SlideShare a Scribd company logo
1 of 11
Download to read offline
Pendidikan                                               Warna— Warni
  KUNJUNGAN ROMO CAROLUS KE SEKOLAH-SEKOLAH DI
                  BAWAH NAUNGAN YSBS
Kunjungan ke Sekolah SMA/SMK Yos Sudarso Jeruklegi :
 Dialog tentang perkembangan, hasil, serta dampak                                         Rekreasi keluarga sekre-
    beasiswa kambing terhadap perkembangan kemajuan                                        tariat YSBS ke Pangandaran
    pendidikan siswa-siswi sekolah Yos Sudarso Jeruklegi.                                  dalam rangka syukuran atas
 Data perkembangan penerimaan siswa baru ( Statistik                                      suksesnya penyelenggaraan
    penerimaan siswa baru ).                                                               Workshop Mitra Misereor se
         - SMK Yos Sudarso Jeruklegi = 62 siswa                                            -Indonesia (23-24/7) diikuti
         - SMA Yos Sudarso Jeruklegi = 40 siswa                                            oleh karyawan sekretariat
 Melihat perkembangan anak-anak yang tinggal di asrama                                    dan kantor padat karya. Pi-
    serta hambatan-hambatan yang terjadi di asrama.          knik berlangsung hangat dan menyenangkan. Bermain di
Kunjungan ke sekolah SMK Yos Sudarso Kawunganten :           pantai, bekerjasama sambil bercengkrama dengan bakar
 Memeriksa dan dialog dengan siswa dan para guru ten-       ikan serta makan dan bernyanyi. Jadi lebih seru ketika
    tang praktek otomotif ringan serta permasalahan-         memberi surprise selamat ulang tahun untuk salah satu
    permasalahan yang dihadapi.                              peserta.
 Merencanakan mendatangkan 3 montir dari proyek                 Esok hari kembali pulang ke Cilacap dengan membawa
    dump truck untuk pelatihan siswa.                        kenangan indah kebersamaan dan kerjasama yang baik
 Melakukan pemeriksaan dan rencana pembelian perala-        seluruh peserta.(Dee)
    tan yang dibutuhkan untuk praktek otomotif.
 Memeriksa ruangan-ruangan kelas yang sudah direno-
    vasi dan bangunan yang sudah dipakai.
Kunjungan ke TK, SD, SMP Pius & SMK Yos Sudarso Si-
dareja :
 Memeriksa pembagian kelas-kelas baru.
 Memeriksa data penerimaan siswa baru ( statistic pene-
    rimaan siswa baru )
         - SMK Pius Sidareja = 632 siswa
         - SMP Pius Sidareja = 30 siswa
 Pembahasan dengan SMP Pius tentang rencana pembe-
    rian beasiswa sebesar Rp. 50.000 / bulan bagi semua
    siswa baru.
 Memeriksa Sekolah TK dan SD Pius namun karena tidak
    ada karyawan maka tidak dilakukan dialog untuk pening-
    katan kualitas pendidikan.
 Memeriksa kantor kepala sekolah dan ruang TU yang
    baru di SMK Yos.
 Melakukan pemeriksaan dan pembahasan bengkel l SMK
    yang hasilnya memerlukan tempat bengkel yang lebih
    luas karena banyak peralatan dibengkel sehingga beng-
    kel tersebut kurang tertata dengan rapi.
Kunjungan ke SMA Yos Sudarso Cilacap :
 Memimpin Misa Jumat I untuk siswa-siswi dan guru serta
    karyawan sekolah yang beragama Katolik.
 Melihat ruangan-ruangan kelas bagaimana kondisi pen-
    gaturan ruangan-ruangan tersebut.
Kunjungan ke TK Maria Immaculata.
 Melakukan pembahasan dengan kepala sekolah dan para
    guru TK Maria Immaculata yang berkaitan dengan para
    siswa yang berkebutuhan khusus, khususnya pemban-
    gunan ruangan terapi dan peralatan untuk anak-anak
    berkebutuhan khusus.
 Peralatan – peralatan anak bekerbutuhan khusus terse-
    but sudah disampaikan dalam kunjungannya ke kantor
    ChildFund dan Cord Aid di Yogyakarta pada tanggal 2
    Agustus 2011.(IS)



                                                                                                                     12
PARTNER & LAPORAN KEGIATAN
       First Narrative Report on Project Nr. 416-025-1014ZG
I. General Information
     1        Name of the partner organization              YAYASAN SOSIAL BINA SEJAHTERA
     2        Project title                                 Protecting reclaimed land and land use for smallholder farming in
                                                            marginal coastal area affected by flooding around Cilacap, Central
                                                            Java
     3        Project number                                416-025-1014 ZG
     4        Reporting Period                              September 1st 2010 - June 1st2011

     5        Total budget                                  790,000.00 EUR

     6        Donor Agency                                  MISEREOR – GERMANY

Brief description of the genesis of the report
1. Initial meetings of villagers – as many as 300 persons in some villages – to discuss and plan the building of a road, dyke
   canal etc. in their village – how would such be possible and among others – “willingness to accep help from a non Islam
   Organization”
2. Process to obtain permission from village to Regency levels –
       * Village Action Committee
       * Village Government – Lurah (Village Leader) + Council
       * Sub Regency Office
       * Regional Planning Board
       * Regency Offices – Public Works Dept. Regents Secretariat, etc.
3. Meetings with N.G.O. staff (Y.S.B.S.) – acceptance of possibility of co-operation
5. Y.S.B.S. field visit to assess if acceptable to criteria, assess project score, feasibility and degree of village input,
   competency and Regional Gov. Input.
6. Discussions on all levels of Gov. Leading to approval of the project.
7. Discussions between Gov. and Y.S.B.S. as to logistics, responsibility of committees, Government and Y.S.B.S. at all levels. E.g.
   if hard surfacing a road – quality of stone, volume of stone per load, at least 5 cubic meters. If as yet there is no bridge
   willingness of locals to carry by hand, cart etc. to project site, etc. Guarantee voluntary inputs – emplacing stone, drains,
   etc.
8. Decision to implement the project by all stake holders.
9. Y.S.B.S. discussions with villagers who quarry and load rocks, gravel etc. as to price per cubic meter, cost of loading,
   guaranteeing rock quality etc.
10. Permission of villages of roads to be traversed to reach project site and compensate (rocks) if roads are damaged. The
   delivery dockets for the rocks have 5 copies are:
   *     One copy for the quarry overseer
   *     One copy for logistics department
   *     One copy for finance department
   *     One copy for monitoring & reporting department
   *     One copy for village action committee.



II. PROJECT INPUT :

1.       Land donated by villagers.
2.       Trees felled etc. to make way for road
3.       Funds from Misereor to pay to quarry, load and transport materials to project site, office equipment, staff cost.
4.       Motorbikes, minibus, small equipment, trucks.
5.       Office, office equipments etc.
6.       Volume of Materials: stone, gravel, clay/small stone, sand pits, etc.
7.       Office administration: Computers, printer, stationery.
8.        Project staff: Project leader, field staffs, cashier, bookkeeper.

