SlideShare una empresa de Scribd logo
1 de 7
GOVERNMENTOF INDIA
                             MINISTRY RAILWAYS
                                     OF
                               (RAILWAY BOARD)




The General Manager (Mech)
The General Manager (Optg)
All Indian Railways

The Director General(Carr)
RDSO, Lucknow

The Executive Director,
CAMTECH, Gwalior

The CCRS, ;Ministry of Civil Aviation,
Lucknow

Sub: Revised maintenance pattern of coaching trains - Running         upto 3500 Kms in
     a round trip with terminal attention at the other end(s)

  Please call for this office ~etter No. 2003/M(C)/141/ 19 Pt dated 1.5.06 as also
subsequent letters adding more trains for being permitted to run upto 3500 Kms
without mandatory pit line maintenance at the other end on a trial basis.

  Board have now decided that in partial modification of Policy Circular No.4 (Rev.
Oct,200l) issued vide this office letter of even No. dated 29.10.2001 read with
clarifications/modifications   issued   vide    letters  No.95/M(C)/1411l     dated
09/18.7.2002, No.2003/M(C)/141119 dated 02.3.2006 and 98/M(C)/l37119 dated
08.03.06, coaching trains may be permitted to run upto 3500 Kms in a round trip
with terminal attention at the other end in lieu of mandatory pit line maintenance.
With this the maintenance pattern of coaching train shall stand revised as annexed.
Mandatory conditions prescribed for round trip running of upto 2500 Kms as
contained in Annexure to this letter of even No. dated 29.10.01 shall apply in this
case also. A copy of these conditions is again enclosed for ready reference.

  Whiie implementing      these   instructions   following   should   be   scrupulously
followed:

 (i)    CME of the Railway on which base depot of the rake is located will
        personally satisfy himself that mandatory condition applicable to primary
        end is fully satisfied.
CME of the Railway on which base depot or thE: rake is located. shaH not
       permit 3500Km round trip operation without first obtaining a. certificate
       from the CME of the Railway where terminal attention is proposed in place
       ot pi', examination certifying that proper facilities exist at the location
       where proposed terminal attention is to be given in accordance with the
       conditions stipulated in the Annexure to this office letter of even No. dated
       29.10.01 and that the internal cleaning of coaches inclu~g      toilets shall in
       no way compromised by such replacement         of pit line maintenance with




               ilVhere there     is & need to enter into c~ contractual agreement for
certain services as a part       of terminal attention the same should be brought ir.
place within three months        of the decision to provide terminal attention at such a
location being given. The       system of running upiO 3500 Kms in a round trip shouiC.
actl:.&lly :Js ir:,pl.emented      af~e::- ensl.::::i:-,; 2vc.':'lability of such a contractual

                                                                               '

                                                                 '11_
                                                                        ~.d ~nyaJ
                                                                        •
                                                                 (ru'ITIn
                                                                            •..
                                                                             r-~l'   j
                                                              Dir.Mech.Engg(Chg)
                                                                Hailway Board
CME of the Railway on which base depot or the rake is located shall not
        permit 3500Km round trip operation without first obtaining a certificate
        from the CME of the Railway where terminal attention is proposed in place
        of pit examination certifying that proper facilities exist at the location
        where proposed terminal attention is to be given in accordance with the
        conditions stipulated in the Annexure to this office letter of even No. dated
        29.10.01 and that the internal cleaning of coaches inclu~g       toilets shall in
        no way compromised by such replacement of pit line maintenance with
        terminal attention.
(iii)   Filnctions assigned to CMEs in· (i) and (if) above shall not be delegated

              Where there     is a need to enter into a contractual agreement for
certain services as a part    of terminal attention the same should be brought in
place within three months     of the decision to provide terminal attention at such a
location being given. The    system of running upto 3500 Kms in a round trip should
actually be ir.:lplemented      afte:- ensuring availability of such a contractual
arrangement.

