AUDIT FINDING/OBSERVATIONSAUDIT FINDING/OBSERVATIONS
VENDOR :Sharda Motor India Ltd
1. DATE : 15.04.101. DATE : 15.04.10
2. AUDITOR :2. AUDITOR :
- HMC : -Mr.LEE SANG SYUNG- HMC : -Mr.LEE SANG SYUNG
- HMI : Jayabalaji( SQA)- HMI : Jayabalaji( SQA)
- HMI :- HMI :
3. CORRECTIVE ACTION SUBMISSION DATE: 12.07.20103. CORRECTIVE ACTION SUBMISSION DATE: 12.07.2010
KAP/
HMI
Sharda P2
Summary of the Observations
Sl
No.
Problem Improvement Details Targt Date
Plan
Remarks
05/10 06/10 07/10
1
Raw Material – to be stored part name wise,
material grade wise, customer wise, lay out and
stock status to be provided
Raw Material – Stored part name wise, material
grade wise, customer wise, lay out and stock
status provided
13.05.10
11 6
2
Stock to be provided in stock status board
Safety stock, preparation stock, emergency stock
Stock provided in stock status board
Safety stock, preparation stock, emergency
stock
15.05.10
3
Tube mill coil storage – pallet height to be reduced
to prevent damage during loading unloading time
Stock status to be provided part number wise
Feasibility will be studied 28.07.10
4
Scrap sheets to be stored out side shop floor
Identification for storage
Scrap sheets removed from shopfloor 12.05.10
5 In lay out – stock status to be added (storage qty) In lay out – stock status added (storage qty) 13.05.10
6
Cut pipes to be arranged properly
Sliding trolley to be provided to ensure FIFO
Cut pipes arranged properly 15.05.10
7
Sliding oil insufficient at RH side
Visual arrow mark to be provided for daily
maintenance
Sliding oil sufficiently used at RH side
Visual arrow mark provided for daily
maintenance
30.05.10
8
Die cushion oil pressure range marking to be
provided for all gauges
Inspection numbers to be provided
Die cushion oil pressure range marking provided
for all gauges
Inspection numbers provided
25.05.10
9 Shut height unbalance to be checked periodically
Shut height unbalance checked periodically and
check point added in check sheet
30.06.10
10
Press cushion pins damaged
Daily cushion pins seating area and mould wear and
tear monitoring required
Damaged Press cushion pins replaced
Daily cushion pins seating area and mould wear
and tear monitoring
15.06.10
Summary of the Observations
Sl
No.
Problem Improvement Details Targt Date
Plan
Remarks
05/10 06/10 07/10
11 Die to be clamped with standard single block Die clamped with standard single block 30.06.10
11 6
12 Standard block to be used to maintain tool height Standard blocks used to maintain tool height 10.06.10
13 Same bolt size to be use for upper & lower die plate .
Same bolt size used for upper & lower die
plate
25.06.10
14 Blank sheets to be stored in table for operator access Blank sheetsstored in table for operator access 25.05.10
15 Visual colour marking for tool control
Visual colour marking provided for tool
control
25.05.10
16
Master defect sample to be marked with different
colour
Master defect sample marked with red colour 20.05.10
17 Route card operation wise Route card operation wise provided 25.05.10
BEFORE AFTER
Raw Material – to be stored part
name wise, material grade wise,
customer wise, lay out and stock
status to be provided
Raw Material – stored part name
wise, material grade wise,
customer wise, lay out and stock
status provided
PROBLEM IMPROVED
QUALITY IMPROVEMENT 1
Target Date
13.05.10
BEFORE AFTER
Stock to be provided in stock
status board
Safety stock, preparation stock,
emergency stock
Stock provided in stock status
board
Safety stock, preparation stock,
emergency stock
PROBLEM IMPROVED
QUALITY IMPROVEMENT 2
Target Date
15.05.10
BEFORE AFTER
•Tube mill coil storage – pallet height to be
reduced to prevent damage during loading
unloading time
•Stock status to be provided part number wise
PROBLEM
IMPROV
ED
QUALITY IMPROVEMENT 3
Target Date
28.07.10
•Tube mill coil storage – pallet height reduced
to prevent damage during loading unloading
time
•Stock status provided size wise
BEFORE AFTER
•Scrap sheets to be stored out side
shop floor
•Identification for storage
•Scrap sheets removed from shop
floorPROBLEM IMPROVED
QUALITY IMPROVEMENT 4
Target Date
12.05.10
BEFORE AFTER
In lay out – stock status to be
added (storage qty)
In lay out – stock status added
(storage qty)PROBLEM IMPROVED
QUALITY IMPROVEMENT 5
Target Date
13.05.10
BEFORE AFTER
•Cut pipes to be arranged
properly
•Sliding trolley to be provided to
ensure FIFO
•Cut pipes arranged properlyPROBLEM IMPROVED
QUALITY IMPROVEMENT 6
Target Date
15.05.10
BEFORE AFTER
•Sliding oil insufficient at RH side
•Visual arrow mark to be
provided for daily maintenance
•Sliding oil sufficiently used at
RH side
•Visual arrow mark provided for
daily maintenance
PROBLEM IMPROVED
QUALITY IMPROVEMENT 7
Target Date
30.05.10
BEFORE AFTER
•Die cushion oil pressure range
marking to be provided for all
gauges
•Inspection numbers to be
provided
•Die cushion oil pressure range
marking provided for all gauges
•Inspection numbers provided
PROBLEM IMPROVED
QUALITY IMPROVEMENT 8
Target Date
25.05.10
BEFORE AFTER
•Shut height unbalance to be
checked periodically
•Shut height unbalance checked
periodically and check point
added in check sheet
PROBLEM IMPROVED
QUALITY IMPROVEMENT 9
Target Date
30.06.10
BEFORE AFTER
•Press cushion pins damaged
•Daily cushion pins seating area
and mould wear and tear
monitoring required
•Damaged Press cushion pins
replaced
•Daily cushion pins seating area
and mould wear and tear
monitoring checked
PROBLEM IMPROVED
QUALITY IMPROVEMENT 10
Target Date
15.06.10
BEFORE AFTER
•Die to be clamped with standard
single block
•Die clamped with standard
single blockPROBLEM IMPROVED
QUALITY IMPROVEMENT 11
Target Date
30.06.10
BEFORE AFTER
•Standard block to be used to
maintain tool height
•Standard blocks used to
maintain tool heightPROBLEM IMPROVED
QUALITY IMPROVEMENT 12
Target Date
10.06.10
BEFORE AFTER
Same bolt size to be use for
upper & lower die plate .
Same bolt size used for upper &
lower die plate
PROBLEM IMPROVED
QUALITY IMPROVEMENT 13
Target Date
25.06.10
BEFORE AFTER
• Blank sheets to be stored in table
for operator access
• Blank sheets stored in table for
operator access
PROBLEM IMPROVED
QUALITY IMPROVEMENT 14
Target Date
25.05.10
BEFORE AFTER
•Visual colour marking for tool
control
•Visual colour marking provided
for tool control
PROBLEM IMPROVED
QUALITY IMPROVEMENT 15
Target Date
25.05.10
BEFORE AFTER
•Master defect sample to be
marked with different colour
•Master defect sample marked
with red colour
PROBLEM IMPROVED
QUALITY IMPROVEMENT 16
Target Date
20.05.10
BEFORE AFTER
•Route card operation wise
•Route card operation wise
provided
PROBLEM IMPROVED
QUALITY IMPROVEMENT 17
Target Date
25.05.10

