These are projects from various college classes as well as some examples of professional work I\'ve done since graduation. (some pages still under construction)
1. This
conceptual,
yet
functional
furniture piece is
designed to mimic the
unexpected twists and
turns of life. The ten
boxes can be arranged
in an infinite number of
ways, always creating a
new piece of furniture
to surprise a guest.
Also, the hinges may
not function as the user
would expect based
on knob positioning.
Lastly, the insides
of the cabinets all
represent good or bad
unexpected life events.
These surprises also
provide entertainment
and puzzlement to the
user.
Pull. Fall 2007. Furniture Design
2. CONSTRUCTION PLAN GENERAL NOTES
1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS GOVERN.
2. ALL PARTITION LOCATIONS SHALL BE AS SHOWN ON FLOOR PLAN. IN CASE OF CONFLICT
NOTIFY DESIGNER. FLOOR PLAN BY DESIGNER TAKES PRECEDENCE OVER ALL OTHER
PLANS.
3. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE.
4. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH WITH NO
VISIBLE JOINTS. ALL EXPOSED GYPSUM BOARD EDGES TO HAVE METAL EDGE TRIM,
U.O.N.
5. ALL DOORS SHALL HAVE 1’-6” CLEARANCE ON STRIKE/PULL SIDE OF DOOR. NOTIFY
DESIGNER OF EXCEPTIONS PROIR TO CLOSING OF PARTITIONS.
6. ALL GLASS SHALL BE CLEAR TEMPERED GLASS, U.O.N. CLEAN AND POLISH ALL GLASS
PRIOR TO PROJECT DELIVERY.
7. ALL MILLWORK TO BE FASTNED TO THE PARTITION. PROVIDE BLOCKING FOR ALL
MILLWORK NOT ON FLOOR SLAB. ALL CONCEALED LUMBER TO BE SEALED AND FIRE
TREATED.
8. COORDINATE WITH OWNER’S SECURITY VENDOR ON PLACEMENT OF SECURITY SYSTEM
AND ELECTRICAL CONNECTIONS.
9. PROVIDE RECESSED S.S. FIRE EXTINGUISHER CABINETS, SMOKE DETECTORS AND OTHER
LIFE SAFETY DEVICES ACCORDING TO DRAWINGS.
10. PROVIDE EXITING SIGNS AND EMERGENCY LIGHTING ACCORDING TO DRAWINGS.
11. MODIFY AND SUPPLEMENT EXISTING SPRINKLER SYSTEM AS REQUIRED BY CODE PER
PARTITION LAYOUT. BUILDING SPRINKLER SYSTEM MUST NOT BE DISRUPTED DURING
CONSTRUCTION.
12. SEE X/AE2.X FOR DOOR HEADER AND JAMB SECTIONS.
13. SEE X/AE2.X FOR TYPICAL DOOR AND FRAME ELEVATIONS.
14. ALL DOOR FRAMES TO BE INSTALLED PLUMB, STRAIGHT AND TRUE. MAINTAIN ADEQUATE
TOLERANCES AND CLEARANCES SO THAT ALL DOORS FIT AS SPECIFIED.
15. PROVIDE ALL PARTS NECESSARY FOR PROPER OPERATION OF ALL DOORS.
16. ALL HARDWARE TO BE ADA COMPLIANT AND AS SPECIFICIED.
17. REFURBISH ALL EXISTING REUSED DOORS AS REQUIRED TO MATCH NEW DOORS.
INSTALL NEW HARDWARE & KEY TO TENANT'S REQUIREMENTS.