                                                                                                                                13
                                                                                                                                 2
9. Supervision, meeting with Village Communities, Kiai’s etc.         1.3 The district Government contributed asphalt/bitumen
10. Meetings Infrastructure Staff, General Admin, Staff                   worth IDR 12 billion and cement IDR 3 billion and funds
    and Board                                                             for gravel on many of the roads.
11. Volume of Materials – 40 Villages + 19            Community
    Building Project Stones – 24.803 mts³, Gravel – 508 mts³,         Objective 2:
    clay / small stone 63.250 mst³. Costs Report of Materials,
    Staff, Transport etc.                                             2.1. a. Mr. Stephanus Mulyadi as Manager in BPH took
12. Financial Report                                                            MICD Block A Course at the PIPM (Community
13. Voluntary work done by tens of thousands of villagers as                    Base Infrastructure Development) Study Program
    their input – GOTONG ROYONG – and a boost to the                            in Gajah Mada University, Post Graduate Faculty,
    culture of voluntary work together to develop their areas.                  at Yogyakarta. The Course on September 27st 2010
15. Work done by Y.S.B.S. staff from start planning,                            – October 15st 2010.
    implementation, finishing, assessing and reporting.                    b. Mr. Ignatius Suharyono as Manager in BPH, already
16. Labor in stone quarries, gravel pits, sand pits, etc.                       attended Training for Modern Administration
17. Maps provided to project sites, project holders                             Office Management at Jakarta on December 14 –
    address, t                                                                  16 ‘2010 . The materials of Training are:
                                                                                      Management
III. PROJECT OUTPUT                                                                   ConceptOffice
                                                                                      Administration Management
Aim 1.                                                                                Responsibility of Administration manager
Making reclaimed land arable. As you witnessed what the                               Carrier Prospect
villagers called “sanitasi” (sanitation) – using the river to bring                   Officer Organization
in sediment to waterlogged land, raising it and then having                           Organization Principles
their first crop of rice and harvest on + 200 hectares. Of land.                      Structure of Organization
                                                                                      Planning and Analyze for Job Description
Aim 2.                                                                                Work Analysis
The road/dyke from Bantarsari to Bugel protects all the low                           Work system Concept
lying rice fields on the left and the irrigation canal enables                        Control System for the organization
them to get two crops per year. As do all other road base/                            Workload Chart
dykes in the area.                                                                    Electronic Data Processing
                                                                                      Time Management
Aim 3.
                                                                      2.2. Mrs. Dian as Treasurer, has enrolled in an Accounts
We work with the Free Farmers Union and The National                       Diploma 3 Study at Muhammadiyah Economic College
Parliament Representative Budiman Soejatmiko to get
                                                                           (STIE Muhammadiyah), the Study will begin on
ownership papers the land. Already succeed in Ujung Alang.                 September 2011, during 6 semesters.
                                                                      2.3. The Work Places of B.P.H. – meeting and document
Objective Achieved
                                                                           rook has been rehabilitated, furnished and equipped
 40 Individual Infrastructure Village Projects. Name of village           and used for Misereor Partner of Indonesia Workshop
  – volume or work. The detail report, on Appendix 1                       on May 30st 2011 - June 2nd 2011.
 19 Small Scale Community projects. Name of village –                     The List of Meetings :
  volume of work. The detail report, on Appendix 2                           Board Meeting on October 21st 2010
 ± 150.000 people were helped by the program and ±                          Field Monitoring on November 13th 2010
  40.000 people were involved with voluntary labor. ± 6.000                  Filed Monitoring on November 14th 2010
  families benefited financially, shelling stones, gravel, sand,
                                                                             BPH Internal Evaluation on November 15th 2010
  red bricks, etc.
                                                                             Field Monitoring on November 15th 2010
                                                                             Board Meeting on November 29th 2010
Objective 1 :
                                                                             Board Meeting & Devision-devision on November
Indicators:
                                                                              30th 2010
1.1 We have built to June 1st 2011: 22.064 meters of new
     road and 11.630 meters rehab. Road, 1320 meters                         Board Meeting on February 2nd 2011
     graveled roads km of road, 20.083 meters road base/dyke                 BPH Internal Evaluation on February 4th 2011
     km of dyke foundations , and drainage channels 25 km.                   Evaluation of Project implementation on February
     Moderate Islamic Leaders lent their weight to the project                14th 2011
     there were no serious floods in the area for rain season                Evaluation of BPH & Division on February 17th2011
     2010/2011                                                               Board Meeting on March 10th 2011
 1.2 All programs were implemented with a large voluntary                    Evaluation of Project implementation on April 5th
     input of villagers. The Misereor Film crew saw the                       2011
     women’s cooking efforts near Pelindukan, Cibeureum                      BPH Internal Evaluation on April 11st 2011.
     drainage canal and road base heightening project. Also
     partook of tapioca tubers cooked by the women of
     Jeruklegi Kulon village for workers and guests.

                                                                                                                              14
                                                                                                                               3
2.4. Each division of Y.S.B.S. has a co-ordination and all staff   6. A number of the staff have done courses as reported
     has a job description. The detail see appendix 3.                earlier and there are weekly and monthly meetings for all
2.5. A Bulletin Volume I (September 2010 – March 2011) has            to become aware of all aspects of the program. Our
     been published and upgrading of the website is planned.          Education Staff has attended workshops etc. at our retreat
                                                                      centre at Kaliori.
Objective 3 :                                                      7. We are exploring development of land owned by O.M.I.
3.1. The response to the river Tsunami at Jeruklegi was very          building houses etc. for future funding of B.P.H. etc..
     effective and all concerned have notes of duties. The         8. We planed and implemented one disaster response
     detail report, see Appendix 4.                                   program at Jeruklegi and we work with Local Gov. as to
     We already make The S.O.P (Standard Operational                  the use of our tall buildings in the event of a Tsunami and
     Procedure) of Emergency Response for Disaster                    we had a Tsunami Warning + 3 months ago and many took
     Management. The detail S.O.P, see Appendix 5.                    refuge in our buildings. We are developing a fire fighting
3.2. The time from request of victims to reception of aid was         ability at A.M.N. for our own needs and that of nearby
     24 hours.                                                        kampungs.
                                                                   9. We are exploring an external evaluation with Gajah Mada
Measures Supported                                                    Univ. and Chris of Satu Nama.
1.   All programs were planned by the villages via the
     L.K.M.D. (Village Development Committee), agreed upon         IV. PROJECT OUTCOMES.
     by Local Gov. at village, sub-regency and regency levels
                                                                   1. Social Capital and Social Cohesion – measured by the en-
     and submitted to us for help. In this period we helped
                                                                      thusiasm and happiness of all concerned – e.g. seen in
     40 villages with roads, dykes and canals and dyke/roads
                                                                      interviews for the Misereor Film and the meetings of
     protecting rice land from fresh and salt water
                                                                      Misereor Workshop Participants and villagers in Pelindu-
     inundation. The villages helped were the more remote
                                                                      kan Village meeting place and also with representatives of
     and the poorer villages of Cilacap Regency. The
                                                                      project areas at the meeting in the workshop room
     communities, local Gov., village organization all helped in
                                                                      Y.S.B.S. Offices – comprising Kiai’s, local Influential People,
     implementing the project.
                                                                      Politicians from the three main Parties, Inter Religions
     Land and labor freely given, e.g. in dyke / road base
                                                                      Communication Forum, Government Officials, Gender
     projects the stipend paid per cubic meter of earth shifted
                                                                      Leaders etc.
     is IDR 10.000 – we pay IDR 5.000 as an incentive and the
                                                                   2. Access to markets, increased income; access to villages,
     other IDR 5.000 is a local input. Regency Gov. supplied
                                                                      e.g. Bugel market place, gold shops, gas bottle supply etc.
     asphalt, cement, gravel, road rollers and expertise from
                                                                   3. Access to mobile Health Clinic; access to electricity; Access
     Dept. of Public Works.
                                                                      to cell phone communication – pricing assessment of pro-
     On initiation the programs produce hope for a brighter           duce; access to teachers, Government People, etc. ; access
     future, enthusiasm to be taking hold of their own                to Schools outside the village; access to Social Intercourse
     development, increase in incomes because of increased            in the Village; access to irrigation water via canal created
     produce and cheaper transport to markets. Access for all         when moving soil for road base; access to building materi-
     social, economic and development is achieved Dykes               als – homes, schools etc.
     etc. are wide enough to take the pressures of fresh and       4. Development of Community via “GOTONG ROYONG”
     sea waters and roads can be traversed even in the rainy          value system.
     season.                                                       5. Increase in self esteem – taking hold of ones future.
2.   The 40 projects consisted of road building – the rocks        6. Good Governance – honesty, necessity for success of pro-
     and gravel being bought in poorer, rocky villages,               ject.
     opening up opportunities to quarry rocks etc. for other       7. Inter Faith Dialogue of Action – working together.
     programs and money is paid to the earth movers in the         8. Strengthening of position of moderate Kiai’s – Sidelining
     most remote villages.                                            extremists.
3.   19 small projects building community spirit, social capital
     and social cohesion were implemented.                         Examples :
4.   Amount of stone quarried – 24.803 mts³                        1. Bojong, Bringkeng, Grugu road. – Villagers had refused to
     Amount of gravel quarried – 508 mts³                             pay taxes until road was repaired. After repairs they paid
     Amount of earth moved-63.250 mts³                                their taxes.
5.   We organized workshops on child protection and all            2. Brebeg village – Public transport vehicles refused to oper-
     program had to be shown as child friendly. We were               ate due to poor condition of the road on repairs began
     invited to Islam religion festivals and asked to speak on        operating again.
     religion tolerance and development. There was more            3. Bantarsari – Bugel – Penikel Road – getting to junior and
     than 5.000 Islam’s present at these events. The evening          Senior High School was so difficult some students droped
     before the Misereor Workshop presentation I met with             out. Even when partly repaired they restarted school.
     all Kiai’s etc. at a Hotel in town and Y.S.B.S. paid for      4. Kamulyan – Cikedondong, Kedung Wadas, Citembong.
     hotel, accommodation etc.. we had a number of                    Was impassible due to continuous rains, flood etc. local
     meetings in the regency with heads of appropriate                produce such as coconut sugar – a very important pro-
     Depts. and Planed implementation together.                       duce of small farmers could not reach market – road
                                                                                                                                  15
                                                                                                                                   4
partly repaired small trucks again gained access. The       6. Increase in incomes – rice harvest areas extended + better
     Regency supplied gravel and will supply free asphalt           price using cell phones for quotes and decreased cost of
     (Bitumen) to perfect the road.                                 transport.
5.   Jeruklegi Kulon – some years ago villagers began plant-     7. Opening of market place, shops etc. in Bugel
     ing commercial trees but as access was too difficult no     8. Small transporters – motor bike taxis etc. helped greatly by
     one would buy the timber. On initiation of hard surfac-        the better roads.
     ing traders immediately began buying their timber.
6.   Ujung Gagak, Karanganyar, Cibeureum, Pelindukan,               The process of writing this report has involved many
     Bugel, Penikel.                                             elements under Yayasan Sosial Bina Sejahtera, that were the
7.   On completing canals the river brought in sediment and      staff of BPH, all project Staff including the field officer,
     raised the land level so they were able to plant and har-   government officer in the level of village, sub district and
     vest rice in hundreds of hectares of land with a marvel-    district, community leaders, religious leaders, direct and
     ous crop due to fertility of sediment . at Misereor work-   indirect beneficiaries of the project’s outcomes.
     shop visit joy was palpable.
                                                                    The information collected by observe method, direct
8.   Extracting sand from the river and placing it a round
                                                                 interview, discussion with the religious and community
     mosques and schools helped build community and Inter
                                                                 leaders, also direct visit to the fields.
     Faith co-operation
                                                                    To support the success of this project, many parties
V. PROJECT IMPACT.                                               involving, those were project staff, the foreman, local
Unforeseen impacts.                                              government, religious and community leaders, also the
                                                                 representation of beneficiaries of the project
1. Gajah Mada Post Graduate Faculty of Community Based
   Infrastructure development Declared Y.S.B.S. Program          Cilacap, July 12nd 2011
   as a Laboratory for Faculty and Students and we were
   asked to participate in Curriculum Development, Lecture       Reported by
   on how to implement Programs, participate in panel            Fr. Charlie Burrows, OMI
   discussion etc. – Staff and Students visited Cilacap, met
   with heads of Gov. Dept’s and visited project sites and a
   student now prepares his thesis on Social Capital, Inter
   Faith dialogue, etc. created by Y.S.B.S. Programs and an      VI. SOME OF PHOTO‘S
   M.O.U. between local Gov. – Gajah Mada Univ. and
   Y.S.B.S. has been prepared and will be signed at some
   big Gajah Mada Function by the Rector, Bupati and
   Y.S.B.S. Director.
2. Because of our perceived ability by Gov. Officials to
   influence the peoples of the Sea Villages, Segara Anakan
   Lagoon and Nusakambangan Island the Ministry of
   Justice and Ministry of Forrest’s asked us to sign an
   M.O.U. handing over Flora and Fauna replanting and
   protecting to us and this was witnessed by both
   Ministers at a ceremony on the Island. The Provincial
   head of the Justice Dept. has visited the program many
   times and the Vice Governor of central Java – Ibu
   Rustiningsih also visited our project sites and declared
   support for our program.                                                                Patimuan Village
3. The wife of the former president – Abdurrahman Wahid
   (Gus Dur deceased) has asked me to accompany her on
   a Ramadan Safari to Nusakambangan Island – meet with
   inmates etc. and discuss an end to the death penalty/
   this again is seen to be because of our impact on the
   people of the area because of the projects seen to
   alleviate poverty etc.
4. Diverting the sediment into waterlogged areas and
   taking sand from the river lessened the amount of
   sediment entering the Segara Anakan lagoon and silting
   up spawning sites of fish shrimp and sea creatures hence
   helping the fishing areas in and outside the lagoon –
   areas dependent on lagoon spawning areas.
5. Kajian Akbar talks – because of our exposure in the
   infrastructure program we have been asked to give talks
   at Islam mass meetings on interfaith dialogue and
   development.                                                                    Kawunganten Village