                                                                 ~.
                                                            (Arvind~l)
                                                          Dir.Mech.Engg(Chg)
                                                            Railway Board
MAINTENANCE PATTERN OF COACHING TRAINS
                                                           (Revision - January 2007)
                                                                            Annexure to letter No.95IMlC)/14111 dated 31.1.07

Sl.    Category       of Preventive     !Under gear     Internal        External           Enroutetrerminati      Brake system check
       train             maintenance    !examination    cleaning,       cleaning     on    ng Examination         prior   to start   at
                         schedules at   ~nd    brake    passenger       nominated                                 platform at the other
                         pitline        ~ystem          amenity         line       with                           end
                                        Imaintenance    attention and   proper
                                        ~t pit line     waterin2        facilities

l.     MaillExp.         At    pnmary    At both the    At both   the   At both the ends   Enroute After every    Complete    air brake
       One-way           end             ends           ends                               250 to 350 Kms of      testing   with issue of
       run>3500Kms.                                                                        run. at                fresh BPC
                                                                                           Locations      to be
                                                                                           decided by Railway
                                                                                           for each train.
                                                                                           Terminating Exam
                                                                                           Terminating station
2.     MaillExp.         At    pnmary    At both the    At both   the   At both the ends   - do-                           -do-
       One        way    end             ends           ends
       run<3500Kms
       but round trip
       run> 3500Kms.
3(a)   MaillExp.         At    pnmary    Only      at   At both   the   At Primary end     - do-                  Only continuity check
       Round trip run    end             Primary end    ends                                                      if stabled at platform,
       upto 3500Kms                                                                                               otherwise, brake power
                                                                                                                  check              with
                                                                                                                  endorsement          on
                                                                                                                  original BPC
3(b)     Interconnected      At primary To be done At primary end At Primary end              Enroute After every
         MaillExp.           end        after          and        each                        250 to 350 Kms of
         Round trip run                 3500Kms.       terminal                               run. at
         upto 3500Kms                   Or 96 hours                                           Locations to be                  -do-
                                        after     the                                         decided by Railway
                                        issue      of                                         for each train.
                                        original                                              Terminating Exam
                                        BPC which                                             Each      terminating
                                        ever        IS                                        station
                                        earlier, only
                                        at Primary
                                        end
4.       Passenger           At pnmary       -do-            -do-      At Primary end                 -do-                     -do-
         trains       with   end
         toilets including
         interconnected
         passenger trains
         /Shuttles
5.       Passenger           At pnmary           To be done     -do-         At Primary end Once a day at                       -do-
         trains without      end                 after                                           primary end or at
         toilets                                 3500Kms.                                        nominated terminal
                                                 Or 7 days
                                                 whichever
                                                 IS    earlier
                                                 only       at
                                                 Primary end
     •   Internal cleaning, Passenger amenity attention and watering may be done at Platform line or nominated stabling line provided
         stipulated facilities are available at such line
     •   Incase the rake stabled in yard for more than 6 hours positive safety arrangement should be made for the rake and in case the
         security is considered inadequate, the rakes should be taken to pit line for attention to under gear as given under column (4)
         above.
APPROVED MANDATORY CONDITIONS TO BE FULFILLED
                  PRIOR TO INTRODUCTION OF ROUND TRIP PRIMARY
                  PATTERN OF MAINTENANCE ON COACHING TRAINS


               The following mandatory      conditions   should be fulfilled prior to.
               introduction of round tripl Kilometers based PRIMARY maintenance
               pattern on any passenger carrying' train on Indian railways:




          1.      The attention during primary maintenance should be made more intensive
                  with special emphasis on the following aspects:

                   i)      The brake gearing should be' properly adjusted including the slack
                           adjuster 'A' dimension & the brake cylinder stroke to ensure 100%
                           Qrake power.
                  ii)      Brake blocks should be changed in only as bogie sets.
                  iii)   . All missing passenger amenity fittings must be replaced and the
                           rake must -be turned out as 'Zero-Missing-Fitting' rake.
                  iv)      Intensive c;leaning of coach toilets .   .