Más contenido relacionado

Destacado

Successful tradeshows
Successful tradeshowsSuccessful tradeshows
Successful tradeshowsAlice Heiman
 
Drytac Company Presentation
Drytac Company PresentationDrytac Company Presentation
Drytac Company PresentationPrintLAT
 
Visual Magnetics Training PrintLAT
Visual Magnetics Training PrintLATVisual Magnetics Training PrintLAT
Visual Magnetics Training PrintLATPrintLAT
 
White toner Transfer paper from Forever, the best and more affordable in the ...
White toner Transfer paper from Forever, the best and more affordable in the ...White toner Transfer paper from Forever, the best and more affordable in the ...
White toner Transfer paper from Forever, the best and more affordable in the ...PrintLAT
 
G-Floor Grapchis Solutions - PrintLAT
G-Floor Grapchis Solutions - PrintLATG-Floor Grapchis Solutions - PrintLAT
G-Floor Grapchis Solutions - PrintLATPrintLAT
 
Growing Your Business Through Referrals
Growing Your Business Through ReferralsGrowing Your Business Through Referrals
Growing Your Business Through ReferralsAlice Heiman
 
Learn about seiko h2 2014
Learn about seiko h2 2014Learn about seiko h2 2014
Learn about seiko h2 2014PrintLAT
 
PrintLAT january 2011
PrintLAT january 2011PrintLAT january 2011
PrintLAT january 2011PrintLAT
 