                                                                                                                             16
                                                                                                                              5
3rd Report on Reforestation Project of Nusakambangan Island

NARRATIVE REPORT
Report Number
Subject                             The Narrative Report Progress of Reforestation Nusakambangan Island with
                                    Strengthening Local Society Model
Name of Partner Organization        Yayasan Sosial Bina Sejahtera Cilacap
The Project Title                   Reforestation of Nusakambangan Island
Report Period                       3rd Report
Report Summary                       The Process of this report involved the Foundation staff, project staff and
                                      the formers being trained .
                                     The information was collected trough direct interview, visitation and field
                                      direct observation.
                                     Contributors: project staff, local government, and the framers

Introduction                                               the reforestation program in Nusakambangan Island.
                                                           To keep the sustainability and the success of the pro-
    As the follow up to the M.O.U. between Central         ject we carry out the system what is called “tumpang
Java Province Law and Human Rights Department and          sari”, which means in the same area among those main
The Foundation of the Bringing About of Prosperity         and hard trees which may not be cut or logged they
and Good Will (YSBS Cilacap) No. WUM.01.10-323,            also plant and cultivate sorts of vegetable called
dated 7 April 2010, in the same year YSBS started the      “palawija”.
reforestation project in Solok Jero area, in Nusakam-         The project was officially confirmed by the Vice Gov-
bangan Island. The purpose of the reforestation pro-       ernor of Central Java Pronvince, Mrs. Rustriningsih, and
ject is to restore the forest in Nusakambangan Island      witnessed by the Law and Human Rights Department of
to the previous ecosystem and give a significant contri-   Central Java Province, Mr. Chairudin Idrus, on May 1st
bution on reducing the danger of global warming.           2011.
Therefore, we prioritize the indigenous plants from the       The following is our report on the implementation of
Island to be planted and the strategy that we use is       the project so far. We are also attaching some pictures
organizing and recruiting the settlers around the area     on the project.
so that they can participate actively in implementing
                                                                                                                17
                                                                                                                 6
The Improvement of the Project.
                                                                                                                                                                               1




Pic 1. Showing the area which has been covered by the indigenous plant from the island. With the appropriate treatment the
plants grew well and healthily.


Seedling                                                                                                                 The seedlings in this Base camp gives a very important
                                                                                                                         education to the settlers, for they can learn the ap-
 The first step of the reforestation is seedling the in-                                                                 propriate seedling process and study how to do the
digenous plants. The seedling nursery is done in the                                                                     seedlings correctly, also how to overcome the plant
area to guarantee the efficiency and the indigenousness                                                                  disease they might encounter. The readied seedlings
of the plants. The seedling planting is done both in the                                                                 then are taken to the settlers‘ area.
base camp of the project and in the settler’s land. The
seedlings in the base camp functions as the samples,                                                                                                                       4
whereas the ones in the settler’s land is meant to re-
duce the distance between the seedling area and the
reforestation area which can minimize the cost of mov-
ing the young plants to the reforestation area.
                                                    Pics 2 and 3, showing the seedling process in the Base Camp of the




                                               2




                                                                                                                                                                           5
                                                    Coordinator Reforestation Project.




                                               3




                                                                                                                                                                               18
                                                                                                                                                                                7
6                                                             9




                                                      7      Pic. 9 shows the indigenous plant among the vegetable and
                                                             fruit trees.

                                                                                                                   10




                                                      8




Pics 4 - 8 show the seedling in the settler’s area next to
their huts.


The implimentation of tumpang sari system
to support the project.

   As we mentioned above that in this reforesta-
tion project we carry out Tumpang Sari system.
We chose that system because there has been no
better system to support the sustainability of the           Pic. 10 the young indigenous plants after the vegetable was
                                                             harvested.
project with the least cost so far. Tumpang Sari
system means the settlers can plant vegetables /                 Due to the failure of the paddy harvest the
palawija among the timber or the fruit trees. So,            previous year, YSBS helped the farmers by donat-
the settlers who are involved in the project do              ing money to buy corn seed, lentils kidney beans,
not receive any payment, but they can still har-             and green peas. Those plants grew very well and
vest from the vegetable and fruit trees which                the first harvest gave a good quality and quantity
they plant among the indigenous plants. This sys-            crop.
tem proves to function very well, where thie sym-
biosis take places.