'°0  I
         2.       Clear maintenance time of 6 hours should be ensured at Primary end to
.,
 I
                  enable intensive attention .
         3.       Provision of proper washing cum maintenance       pit line facility with
                  adequate testing equipment and High pressure jet cleaning plant at
                  primary end

         4.        Adequate    gang ~trength with proper    supervision   to ensure intensive
                  attention.




         5.       Fresh BPC should be issued wherever the brake power check is provided
                  in the Revised Coaching Maintenance pattern.

         6.       Whenever the lie-over is more than 2 hours at the platform or the rake is
                  stabled in the yard, the rake should be locked and positive security should
                ~ be provided.
The minimum infrastructure to be provided at the platforms from where
     trains are returned without secondary maintenance should consist of :

                    One storage room for essential safety and passenger
                    amenity item.
                    Road transportation facility for ferrying material from the
                    main depot
                    Mobile high pressure cleaning machines in adequate
                   numbers.
                   2" water connection at both the ends of the platform for quick
                   filling of high pressure jet cleaning-machines
                   Washable apron on the platform 1ines with covered drains to
                   facilitate movement of maintenance staff.
                   Walkie-Talkie/Radio trunking sets for quick and. easy
                  communication
                  Standard watering hydrants
                  Flood light at the platform ends for rolling-in examination at
                  night and 110 V. Inspection lights along the side of the track
                  for night e~amination of the under gear

8.   A jotnt safety certificate covering each clause of the mandatory conditions
     will be is·sued by Mechanical and Operating branches at Divisional level
     prior to changing over any train to the revised coaching maintenance
     pattern. No relaxation will be permissible except with approval of the
     Board on case to case basis.

Más contenido relacionado

La actualidad más candente

Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot reportAshutosh Khaitan
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur pptRamsubhash Meena
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportALOK RAJ
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentationTURENDARSAHU
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)SrinivasaRao Guduru
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report mainVicky Gupta
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreRao Khola
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coachesSrinivasaRao Guduru
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfTCCW1
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwayChirag Jain
 
Carriage and wagon
Carriage and wagon Carriage and wagon
Carriage and wagon Deewan singh
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesrakeshmanthu
 

La actualidad más candente (20)

Bogie
BogieBogie
Bogie
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur ppt
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report main
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coaches
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdf
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 
Carriage and wagon
Carriage and wagon Carriage and wagon
Carriage and wagon
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coaches
 
ICF Bogie
ICF BogieICF Bogie
ICF Bogie
 

Destacado

Traffic and maintenance spares for coaching stock
Traffic and maintenance spares for coaching stockTraffic and maintenance spares for coaching stock
Traffic and maintenance spares for coaching stockSrinivasaRao Guduru
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagonAjeet Kumar
 
Handbook on bogie mounted brake system on freight stock
Handbook on bogie mounted brake system on freight stockHandbook on bogie mounted brake system on freight stock
Handbook on bogie mounted brake system on freight stockSrinivasaRao Guduru
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 

Destacado (7)

Traffic and maintenance spares for coaching stock
Traffic and maintenance spares for coaching stockTraffic and maintenance spares for coaching stock
Traffic and maintenance spares for coaching stock
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
Handbook on bogie mounted brake system on freight stock
Handbook on bogie mounted brake system on freight stockHandbook on bogie mounted brake system on freight stock
Handbook on bogie mounted brake system on freight stock
 
AIR BRAKE SYSTEM
AIR BRAKE SYSTEMAIR BRAKE SYSTEM
AIR BRAKE SYSTEM
 
Modified Fiat Bogie
Modified Fiat BogieModified Fiat Bogie
Modified Fiat Bogie
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Wheel Defects
Wheel DefectsWheel Defects
Wheel Defects
 