18. COORDINATE ALL KEYING WITH PROJECT MANAGER AND PRESCIENCE REPRESENTATIVE.
KEY NOTES
C1. PLACEMENT OF SAVED MILLWORK FROM OLD SITE
C2. PLACMENT OF 4X8 SHEET OF PLYWOOD FOR TELEPHONE BOARD
Interior Specifications
II was an entire
ROOM SCHEDULE DOOR SCHEDULE DOOR TYPES HARDWARE GROUPS
301 RECEPTION AREA
A Building Standard fire rated corridor service door assembly with 45 minute rating, S Label
HARDWARE GROUP
TRANSOM WINDOW
302 LARGE CONFERENCE ROOM Group 1 Each of door shall have:
303 SMALL CONFERENCE ROOM Solid core plain sliced birch veneer, clear satin finish. Hinges: (2 pair) Hager BB1279 4.5 x 4.5 Chrome
DOOR NUMBER
304 OFFICE B Building Standard interior door assembly Lockset: Schlage AL Series, Saturn
FRAME TYPE
DOOR TYPE
305 OFFICE Solid core plain sliced birch veneer, clear satin finish. Finish: 626, Exit/Storeroom Function
semester devoted to
306 OFFICE C Existing Building Standard fire rated corridor door assembly Cylinder: Schlage interchangeable core
307 BREAK ROOM D Custom door interior door assembly with 1/4” tempered glass inset Closer: LCN 4041 -Cush
SIZE
308 SERVER ROOM
Solid core plain sliced birch veneer, clear satin finish. Finish: Satin Chrome
309 WORK ROOM
301 6070 A 4 1 E Building Standard interior door assembly with 2'x2' louvered panel Wall Stop: Ives WS443
310 OPEN OFFICE
302 3070 F 1 3 Finish: SS
311 NORTH CORRIDOR Solid core plain sliced birch veneer, clear satin finish
303 6070 D 1 3
312 SOUTH CORRIDOR F Building Standard bi-fold door Group 2 Each of door shall have:
304 3070 B 3 2 Y
313 WOMEN'S RESTROOM Solid core plain sliced birch veneer, clear satin finish Hinges: (2 pair) Hager BB1279 4.5 x 4.5 Chrome
305 3070 B 2 2 Y
interior design related
314 MEN'S RESTROOM Lockset: Schlage AL Series, Saturn
306 3070 B 3 2 Y FRAME TYPES
307 3070 B 2 2 Y Finish: 626, Office Function
1 Building Standard Western Integrated Frame, Wall Stop: Ives WS443
308 3070 E 1 3
309 3070 B 1 3 Y factory primed, bronze finish. Finish: SS
310 3070 A 4 1 2 Building Standard Western Integrated Frame, with standard 24” wide 1/4” tempered sidelight, Coat Hook Schlage 923
311 3070 A 4 1 left sided, factory primed,bronze finish Finish: 626
312 3070 A 4 1 3 Building Standard Western Integrated Frame, with standard 24” wide 1/4” tempered sidelight, Group 3 Each of door shall have:
313 3070 C 5 1
right sided, factory primed, bronze finish.
construction drawings.
Hinges: (2 pair) Hager BB1279 4.5 x 4.5 Chrome
314 3070 C 5 1
315 3070 C 5 1 4 Building Standard Western Integrated Frame with 45 minute rated Lockset: Schlage AL Series, Saturn
316 3070 C 5 1 factory primed, bronze finish. Finish: 626, Passage Function
317 3070 C 5 1 5 Existing Building fire rated corridor door frame Wall Stop: Ives WS443
318 3070 C 5 1 Finish: SS
319 3070 C 5 1
320 3070 C 5 1
321 3070 C 5 1
Throughout the course
322 3070 C 5 1
of the semester I had
to create a sheet set
containing: a title page,
demo plan, construction FINISH PLAN GENERAL NOTES:
plan, wall and door
CARPETING GENERAL NOTES:
1. MATERIALS: AS SPECIFIED ON FINISH PLAN.
2. FLOOR PREPARATION: PREPARE SUBSTRATE TO INSURE FIRST QUALITY
INSTALLATION. CLEANING FLOORS: THE CONTRACTOR SHALL BROOM CLEAN
AND PREPARE FLOORS TO SATISFACTORY CONDITION TO RECEIVE
MATERIALS. CURING: CONCRETE SUB FLOORS SHOULD HAVE CURED FOR AT
LEAST 90 DAYS PRIOR TO INSTALLATION. UNDERLAYMENT/LEVELING COAT:
SHALL BE USED TO ELIMINATE HEIGHT DIFFERENCES AT FINISH FLOORING
sections, architectural
TRANSITIONS. UNDERLAYMENT TO CONSIST OF PLYWOOD IN THE
APPROPRIATE THICKNESS TO BE GLUED AND POWER NAILED TO THE SUB
FLOOR. FOR MINOR FINISH THICKNESS DIFFERENCES, PROVIDE LATEX
COMPOUND "FEATHERING" TO MAKE A SMOOTH TRANSITION.
