Holistic Transmission and
                                  Resource Planning
                                  - For the Good of the Whole

                                  Stephen Lee
                                  Senior Technical Executive
                                  Power System Planning and Operation
                                  March 3, 2008

                                   Presented to IEEE Power Engineering Society
IEEE Power and Energy Magazine,
                                              San Francisco Chapter
        Sept/Oct 2007                Hosted by California PUC, San Francisco
Outline

      • Electricity – Central Planning or Free Market
      • What is Holistic Planning?
      • Integrated Planning Revisited
      • Reliability Assessment of Whole Operating Space
      • Holistic Transmission Planning
      • Holistic Resource Planning
      • Concept of Unity in Diversity
      • Optimal Holistic Resource Mix with CO2 Cost
      • Costs and Benefits Distribution
      • Demonstration of the CAR software


© 2007 Electric Power Research Institute, Inc. All rights reserved.   2
Electricity – Central Planning or Free Market

      • Decades of the regulatory model or “Central Planning”
         – Problems of cost-overrun and/or over-capacity
         – Central planning does not handle uncertainties well
      • Power markets
         – California market meltdown and bankruptcy of Enron
         – Free markets tend to be short-sighted and not social
           conscious
      • Lessons learned
         – Both systems have problems




© 2007 Electric Power Research Institute, Inc. All rights reserved.   3
Need for New Approach

      • With restructuring and greater market activities, the power
        grid is being used in ways not in the original designs
      • Increased reliability risk to grid operation
      • Increased burden on greater situational awareness by
        operators
      • It is time to revisit the way we plan the power grid
      • The power grid should again be designed to be operated
        in the new ways it will be used, and perhaps even in
        unanticipated uses
      • Key words: HOLISTIC, ROBUST, FLEXIBLE



© 2007 Electric Power Research Institute, Inc. All rights reserved.   4
What is Holistic Planning?

      • Holistic Planning is to develop a whole or a part of the
        electric power system, with full consideration of all its
        parts, responsive to the public, modeling all reasonably
        probable scenarios of uncertainties affecting planning as
        well as future power system operating conditions, with
        additional tests to assess the robustness of the system
        when exposed to “unlikely” but potentially devastating
        disturbances or other events, in order to achieve a system
        which has:
         – Economic efficiency
         – Adequate reliability
         – Acceptable environmental impacts

© 2007 Electric Power Research Institute, Inc. All rights reserved.   5
Principles of Holistic Planning

      • To compare alternative plans, a comprehensive and quantitative
        metric which corresponds to the maximization of public benefits for
        the whole system.
      • Probabilistic reliability criteria in lieu of deterministic criteria; otherwise,
        transmission investments could be driven equally by contingencies
        that have widely different probabilities, resulting in non-optimal
        resource allocation.
      • The scope of the whole system extends beyond the power system to
        include the local, regional and global environment.
      • Fair and equitable method for allocating costs and benefits having a
        causal and proportional relationship between the use of the assets
        and the costs or benefits to be borne by the parties.
      • The rules of the road for each party should be such that its incentive
        does not induce decisions against the global objective of the whole
        system. Instead, each party would stand to gain if the whole system
        achieves more and more global optimality. By following individual and
        diverse incentives, unity in global objective should be achieved.

© 2007 Electric Power Research Institute, Inc. All rights reserved.   6
Integrated Planning Revisited

      • The ideological platform is “optimal resource allocation”
      • A balanced evaluation of the supply side and the demand
        side in which all energy supply alternatives and all
        conversion of energy into energy services are subject to
        evaluation on a level playing field.
      • Involves individuals as well as collective preferences
      • For example, on the individual side, customers want full
        control of choices which they make based on the options
        presented to them; on the collective side, customers do
        accept affiliation to a group and therefore admit to
        assume their share of a collective responsibility
      • Integrated planning can be viewed as a process for
        balancing individual as well as collective preferences.

© 2007 Electric Power Research Institute, Inc. All rights reserved.   7
Reliability Assessment of Whole Operating
      Space

      • We assess reliability for limited operating conditions, e.g.,
        – Annual peak load
        – All transmission lines in service
      • What about?
        – Other load levels or other hours
        – Maintenance schedules of transmission and
          generation
        – External or market transactions




© 2007 Electric Power Research Institute, Inc. All rights reserved.   8
Boundary Conditions

                                                                                            Wh
                                                                                             c
                                                                                           at
                                                                                           M
                                                                                         –p
                                                                                       sis
                                                                                      wD
                                             Outside Boundary                     i
                                                                                 tF
                                                                                    ln
                                                                                   oo
                                             Conditions                      eer
                                                                               ra
                                                                         P ow
                                                                          en
                                                                         G
              Load and Load Profile




                                                                                           Inside Boundary Conditions
                       Voltage




                                                                                           Operating
                                                                                           State – “You are here”


                                                                                             System Operating
                                                                                             Limits



                                                     Transmission and Generator
                                                      Connectivity and Topology
© 2007 Electric Power Research Institute, Inc. All rights reserved.        9
G1 is net export out of area A1, when positive.
                      Community                                                                 G2 is net export out of area A2, when positive.
                         Activity                                                       G3 >0   G3 is net export out of area A3, when positive.
                                                                                                G4 = - G1 - G2 - G3, is automatically given,
                             Room                                                               when G1, G2, and G3 are specified.



