1. 8 Price Avenue
Middlesbrough
Cleveland
UK
TS5 4PU
Date: Tel: +44 (0) 7927 911 860
Dear Sirs,
Ref: Vacancies for a Level 4 Rigger
I am writing to ask about any suitable vacancies that you might have, either now or in the future, in
the above sector of employment. As you will note from my CV, attached for your attention, I am an
experienced Rigger and I am willing to work in any global location and environment. A strong
'Team Player' with a 'Can Do' approach, I always give 100% and more to my work and always
within the required time constraints. I strongly believe that with my combined knowledge and
experience I could be a valuable asset to your company in either a short or long term capacity. With
this in mind I would welcome the opportunity of further discussion regarding my application and at
your convenience.
I would also ask that you retain my details on your systems for any future and suitable roles that
may arise.
Your consideration is fully appreciated and I look forward to receiving your reply, either by letter,
telephone or email.
Yours faithfully,
Stewart Ryan.
2. STEWART RYAN
ONSHORE & OFFSHORE : L4 RIGGER
AVAILABILITY : TO BE ARRANGED
8 Price Avenue, Middlesbrough, Cleveland, UK. TS5 4PU.
► Tel Mobile: +44 (0) 7927 911 860
► Tel Home: +44 (0) 1642 828 355
► Email: stewart1562ryan@hotmail.co.uk
► Nationality British
Personal Profile:
A highly motivated, confident and experienced Level 4 Rigger, capable of working as a strong team
player and alone when required to, whilst ensuring Health & Safety at all times. I have worked on
various North Sea Platforms and Wind Farms, both in the UK and internationally. Willing to work
in any location, having no issues in being away from home for long periods of time. I keep my
skills updated as an aid to both my personal and professional development.
Vocational Qualifications:
► Vantage No: 1137426
► OPITO: Rigging – Level 4
► Diploma in Moving Engineering Construction Loads – Level 3
► IRATA: Rope Access – Level 1
► ECITB: Ace Card – Level 3
► ECITB: Safety Passport
► OPITO: B.O.S.I.E.T & M.I.S.T + CA & EBS
► Norwegian Escape Chute
► IOSH: Working Safely
► Offshore / BSSIC Safety Training Module
► Offshore Medical
► Working at Height & Rescue Training
► Confined Spaces Safety Awareness ( including Safety Harness Inspection & Rescue )
► Gas Monitor Usage
► Face Fit
► First Aid Training
Employment History:
2015 – 2016: Able Rig Yard / Petrofac – Rigger
I was employed in all rigging duties on the Forties Alpha.
2013 – 2015: WoodGroup PSN – Rigger
All aspects of Rigging was undertaken on various North Sea platforms and Wind Farms in the UK
and Europe. This included rigging, slinging, lifting and movement of various loads. The installation
of 700th
monopoles and 400th
transition pieces, grouting and general deck work.
3. Feb 2012 – 2013: VSCM – Rigger
Sheringham Shoal: I was working as part of a Tower Team on the Sheringham Shoal Wind Farm,
on a project to rectify faults on bell mouths and pips, whilst working in conjunction with the
constructor and dive team. Setting up static rigging to lift bell mouths back into the correct position.
I was living on the Regina Baltic hotel ship, using transfer boats getting to each tower.
Toisa Warrior: I was working on the back deck of the Toisa Warrior alongside the ROV team
assisting in lifting the CT 1 Trenching ROV in and out of the sea safely. I performed all other
rigging duties that arose and krept all of the gear in good order.
Nov 2011 – Dec 2011: VSM / KMB Recruitment – Rigger
Sheringham Shoal: Aboard the Nordhoek constructor ship, working with the Tower crew, lifting X
frames and J tubes operating winch to pull cable and placing grout bags and 8 ton gravel bags.
Aug 2011 – Nov 2011: Lucite International – Rigger
I was working on the MM7 MM8 shutdown using all aspects of rigging, slimging and banking.
2008 – 2011: KMB Recruitment – Rigger & Erector
I was working on several shutdowns throughout Teeside, doing all aspects of rigging. Also
shutdowns on Corus / Leven Bridge.
Jul 2006 – Sep 2006: G.N.M Resources – Rigger
South Shields A & P Yard Producer 111. The major refit of a floating oil rig.
2003 – 2005: Aker Kvaerner – Rigger & Erector
I was on the maintenance and overhaul of the Wilton site, which included BASF, TAT8, TAT7,
Dupont SDC and Dupont Acids 1.
All other roles in Rigging / Erecting dating back to 1989, details on request.
References:
Mr Kevin McBride Rigging Superintendent Tel: +44 (0) 7990 594 773
Mr Tony Solan Rigging Superintendent Tel: +44 (0) 1642 240 670