Similar a Revised Maintenance of Coaching Trains

16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno reportdrbmc
 
INTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYSINTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYSShubhankarShukla3
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.pptssuser9cea3f
 
Supply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptSupply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptDrAyyarKandasamy
 
CODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptxCODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptxketanitcell
 
Few remarkable advancement in railways around the globe
Few remarkable advancement in railways around the globeFew remarkable advancement in railways around the globe
Few remarkable advancement in railways around the globeSHASHANKKUMAR426
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATIONINDUSTRIAL ENGINEERING
 
Railway Geometric Design
Railway Geometric DesignRailway Geometric Design
Railway Geometric DesignUmar Karimi
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknowpradeep verma
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway Mohammad Adnan
 
Fuzzy Control of a Large Crane Structure
Fuzzy Control of a Large Crane StructureFuzzy Control of a Large Crane Structure
Fuzzy Control of a Large Crane Structureijeei-iaes
 
MWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTMWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTKampilimba Mwape
 
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...PrasenjitDey49
 

Similar a Revised Maintenance of Coaching Trains (20)

16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
INTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYSINTERNSHIP AT INDIAN RAILWAYS
INTERNSHIP AT INDIAN RAILWAYS
 
Rail track geometry
Rail track geometryRail track geometry
Rail track geometry
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.ppt
 
Supply systems for Electric Traction.ppt
Supply systems for Electric Traction.pptSupply systems for Electric Traction.ppt
Supply systems for Electric Traction.ppt
 
EXPLINER
EXPLINEREXPLINER
EXPLINER
 
Pavement eng re
Pavement eng rePavement eng re
Pavement eng re
 
CODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptxCODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptx
 
Track
TrackTrack
Track
 
Few remarkable advancement in railways around the globe
Few remarkable advancement in railways around the globeFew remarkable advancement in railways around the globe
Few remarkable advancement in railways around the globe
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
Railway Geometric Design
Railway Geometric DesignRailway Geometric Design
Railway Geometric Design
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
D011132935
D011132935D011132935
D011132935
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Fuzzy Control of a Large Crane Structure
Fuzzy Control of a Large Crane StructureFuzzy Control of a Large Crane Structure
Fuzzy Control of a Large Crane Structure
 
MWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTMWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORT
 
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...
Effects of Vehicle Running Mode on Rail Potential and Stray Current in DC Mas...
 

Más de SrinivasaRao Guduru

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing deviceSrinivasaRao Guduru
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugsSrinivasaRao Guduru
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coachesSrinivasaRao Guduru
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01SrinivasaRao Guduru
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogieSrinivasaRao Guduru
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen managementSrinivasaRao Guduru
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)SrinivasaRao Guduru
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesSrinivasaRao Guduru
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...SrinivasaRao Guduru
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterSrinivasaRao Guduru
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilitiesSrinivasaRao Guduru
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan SrinivasaRao Guduru
 
Maintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockMaintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockSrinivasaRao Guduru
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coachesSrinivasaRao Guduru
 
Making of traditional filter coffee
Making of traditional filter coffeeMaking of traditional filter coffee
Making of traditional filter coffeeSrinivasaRao Guduru
 

Más de SrinivasaRao Guduru (20)

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing device
 
Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugs
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coaches
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogie
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering system
 
Bio toilets presentation
Bio toilets presentation Bio toilets presentation
Bio toilets presentation
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen management
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coaches
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering system
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counter
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilities
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan
 
Maintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockMaintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stock
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coaches
 
Making of traditional filter coffee
Making of traditional filter coffeeMaking of traditional filter coffee
Making of traditional filter coffee
 

Último

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 

Último (20)