                                                         G3=3000                                           G2 >0
                                              G3=2000

   A 4-Area
Interconnection
                                                   G3= 0
                                                                                                                                G1 >0
   A1                A2

                                                     G3= -2000
   A3                A4


                                                                       G3= -3000

 The Constraints on Any Combination
 of Net Exports (G1, G2, G3 and G4)
     are walls of this 3-D “CAR”
                                                                                                A floor plan is a two-dimensional nomogram.
 © 2007 Electric Power Research Institute, Inc. All rights reserved.               10
G3 >0


                                                   G3=3000                                      G2 >0




                                                               G3= 0
                                                                                                        G1 >0




                                                                       G3= -3000




© 2007 Electric Power Research Institute, Inc. All rights reserved.                11
N-0
                                                                      N-1




                                                                                 Boundary = N-1
                                                                                 Contingency Criteria


© 2007 Electric Power Research Institute, Inc. All rights reserved.         12
N-1 criteria
                        enforce
                        possibly uneven
                        reliability

                                           N-1




                                                                           Boundary = N-2
                                                                           Contingency Criteria



© 2007 Electric Power Research Institute, Inc. All rights reserved.   13
CAR Provides Statistics of Contingency
      Constraints to TNB (Malaysia)




© 2007 Electric Power Research Institute, Inc. All rights reserved.   14
Bar Chart for a Month




© 2007 Electric Power Research Institute, Inc. All rights reserved.   15
Holistic Transmission Planning


                                                                                 • White space is the inside
                                                                                   of the CAR (community
                                                                                   Activity Room) where
                                                                                   operation is reliable
                                                                                 • Future growth requires
                                                                                   operating outside the
                                                                                   white space
                                                                                 • How do we expand the
                                                                                   grid to fit all future
                                                      Line 2-4                     operating conditions
                                                                                   (described by the ellipse?)
                                                                 Line 1-4        • CAR gives the holistic
                                                                                   answer by moving all
                                                                                   necessary walls the right
                                                                                   amount (increase
                                                                                   capacities of line 1-4 by
                                                                                   2500 MW and 2-4 by 1200
                                                                                   MW)


© 2007 Electric Power Research Institute, Inc. All rights reserved.         16
Variation of CAR with Different Load Levels
                       Duration




                                                                      Load Level
© 2007 Electric Power Research Institute, Inc. All rights reserved.        17
Relate Monthly Load Duration Curves to
      Scheduled Outages

                                                                      Monthly Load Duration Curves
                      Hours




                              0                              5000            10000               15000   20000   25000

                                                                                     Load (MW)


© 2007 Electric Power Research Institute, Inc. All rights reserved.                    18
No. of Simultaneous Scheduled and Unscheduled Line
      Outages (Within Same Day) Over 12 Months of a Year
      (Maximum, Average and Minimum)

                                                                          Simultaneous Line Outages (All)

                                   20.0




                                   15.0
                    No. of Lines




                                   10.0




                                    5.0




                                    0.0
                                          1           2               3       4       5      6        7      8      9     10      11   12
                                                                                              Month
                                              Max Outages / Day                   Min Outages / Day       Average Outages / Day


© 2007 Electric Power Research Institute, Inc. All rights reserved.                          19
Holistic Resource Planning




      • How to achieve results of integrated planning in today’s
        non-vertical utility structure?
      • Parts of the whole maximizing their separate incentives
        may work against achieving the good of the whole




© 2007 Electric Power Research Institute, Inc. All rights reserved.   20
Unity in Diversity

      • Diversity means the exercise of an individual’s right of
        free choices.
      • Unity in Diversity means creating unity while preserving
        diversity, or allowing diversity to achieve unity.
      • Hypothesis –
         – Align an individual’s selfish incentive more with the
           socially optimal objective
         – Then the creative energy of individuals would achieve
           the social objective.




© 2007 Electric Power Research Institute, Inc. All rights reserved.   21
Optimal Decisions

                                                                                      Total Cost = Tier 1 Cost + Tier 2 Cost




                                      Tier 1 Costs                                            Tier 2 Costs (Public Good)
                                      (Direct Costs)




                                                                                   * Best Decision


                                                      Decision is not optimal if Tier 2 costs are ignored

© 2007 Electric Power Research Institute, Inc. All rights reserved.           22
Common Property of the Human Race?