3. LAYOUT: ALL CARPET, UNLESS OTHERWISE STATED, SHALL RUN IN SAME
DIRECTION. STANDARD SEAMLESS BROADLOOM WIDTHS SHALL BE USED
UNLESS THE SIZE REQUIRED NECESSITATES SEAMING. SEAMS SHALL BE KEPT
TO A MINIMUM. SEAMS SHALL GENERALLY NOT OCCUR AT DOORWAYS
and millwork details,
PERPENDICULAR TO THE DOOR. SEAMS OCCURRING AT DOORS PARALLEL TO
THE DOORS SHALL BE CENTERED DIRECTLY UNDER THE DOOR.
4. VINYL BASE: STANDARD (AS SPECIFIED) 4" VINYL COVE BASE TO BE
INSTALLED WHERE CARPET OCCURS, UNLESS OTHERWISE NOTED.
5. CARPET BASE: 4" BOUND (OR SURGED) CARPET BASE TO MATCH ADJOINING
CARPET IN ALL CARPETED AREAS WHERE SPECIFIED ON THE ARCHITECTURAL
DRAWINGS. DIRECT GLUE ALL CARPET BASE TO WALL.
6. INSTALLATION: DIRECT GLUE - DOWN. FLOOR PREPARATION: FLOORS
SHALL BE CHECKED FOR MOISTURE CONTENT. FLOOR MUST BE FREE FROM
elevations, reflected
MOISTURE, DUST, OILS, GREASE, WAX, OR OTHER FOREIGN MATTER. CRACKS
1/8" OR MORE, HOLES AND UNEVENNESS MUST BE FILLED WITH LATEX-BASED
FLOOR FILLER. ANY PROTRUDING OBJECTS SHOULD BE GROUND SMOOTH
WITH THE FLOOR SURFACE. FLOOR PRIMER SHALL BE APPLIED TO ALL AREAS
TO BE CARPETED,
WHICH HAVE PREVIOUSLY BEEN COVERED WITH VINYL COMPOSITION TILE OR
AS RECOMMENDED BY THE MANUFACTURER. PRIMER MUST BE COMPATIBLE
WITH CARPET AND ADHESIVE TO BE UTILIZED. ADHESIVE: ADHESIVE SHALL BE
A LATEX PRODUCT APPROVED FOR USE BY THE MANUFACTURER.
ceiling plan, electrical
EXECUTION: INSTALLATION IS TO BE MADE BY TEAMS LARGE ENOUGH TO
HANDLE DIRECT GLUE-DOWN INSTALLATION OF CARPET. EACH PROPOSAL
MUST BE ACCOMPANIED BY A COPY OF THE MANUFACTURER'S
RECOMMENDED PROCEDURE FOR INSTALLING THEIR PRODUCT IN DIRECT
GLUE-DOWN METHOD.
7. ALL AREAS ARE TO BE CARPET ON DRAWING UNLESS OTHERWISE NOTED.
VCT / RESILIENT TILE / VINYL BASE GENERAL NOTES:
plan, finish plan,
1. MATERIALS: STANDARD 12 X 12 VINYL COMPOSITION TILE.
2. LAYOUT: ALL RESILIENT TILE SHALL BE LAID IN A "MONOLITHIC" PATTERN
WITH ALL GRAIN OR TEXTURE RUNNING IN THE SAME DIRECTION, UNLESS
OTHERWISE NOTED. CUT FLOORING ONLY
AT INTERSECTION OF VERTICAL SURFACES; LAY SYMMETRICALLY ABOUT
ROOM CENTER LINES WITH JOINTS TIGHTLY BUTTED.
3. ADHESIVE: SHALL BE A LATEX PRODUCT APPROVED FOR USE IN THIS TYPE
OF INSTALLATION BY THE TILE OR BASE MANUFACTURER.
4. EXECUTION: FLOORING SHALL BE INSTALLED BY EXPERIENCED INSTALLERS
furniture plan, also
APPROVED BY MANUFACTURER, AND IN STRICT ACCORDANCE WITH
MANUFACTURER'S INSTALLATION SPECIFICATIONS.
5. VINYL BASE: STANDARD (AS SPECIFIED) 4" VINYL COVE BASE TO BE
INSTALLED WHERE RESILIENT TILE OCCURS.
6. CLEANING: RESILIENT TILE SHALL BE CLEANED AND WAXED NO SOONER
THAT FIVE (5) DAYS FOLLOWING INSTALLATION. CLEAN WITH NEUTRAL
CLEANER, RINSE, DRY, AND APPLY ONE COAT OF HIGH GRADE WATER
EMULSION WAX, SUCH AS ARMSTRONG LINOGLASS WAX. WAXING MUST BE
furniture, finish, and
DONE PRIOR TO PROJECT TURN-OVER.