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 

Revised Maintenance of Coaching Trains

  • 1. GOVERNMENTOF INDIA MINISTRY RAILWAYS OF (RAILWAY BOARD) The General Manager (Mech) The General Manager (Optg) All Indian Railways The Director General(Carr) RDSO, Lucknow The Executive Director, CAMTECH, Gwalior The CCRS, ;Ministry of Civil Aviation, Lucknow Sub: Revised maintenance pattern of coaching trains - Running upto 3500 Kms in a round trip with terminal attention at the other end(s) Please call for this office ~etter No. 2003/M(C)/141/ 19 Pt dated 1.5.06 as also subsequent letters adding more trains for being permitted to run upto 3500 Kms without mandatory pit line maintenance at the other end on a trial basis. Board have now decided that in partial modification of Policy Circular No.4 (Rev. Oct,200l) issued vide this office letter of even No. dated 29.10.2001 read with clarifications/modifications issued vide letters No.95/M(C)/1411l dated 09/18.7.2002, No.2003/M(C)/141119 dated 02.3.2006 and 98/M(C)/l37119 dated 08.03.06, coaching trains may be permitted to run upto 3500 Kms in a round trip with terminal attention at the other end in lieu of mandatory pit line maintenance. With this the maintenance pattern of coaching train shall stand revised as annexed. Mandatory conditions prescribed for round trip running of upto 2500 Kms as contained in Annexure to this letter of even No. dated 29.10.01 shall apply in this case also. A copy of these conditions is again enclosed for ready reference. Whiie implementing these instructions following should be scrupulously followed: (i) CME of the Railway on which base depot of the rake is located will personally satisfy himself that mandatory condition applicable to primary end is fully satisfied.
  • 2. CME of the Railway on which base depot or thE: rake is located. shaH not permit 3500Km round trip operation without first obtaining a. certificate from the CME of the Railway where terminal attention is proposed in place ot pi', examination certifying that proper facilities exist at the location where proposed terminal attention is to be given in accordance with the conditions stipulated in the Annexure to this office letter of even No. dated 29.10.01 and that the internal cleaning of coaches inclu~g toilets shall in no way compromised by such replacement of pit line maintenance with ilVhere there is & need to enter into c~ contractual agreement for certain services as a part of terminal attention the same should be brought ir. place within three months of the decision to provide terminal attention at such a location being given. The system of running upiO 3500 Kms in a round trip shouiC. actl:.&lly :Js ir:,pl.emented af~e::- ensl.::::i:-,; 2vc.':'lability of such a contractual ' '11_ ~.d ~nyaJ • (ru'ITIn •.. r-~l' j Dir.Mech.Engg(Chg) Hailway Board
  • 3. CME of the Railway on which base depot or the rake is located shall not permit 3500Km round trip operation without first obtaining a certificate from the CME of the Railway where terminal attention is proposed in place of pit examination certifying that proper facilities exist at the location where proposed terminal attention is to be given in accordance with the conditions stipulated in the Annexure to this office letter of even No. dated 29.10.01 and that the internal cleaning of coaches inclu~g toilets shall in no way compromised by such replacement of pit line maintenance with terminal attention. (iii) Filnctions assigned to CMEs in· (i) and (if) above shall not be delegated Where there is a need to enter into a contractual agreement for certain services as a part of terminal attention the same should be brought in place within three months of the decision to provide terminal attention at such a location being given. The system of running upto 3500 Kms in a round trip should actually be ir.:lplemented afte:- ensuring availability of such a contractual arrangement. ~. (Arvind~l) Dir.Mech.Engg(Chg) Railway Board