             “It is a position not to be controverted that the earth, in its natural,
                 cultivated state was, and ever would have continued to be, the common
                 property of the human race.”         -- Thomas Paine, Agrarian Justice

      • Tier 2 assets (e.g., air, water, land) with PROPERTY RIGHTS
        belonging to the inhabitants
      • Create a Tier 2 class of ownership
      • Distribute Tier 2 revenues and benefits to all Tier 2 owners
        through Public Benefits Funds (PBF)
      • People will then behave in accordance with the objectives of
        minimizing the total Cost (direct Tier 1 + Tier 2 costs)




© 2007 Electric Power Research Institute, Inc. All rights reserved.   23
Basic Principles of UDi-ism
      (Unity in Diversity)

      • Tier 2 Assets and Prices to capture externalities
      • Tier 2 Ownership and Property Rights


                                                                       What if the price of a hamburger includes a medical cost
                                                                        due to health effect?
                                                                      What benefits will it bring to the consumer and to the country?

                                                                      What new and healthier food will become good businesses?




© 2007 Electric Power Research Institute, Inc. All rights reserved.                24
Levelized Annual Cost for Six Power Plant Types with
                                CO2 Cost = $40/ton

              1000

               900

               800

               700                                                                                        Nuclear
               600                                                                                        COAL
    $/kW/yr




                                                                                                          Comb Cycle
               500
                                                                                                          IGCC
               400                                                                                        CT
               300                                                                                        Wind/Solar w Storage

               200

               100

                 0
                     0           1000           2000            3000   4000   5000   6000   7000   8000
                                                            Hours per Year Operation




© 2007 Electric Power Research Institute, Inc. All rights reserved.                  25
CO2 Price Sensitivity of Electric Generation Market Shares
                              with Oil Price at 60 $/bbl, Coal Price at 4 $/MBTU and
                                       Wind/Solar w Storage at 5000 $/kW
                    100%

                    90%

                    80%

                    70%
                                                                                                                                                   Wind/Solar w Storage
     Market Share




                    60%                                                                                                                            CT
                                                                                                                                                   IGCC
                    50%
                                                                                                                                                   Comb Cycle
                    40%                                                                                                                            COAL
                                                                                                                                                   Nuclear
                    30%

                    20%

                    10%

                     0%
                      $-

                           $5



                                             5

                                                     0

                                                              5

                                                                         0

                                                                                5

                                                                                       0




                                                                                                            5

                                                                                                                   0

                                                                                                                          5

                                                                                                                                 0

                                                                                                                                        5

                                                                                                                                               0
                                    0




                                                                                              5

                                                                                                     0
                                 $1

                                          $1

                                                  $2

                                                           $2

                                                                      $3

                                                                             $3

                                                                                    $4

                                                                                           $4

                                                                                                  $5

                                                                                                         $5

                                                                                                                $6

                                                                                                                       $6

                                                                                                                              $7

                                                                                                                                     $7

                                                                                                                                            $8
                                                                             CO2 Cost ($/ton)



© 2007 Electric Power Research Institute, Inc. All rights reserved.                                  26
© 2007 Electric Power Research Institute, Inc. All rights reserved.   27
Oil Price = $60 / bbl




© 2007 Electric Power Research Institute, Inc. All rights reserved.        28
Oil Price = $90 / bbl




© 2007 Electric Power Research Institute, Inc. All rights reserved.        29
Flow of Money for Cap and Trade System


                                                                              Exchange
                                                                                                   $
                                                             $


                                                                          Allowance Certificates



                                 Green Power Plant                                                     Non-compliant
                                                                                                        Power Plant

                                                                      $                        $




                                                 Electricity                                              Electricity
                                                                      Electricity Consumers

© 2007 Electric Power Research Institute, Inc. All rights reserved.                30
Flow of Money with CO2 Public Benefits Fund

                                                                      Accountable to International Agreements


                                                                                    Trustee of
                                                                                   CO2 Charge
                                                                                                         High $
                                                0 or Low $



                                                                               Rebate incentives and
                                                                                Electricity subsidies

                                Green Power Plant                                                         Non-compliant
                                                                                                           Power Plant

                                                                           $                        $




                                               Electricity                                                      Electricity
                                                                            Electricity Consumers
© 2007 Electric Power Research Institute, Inc. All rights reserved.                      31
Costs and Benefits Distribution

      • Economics should be based on costs and not on prices
      • Rational decisions by non-public entities are based on
        financial incentives (selfish) + other factors of persuasion
      • If costs and benefits are not distributed equitably, rational
        decisions may not be compatible with optimal resource
        allocation for the Good of the Whole