7. VCT FLOOR TO CARPET JUNCTIONS: TRANSITION STRIP TWO (TS-2) TO BE
USED.
8. CERAMIC TILE TO CARPET JUNCTIONS: TRANSITION STRIP ONE (TS-1) TO BE
USED.
WALL FINISH GENERAL NOTES:
1. MATERIALS: AS SPECIFIED ON FINISH PLANS AND SCHEDULES.
2. SURFACE PREPARATION: ALL WALLS SHALL BE PROPERLY PREPARED,
other schedules.
SPACKLED, SANDED, ETC. TO PROVIDE A SMOOTH SURFACE. ALL ELECTRICAL
SWITCHES AND OUTLET PLATES, SURFACE
HARDWARE, ETC., SHALL BE REMOVED BEFORE PAINTING OR WALLCOVERING.
PROTECT AND REPLACE SAME WHEN PAINTING IS COMPLETE.
3. PROTECTION: ALL WORK BY OTHERS SHALL BE ADEQUATELY
PROTECTED AGAINST DAMAGE FROM PAINT AND FROM THE APPLICATION OF
THE VARIOUS ADHESIVES USED IN INSTALLING ALL WALL COVERINGS. ON
COMPLETION, ALL OTHER WORK SHALL BE LEFT FREE OF DAUBS, SPOTS, AND
SPLATTERS OF PAINT AND ADHESIVES.
4. FIRE RESISTIVE RATINGS: MATERIALS INSTALLED IN ALL AREAS SHALL BE
FIRE RESISTIVE RATED AS TESTED AND APPROVED BY THE UNDERWRITERS
LABORATORIES, INC., MEETING REQUIREMENTS OF U.S. PUBLIC HEALTH
SERVICES. FIRE RESISTANT RATING OF MATERIALS SHALL BE CLASS A AND
MEET THE FIRE CODE APPLICABLE IN THE BUILDING.
5. QUALITY: MATERIALS USED FOR PAINTING SHALL BE BY FIRST
QUALITY MANUFACTURER'S SUCH AS, PRATT & LAMBERT, OR
BENJAMINMOORE AND PAINTING WORK SHALL BE DONE ACCORDING TO
MANUFACTURERS LATEST PRINTED INSTRUCTIONS. COMPLETE LENGTHS OF
WALL COVERING SHALL BE INSPECTED IMMEDIATELY UPON RECEIPT AND
BEFORE INSTALLATIONS BY CONTRACTOR TO MAKE CERTAIN THAT THEY ARE
FREE FROM DEFECTS OF ANY KIND, AND ARE IN CORRECT QUANTITY, WIDTHS,
PATTERN, AND COLOR. CONTRACTOR SHALL IMMEDIATELY NOTIFY PROJECT FINISH SPECIFICATION SUMMARY
MANAGER BY PHONE AND IN WRITING OF ANY DEVIATION.
