sur une imprimante multifonctions
Numérisé sur une imprimante multifonctionsNumérisé sur une imprimante multifonctions
Numérisé sur une imprimante multifonctionsScott Rains
 
Graveur Coatantiec
Graveur CoatantiecGraveur Coatantiec
Graveur CoatantiecScott Rains
 
Guernsey Philatelic News Nov 1981 vol. 3
Guernsey Philatelic News Nov 1981 vol. 3Guernsey Philatelic News Nov 1981 vol. 3
Guernsey Philatelic News Nov 1981 vol. 3Scott Rains
 
Turkey: International Year of Disabled Persons (IYDP)
Turkey: International Year of Disabled Persons (IYDP)Turkey: International Year of Disabled Persons (IYDP)
Turkey: International Year of Disabled Persons (IYDP)Scott Rains
 
Belgium IYDP Data Sheet
Belgium IYDP Data SheetBelgium IYDP Data Sheet
Belgium IYDP Data SheetScott Rains
 
Belgium's IYDP Stamps
Belgium's IYDP  StampsBelgium's IYDP  Stamps
Belgium's IYDP StampsScott Rains
 
Tracing Disability Representation After the1981UN International Year of Disab...
Tracing Disability Representation After the1981UN International Year of Disab...Tracing Disability Representation After the1981UN International Year of Disab...
Tracing Disability Representation After the1981UN International Year of Disab...Scott Rains
 
Catalyst spring summer-2015
Catalyst spring summer-2015Catalyst spring summer-2015
Catalyst spring summer-2015Scott Rains
 
The Purpose of a Conference on Inclusive Tourism
 The Purpose of a Conference on Inclusive Tourism The Purpose of a Conference on Inclusive Tourism
The Purpose of a Conference on Inclusive TourismScott Rains
 
San Marino Declaration on Inclusive Tourism - 2014
San Marino Declaration on Inclusive Tourism - 2014San Marino Declaration on Inclusive Tourism - 2014
San Marino Declaration on Inclusive Tourism - 2014Scott Rains
 
Veterans with Disabilities Toolkit
Veterans with Disabilities ToolkitVeterans with Disabilities Toolkit
Veterans with Disabilities ToolkitScott Rains
 
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...Scott Rains
 
Disability Rights in Nepal: NAPD Magazine
Disability Rights in Nepal: NAPD MagazineDisability Rights in Nepal: NAPD Magazine
Disability Rights in Nepal: NAPD MagazineScott Rains
 
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010Scott Rains
 
The Matera Manifesto on Cultural Inclusion (In Italian and English)
The Matera Manifesto on Cultural Inclusion (In Italian and English)The Matera Manifesto on Cultural Inclusion (In Italian and English)
The Matera Manifesto on Cultural Inclusion (In Italian and English)Scott Rains
 
Declaration Montreal sur Tourisme pour Tous
Declaration Montreal sur Tourisme pour TousDeclaration Montreal sur Tourisme pour Tous
Declaration Montreal sur Tourisme pour TousScott Rains
 
Going to Wild Places I Could Only Dream About - Slideshow
Going to Wild Places I Could Only Dream About - SlideshowGoing to Wild Places I Could Only Dream About - Slideshow
Going to Wild Places I Could Only Dream About - SlideshowScott Rains
 
Destinations for All: How Far Have We Come?
Destinations for All: How Far Have We Come?Destinations for All: How Far Have We Come?
Destinations for All: How Far Have We Come?Scott Rains
 
Montreal Declaration on Inclusive Tourism in Destinations
Montreal Declaration on Inclusive Tourism in DestinationsMontreal Declaration on Inclusive Tourism in Destinations
Montreal Declaration on Inclusive Tourism in DestinationsScott Rains
 

More from Scott Rains (20)

Numérisé sur une imprimante multifonctions
Numérisé sur une imprimante multifonctionsNumérisé sur une imprimante multifonctions
Numérisé sur une imprimante multifonctions
 
Graveur Coatantiec
Graveur CoatantiecGraveur Coatantiec
Graveur Coatantiec
 
Guernsey Philatelic News Nov 1981 vol. 3
Guernsey Philatelic News Nov 1981 vol. 3Guernsey Philatelic News Nov 1981 vol. 3
Guernsey Philatelic News Nov 1981 vol. 3
 
Turkey: International Year of Disabled Persons (IYDP)
Turkey: International Year of Disabled Persons (IYDP)Turkey: International Year of Disabled Persons (IYDP)
Turkey: International Year of Disabled Persons (IYDP)
 
Belgium IYDP Data Sheet
Belgium IYDP Data SheetBelgium IYDP Data Sheet
Belgium IYDP Data Sheet
 
Belgium's IYDP Stamps
Belgium's IYDP  StampsBelgium's IYDP  Stamps
Belgium's IYDP Stamps
 
Tracing Disability Representation After the1981UN International Year of Disab...
Tracing Disability Representation After the1981UN International Year of Disab...Tracing Disability Representation After the1981UN International Year of Disab...
Tracing Disability Representation After the1981UN International Year of Disab...
 