© 2007 Electric Power Research Institute, Inc. All rights reserved.   32

Más contenido relacionado

Destacado

FOWD 2007: Beautifying the web
FOWD 2007: Beautifying the webFOWD 2007: Beautifying the web
FOWD 2007: Beautifying the webCindy Li
 
Lockecarey Brochure Emailformat
Lockecarey Brochure EmailformatLockecarey Brochure Emailformat
Lockecarey Brochure Emailformatguest718ab9
 
Sync Presentation Wei
Sync Presentation WeiSync Presentation Wei
Sync Presentation WeiKiddy Zhou
 
Pelatihan KBK: Dosen STP Trisakti
Pelatihan KBK: Dosen STP TrisaktiPelatihan KBK: Dosen STP Trisakti
Pelatihan KBK: Dosen STP TrisaktiNoersal Samad
 
The Unbearable Stupidity of Modeling
The Unbearable Stupidity of ModelingThe Unbearable Stupidity of Modeling
The Unbearable Stupidity of Modelingmerks
 
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09Paul W. Johnson
 
Team Sync Presentation 111208
Team Sync Presentation 111208Team Sync Presentation 111208
Team Sync Presentation 111208Kiddy Zhou
 
Felice cavallotti primary school albuzzano italy
Felice cavallotti primary school albuzzano italyFelice cavallotti primary school albuzzano italy
Felice cavallotti primary school albuzzano italyKatia Calegari
 
Designing Your Future:Networking without the Ick
Designing Your Future:Networking without the IckDesigning Your Future:Networking without the Ick
Designing Your Future:Networking without the IckCindy Li
 
Criaturas Del Mar 8804
Criaturas Del Mar 8804Criaturas Del Mar 8804
Criaturas Del Mar 8804profejean
 
Data Enabled Enterprise Modeler (De2 M) Overview V2.12
Data Enabled Enterprise Modeler (De2 M) Overview V2.12Data Enabled Enterprise Modeler (De2 M) Overview V2.12
Data Enabled Enterprise Modeler (De2 M) Overview V2.12Paul W. Johnson
 

Destacado (20)

FOWD 2007: Beautifying the web
FOWD 2007: Beautifying the webFOWD 2007: Beautifying the web
FOWD 2007: Beautifying the web
 
E-Government Beacon
E-Government BeaconE-Government Beacon
E-Government Beacon
 
Lockecarey Brochure Emailformat
Lockecarey Brochure EmailformatLockecarey Brochure Emailformat
Lockecarey Brochure Emailformat
 
Sync Presentation Wei
Sync Presentation WeiSync Presentation Wei
Sync Presentation Wei
 
Angelica rice
Angelica riceAngelica rice
Angelica rice
 
MPM Model Portfolio
MPM Model PortfolioMPM Model Portfolio
MPM Model Portfolio
 
Pelatihan KBK: Dosen STP Trisakti
Pelatihan KBK: Dosen STP TrisaktiPelatihan KBK: Dosen STP Trisakti
Pelatihan KBK: Dosen STP Trisakti
 
Pungile
PungilePungile
Pungile
 
The Unbearable Stupidity of Modeling
The Unbearable Stupidity of ModelingThe Unbearable Stupidity of Modeling
The Unbearable Stupidity of Modeling
 
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09
MID_03_Pragmatica_Innovations_Service_Model (PrISM)-CONFERENCE-2015-04-09
 
الذرة
الذرةالذرة
الذرة
 
Team Sync Presentation 111208
Team Sync Presentation 111208Team Sync Presentation 111208
Team Sync Presentation 111208
 
Felice cavallotti primary school albuzzano italy
Felice cavallotti primary school albuzzano italyFelice cavallotti primary school albuzzano italy
Felice cavallotti primary school albuzzano italy
 
Designing Your Future:Networking without the Ick
Designing Your Future:Networking without the IckDesigning Your Future:Networking without the Ick
Designing Your Future:Networking without the Ick
 
Marsha Randolph Photography Product Gallery. Still L Ife
Marsha Randolph Photography Product Gallery. Still L IfeMarsha Randolph Photography Product Gallery. Still L Ife
Marsha Randolph Photography Product Gallery. Still L Ife
 
Simone rice
Simone riceSimone rice
Simone rice
 
MPM Sports _Fitness Photography & Project Reel
MPM Sports _Fitness Photography & Project ReelMPM Sports _Fitness Photography & Project Reel
MPM Sports _Fitness Photography & Project Reel
 
Criaturas Del Mar 8804
Criaturas Del Mar 8804Criaturas Del Mar 8804
Criaturas Del Mar 8804
 