Destacado (8)

Successful tradeshows
Successful tradeshowsSuccessful tradeshows
Successful tradeshows
 
Drytac Company Presentation
Drytac Company PresentationDrytac Company Presentation
Drytac Company Presentation
 
Visual Magnetics Training PrintLAT
Visual Magnetics Training PrintLATVisual Magnetics Training PrintLAT
Visual Magnetics Training PrintLAT
 
White toner Transfer paper from Forever, the best and more affordable in the ...
White toner Transfer paper from Forever, the best and more affordable in the ...White toner Transfer paper from Forever, the best and more affordable in the ...
White toner Transfer paper from Forever, the best and more affordable in the ...
 
G-Floor Grapchis Solutions - PrintLAT
G-Floor Grapchis Solutions - PrintLATG-Floor Grapchis Solutions - PrintLAT
G-Floor Grapchis Solutions - PrintLAT
 
Growing Your Business Through Referrals
Growing Your Business Through ReferralsGrowing Your Business Through Referrals
Growing Your Business Through Referrals
 
Learn about seiko h2 2014
Learn about seiko h2 2014Learn about seiko h2 2014
Learn about seiko h2 2014
 
PrintLAT january 2011
PrintLAT january 2011PrintLAT january 2011
PrintLAT january 2011
 

Similar a Sharda p2 kap obs 06 07 10

Complain Process as per ISO 9001_11 - 2015.pptx
Complain Process as per ISO 9001_11 - 2015.pptxComplain Process as per ISO 9001_11 - 2015.pptx
Complain Process as per ISO 9001_11 - 2015.pptxShanmukhSrinivasRedd
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them AllVibra
 
Forward revrese pressure not ok
Forward revrese pressure not okForward revrese pressure not ok
Forward revrese pressure not okJeetin Agrawal
 
Kontro Quarterly 4th 2018
Kontro Quarterly 4th 2018Kontro Quarterly 4th 2018
Kontro Quarterly 4th 2018Brent Keeter
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvementAbdullah Ansari
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Groupwomgroup
 
A Brief Presentation On Bearing Fault Detection Techniques .pdf
A Brief Presentation On Bearing Fault Detection Techniques .pdfA Brief Presentation On Bearing Fault Detection Techniques .pdf
A Brief Presentation On Bearing Fault Detection Techniques .pdfHemanth Kumar Jawahar
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfssuser5599ce
 
2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptxDarrenWijaya5
 
Sirris manufacturing day 2013 Nick Orchard
Sirris manufacturing day 2013   Nick OrchardSirris manufacturing day 2013   Nick Orchard
Sirris manufacturing day 2013 Nick OrchardSirris
 
Parker Kittiwake Sampling Solutions Brochure
Parker Kittiwake Sampling Solutions BrochureParker Kittiwake Sampling Solutions Brochure
Parker Kittiwake Sampling Solutions BrochureParker Kittiwake
 
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRushikesh Patil
 
Barry Crowley CV April 15
Barry Crowley CV April 15Barry Crowley CV April 15
Barry Crowley CV April 15Barry Crowley
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxssuser61b22e
 

Similar a Sharda p2 kap obs 06 07 10 (20)

Complain Process as per ISO 9001_11 - 2015.pptx
Complain Process as per ISO 9001_11 - 2015.pptxComplain Process as per ISO 9001_11 - 2015.pptx
Complain Process as per ISO 9001_11 - 2015.pptx
 
Salehuddin case study procurement and contract management
Salehuddin case study procurement and contract managementSalehuddin case study procurement and contract management
Salehuddin case study procurement and contract management
 
Project Management
Project ManagementProject Management
Project Management
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
Forward revrese pressure not ok
Forward revrese pressure not okForward revrese pressure not ok
Forward revrese pressure not ok
 
Kontro Quarterly 4th 2018
Kontro Quarterly 4th 2018Kontro Quarterly 4th 2018
Kontro Quarterly 4th 2018
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Group
 
A Brief Presentation On Bearing Fault Detection Techniques .pdf
A Brief Presentation On Bearing Fault Detection Techniques .pdfA Brief Presentation On Bearing Fault Detection Techniques .pdf
A Brief Presentation On Bearing Fault Detection Techniques .pdf
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdf
 
Sector Gear
Sector GearSector Gear
Sector Gear
 
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability WorkshopMaya Nissim: 2013 Sandia Wind Plant Reliability Workshop
Maya Nissim: 2013 Sandia Wind Plant Reliability Workshop
 