                                                                                                                     19
                                                                                                                      8
The Harvest                                                    Instructions for the Non Worker People
                                                               in Nusakambangan Island
                                                          11
                                                                                                                       15




Pic. 11 shows the „Palawija“ which grew very well and gave         To maintain the security and the success of the refores-
the farmers the successful way out to overcome the prob-       tation project in Nusakambangan Island, two years before
lem due to the Paddy Gogo failure.                             ( in 2009 ) Nusakambangan Prison authority issued instruc-
                                                               tions for settlers/non worker people around the Nusakam-
                                                               bangan Prison area. There are 5 ( five ) prohibitions in that
The Harvest
                                                               instructions that should be obeyed by all non workers peo-
The Palawija Harvest helped by the Foundation                  ple in the area, e.g.: prohibition to change the function and
Corn                          7,5 ton         July 2011        mission of Nusakambangan forest, to log the natural trees
Kindey Beans                  6 ton           July 2011        or planted trees, to open a new area/settlement, to sell or
Green Beans                   6 ton           July 2011        buy land/farmer area, and prohibition to hunt.
                                                                   The settlers/farmers who are being trained by the Foun-
                                                          12   dation have always obeyed those five prohibitions.
                                                               Unfortunately, those instructions are only directed to the
                                                               non worker people in Nusakambangan area. Some prob-
                                                               lems still comes up so far, such as there are still timber-
                                                               thieves and hunters who come from outside the Nusakam-
                                                               bangan area (they are not the people who live in Nusakam-
                                                               bangan Island).

                                                               Planting the Spaying

                                                                   The Reforestation Project managed by the Foun-
                                                          13   dation of the Bringing About of the Prosperity and
                                                               Good Will in Solok Jero area, Nusakambangan Island
                                                               has shown a satisfying improvement. Tumpangsari
                                                               system works very well, (warga binaan) the farmers
                                                               can harvest and the indigenous plants have grown
                                                               very well. These following pictures show some trees
                                                               being planted, namely Jabon trees, have grown very
                                                               well.
                                                                                                                       16

                                                          14




                                                               Pic. 16 shows the young indigenous trees (managed to
      Pics 12-14 show the harvest of Corn and beans.           grow well)
                                                                                                                         20
                                                                                                                          9
Spectacles/Problems                                              The Coordination Meeting with The Wardens of Batu
                                                                 Nusakambangan Prison.
The settlers/farmers in Solok Jero who are trained by
the foundation have some roles. Besides as the pio-              The Reforestation Project in Nusakambangan Island
neers who plan the indigenous plants, they also help             can only work well if the security is well guaranteed.
the forest police to guard the Nusakambangan forest              Therefore, the existence of Warden Squad who work
from the timber thieves. As a result, sometimes they             hand in hand with the people in keeping the security
have a threat from the timber thieves. Mr. Memet,                is also urgent. The Foundation always makes a coordi-
the Foundation’s coordinator of the reforestation pro-           nation and regularly have a meeting with the squad to
ject, is one of those who have ever been threatened              consolidate the forest security and the farmer safety
by the timber thieves, because he helped the police              in Nusakambangan Island.
to catch the thieves. To protect the farmers from the
threat, the Foundation asked for help from the Ma-                                                                           19
rines who post in Klaces, Nusakambangan.

                                                           17




                                                                 Pic. 19 showing the meeting between Father Charlie with the Batu
                                                                 Prison Squad discussing the coordination with the farmer to catch
                                                                 the timber thieves. One gang has been arrested and is waiting for
                                                                 the trial.
 Pic. 17 Mr. Memet and the Marines are exchanging the mobile
 numbers to communicate in case of the threatsor other danger-   The Commitment for the Future
 ous criminal actions.
                                                                       The Foundation Reforestation Project, especially
                                                                 in Solok Jero area, has just been started. From the
    The Foundation not only gave donations in the                evaluation of the first period we can conclude that
form of seeds and other farming material, but also a             the Reforestation Project is showing a satisfying pro-
training, educational meeting, and discussion on find-           gress. Even some of the indigenous trees has grown
ing solution on how to send their children to school             more than 2 ( two ) meters tall. On the other hand,
for a better future than just farming in Nusakamban-             due to the harvest of Palawija and fruit trees, the
gan Island. Therefore, the Foundation regularly has a            farmers become more enthusiastic to succeed the big
meeting with the farmers.                                        Reforestation Project in Nusakambangan Island.
    The following picture (18) shows Father Charlie,                   Up to the moment, there are 7 hectares of the
OMI, is discussing with the farmers on the possibilities         farmers’ land which still have not been planted with
of their children going to schools managed by the                the indigenous plants. This is because of the dry sea-
Foundation with the scholarship from the Foundation.             son which makes it unable to plant the indigenous
Two schools which are promising enough among oth-                trees. The planting will be done as soon as the next
ers are: SMK ( Vocational School ) and Akademi Mari-             wet season comes. The next wet season is predicted
tim Nusantara (Nusantara Maritime Academy). Both                 to start in September 2011.
have proved to enable the graduates to get jobs                        As committed from the beginning, the Founda-
quicker with a very well payment. In this case, they             tion of the Bringing About of the Prosperity and Good
can help the parents in Nusakambangan Island.                    Will still commits to give 1(one) million rupiahs to
                                                                 every farmer who succeeds to plant the indigenous
                                                           18
                                                                 plant and fruit trees in their land. Hopefully with that
                                                                 money they can cultivate more arid savanna to be
                                                                 planted with the indigenous plants and the fruit tress
                                                                 with the Tumpang Sari system so that the Reforesta-
                                                                 tion widens. In that Reforestation area, it is forbidden
                                                                 to plant productive plants, but only the indigenous
                                                                 plants and fruit trees. The farmer/people are not al-
                                                                 lowed to cut or log the trees. They can only harvest
                                                                 the fruits from the trees.

                                                                                                                               10
                                                                                                                               21
On Thursday, 4 August 2011, after the meeting on The            CONCLUSION
Uncontrolled Forest Logging especially Albiso Trees in
Nusakambangan Island, which was held in Cilacap Dis-                As the conclusion, we can inform that the Refor-
trict’s Meeting Room, we made a discussion with the             estation Project which is done together with the farm-
Forest Police on working together to support the in-            ers in Solok Jero Nusakambangan has shown a very
digenous plants seedling in Solok Jero. The result of           satisfying result. Regarding about the importance of
the discussion was the Forest Police was willing to             Reforestation for human life, we are committed to
guide the farmers to find the seed in the reservation           keep on doing the Reforestation Project. We are
forest and train the farmer on how to propagate the             grateful that the same commitment also happens to
seedlings properly in such a way that it produces the           Central Java Province Law and Human Rights Depart-
high quality indigenous trees. Based on our data,               ment, Government and parties involved.
there are 170.000 indigenous seedlings in the polly-                This is the report that we can provide so far. We
bags which are ready to be planted in the wet season.           really appreciate and deeply thank for all the support
                                                                and partnership that have been given so far and in the
                                                                future (sm).

                                                                                                                  20




                  Pic. 20-21 shows the land which is ready to be planted with the indigenous plants
                                                                                                                 21




                                                                                                                   22
                                                                                                                   11

More Related Content

Similar to BULETIN YSBS Vol.II. Part II

IND-2012-28 Navy Children School, Goa Lake project
IND-2012-28  Navy Children School, Goa Lake projectIND-2012-28  Navy Children School, Goa Lake project
IND-2012-28 Navy Children School, Goa Lake projecticandfc
 
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSASITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSAAmos Tan
 
CV_Mwasiti A. Rashid_New
CV_Mwasiti A. Rashid_NewCV_Mwasiti A. Rashid_New
CV_Mwasiti A. Rashid_NewMwasiti Rashid
 
Meghalaya rainwater harvesting workshop report April 2017
Meghalaya rainwater harvesting workshop report April 2017Meghalaya rainwater harvesting workshop report April 2017
Meghalaya rainwater harvesting workshop report April 2017biometrust
 
Meghalaya rainwater harvesting workshop report August 2017
Meghalaya rainwater harvesting workshop report August 2017Meghalaya rainwater harvesting workshop report August 2017
Meghalaya rainwater harvesting workshop report August 2017biometrust
 
Ary sendy project excerpts1-updated jan 2015
Ary sendy project excerpts1-updated jan 2015Ary sendy project excerpts1-updated jan 2015
Ary sendy project excerpts1-updated jan 2015JIM GED
 
Ary-Sendy_excerpts-of-past project
Ary-Sendy_excerpts-of-past projectAry-Sendy_excerpts-of-past project
Ary-Sendy_excerpts-of-past projectJIM GED
 
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docx
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docxANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docx
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docxErnesto Fogata
 