My country
My countryMy country
My country
 
Data Enabled Enterprise Modeler (De2 M) Overview V2.12
Data Enabled Enterprise Modeler (De2 M) Overview V2.12Data Enabled Enterprise Modeler (De2 M) Overview V2.12
Data Enabled Enterprise Modeler (De2 M) Overview V2.12
 

Similar a Holistic Planning (For the Good of the Whole)

public serviceenterprise group Deutsche
public serviceenterprise group  Deutschepublic serviceenterprise group  Deutsche
public serviceenterprise group Deutschefinance20
 
public serviceenterprise group _Deutsche
public serviceenterprise group _Deutschepublic serviceenterprise group _Deutsche
public serviceenterprise group _Deutschefinance20
 
A_genetic_algorithm_based_approach_for_optimal_all.pdf
A_genetic_algorithm_based_approach_for_optimal_all.pdfA_genetic_algorithm_based_approach_for_optimal_all.pdf
A_genetic_algorithm_based_approach_for_optimal_all.pdfNguyenQuoc78
 
Typical Meteorological Year Use in Solar Energy Assessments by Vaisala
Typical Meteorological Year Use in Solar Energy Assessments by VaisalaTypical Meteorological Year Use in Solar Energy Assessments by Vaisala
Typical Meteorological Year Use in Solar Energy Assessments by VaisalaGwendalyn Bender
 
Economical and Reliable Expansion Alternative of Composite Power System under...
Economical and Reliable Expansion Alternative of Composite Power System under...Economical and Reliable Expansion Alternative of Composite Power System under...
Economical and Reliable Expansion Alternative of Composite Power System under...IJECEIAES
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...arvindsinghrathore6
 
Power System Planning
Power System PlanningPower System Planning
Power System Planninglinsstalex
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program RCREEE
 
Verification process for DER modeling in interconnection-wide base case creation
Verification process for DER modeling in interconnection-wide base case creationVerification process for DER modeling in interconnection-wide base case creation
Verification process for DER modeling in interconnection-wide base case creationPower System Operation
 
Improved technique for under voltage load shedding using Genetic Algorithm an...
Improved technique for under voltage load shedding using Genetic Algorithm an...Improved technique for under voltage load shedding using Genetic Algorithm an...
Improved technique for under voltage load shedding using Genetic Algorithm an...Dr.Raja Masood Larik
 
public serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchpublic serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchfinance20
 
public serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchpublic serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchfinance20
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecastinglinsstalex
 
Estimating Project LCOE-an Analysis of Geothermal PPA Data
Estimating Project LCOE-an Analysis of Geothermal PPA DataEstimating Project LCOE-an Analysis of Geothermal PPA Data
Estimating Project LCOE-an Analysis of Geothermal PPA DataKevin Hernandez
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNINGNishaDangi99
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencefinance20
 

Similar a Holistic Planning (For the Good of the Whole) (20)

Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
 
Emtp Mahseredjian R&D
Emtp Mahseredjian R&DEmtp Mahseredjian R&D
Emtp Mahseredjian R&D
 
public serviceenterprise group Deutsche
public serviceenterprise group  Deutschepublic serviceenterprise group  Deutsche
public serviceenterprise group Deutsche
 
public serviceenterprise group _Deutsche
public serviceenterprise group _Deutschepublic serviceenterprise group _Deutsche
public serviceenterprise group _Deutsche
 
A_genetic_algorithm_based_approach_for_optimal_all.pdf
A_genetic_algorithm_based_approach_for_optimal_all.pdfA_genetic_algorithm_based_approach_for_optimal_all.pdf
A_genetic_algorithm_based_approach_for_optimal_all.pdf
 
Typical Meteorological Year Use in Solar Energy Assessments by Vaisala
Typical Meteorological Year Use in Solar Energy Assessments by VaisalaTypical Meteorological Year Use in Solar Energy Assessments by Vaisala
Typical Meteorological Year Use in Solar Energy Assessments by Vaisala
 
Economical and Reliable Expansion Alternative of Composite Power System under...
Economical and Reliable Expansion Alternative of Composite Power System under...Economical and Reliable Expansion Alternative of Composite Power System under...
Economical and Reliable Expansion Alternative of Composite Power System under...
 
EE6603 - Power System Operation & Control
EE6603 - Power System Operation & ControlEE6603 - Power System Operation & Control
EE6603 - Power System Operation & Control
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program
 
Verification process for DER modeling in interconnection-wide base case creation
Verification process for DER modeling in interconnection-wide base case creationVerification process for DER modeling in interconnection-wide base case creation
Verification process for DER modeling in interconnection-wide base case creation
 
Improved technique for under voltage load shedding using Genetic Algorithm an...
Improved technique for under voltage load shedding using Genetic Algorithm an...Improved technique for under voltage load shedding using Genetic Algorithm an...
Improved technique for under voltage load shedding using Genetic Algorithm an...
 