Catalyst spring summer-2015
Catalyst spring summer-2015Catalyst spring summer-2015
Catalyst spring summer-2015
 
The Purpose of a Conference on Inclusive Tourism
 The Purpose of a Conference on Inclusive Tourism The Purpose of a Conference on Inclusive Tourism
The Purpose of a Conference on Inclusive Tourism
 
San Marino Declaration on Inclusive Tourism - 2014
San Marino Declaration on Inclusive Tourism - 2014San Marino Declaration on Inclusive Tourism - 2014
San Marino Declaration on Inclusive Tourism - 2014
 
Veterans with Disabilities Toolkit
Veterans with Disabilities ToolkitVeterans with Disabilities Toolkit
Veterans with Disabilities Toolkit
 
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...
On Disability and Tourism in Nepal: Article by Scott Rains and Interview with...
 
Disability Rights in Nepal: NAPD Magazine
Disability Rights in Nepal: NAPD MagazineDisability Rights in Nepal: NAPD Magazine
Disability Rights in Nepal: NAPD Magazine
 
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010
Travel South Africa in a Wheelchair - Forward Magzine, Feb 2010
 
The Matera Manifesto on Cultural Inclusion (In Italian and English)
The Matera Manifesto on Cultural Inclusion (In Italian and English)The Matera Manifesto on Cultural Inclusion (In Italian and English)
The Matera Manifesto on Cultural Inclusion (In Italian and English)
 
Declaration Montreal sur Tourisme pour Tous
Declaration Montreal sur Tourisme pour TousDeclaration Montreal sur Tourisme pour Tous
Declaration Montreal sur Tourisme pour Tous
 
Going to Wild Places I Could Only Dream About - Slideshow
Going to Wild Places I Could Only Dream About - SlideshowGoing to Wild Places I Could Only Dream About - Slideshow
Going to Wild Places I Could Only Dream About - Slideshow
 
Destinations for All: How Far Have We Come?
Destinations for All: How Far Have We Come?Destinations for All: How Far Have We Come?
Destinations for All: How Far Have We Come?
 
Montreal Declaration on Inclusive Tourism in Destinations
Montreal Declaration on Inclusive Tourism in DestinationsMontreal Declaration on Inclusive Tourism in Destinations
Montreal Declaration on Inclusive Tourism in Destinations
 
S10 p1
S10 p1S10 p1
S10 p1
 

Recently uploaded

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Recently uploaded (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