MANUFACTUER STYLE COLOR OTHER
6. SUBMITTALS: UPON RECEIPT OF WALL COVERING FROM MANUFACTURE(S),
A PROPERLY TAGGED SAMPLE WITH MANUFACTURER'S LABEL AND FLOORING
CPT 1 BENTLY/PRINCE STREET VASAKA 5C41 CADAGAN LOOP
ARCHITECTURAL WALL COVERING
INDICATION SHALL BE SUBMITTED TO PROJECT DESIGNER FOR APPROVAL CPT 2 BENTLY/PRINCE STREET FIERA 885893 BROADLOOM&TILE
BEFORE INSTALLATION. GOODS SUPPLIED FROM MORE THAN ONE DYE LOT VCT 1 ALLSTATE MVT2 PL2020
FOR USE IN A SINGLE AREA WILL NOT BE ACCEPTED. DRAWDOWNS OF PAINTS VWB1 JOHNSONITE WALL BASE 1/8" CB-21 PLATINUM
SPECIFIED TO BE SUBMITTED TO DESIGNER FOR APPROVAL. VWB2 JOHNSONITE WALL BASE VINYL CB-34 PUTTY
7. INSTALLATION: ALL WALL COVERING SHALL BE HUNG IN STRICT CWB1 BENTLY/PRINCE STREET FIERA 885893 BOUND EDGE
ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN T1 DALTILE PORCEALTO CD62 12X12
INSTRUCTIONS. ALL SEAMS MUST BE CLOSELY AND NEATLY BUTTED AND G1 CUSTOMBUILDING PRODUCTS POLYBLEND #60 CHARCOAL USE WITH T1
ALIGNED TO THE WALL COVERING PATTERN, ALL AIR POCKETS AND BUBBLES L1 FORBO MARMOLEUM VIVACE 3405 GRANADA
ELIMINATED, AND THERE MUST BE A FIRM BOND OF THE WALL COVERING TO TS1 JOHNSONITE EGXXJ FOG
THE UNDERLYING WALL SURFACES. EXCEPT WHERE INDICATED, ALL SEAMS ROOM FINISH SCHEDULE
TS2 JOHNSONITE CRSXXD DUST
MUST BE MADE A MINIMUM OF 4" FROM ALL INSIDE AND OUTSIDE CORNERS ROOM FLOORS BASE WALLS CLG
AND NO HORIZONTAL SEAMS WILL BE ACCEPTED. ALL FINISHED SURFACES WALLS
NORTH
SOUTH
VWB 1
VWB 2
CWB 1
P1 BENJAMIN MOORE EGGSHELL 2126-60
WEST
CPT 1
CPT 2
VCT 1
MUST BE CLEANED AS THE WORK PROGRESSES AND ALL EXCESS PASTE AND
EAST
GYP.
ACT
ADHESIVES MUST BE REMOVED. CONTRACTOR TO INSTALL ALL FABRIC WALL P2 BENJAMIN MOORE EGGSHELL 2130-50
L1
T2
COVERING WITH A FRESH BLADE PER CUT. P3 BENJAMIN MOORE EGGSHELL 2133-50
8. PAINTING MATERIALS: AS SPECIFIED ON FINISH PLANS. P4 BENJAMIN MOORE FLAT OC-21 FOR GYP. CEILINGS
301 RECEPTION X X WC1 P2 P2 P2 X
9. PAINTING: ALL PAINT SHALL BE RECOMMENDED BY THE PAINT WC1 VURE DESIGN ETCH 4446-WHEAT
302 LARGE CONFERENCE X X P3 P3 P3 P3 X X
MANUFACTURERS FOR SPECIFIC SURFACES. PROVIDE THE FOLLOWING PAINT WC2 VURE DESIGN ETCH 4454-WHEAT
303 SMALL CONFERENCE X X P1 P1 P1 P1 X
SYSTEMS FOR THE VARIOUS SUBSTRATES INDICATED. SEE FINISH PLANS FOR T2 DALTILE SEMI-GLOSS ODM7 6X6
304 VP OFFICE X X P1 P1 P1 P1 X
EXACT LOCATION. G2 HYROMENT DESINGER SERIES HEATHER USE WITH T2
305 CFO OFFICE X X P1 P1 P1 P1 X
10. DRYWALL PARTITIONS: 306 CEO OFFICE X X P3 P3 P3 P3 X
1ST COAT LATEX, FLAT DRYWALL PRIMER CEILING 307 BREAK ROOM X X P1 P2 P2 P2 X
2ND COAT LATEX, EGGSHELL ACT1 ARMSTRONG 2 X 2 NATURAL FISSURED II WHITE - 56704
308 SERVER ROOM X X X P1 P1 P1 P1 X
3RD COAT LATEX, EGGSHELL DOORS/WINDOWS 309 WORK ROOM X X P2 P2 P2 P2 X
11. DOORS, FRAMES, MISCELLANEOUS METALS: MOHAWK DOORS BIRCH - PLAIN SLICED CLEAR FINISH 310 OPEN OFFICE X X P1 P1 P1 P1 X
1ST COAT PRIMER (OMIT IF FACTORY-PRIMED) WESTERN INTEGRATED FRAMES BRONZE 311 NORTH CORRIDOR X X WC2 WC2 WC2 WC2 X
2ND COAT ALKYD, SEMI-GLOSS ENAMEL BALI - 1" MINI BLINDS STANDARD ALUMNINUM 312 SOUTH CORRIDOR X X WC2 WC2 WC2 WC2 X
3RD COAT ALKYD, SEMI-GLOSS ENAMEL
PLASTIC LAMINATES 313 WOMEN'S RESTROOM X P1/T2 P1/T2 P1/T2 P1/T2 X
12. DRYWALL SOFFITS & COVES:
P-LAM 1 FORMICA 689-58 STELLAR 314 MEN'S RESTROOM X P1/T2 P1/T2 P1/T2 P1/T2 X
1ST COAT PRIMER
P-LAM 2 FORMICA 927-58 FOLKSTONE
2ND COAT LATEX, FLAT ENAMEL
3RD COAT LATEX, FLAT ENAMEL P-LAM 3 FORMICA 923-58 SURF
13. COORDINATION: PAINTING CONTRACTOR TO PAINT ALL NON-SHOP P-LAM 4 FORMICA 508-58 MOUSE GRAFIX
FINISHED WORK, WHICH REQUIRES PAINTING (I.E. CLOSET SHELVING, P-LAM 5 FORMICA 464-58 GRAYSTONE
MISCELLANEOUS METALS, ETC.). ALL PAINTED FINISH HVAC WORK LOCATED IN GRANITE
GRILLES, DIFFUSERS, DRYWALL SOFFITS, FACES AND CEILING TO BE FIELD GRAN 1 HOME GRANITE GROUP D BLUE PEARL
PAINTED TO MATCH ADJACENT SURFACES.