Ah31245249
Ah31245249Ah31245249
Ah31245249
 
public serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchpublic serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynch
 
public serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynchpublic serviceenterprise group MerrillLynch
public serviceenterprise group MerrillLynch
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
Estimating Project LCOE-an Analysis of Geothermal PPA Data
Estimating Project LCOE-an Analysis of Geothermal PPA DataEstimating Project LCOE-an Analysis of Geothermal PPA Data
Estimating Project LCOE-an Analysis of Geothermal PPA Data
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConference
 

Más de Stephen Lee

How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...
How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...
How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...Stephen Lee
 
A Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to SocietyA Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to SocietyStephen Lee
 
The Smart Power Grid
The Smart Power GridThe Smart Power Grid
The Smart Power GridStephen Lee
 
Future Planning in Power Grid
Future Planning in Power GridFuture Planning in Power Grid
Future Planning in Power GridStephen Lee
 
Smart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy CouncilSmart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy CouncilStephen Lee
 
Risk of Cascading Outages
Risk of Cascading OutagesRisk of Cascading Outages
Risk of Cascading OutagesStephen Lee
 
Udi-ism Berkeley 4/2005 Presentation
Udi-ism Berkeley 4/2005 PresentationUdi-ism Berkeley 4/2005 Presentation
Udi-ism Berkeley 4/2005 PresentationStephen Lee
 
Smart Grid Vision
Smart Grid VisionSmart Grid Vision
Smart Grid VisionStephen Lee
 
Connecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridConnecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridStephen Lee
 

Más de Stephen Lee (10)

How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...
How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...
How Integration of Systems Will Bring Concrete Benefits to the Earth and to M...
 
A Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to SocietyA Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to Society
 
The Smart Power Grid
The Smart Power GridThe Smart Power Grid
The Smart Power Grid
 
Future Planning in Power Grid
Future Planning in Power GridFuture Planning in Power Grid
Future Planning in Power Grid
 
Smart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy CouncilSmart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy Council
 
Risk of Cascading Outages
Risk of Cascading OutagesRisk of Cascading Outages
Risk of Cascading Outages
 
Udi-ism Berkeley 4/2005 Presentation
Udi-ism Berkeley 4/2005 PresentationUdi-ism Berkeley 4/2005 Presentation
Udi-ism Berkeley 4/2005 Presentation
 
UDI-ism
UDI-ismUDI-ism
UDI-ism
 
Smart Grid Vision
Smart Grid VisionSmart Grid Vision
Smart Grid Vision
 
Connecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridConnecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission Grid
 

Último

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 

Último (20)

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 

Holistic Planning (For the Good of the Whole)