  • 4. MAINTENANCE PATTERN OF COACHING TRAINS (Revision - January 2007) Annexure to letter No.95IMlC)/14111 dated 31.1.07 Sl. Category of Preventive !Under gear Internal External Enroutetrerminati Brake system check train maintenance !examination cleaning, cleaning on ng Examination prior to start at schedules at ~nd brake passenger nominated platform at the other pitline ~ystem amenity line with end Imaintenance attention and proper ~t pit line waterin2 facilities l. MaillExp. At pnmary At both the At both the At both the ends Enroute After every Complete air brake One-way end ends ends 250 to 350 Kms of testing with issue of run>3500Kms. run. at fresh BPC Locations to be decided by Railway for each train. Terminating Exam Terminating station 2. MaillExp. At pnmary At both the At both the At both the ends - do- -do- One way end ends ends run<3500Kms but round trip run> 3500Kms. 3(a) MaillExp. At pnmary Only at At both the At Primary end - do- Only continuity check Round trip run end Primary end ends if stabled at platform, upto 3500Kms otherwise, brake power check with endorsement on original BPC
  • 5. 3(b) Interconnected At primary To be done At primary end At Primary end Enroute After every MaillExp. end after and each 250 to 350 Kms of Round trip run 3500Kms. terminal run. at upto 3500Kms Or 96 hours Locations to be -do- after the decided by Railway issue of for each train. original Terminating Exam BPC which Each terminating ever IS station earlier, only at Primary end 4. Passenger At pnmary -do- -do- At Primary end -do- -do- trains with end toilets including interconnected passenger trains /Shuttles 5. Passenger At pnmary To be done -do- At Primary end Once a day at -do- trains without end after primary end or at toilets 3500Kms. nominated terminal Or 7 days whichever IS earlier only at Primary end • Internal cleaning, Passenger amenity attention and watering may be done at Platform line or nominated stabling line provided stipulated facilities are available at such line • Incase the rake stabled in yard for more than 6 hours positive safety arrangement should be made for the rake and in case the security is considered inadequate, the rakes should be taken to pit line for attention to under gear as given under column (4) above.
  • 6. APPROVED MANDATORY CONDITIONS TO BE FULFILLED PRIOR TO INTRODUCTION OF ROUND TRIP PRIMARY PATTERN OF MAINTENANCE ON COACHING TRAINS The following mandatory conditions should be fulfilled prior to. introduction of round tripl Kilometers based PRIMARY maintenance pattern on any passenger carrying' train on Indian railways: 1. The attention during primary maintenance should be made more intensive with special emphasis on the following aspects: i) The brake gearing should be' properly adjusted including the slack adjuster 'A' dimension & the brake cylinder stroke to ensure 100% Qrake power. ii) Brake blocks should be changed in only as bogie sets. iii) . All missing passenger amenity fittings must be replaced and the rake must -be turned out as 'Zero-Missing-Fitting' rake. iv) Intensive c;leaning of coach toilets . . '°0 I 2. Clear maintenance time of 6 hours should be ensured at Primary end to ., I enable intensive attention . 3. Provision of proper washing cum maintenance pit line facility with adequate testing equipment and High pressure jet cleaning plant at primary end 4. Adequate gang ~trength with proper supervision to ensure intensive attention. 5. Fresh BPC should be issued wherever the brake power check is provided in the Revised Coaching Maintenance pattern. 6. Whenever the lie-over is more than 2 hours at the platform or the rake is stabled in the yard, the rake should be locked and positive security should ~ be provided.
  • 7. The minimum infrastructure to be provided at the platforms from where trains are returned without secondary maintenance should consist of : One storage room for essential safety and passenger amenity item. Road transportation facility for ferrying material from the main depot Mobile high pressure cleaning machines in adequate numbers. 2" water connection at both the ends of the platform for quick filling of high pressure jet cleaning-machines Washable apron on the platform 1ines with covered drains to facilitate movement of maintenance staff. Walkie-Talkie/Radio trunking sets for quick and. easy communication Standard watering hydrants Flood light at the platform ends for rolling-in examination at night and 110 V. Inspection lights along the side of the track for night e~amination of the under gear 8. A jotnt safety certificate covering each clause of the mandatory conditions will be is·sued by Mechanical and Operating branches at Divisional level prior to changing over any train to the revised coaching maintenance pattern. No relaxation will be permissible except with approval of the Board on case to case basis.