14. PAINTING & WALL COVERING INSTALLATION TO OCCUR BEFORE MILLWORK WOODS
INSTALLATION. WD 1 NORTHERN WOODS VENEER PLAIN SLICED BIRCH CLEAR FINSIH
Excite Advertising Agency Specification Drawings. Spring 2007. Interior Specifications II
3. At the time
of this
project, the
Red Cedar
Physical
Rehabilitation Center
in Menmoonie, WI
was going through a
redesigning process.
Plans for the expansion
had been drawn, but
no lighting plan was
set. My job was to
propose a lighting plan
for the facility based
on calculations and
techniques learned in
class. Each room was
to have an appropriate
amount of lighting and
selected fixtures. My
design took elements
from the adjoining
hospital, and also
incorporated circular
ceiling pieces.
Red Cedar Physical Rehabilitation Services Expansion. Fall 2007. Lighting Design
4. Left: ‘Still Life’-Drawing I (Fall 2004) ‘Sipping
Bottom: ‘Travis’-Life Drawing (Fall 2006) Under a
Right: ‘Ginger Root Contour’-Life Drawing Palm Tree’-
(Fall 2006) 3D Design
(Spring
2005)
The interior Fashion
design Without
concentration at UW- Fabric:
Stout is part of the art tropical
program. Therefore, dress made
before I started my of drinking
interior design courses, straws,
I took two years of shelf liner,
basic drawing and flowers,
design classes. All and fishing
design students are line
required to take four ‘Self Portrait’-Serigraphy (Fall 2005)
studio electives. I
chose Serigraphy, Life
Drawing, Sculpture,
and Furniture Design. ‘Flute Becomes Cow’-Drawing II
The selections on this (Spring 2005) Flute transforms
page are some of my into stuffed cow, and paper rotates
favorite projects from over the course of eight
these classes. Pieces drawings.
along the bottom row
are projects or sketches
from these classes also.
Fundamental Design and Studio Work
5. Coyote’s
Motorcycle
Den is a
proposed
retail/repair shop
selling used bike parts
and Harley-Davidson
paraphernalia. It is also
intended to emphasize
community in its
remote South Dakota
town. As a contract for
the honors program, I
worked with a group of
ten retail management
majors in a marketing
class. Their assignment
was to create a concept
and general layout in
order to generate ideas
for their client. I was
contracted to produce
the design presentation
based on the sketches
and ideas of the class.
Coyote’s Motorcycle Den. Spring 2008. Honors Contract With Retail Marketing Students
6. 20'-0"
GARAGE?
4'-0"
12'-4" 12'-4"
refrigerator
SL. CLG.
SL. CLG.
10'-4"
10'-4"
DINING
KITCHEN
dishwasher
22'-8"
30" drop-in
BEDROOM BEDROOM
range/oven
combination
desk/comp.
30'-0"
2'-6"
3'-8"
desk/comp.
17'-8"
10'-6"
10'-2"
LIVING/FAMILY SL. CLG. SL. CLG.
3'-4"
MASTER
21'-0"
26'-0"
Sketchup Renderings. Spring 2009. Bungalow Pros Design Internship