  • 1. Holistic Transmission and Resource Planning - For the Good of the Whole Stephen Lee Senior Technical Executive Power System Planning and Operation March 3, 2008 Presented to IEEE Power Engineering Society IEEE Power and Energy Magazine, San Francisco Chapter Sept/Oct 2007 Hosted by California PUC, San Francisco
  • 2. Outline • Electricity – Central Planning or Free Market • What is Holistic Planning? • Integrated Planning Revisited • Reliability Assessment of Whole Operating Space • Holistic Transmission Planning • Holistic Resource Planning • Concept of Unity in Diversity • Optimal Holistic Resource Mix with CO2 Cost • Costs and Benefits Distribution • Demonstration of the CAR software © 2007 Electric Power Research Institute, Inc. All rights reserved. 2
  • 3. Electricity – Central Planning or Free Market • Decades of the regulatory model or “Central Planning” – Problems of cost-overrun and/or over-capacity – Central planning does not handle uncertainties well • Power markets – California market meltdown and bankruptcy of Enron – Free markets tend to be short-sighted and not social conscious • Lessons learned – Both systems have problems © 2007 Electric Power Research Institute, Inc. All rights reserved. 3
  • 4. Need for New Approach • With restructuring and greater market activities, the power grid is being used in ways not in the original designs • Increased reliability risk to grid operation • Increased burden on greater situational awareness by operators • It is time to revisit the way we plan the power grid • The power grid should again be designed to be operated in the new ways it will be used, and perhaps even in unanticipated uses • Key words: HOLISTIC, ROBUST, FLEXIBLE © 2007 Electric Power Research Institute, Inc. All rights reserved. 4
  • 5. What is Holistic Planning? • Holistic Planning is to develop a whole or a part of the electric power system, with full consideration of all its parts, responsive to the public, modeling all reasonably probable scenarios of uncertainties affecting planning as well as future power system operating conditions, with additional tests to assess the robustness of the system when exposed to “unlikely” but potentially devastating disturbances or other events, in order to achieve a system which has: – Economic efficiency – Adequate reliability – Acceptable environmental impacts © 2007 Electric Power Research Institute, Inc. All rights reserved. 5
  • 6. Principles of Holistic Planning • To compare alternative plans, a comprehensive and quantitative metric which corresponds to the maximization of public benefits for the whole system. • Probabilistic reliability criteria in lieu of deterministic criteria; otherwise, transmission investments could be driven equally by contingencies that have widely different probabilities, resulting in non-optimal resource allocation. • The scope of the whole system extends beyond the power system to include the local, regional and global environment. • Fair and equitable method for allocating costs and benefits having a causal and proportional relationship between the use of the assets and the costs or benefits to be borne by the parties. • The rules of the road for each party should be such that its incentive does not induce decisions against the global objective of the whole system. Instead, each party would stand to gain if the whole system achieves more and more global optimality. By following individual and diverse incentives, unity in global objective should be achieved. © 2007 Electric Power Research Institute, Inc. All rights reserved. 6
  • 7. Integrated Planning Revisited • The ideological platform is “optimal resource allocation” • A balanced evaluation of the supply side and the demand side in which all energy supply alternatives and all conversion of energy into energy services are subject to evaluation on a level playing field. • Involves individuals as well as collective preferences • For example, on the individual side, customers want full control of choices which they make based on the options presented to them; on the collective side, customers do accept affiliation to a group and therefore admit to assume their share of a collective responsibility • Integrated planning can be viewed as a process for balancing individual as well as collective preferences. © 2007 Electric Power Research Institute, Inc. All rights reserved. 7
  • 8. Reliability Assessment of Whole Operating Space • We assess reliability for limited operating conditions, e.g., – Annual peak load – All transmission lines in service • What about? – Other load levels or other hours – Maintenance schedules of transmission and generation – External or market transactions © 2007 Electric Power Research Institute, Inc. All rights reserved. 8
  • 9. Boundary Conditions Wh c at M –p sis wD Outside Boundary i tF ln oo Conditions eer ra P ow en G Load and Load Profile Inside Boundary Conditions Voltage Operating State – “You are here” System Operating Limits Transmission and Generator Connectivity and Topology © 2007 Electric Power Research Institute, Inc. All rights reserved. 9
  • 10. G1 is net export out of area A1, when positive. Community G2 is net export out of area A2, when positive. Activity G3 >0 G3 is net export out of area A3, when positive. G4 = - G1 - G2 - G3, is automatically given, Room when G1, G2, and G3 are specified. G3=3000 G2 >0 G3=2000 A 4-Area Interconnection G3= 0 G1 >0 A1 A2 G3= -2000 A3 A4 G3= -3000 The Constraints on Any Combination of Net Exports (G1, G2, G3 and G4) are walls of this 3-D “CAR” A floor plan is a two-dimensional nomogram. © 2007 Electric Power Research Institute, Inc. All rights reserved. 10
  • 11. G3 >0 G3=3000 G2 >0 G3= 0 G1 >0 G3= -3000 © 2007 Electric Power Research Institute, Inc. All rights reserved. 11
  • 12. N-0 N-1 Boundary = N-1 Contingency Criteria © 2007 Electric Power Research Institute, Inc. All rights reserved. 12