SIKKIM AND SCIENCE.pptx
SIKKIM AND SCIENCE.pptxSIKKIM AND SCIENCE.pptx
SIKKIM AND SCIENCE.pptxShreya520518
 
RCE Greater Pwani - Introduction and Overview
RCE Greater Pwani - Introduction and OverviewRCE Greater Pwani - Introduction and Overview
RCE Greater Pwani - Introduction and OverviewESD UNU-IAS
 
Centre of excellence application
Centre of excellence applicationCentre of excellence application
Centre of excellence applicationjuliebeattie
 
MarkLim_CV
MarkLim_CVMarkLim_CV
MarkLim_CVMark Lim
 
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al Pinnacle Educational Services
 
Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectBryan Yeoh
 
We all stand togehter xanthi
We all stand togehter xanthiWe all stand togehter xanthi
We all stand togehter xanthi2epalxanthis
 

Similar to BULETIN YSBS Vol.II. Part II (20)

Recent and on-going Peat action research in Indonesia
Recent and on-going Peat action research in IndonesiaRecent and on-going Peat action research in Indonesia
Recent and on-going Peat action research in Indonesia
 
IND-2012-28 Navy Children School, Goa Lake project
IND-2012-28  Navy Children School, Goa Lake projectIND-2012-28  Navy Children School, Goa Lake project
IND-2012-28 Navy Children School, Goa Lake project
 
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSASITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
 
CV_Mwasiti A. Rashid_New
CV_Mwasiti A. Rashid_NewCV_Mwasiti A. Rashid_New
CV_Mwasiti A. Rashid_New
 
Meghalaya rainwater harvesting workshop report April 2017
Meghalaya rainwater harvesting workshop report April 2017Meghalaya rainwater harvesting workshop report April 2017
Meghalaya rainwater harvesting workshop report April 2017
 
Meghalaya rainwater harvesting workshop report August 2017
Meghalaya rainwater harvesting workshop report August 2017Meghalaya rainwater harvesting workshop report August 2017
Meghalaya rainwater harvesting workshop report August 2017
 
Ary sendy project excerpts1-updated jan 2015
Ary sendy project excerpts1-updated jan 2015Ary sendy project excerpts1-updated jan 2015
Ary sendy project excerpts1-updated jan 2015
 
Ary-Sendy_excerpts-of-past project
Ary-Sendy_excerpts-of-past projectAry-Sendy_excerpts-of-past project
Ary-Sendy_excerpts-of-past project
 
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docx
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docxANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docx
ANNUAL-IMPLEMENTATION-PLAN-SY 2021-2022-SAMPLE.docx
 
Rural Project
Rural ProjectRural Project
Rural Project
 
SIKKIM AND SCIENCE.pptx
SIKKIM AND SCIENCE.pptxSIKKIM AND SCIENCE.pptx
SIKKIM AND SCIENCE.pptx
 
RCE Greater Pwani - Introduction and Overview
RCE Greater Pwani - Introduction and OverviewRCE Greater Pwani - Introduction and Overview
RCE Greater Pwani - Introduction and Overview
 
Centre of excellence application
Centre of excellence applicationCentre of excellence application
Centre of excellence application
 
MarkLim_CV
MarkLim_CVMarkLim_CV
MarkLim_CV
 
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al
Geosicience Canada GAC/AGC Vol. 42 No. 4. Hymers et al
 
Jurisprudential model
Jurisprudential modelJurisprudential model
Jurisprudential model
 
Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized Project
 
Issue 28 final
Issue 28 finalIssue 28 final
Issue 28 final
 
Nelsap news april 2020
Nelsap news april 2020Nelsap news april 2020
Nelsap news april 2020
 
We all stand togehter xanthi
We all stand togehter xanthiWe all stand togehter xanthi
We all stand togehter xanthi
 

More from YSBS

Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...
Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...
Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...YSBS
 
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacap
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacapYSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacap
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacapYSBS
 
BULETIN YSBS Vol.II part I
BULETIN YSBS Vol.II part IBULETIN YSBS Vol.II part I
BULETIN YSBS Vol.II part IYSBS
 
Laporan progres penghijauan di nusakambangan
Laporan progres penghijauan di nusakambanganLaporan progres penghijauan di nusakambangan
Laporan progres penghijauan di nusakambanganYSBS
 
Profil LPK Yos Sudarso Sokaraja
Profil LPK Yos Sudarso SokarajaProfil LPK Yos Sudarso Sokaraja
Profil LPK Yos Sudarso SokarajaYSBS
 
Ysbs üBersicht
Ysbs üBersichtYsbs üBersicht
Ysbs üBersichtYSBS
 

More from YSBS (6)

Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...
Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...
Narrative report project nr. 416-025-1014 zg reporting period dec. 1st, 2011 ...
 
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacap
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacapYSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacap
YSBS- proyek penyudetan lumpur pelindukan-kampung laut, cilacap
 
BULETIN YSBS Vol.II part I
BULETIN YSBS Vol.II part IBULETIN YSBS Vol.II part I
BULETIN YSBS Vol.II part I
 
Laporan progres penghijauan di nusakambangan
Laporan progres penghijauan di nusakambanganLaporan progres penghijauan di nusakambangan
Laporan progres penghijauan di nusakambangan
 
Profil LPK Yos Sudarso Sokaraja
Profil LPK Yos Sudarso SokarajaProfil LPK Yos Sudarso Sokaraja
Profil LPK Yos Sudarso Sokaraja
 
Ysbs üBersicht
Ysbs üBersichtYsbs üBersicht
Ysbs üBersicht
 

Recently uploaded

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Recently uploaded (20)