2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx
 
Sirris manufacturing day 2013 Nick Orchard
Sirris manufacturing day 2013   Nick OrchardSirris manufacturing day 2013   Nick Orchard
Sirris manufacturing day 2013 Nick Orchard
 
BTS OILFIELD INTRO
BTS OILFIELD INTROBTS OILFIELD INTRO
BTS OILFIELD INTRO
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
 
Parker Kittiwake Sampling Solutions Brochure
Parker Kittiwake Sampling Solutions BrochureParker Kittiwake Sampling Solutions Brochure
Parker Kittiwake Sampling Solutions Brochure
 
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
 
Barry Crowley CV April 15
Barry Crowley CV April 15Barry Crowley CV April 15
Barry Crowley CV April 15
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
 

Último

Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfAnhNguyen97152
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyHanna Klim
 
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...ISONIKELtd
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023Steve Rader
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursKaiNexus
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examplesamberjiles31
 
Trauma Training Service for First Responders
Trauma Training Service for First RespondersTrauma Training Service for First Responders
Trauma Training Service for First RespondersBPOQe
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..dlewis191
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Winbusinessin
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsyasinnathani
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 

Último (20)

Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agency
 
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...
ISONIKE Ltd Accreditation for the Conformity Assessment and Certification of ...
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, Ours
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examples
 
Trauma Training Service for First Responders
Trauma Training Service for First RespondersTrauma Training Service for First Responders
Trauma Training Service for First Responders
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..
 
WAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdfWAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdf
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story points
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 