  • 13. N-1 criteria enforce possibly uneven reliability N-1 Boundary = N-2 Contingency Criteria © 2007 Electric Power Research Institute, Inc. All rights reserved. 13
  • 14. CAR Provides Statistics of Contingency Constraints to TNB (Malaysia) © 2007 Electric Power Research Institute, Inc. All rights reserved. 14
  • 15. Bar Chart for a Month © 2007 Electric Power Research Institute, Inc. All rights reserved. 15
  • 16. Holistic Transmission Planning • White space is the inside of the CAR (community Activity Room) where operation is reliable • Future growth requires operating outside the white space • How do we expand the grid to fit all future Line 2-4 operating conditions (described by the ellipse?) Line 1-4 • CAR gives the holistic answer by moving all necessary walls the right amount (increase capacities of line 1-4 by 2500 MW and 2-4 by 1200 MW) © 2007 Electric Power Research Institute, Inc. All rights reserved. 16
  • 17. Variation of CAR with Different Load Levels Duration Load Level © 2007 Electric Power Research Institute, Inc. All rights reserved. 17
  • 18. Relate Monthly Load Duration Curves to Scheduled Outages Monthly Load Duration Curves Hours 0 5000 10000 15000 20000 25000 Load (MW) © 2007 Electric Power Research Institute, Inc. All rights reserved. 18
  • 19. No. of Simultaneous Scheduled and Unscheduled Line Outages (Within Same Day) Over 12 Months of a Year (Maximum, Average and Minimum) Simultaneous Line Outages (All) 20.0 15.0 No. of Lines 10.0 5.0 0.0 1 2 3 4 5 6 7 8 9 10 11 12 Month Max Outages / Day Min Outages / Day Average Outages / Day © 2007 Electric Power Research Institute, Inc. All rights reserved. 19
  • 20. Holistic Resource Planning • How to achieve results of integrated planning in today’s non-vertical utility structure? • Parts of the whole maximizing their separate incentives may work against achieving the good of the whole © 2007 Electric Power Research Institute, Inc. All rights reserved. 20
  • 21. Unity in Diversity • Diversity means the exercise of an individual’s right of free choices. • Unity in Diversity means creating unity while preserving diversity, or allowing diversity to achieve unity. • Hypothesis – – Align an individual’s selfish incentive more with the socially optimal objective – Then the creative energy of individuals would achieve the social objective. © 2007 Electric Power Research Institute, Inc. All rights reserved. 21
  • 22. Optimal Decisions Total Cost = Tier 1 Cost + Tier 2 Cost Tier 1 Costs Tier 2 Costs (Public Good) (Direct Costs) * Best Decision Decision is not optimal if Tier 2 costs are ignored © 2007 Electric Power Research Institute, Inc. All rights reserved. 22
  • 23. Common Property of the Human Race? “It is a position not to be controverted that the earth, in its natural, cultivated state was, and ever would have continued to be, the common property of the human race.” -- Thomas Paine, Agrarian Justice • Tier 2 assets (e.g., air, water, land) with PROPERTY RIGHTS belonging to the inhabitants • Create a Tier 2 class of ownership • Distribute Tier 2 revenues and benefits to all Tier 2 owners through Public Benefits Funds (PBF) • People will then behave in accordance with the objectives of minimizing the total Cost (direct Tier 1 + Tier 2 costs) © 2007 Electric Power Research Institute, Inc. All rights reserved. 23
  • 24. Basic Principles of UDi-ism (Unity in Diversity) • Tier 2 Assets and Prices to capture externalities • Tier 2 Ownership and Property Rights What if the price of a hamburger includes a medical cost due to health effect? What benefits will it bring to the consumer and to the country? What new and healthier food will become good businesses? © 2007 Electric Power Research Institute, Inc. All rights reserved. 24
  • 25. Levelized Annual Cost for Six Power Plant Types with CO2 Cost = $40/ton 1000 900 800 700 Nuclear 600 COAL $/kW/yr Comb Cycle 500 IGCC 400 CT 300 Wind/Solar w Storage 200 100 0 0 1000 2000 3000 4000 5000 6000 7000 8000 Hours per Year Operation © 2007 Electric Power Research Institute, Inc. All rights reserved. 25
  • 26. CO2 Price Sensitivity of Electric Generation Market Shares with Oil Price at 60 $/bbl, Coal Price at 4 $/MBTU and Wind/Solar w Storage at 5000 $/kW 100% 90% 80% 70% Wind/Solar w Storage Market Share 60% CT IGCC 50% Comb Cycle 40% COAL Nuclear 30% 20% 10% 0% $- $5 5 0 5 0 5 0 5 0 5 0 5 0 0 5 0 $1 $1 $2 $2 $3 $3 $4 $4 $5 $5 $6 $6 $7 $7 $8 CO2 Cost ($/ton) © 2007 Electric Power Research Institute, Inc. All rights reserved. 26
  • 27. © 2007 Electric Power Research Institute, Inc. All rights reserved. 27
  • 28. Oil Price = $60 / bbl © 2007 Electric Power Research Institute, Inc. All rights reserved. 28
  • 29. Oil Price = $90 / bbl © 2007 Electric Power Research Institute, Inc. All rights reserved. 29
  • 30. Flow of Money for Cap and Trade System Exchange $ $ Allowance Certificates Green Power Plant Non-compliant Power Plant $ $ Electricity Electricity Electricity Consumers © 2007 Electric Power Research Institute, Inc. All rights reserved. 30
  • 31. Flow of Money with CO2 Public Benefits Fund Accountable to International Agreements Trustee of CO2 Charge High $ 0 or Low $ Rebate incentives and Electricity subsidies Green Power Plant Non-compliant Power Plant $ $ Electricity Electricity Electricity Consumers © 2007 Electric Power Research Institute, Inc. All rights reserved. 31
  • 32. Costs and Benefits Distribution • Economics should be based on costs and not on prices • Rational decisions by non-public entities are based on financial incentives (selfish) + other factors of persuasion • If costs and benefits are not distributed equitably, rational decisions may not be compatible with optimal resource allocation for the Good of the Whole © 2007 Electric Power Research Institute, Inc. All rights reserved. 32