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

BULETIN YSBS Vol.II. Part II

  • 1. Pendidikan Warna— Warni KUNJUNGAN ROMO CAROLUS KE SEKOLAH-SEKOLAH DI BAWAH NAUNGAN YSBS Kunjungan ke Sekolah SMA/SMK Yos Sudarso Jeruklegi :  Dialog tentang perkembangan, hasil, serta dampak Rekreasi keluarga sekre- beasiswa kambing terhadap perkembangan kemajuan tariat YSBS ke Pangandaran pendidikan siswa-siswi sekolah Yos Sudarso Jeruklegi. dalam rangka syukuran atas  Data perkembangan penerimaan siswa baru ( Statistik suksesnya penyelenggaraan penerimaan siswa baru ). Workshop Mitra Misereor se - SMK Yos Sudarso Jeruklegi = 62 siswa -Indonesia (23-24/7) diikuti - SMA Yos Sudarso Jeruklegi = 40 siswa oleh karyawan sekretariat  Melihat perkembangan anak-anak yang tinggal di asrama dan kantor padat karya. Pi- serta hambatan-hambatan yang terjadi di asrama. knik berlangsung hangat dan menyenangkan. Bermain di Kunjungan ke sekolah SMK Yos Sudarso Kawunganten : pantai, bekerjasama sambil bercengkrama dengan bakar  Memeriksa dan dialog dengan siswa dan para guru ten- ikan serta makan dan bernyanyi. Jadi lebih seru ketika tang praktek otomotif ringan serta permasalahan- memberi surprise selamat ulang tahun untuk salah satu permasalahan yang dihadapi. peserta.  Merencanakan mendatangkan 3 montir dari proyek Esok hari kembali pulang ke Cilacap dengan membawa dump truck untuk pelatihan siswa. kenangan indah kebersamaan dan kerjasama yang baik  Melakukan pemeriksaan dan rencana pembelian perala- seluruh peserta.(Dee) tan yang dibutuhkan untuk praktek otomotif.  Memeriksa ruangan-ruangan kelas yang sudah direno- vasi dan bangunan yang sudah dipakai. Kunjungan ke TK, SD, SMP Pius & SMK Yos Sudarso Si- dareja :  Memeriksa pembagian kelas-kelas baru.  Memeriksa data penerimaan siswa baru ( statistic pene- rimaan siswa baru ) - SMK Pius Sidareja = 632 siswa - SMP Pius Sidareja = 30 siswa  Pembahasan dengan SMP Pius tentang rencana pembe- rian beasiswa sebesar Rp. 50.000 / bulan bagi semua siswa baru.  Memeriksa Sekolah TK dan SD Pius namun karena tidak ada karyawan maka tidak dilakukan dialog untuk pening- katan kualitas pendidikan.  Memeriksa kantor kepala sekolah dan ruang TU yang baru di SMK Yos.  Melakukan pemeriksaan dan pembahasan bengkel l SMK yang hasilnya memerlukan tempat bengkel yang lebih luas karena banyak peralatan dibengkel sehingga beng- kel tersebut kurang tertata dengan rapi. Kunjungan ke SMA Yos Sudarso Cilacap :  Memimpin Misa Jumat I untuk siswa-siswi dan guru serta karyawan sekolah yang beragama Katolik.  Melihat ruangan-ruangan kelas bagaimana kondisi pen- gaturan ruangan-ruangan tersebut. Kunjungan ke TK Maria Immaculata.  Melakukan pembahasan dengan kepala sekolah dan para guru TK Maria Immaculata yang berkaitan dengan para siswa yang berkebutuhan khusus, khususnya pemban- gunan ruangan terapi dan peralatan untuk anak-anak berkebutuhan khusus.  Peralatan – peralatan anak bekerbutuhan khusus terse- but sudah disampaikan dalam kunjungannya ke kantor ChildFund dan Cord Aid di Yogyakarta pada tanggal 2 Agustus 2011.(IS) 12
  • 2. PARTNER & LAPORAN KEGIATAN First Narrative Report on Project Nr. 416-025-1014ZG I. General Information 1 Name of the partner organization YAYASAN SOSIAL BINA SEJAHTERA 2 Project title Protecting reclaimed land and land use for smallholder farming in marginal coastal area affected by flooding around Cilacap, Central Java 3 Project number 416-025-1014 ZG 4 Reporting Period September 1st 2010 - June 1st2011 5 Total budget 790,000.00 EUR 6 Donor Agency MISEREOR – GERMANY Brief description of the genesis of the report 1. Initial meetings of villagers – as many as 300 persons in some villages – to discuss and plan the building of a road, dyke canal etc. in their village – how would such be possible and among others – “willingness to accep help from a non Islam Organization” 2. Process to obtain permission from village to Regency levels – * Village Action Committee * Village Government – Lurah (Village Leader) + Council * Sub Regency Office * Regional Planning Board * Regency Offices – Public Works Dept. Regents Secretariat, etc. 3. Meetings with N.G.O. staff (Y.S.B.S.) – acceptance of possibility of co-operation 5. Y.S.B.S. field visit to assess if acceptable to criteria, assess project score, feasibility and degree of village input, competency and Regional Gov. Input. 6. Discussions on all levels of Gov. Leading to approval of the project. 7. Discussions between Gov. and Y.S.B.S. as to logistics, responsibility of committees, Government and Y.S.B.S. at all levels. E.g. if hard surfacing a road – quality of stone, volume of stone per load, at least 5 cubic meters. If as yet there is no bridge willingness of locals to carry by hand, cart etc. to project site, etc. Guarantee voluntary inputs – emplacing stone, drains, etc. 8. Decision to implement the project by all stake holders. 9. Y.S.B.S. discussions with villagers who quarry and load rocks, gravel etc. as to price per cubic meter, cost of loading, guaranteeing rock quality etc. 10. Permission of villages of roads to be traversed to reach project site and compensate (rocks) if roads are damaged. The delivery dockets for the rocks have 5 copies are: * One copy for the quarry overseer * One copy for logistics department * One copy for finance department * One copy for monitoring & reporting department * One copy for village action committee. II. PROJECT INPUT : 1. Land donated by villagers. 2. Trees felled etc. to make way for road 3. Funds from Misereor to pay to quarry, load and transport materials to project site, office equipment, staff cost. 4. Motorbikes, minibus, small equipment, trucks. 5. Office, office equipments etc. 6. Volume of Materials: stone, gravel, clay/small stone, sand pits, etc. 7. Office administration: Computers, printer, stationery. 8. Project staff: Project leader, field staffs, cashier, bookkeeper. 13 2
  • 3. 9. Supervision, meeting with Village Communities, Kiai’s etc. 1.3 The district Government contributed asphalt/bitumen 10. Meetings Infrastructure Staff, General Admin, Staff worth IDR 12 billion and cement IDR 3 billion and funds and Board for gravel on many of the roads. 11. Volume of Materials – 40 Villages + 19 Community Building Project Stones – 24.803 mts³, Gravel – 508 mts³, Objective 2: clay / small stone 63.250 mst³. Costs Report of Materials, Staff, Transport etc. 2.1. a. Mr. Stephanus Mulyadi as Manager in BPH took 12. Financial Report MICD Block A Course at the PIPM (Community 13. Voluntary work done by tens of thousands of villagers as Base Infrastructure Development) Study Program their input – GOTONG ROYONG – and a boost to the in Gajah Mada University, Post Graduate Faculty, culture of voluntary work together to develop their areas. at Yogyakarta. The Course on September 27st 2010 15. Work done by Y.S.B.S. staff from start planning, – October 15st 2010. implementation, finishing, assessing and reporting. b. Mr. Ignatius Suharyono as Manager in BPH, already 16. Labor in stone quarries, gravel pits, sand pits, etc. attended Training for Modern Administration 17. Maps provided to project sites, project holders Office Management at Jakarta on December 14 – address, t 16 ‘2010 . The materials of Training are:  Management III. PROJECT OUTPUT  ConceptOffice  Administration Management Aim 1.  Responsibility of Administration manager Making reclaimed land arable. As you witnessed what the  Carrier Prospect villagers called “sanitasi” (sanitation) – using the river to bring  Officer Organization in sediment to waterlogged land, raising it and then having  Organization Principles their first crop of rice and harvest on + 200 hectares. Of land.  Structure of Organization  Planning and Analyze for Job Description Aim 2.  Work Analysis The road/dyke from Bantarsari to Bugel protects all the low  Work system Concept lying rice fields on the left and the irrigation canal enables  Control System for the organization them to get two crops per year. As do all other road base/  Workload Chart dykes in the area.  Electronic Data Processing  Time Management Aim 3. 2.2. Mrs. Dian as Treasurer, has enrolled in an Accounts We work with the Free Farmers Union and The National Diploma 3 Study at Muhammadiyah Economic College Parliament Representative Budiman Soejatmiko to get (STIE Muhammadiyah), the Study will begin on ownership papers the land. Already succeed in Ujung Alang. September 2011, during 6 semesters. 2.3. The Work Places of B.P.H. – meeting and document Objective Achieved rook has been rehabilitated, furnished and equipped  40 Individual Infrastructure Village Projects. Name of village and used for Misereor Partner of Indonesia Workshop – volume or work. The detail report, on Appendix 1 on May 30st 2011 - June 2nd 2011.  19 Small Scale Community projects. Name of village – The List of Meetings : volume of work. The detail report, on Appendix 2  Board Meeting on October 21st 2010  ± 150.000 people were helped by the program and ±  Field Monitoring on November 13th 2010 40.000 people were involved with voluntary labor. ± 6.000  Filed Monitoring on November 14th 2010 families benefited financially, shelling stones, gravel, sand,  BPH Internal Evaluation on November 15th 2010 red bricks, etc.  Field Monitoring on November 15th 2010  Board Meeting on November 29th 2010 Objective 1 :  Board Meeting & Devision-devision on November Indicators: 30th 2010 1.1 We have built to June 1st 2011: 22.064 meters of new road and 11.630 meters rehab. Road, 1320 meters  Board Meeting on February 2nd 2011 graveled roads km of road, 20.083 meters road base/dyke  BPH Internal Evaluation on February 4th 2011 km of dyke foundations , and drainage channels 25 km.  Evaluation of Project implementation on February Moderate Islamic Leaders lent their weight to the project 14th 2011 there were no serious floods in the area for rain season  Evaluation of BPH & Division on February 17th2011 2010/2011  Board Meeting on March 10th 2011 1.2 All programs were implemented with a large voluntary  Evaluation of Project implementation on April 5th input of villagers. The Misereor Film crew saw the 2011 women’s cooking efforts near Pelindukan, Cibeureum  BPH Internal Evaluation on April 11st 2011. drainage canal and road base heightening project. Also partook of tapioca tubers cooked by the women of Jeruklegi Kulon village for workers and guests. 14 3