Disability Policy Audit Research Final Report

  • 1. ISSUE 1 JUNE 2008 • Introduction Tennis Courts Building Standards • • Statutory Approvals Brief • Disabled Users Policy • Contract • Environmental Policy • Design Parameters • Design Introduction The purpose of the tennis court building brief is to provide a guide to the minimum standards to which new outdoor courts should be constructed. This information should not be considered to be a complete building brief in itself but the basis from which a full project brief, design and specification can be evolved. It should be noted that the dimensions contained in this document are for recreational play and many require to be exceeded for specialist events and tournaments. In these instances further advice should be sought from the LTA. Standards All construction projects should conform to the requirements of all relevant current building legislation, including British Standards and Codes of Practice. Statutory Approvals The LTA requires confirmation in writing that planning approvals have been obtained (where appropriate). It should be noted that the Construction Regulation 2007 (CDM Regulations) will apply to most projects. 1
  • 2. Disabled Users Policy All new tennis facilities and extensions or refurbishment works to existing facilities should meet or exceed the standards required by law (set out in the current Building Regulations). The technical, financial and tennis development aspects of all projects applying for LTA loans or grants are vetted, and access for disabled users is considered as part of this process. Please also refer to DTLR Building Regulations, When designing any tennis facility, whether indoor, outdoor or both, always consider the following for all potential users: • Designated accessible parking. • Access to all areas externally. • High level bolts that cannot be reached. • Matting impeding movement. • Door widths that are too narrow. Sports chairs range up to a 1000mm wheelbase. • Strength of door closers. • Corridor widths that do not allow passing of wheelchairs. • Steps and thresholds that obstruct movement and use. • Electrical sockets/switches, taps, handles, etc. are positioned to high to be reached. • Use of colours that are inappropriate for anyone with a sight impairment. • Ramp gradients that are steep or have no landing areas. • Steps generally. • Unnecessary restrictions on the use of some tennis court surfaces. • Viewing - height of balustrades and fences. Contract All projects that require LTA funding should use a recognised standard form of building contract e.g. Joint Contracts Tribunal (JCT) standard forms, which are suitable for dealing with a range of project values and types. Space should be allocated on the construction site signboard for an “LTA Building for Tennis” sign (310mm x 1220mm). Environmental Policy The LTA embraces environmental issues in the design of tennis facilities. The following areas should be considered: • use of materials obtained from renewable sources • measures to minimise dependence on finite fossil fuels, emissions and operating costs and improve energy efficiency. 2
  • 3. Design Parameters Tennis Court Dimensions Principal Playing Area (The area bounded by the outside of the court lines) Length 23.77m (78’ 0”) Width 10.97m (36’ 0”) Length of net (doubles) 12.8m (42’ 0”) Width of play lines (white) excluding 5cm (2”) base line included within above court size Base Line 5-10cm(4”) Other dimensions Recommended Min Size Size Runback (i.e. clear depth behind 6.40m (21’ 0”) 5.49m (18’00”) baselines, at each end) Side-run (i.e. clear width beside each 3.66m (12’ 0”) 3.05m (10’0”) side) Side-run between courts not separately 4.27m (14’ 0”) 3.66m (12’0”) enclosed Design The design of the scheme should be visually pleasing and create an environment that will be attractive to users of all ages and abilities. It should be fit for its intended purpose and made attractive by the considered use of landscaping materials, textures and colours in suitable combinations. Court Layout and Orientation Courts should be positioned with the centre-line of the courts running in a generally north/south orientation, although conditions may prevent this arrangement. This is to avoid problems of serving into the during the summer months. Courts should not preferably exceed three in a row. Consideration should be given for access to each court, without interrupting play on adjoining courts. If adjacent to an indoor centre the outdoor courts should have access to the ancillary accommodation of the centre. The court layout should preferably ensure a view of all outdoor courts from reception in order to control their use, allow viewing from the social areas and have some visual relationship with any indoor courts. Paths and Lighting Paths must be provided to all court access doors and to allow movement around the site. Paths must have a suitable camber to shed water and be constructed from a suitable low slip material. Paths should be at least 1.50m wide where space permits for sports wheelchair access. 3
  • 4. Shelters On court shelters should be considered as an amenity for tennis court users and to enhance the environment. Playing Surface The choice of surface needs careful study and can be complicated by the use many trade names for similar surfaces. Refer to your Facility Project Manager for general guidance on appropriate surfaces for your club. Construction Bases for courts will be macadam on granular fill a thickness suitable for the site conditions and in accordance with the court surface installers instructions and specifications. Extensive repairs, patching or grinding of surfaces will not be permitted. Special attention is to be paid to the junction between the court construction and the edge detail to ensure separation and lifting does not occur at the perimeters due to moisture penetration or frost heave. Gradient Non-porous courts should be laid to a gradient to assist the removal of surface water. The gradient should be across the court or lengthways depending upon site conditions and the fall must be in a single plane. The gradient for non-porous courts shall be min. 1:120 and max 1:100. Porous courts should be laid to a maximum gradient of 1:120 and a minimum of 1:200. Porous court may be laid flat if a gradient is incorporated to the formation level. Court Fencing It is suggested that all courts are to be fenced in green or black chain link fencing to BS1722 Part 13. Angle section fence posts 50x50 are commonly adopted, however a 60mm diameter tubular or rolled hollow section, plastic coated coloured black or green post is preferred. Careful attention should be paid to fixings, to ensure that there are no sharp edges that would cause injury to either players or spectators. The base of the fencing should be constructed so that the tennis balls cannot get underneath the fencing and the edge of the court construction. This can take the form of a horizontal bracing bar. Generally the fencing should be 2.75m high, however, lowered sections should be considered for viewing. The fencing should then be 2.75m behind the base line and return two bays full height, the second of which should slope down to height of 1.2m above the court surface for the reminder of the side elevations. Where it can be achieved fencing dividing multiple court enclosures should be min.1.2m high with one bay from the surround fencing brought into the court at full height. The gate provision should allow for maintenance access for batch court surface and floodlighting Windbreaks Wind screening maybe provided either in the form of landscaped earth mounds, planting or porous windbreak screens mounted on the court fencing. The design of the fencing must take due consideration of the additional wind loads applied by the windbreaks with additional or 4
  • 5. strengthened supports whether or not windbreaks are included in the scheme. Windbreaks should not be left up all year. Fixtures and Fittings Equipment provided per court should include the following: • Net and Posts • Centre band and anchor • Brushes and other maintenance equipment necessary to maintain specialist surfaces, including suitable means to move water away from the surface. • Waste Bins Services Where necessary provision should be considered to enable adequate water, electrical and public address supplies to each court. These shall be terminated in secure and safe boxes conforming with the relevant regulations. Where not required service ducts should be provided to aid future installations. Adequate drainage should be provided for each court as appropriate for the surface. Floodlighting The floodlights are to be designed to meet LTA guidelines for illumination and to ensure that routine maintenance such as changing of bulbs, can be accomplished simply. The floodlight columns should preferably not be positioned inside court enclosures. The electrical installation should conform to the IEE regulations current at the date of installation. Controls should enable individual courts to be illuminated and controlled from a central point. If show courts are to be included in the facilities, their special requirements must be taken into consideration in the floodlighting scheme design installation. Where floodlights are not to be provided then the installation of the necessary ducting etc., should be considered to enable floodlights to be fitted at a latter date. Consideration should be given to the layout of the ducting to enable central columns between courts to be accommodated. For more detailed information in respect of floodlighting installation please refer to our floodlighting guidance note. 5