Sharda p2 kap obs 06 07 10

  • 1. AUDIT FINDING/OBSERVATIONSAUDIT FINDING/OBSERVATIONS VENDOR :Sharda Motor India Ltd 1. DATE : 15.04.101. DATE : 15.04.10 2. AUDITOR :2. AUDITOR : - HMC : -Mr.LEE SANG SYUNG- HMC : -Mr.LEE SANG SYUNG - HMI : Jayabalaji( SQA)- HMI : Jayabalaji( SQA) - HMI :- HMI : 3. CORRECTIVE ACTION SUBMISSION DATE: 12.07.20103. CORRECTIVE ACTION SUBMISSION DATE: 12.07.2010 KAP/ HMI Sharda P2
  • 2. Summary of the Observations Sl No. Problem Improvement Details Targt Date Plan Remarks 05/10 06/10 07/10 1 Raw Material – to be stored part name wise, material grade wise, customer wise, lay out and stock status to be provided Raw Material – Stored part name wise, material grade wise, customer wise, lay out and stock status provided 13.05.10 11 6 2 Stock to be provided in stock status board Safety stock, preparation stock, emergency stock Stock provided in stock status board Safety stock, preparation stock, emergency stock 15.05.10 3 Tube mill coil storage – pallet height to be reduced to prevent damage during loading unloading time Stock status to be provided part number wise Feasibility will be studied 28.07.10 4 Scrap sheets to be stored out side shop floor Identification for storage Scrap sheets removed from shopfloor 12.05.10 5 In lay out – stock status to be added (storage qty) In lay out – stock status added (storage qty) 13.05.10 6 Cut pipes to be arranged properly Sliding trolley to be provided to ensure FIFO Cut pipes arranged properly 15.05.10 7 Sliding oil insufficient at RH side Visual arrow mark to be provided for daily maintenance Sliding oil sufficiently used at RH side Visual arrow mark provided for daily maintenance 30.05.10 8 Die cushion oil pressure range marking to be provided for all gauges Inspection numbers to be provided Die cushion oil pressure range marking provided for all gauges Inspection numbers provided 25.05.10 9 Shut height unbalance to be checked periodically Shut height unbalance checked periodically and check point added in check sheet 30.06.10 10 Press cushion pins damaged Daily cushion pins seating area and mould wear and tear monitoring required Damaged Press cushion pins replaced Daily cushion pins seating area and mould wear and tear monitoring 15.06.10
  • 3. Summary of the Observations Sl No. Problem Improvement Details Targt Date Plan Remarks 05/10 06/10 07/10 11 Die to be clamped with standard single block Die clamped with standard single block 30.06.10 11 6 12 Standard block to be used to maintain tool height Standard blocks used to maintain tool height 10.06.10 13 Same bolt size to be use for upper & lower die plate . Same bolt size used for upper & lower die plate 25.06.10 14 Blank sheets to be stored in table for operator access Blank sheetsstored in table for operator access 25.05.10 15 Visual colour marking for tool control Visual colour marking provided for tool control 25.05.10 16 Master defect sample to be marked with different colour Master defect sample marked with red colour 20.05.10 17 Route card operation wise Route card operation wise provided 25.05.10
  • 4. BEFORE AFTER Raw Material – to be stored part name wise, material grade wise, customer wise, lay out and stock status to be provided Raw Material – stored part name wise, material grade wise, customer wise, lay out and stock status provided PROBLEM IMPROVED QUALITY IMPROVEMENT 1 Target Date 13.05.10
  • 5. BEFORE AFTER Stock to be provided in stock status board Safety stock, preparation stock, emergency stock Stock provided in stock status board Safety stock, preparation stock, emergency stock PROBLEM IMPROVED QUALITY IMPROVEMENT 2 Target Date 15.05.10
  • 6. BEFORE AFTER •Tube mill coil storage – pallet height to be reduced to prevent damage during loading unloading time •Stock status to be provided part number wise PROBLEM IMPROV ED QUALITY IMPROVEMENT 3 Target Date 28.07.10 •Tube mill coil storage – pallet height reduced to prevent damage during loading unloading time •Stock status provided size wise
  • 7. BEFORE AFTER •Scrap sheets to be stored out side shop floor •Identification for storage •Scrap sheets removed from shop floorPROBLEM IMPROVED QUALITY IMPROVEMENT 4 Target Date 12.05.10
  • 8. BEFORE AFTER In lay out – stock status to be added (storage qty) In lay out – stock status added (storage qty)PROBLEM IMPROVED QUALITY IMPROVEMENT 5 Target Date 13.05.10
  • 9. BEFORE AFTER •Cut pipes to be arranged properly •Sliding trolley to be provided to ensure FIFO •Cut pipes arranged properlyPROBLEM IMPROVED QUALITY IMPROVEMENT 6 Target Date 15.05.10
  • 10. BEFORE AFTER •Sliding oil insufficient at RH side •Visual arrow mark to be provided for daily maintenance •Sliding oil sufficiently used at RH side •Visual arrow mark provided for daily maintenance PROBLEM IMPROVED QUALITY IMPROVEMENT 7 Target Date 30.05.10
  • 11. BEFORE AFTER •Die cushion oil pressure range marking to be provided for all gauges •Inspection numbers to be provided •Die cushion oil pressure range marking provided for all gauges •Inspection numbers provided PROBLEM IMPROVED QUALITY IMPROVEMENT 8 Target Date 25.05.10
  • 12. BEFORE AFTER •Shut height unbalance to be checked periodically •Shut height unbalance checked periodically and check point added in check sheet PROBLEM IMPROVED QUALITY IMPROVEMENT 9 Target Date 30.06.10
  • 13. BEFORE AFTER •Press cushion pins damaged •Daily cushion pins seating area and mould wear and tear monitoring required •Damaged Press cushion pins replaced •Daily cushion pins seating area and mould wear and tear monitoring checked PROBLEM IMPROVED QUALITY IMPROVEMENT 10 Target Date 15.06.10
  • 14. BEFORE AFTER •Die to be clamped with standard single block •Die clamped with standard single blockPROBLEM IMPROVED QUALITY IMPROVEMENT 11 Target Date 30.06.10
  • 15. BEFORE AFTER •Standard block to be used to maintain tool height •Standard blocks used to maintain tool heightPROBLEM IMPROVED QUALITY IMPROVEMENT 12 Target Date 10.06.10
  • 16. BEFORE AFTER Same bolt size to be use for upper & lower die plate . Same bolt size used for upper & lower die plate PROBLEM IMPROVED QUALITY IMPROVEMENT 13 Target Date 25.06.10
  • 17. BEFORE AFTER • Blank sheets to be stored in table for operator access • Blank sheets stored in table for operator access PROBLEM IMPROVED QUALITY IMPROVEMENT 14 Target Date 25.05.10
  • 18. BEFORE AFTER •Visual colour marking for tool control •Visual colour marking provided for tool control PROBLEM IMPROVED QUALITY IMPROVEMENT 15 Target Date 25.05.10
  • 19. BEFORE AFTER •Master defect sample to be marked with different colour •Master defect sample marked with red colour PROBLEM IMPROVED QUALITY IMPROVEMENT 16 Target Date 20.05.10
  • 20. BEFORE AFTER •Route card operation wise •Route card operation wise provided PROBLEM IMPROVED QUALITY IMPROVEMENT 17 Target Date 25.05.10