  • 4. 2.4. Each division of Y.S.B.S. has a co-ordination and all staff 6. A number of the staff have done courses as reported has a job description. The detail see appendix 3. earlier and there are weekly and monthly meetings for all 2.5. A Bulletin Volume I (September 2010 – March 2011) has to become aware of all aspects of the program. Our been published and upgrading of the website is planned. Education Staff has attended workshops etc. at our retreat centre at Kaliori. Objective 3 : 7. We are exploring development of land owned by O.M.I. 3.1. The response to the river Tsunami at Jeruklegi was very building houses etc. for future funding of B.P.H. etc.. effective and all concerned have notes of duties. The 8. We planed and implemented one disaster response detail report, see Appendix 4. program at Jeruklegi and we work with Local Gov. as to We already make The S.O.P (Standard Operational the use of our tall buildings in the event of a Tsunami and Procedure) of Emergency Response for Disaster we had a Tsunami Warning + 3 months ago and many took Management. The detail S.O.P, see Appendix 5. refuge in our buildings. We are developing a fire fighting 3.2. The time from request of victims to reception of aid was ability at A.M.N. for our own needs and that of nearby 24 hours. kampungs. 9. We are exploring an external evaluation with Gajah Mada Measures Supported Univ. and Chris of Satu Nama. 1. All programs were planned by the villages via the L.K.M.D. (Village Development Committee), agreed upon IV. PROJECT OUTCOMES. by Local Gov. at village, sub-regency and regency levels 1. Social Capital and Social Cohesion – measured by the en- and submitted to us for help. In this period we helped thusiasm and happiness of all concerned – e.g. seen in 40 villages with roads, dykes and canals and dyke/roads interviews for the Misereor Film and the meetings of protecting rice land from fresh and salt water Misereor Workshop Participants and villagers in Pelindu- inundation. The villages helped were the more remote kan Village meeting place and also with representatives of and the poorer villages of Cilacap Regency. The project areas at the meeting in the workshop room communities, local Gov., village organization all helped in Y.S.B.S. Offices – comprising Kiai’s, local Influential People, implementing the project. Politicians from the three main Parties, Inter Religions Land and labor freely given, e.g. in dyke / road base Communication Forum, Government Officials, Gender projects the stipend paid per cubic meter of earth shifted Leaders etc. is IDR 10.000 – we pay IDR 5.000 as an incentive and the 2. Access to markets, increased income; access to villages, other IDR 5.000 is a local input. Regency Gov. supplied e.g. Bugel market place, gold shops, gas bottle supply etc. asphalt, cement, gravel, road rollers and expertise from 3. Access to mobile Health Clinic; access to electricity; Access Dept. of Public Works. to cell phone communication – pricing assessment of pro- On initiation the programs produce hope for a brighter duce; access to teachers, Government People, etc. ; access future, enthusiasm to be taking hold of their own to Schools outside the village; access to Social Intercourse development, increase in incomes because of increased in the Village; access to irrigation water via canal created produce and cheaper transport to markets. Access for all when moving soil for road base; access to building materi- social, economic and development is achieved Dykes als – homes, schools etc. etc. are wide enough to take the pressures of fresh and 4. Development of Community via “GOTONG ROYONG” sea waters and roads can be traversed even in the rainy value system. season. 5. Increase in self esteem – taking hold of ones future. 2. The 40 projects consisted of road building – the rocks 6. Good Governance – honesty, necessity for success of pro- and gravel being bought in poorer, rocky villages, ject. opening up opportunities to quarry rocks etc. for other 7. Inter Faith Dialogue of Action – working together. programs and money is paid to the earth movers in the 8. Strengthening of position of moderate Kiai’s – Sidelining most remote villages. extremists. 3. 19 small projects building community spirit, social capital and social cohesion were implemented. Examples : 4. Amount of stone quarried – 24.803 mts³ 1. Bojong, Bringkeng, Grugu road. – Villagers had refused to Amount of gravel quarried – 508 mts³ pay taxes until road was repaired. After repairs they paid Amount of earth moved-63.250 mts³ their taxes. 5. We organized workshops on child protection and all 2. Brebeg village – Public transport vehicles refused to oper- program had to be shown as child friendly. We were ate due to poor condition of the road on repairs began invited to Islam religion festivals and asked to speak on operating again. religion tolerance and development. There was more 3. Bantarsari – Bugel – Penikel Road – getting to junior and than 5.000 Islam’s present at these events. The evening Senior High School was so difficult some students droped before the Misereor Workshop presentation I met with out. Even when partly repaired they restarted school. all Kiai’s etc. at a Hotel in town and Y.S.B.S. paid for 4. Kamulyan – Cikedondong, Kedung Wadas, Citembong. hotel, accommodation etc.. we had a number of Was impassible due to continuous rains, flood etc. local meetings in the regency with heads of appropriate produce such as coconut sugar – a very important pro- Depts. and Planed implementation together. duce of small farmers could not reach market – road 15 4
  • 5. partly repaired small trucks again gained access. The 6. Increase in incomes – rice harvest areas extended + better Regency supplied gravel and will supply free asphalt price using cell phones for quotes and decreased cost of (Bitumen) to perfect the road. transport. 5. Jeruklegi Kulon – some years ago villagers began plant- 7. Opening of market place, shops etc. in Bugel ing commercial trees but as access was too difficult no 8. Small transporters – motor bike taxis etc. helped greatly by one would buy the timber. On initiation of hard surfac- the better roads. ing traders immediately began buying their timber. 6. Ujung Gagak, Karanganyar, Cibeureum, Pelindukan, The process of writing this report has involved many Bugel, Penikel. elements under Yayasan Sosial Bina Sejahtera, that were the 7. On completing canals the river brought in sediment and staff of BPH, all project Staff including the field officer, raised the land level so they were able to plant and har- government officer in the level of village, sub district and vest rice in hundreds of hectares of land with a marvel- district, community leaders, religious leaders, direct and ous crop due to fertility of sediment . at Misereor work- indirect beneficiaries of the project’s outcomes. shop visit joy was palpable. The information collected by observe method, direct 8. Extracting sand from the river and placing it a round interview, discussion with the religious and community mosques and schools helped build community and Inter leaders, also direct visit to the fields. Faith co-operation To support the success of this project, many parties V. PROJECT IMPACT. involving, those were project staff, the foreman, local Unforeseen impacts. government, religious and community leaders, also the representation of beneficiaries of the project 1. Gajah Mada Post Graduate Faculty of Community Based Infrastructure development Declared Y.S.B.S. Program Cilacap, July 12nd 2011 as a Laboratory for Faculty and Students and we were asked to participate in Curriculum Development, Lecture Reported by on how to implement Programs, participate in panel Fr. Charlie Burrows, OMI discussion etc. – Staff and Students visited Cilacap, met with heads of Gov. Dept’s and visited project sites and a student now prepares his thesis on Social Capital, Inter Faith dialogue, etc. created by Y.S.B.S. Programs and an VI. SOME OF PHOTO‘S M.O.U. between local Gov. – Gajah Mada Univ. and Y.S.B.S. has been prepared and will be signed at some big Gajah Mada Function by the Rector, Bupati and Y.S.B.S. Director. 2. Because of our perceived ability by Gov. Officials to influence the peoples of the Sea Villages, Segara Anakan Lagoon and Nusakambangan Island the Ministry of Justice and Ministry of Forrest’s asked us to sign an M.O.U. handing over Flora and Fauna replanting and protecting to us and this was witnessed by both Ministers at a ceremony on the Island. The Provincial head of the Justice Dept. has visited the program many times and the Vice Governor of central Java – Ibu Rustiningsih also visited our project sites and declared support for our program. Patimuan Village 3. The wife of the former president – Abdurrahman Wahid (Gus Dur deceased) has asked me to accompany her on a Ramadan Safari to Nusakambangan Island – meet with inmates etc. and discuss an end to the death penalty/ this again is seen to be because of our impact on the people of the area because of the projects seen to alleviate poverty etc. 4. Diverting the sediment into waterlogged areas and taking sand from the river lessened the amount of sediment entering the Segara Anakan lagoon and silting up spawning sites of fish shrimp and sea creatures hence helping the fishing areas in and outside the lagoon – areas dependent on lagoon spawning areas. 5. Kajian Akbar talks – because of our exposure in the infrastructure program we have been asked to give talks at Islam mass meetings on interfaith dialogue and development. Kawunganten Village 16 5
  • 6. 3rd Report on Reforestation Project of Nusakambangan Island NARRATIVE REPORT Report Number Subject The Narrative Report Progress of Reforestation Nusakambangan Island with Strengthening Local Society Model Name of Partner Organization Yayasan Sosial Bina Sejahtera Cilacap The Project Title Reforestation of Nusakambangan Island Report Period 3rd Report Report Summary  The Process of this report involved the Foundation staff, project staff and the formers being trained .  The information was collected trough direct interview, visitation and field direct observation.  Contributors: project staff, local government, and the framers Introduction the reforestation program in Nusakambangan Island. To keep the sustainability and the success of the pro- As the follow up to the M.O.U. between Central ject we carry out the system what is called “tumpang Java Province Law and Human Rights Department and sari”, which means in the same area among those main The Foundation of the Bringing About of Prosperity and hard trees which may not be cut or logged they and Good Will (YSBS Cilacap) No. WUM.01.10-323, also plant and cultivate sorts of vegetable called dated 7 April 2010, in the same year YSBS started the “palawija”. reforestation project in Solok Jero area, in Nusakam- The project was officially confirmed by the Vice Gov- bangan Island. The purpose of the reforestation pro- ernor of Central Java Pronvince, Mrs. Rustriningsih, and ject is to restore the forest in Nusakambangan Island witnessed by the Law and Human Rights Department of to the previous ecosystem and give a significant contri- Central Java Province, Mr. Chairudin Idrus, on May 1st bution on reducing the danger of global warming. 2011. Therefore, we prioritize the indigenous plants from the The following is our report on the implementation of Island to be planted and the strategy that we use is the project so far. We are also attaching some pictures organizing and recruiting the settlers around the area on the project. so that they can participate actively in implementing 17 6
  • 7. The Improvement of the Project. 1 Pic 1. Showing the area which has been covered by the indigenous plant from the island. With the appropriate treatment the plants grew well and healthily. Seedling The seedlings in this Base camp gives a very important education to the settlers, for they can learn the ap- The first step of the reforestation is seedling the in- propriate seedling process and study how to do the digenous plants. The seedling nursery is done in the seedlings correctly, also how to overcome the plant area to guarantee the efficiency and the indigenousness disease they might encounter. The readied seedlings of the plants. The seedling planting is done both in the then are taken to the settlers‘ area. base camp of the project and in the settler’s land. The seedlings in the base camp functions as the samples, 4 whereas the ones in the settler’s land is meant to re- duce the distance between the seedling area and the reforestation area which can minimize the cost of mov- ing the young plants to the reforestation area. Pics 2 and 3, showing the seedling process in the Base Camp of the 2 5 Coordinator Reforestation Project. 3 18 7
  • 8. 6 9 7 Pic. 9 shows the indigenous plant among the vegetable and fruit trees. 10 8 Pics 4 - 8 show the seedling in the settler’s area next to their huts. The implimentation of tumpang sari system to support the project. As we mentioned above that in this reforesta- tion project we carry out Tumpang Sari system. We chose that system because there has been no better system to support the sustainability of the Pic. 10 the young indigenous plants after the vegetable was harvested. project with the least cost so far. Tumpang Sari system means the settlers can plant vegetables / Due to the failure of the paddy harvest the palawija among the timber or the fruit trees. So, previous year, YSBS helped the farmers by donat- the settlers who are involved in the project do ing money to buy corn seed, lentils kidney beans, not receive any payment, but they can still har- and green peas. Those plants grew very well and vest from the vegetable and fruit trees which the first harvest gave a good quality and quantity they plant among the indigenous plants. This sys- crop. tem proves to function very well, where thie sym- biosis take places. 19 8
  • 9. The Harvest Instructions for the Non Worker People in Nusakambangan Island 11 15 Pic. 11 shows the „Palawija“ which grew very well and gave To maintain the security and the success of the refores- the farmers the successful way out to overcome the prob- tation project in Nusakambangan Island, two years before lem due to the Paddy Gogo failure. ( in 2009 ) Nusakambangan Prison authority issued instruc- tions for settlers/non worker people around the Nusakam- bangan Prison area. There are 5 ( five ) prohibitions in that The Harvest instructions that should be obeyed by all non workers peo- The Palawija Harvest helped by the Foundation ple in the area, e.g.: prohibition to change the function and Corn 7,5 ton July 2011 mission of Nusakambangan forest, to log the natural trees Kindey Beans 6 ton July 2011 or planted trees, to open a new area/settlement, to sell or Green Beans 6 ton July 2011 buy land/farmer area, and prohibition to hunt. The settlers/farmers who are being trained by the Foun- 12 dation have always obeyed those five prohibitions. Unfortunately, those instructions are only directed to the non worker people in Nusakambangan area. Some prob- lems still comes up so far, such as there are still timber- thieves and hunters who come from outside the Nusakam- bangan area (they are not the people who live in Nusakam- bangan Island). Planting the Spaying The Reforestation Project managed by the Foun- 13 dation of the Bringing About of the Prosperity and Good Will in Solok Jero area, Nusakambangan Island has shown a satisfying improvement. Tumpangsari system works very well, (warga binaan) the farmers can harvest and the indigenous plants have grown very well. These following pictures show some trees being planted, namely Jabon trees, have grown very well. 16 14 Pic. 16 shows the young indigenous trees (managed to Pics 12-14 show the harvest of Corn and beans. grow well) 20 9
  • 10. Spectacles/Problems The Coordination Meeting with The Wardens of Batu Nusakambangan Prison. The settlers/farmers in Solok Jero who are trained by the foundation have some roles. Besides as the pio- The Reforestation Project in Nusakambangan Island neers who plan the indigenous plants, they also help can only work well if the security is well guaranteed. the forest police to guard the Nusakambangan forest Therefore, the existence of Warden Squad who work from the timber thieves. As a result, sometimes they hand in hand with the people in keeping the security have a threat from the timber thieves. Mr. Memet, is also urgent. The Foundation always makes a coordi- the Foundation’s coordinator of the reforestation pro- nation and regularly have a meeting with the squad to ject, is one of those who have ever been threatened consolidate the forest security and the farmer safety by the timber thieves, because he helped the police in Nusakambangan Island. to catch the thieves. To protect the farmers from the threat, the Foundation asked for help from the Ma- 19 rines who post in Klaces, Nusakambangan. 17 Pic. 19 showing the meeting between Father Charlie with the Batu Prison Squad discussing the coordination with the farmer to catch the timber thieves. One gang has been arrested and is waiting for the trial. Pic. 17 Mr. Memet and the Marines are exchanging the mobile numbers to communicate in case of the threatsor other danger- The Commitment for the Future ous criminal actions. The Foundation Reforestation Project, especially in Solok Jero area, has just been started. From the The Foundation not only gave donations in the evaluation of the first period we can conclude that form of seeds and other farming material, but also a the Reforestation Project is showing a satisfying pro- training, educational meeting, and discussion on find- gress. Even some of the indigenous trees has grown ing solution on how to send their children to school more than 2 ( two ) meters tall. On the other hand, for a better future than just farming in Nusakamban- due to the harvest of Palawija and fruit trees, the gan Island. Therefore, the Foundation regularly has a farmers become more enthusiastic to succeed the big meeting with the farmers. Reforestation Project in Nusakambangan Island. The following picture (18) shows Father Charlie, Up to the moment, there are 7 hectares of the OMI, is discussing with the farmers on the possibilities farmers’ land which still have not been planted with of their children going to schools managed by the the indigenous plants. This is because of the dry sea- Foundation with the scholarship from the Foundation. son which makes it unable to plant the indigenous Two schools which are promising enough among oth- trees. The planting will be done as soon as the next ers are: SMK ( Vocational School ) and Akademi Mari- wet season comes. The next wet season is predicted tim Nusantara (Nusantara Maritime Academy). Both to start in September 2011. have proved to enable the graduates to get jobs As committed from the beginning, the Founda- quicker with a very well payment. In this case, they tion of the Bringing About of the Prosperity and Good can help the parents in Nusakambangan Island. Will still commits to give 1(one) million rupiahs to every farmer who succeeds to plant the indigenous 18 plant and fruit trees in their land. Hopefully with that money they can cultivate more arid savanna to be planted with the indigenous plants and the fruit tress with the Tumpang Sari system so that the Reforesta- tion widens. In that Reforestation area, it is forbidden to plant productive plants, but only the indigenous plants and fruit trees. The farmer/people are not al- lowed to cut or log the trees. They can only harvest the fruits from the trees. 10 21
  • 11. On Thursday, 4 August 2011, after the meeting on The CONCLUSION Uncontrolled Forest Logging especially Albiso Trees in Nusakambangan Island, which was held in Cilacap Dis- As the conclusion, we can inform that the Refor- trict’s Meeting Room, we made a discussion with the estation Project which is done together with the farm- Forest Police on working together to support the in- ers in Solok Jero Nusakambangan has shown a very digenous plants seedling in Solok Jero. The result of satisfying result. Regarding about the importance of the discussion was the Forest Police was willing to Reforestation for human life, we are committed to guide the farmers to find the seed in the reservation keep on doing the Reforestation Project. We are forest and train the farmer on how to propagate the grateful that the same commitment also happens to seedlings properly in such a way that it produces the Central Java Province Law and Human Rights Depart- high quality indigenous trees. Based on our data, ment, Government and parties involved. there are 170.000 indigenous seedlings in the polly- This is the report that we can provide so far. We bags which are ready to be planted in the wet season. really appreciate and deeply thank for all the support and partnership that have been given so far and in the future (sm). 20 Pic. 20-21 shows the land which is ready to be planted with the indigenous plants 21 22 11