SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
A product of...
           Navy Office of Information
           www.navy.mil


                                                                                                   August 18, 2011


Enlisted Retention Board (ERB)
    "We value every Sailor--it is important that our people understand why we are conducting this board, feel the process has
       been transparent and believe they have been treated fairly. These Sailors have served honorably and the Navy is
                                    committed to doing all it can to help in the transition process."
                                                                  – Adm. Jonathan W. Greenert, Vice Chief of Naval Operations
The competition to stay Navy is intense. Overmanning in some ratings is not sustainable because it causes
undermanning in others. To ensure Navy is positioned to meet future mission requirements, we must balance the
force by retaining Sailors in the right mix of ratings and paygrades. To meet our end strength requirement and afford
high performing Sailors an opportunity to reenlist and advance, the Enlisted Retention Board will review the records
of Sailors in 31 of 84 ratings.
Which Sailors Will be Affected?
  • The ERB will review roughly 16,000 records to identify approximately 13,000 to be retained; approximately
      3,000 Sailors will be separated. In essence, the board will review about 6% of the force to separate 1%.
  • Selected third class petty officers through senior chief petty officers in 31 overmanned ratings with greater
      than seven but less than 15 years of cumulative service as of Oct. 1, 2011 are eligible for the ERB.
  • The overmanned ratings are: ABF, AD, AE, AG, AM, AS, AT, AWF, AWR, AWV, AZ, BU, CE, CM, EA,
      EMSW, EO, ETSW, FC(Non-AEGIS), GSE, MMSW, MN, MR, OS, PR, PS, RP, SH, STG, SW and UT.
How Will the Board Work?
  • The board is more fair than solely relying on PTS to shape the force to meet future manpower requirements
      in a fair and transparent manner.
  • The board will be conducted in two independent phases - Phase I will review the records of E4 to E5 Sailors
      and will convene Aug. 22. Phase II will review the records of E6 to E8 Sailors and will convene Sept. 26.
  • Maximum retention quotas were developed by rating, paygrade and years of service.
  • Approximately 2,000 conversion requests were received from ERB eligible Sailors. Sailors who are not
      selected for retention within their rate will be considered for conversion after the board to provide an
      opportunity for continued service.
  • Sailors not selected for retention can compete for a Selected Reserve quota through PTS, if eligible.
  • The board will consider both performance criteria and specific quotas for each rating. Sailors not retained for
      performance reasons will not be afforded an opportunity to convert, or transition to the Selected Reserve.
What Happens After the Board?
  • Once the board results are reviewed and approved, commanding officers (CO) will be notified via
      NAVADMIN. The results will be posted on Bupers Online with CO restricted access for 7 days. COs will
      personally contact and provide counseling to each affected Sailor IAW NAVADMIN 129/11.

                         Key Messages                                                Facts & Figures
•     The ERB enables the Navy to manage manpower                 Important Dates:
      requirements in a fair and transparent manner.              • Aug. 22, 2011: ERB Phase I Convenes (E4/E5)
•     The Navy is committed to doing all it can to help           • Sept. 26, 2011: ERB Phase II Convenes (E6-E8)
      Sailors transition to a different rating or into the        • October 2011: ERB Phase I Results Announced
      civilian sector.                                            • November 2011: ERB Phase II Results Announced
•     The Navy will provide additional transition services        • Jan. 13, 2012: Operational Waiver Requests Due
      to affected Sailors to help build on the skills, success    • Jun. 30, 2012: Last Day to Separate (Unless Waived)
      and training acquired during their Navy careers to
                                                                  • Sept. 30, 2012: Last Day to Separate ALL Sailors Not
      succeed in the civilian job market.
                                                                     Selected for Retention

Más contenido relacionado

Destacado

Grupo 16
Grupo 16Grupo 16
Grupo 16
adsmlu
 
Pseudocódigo de Programación
Pseudocódigo de ProgramaciónPseudocódigo de Programación
Pseudocódigo de Programación
reinimar912
 
Step Mo Art1
Step Mo Art1Step Mo Art1
Step Mo Art1
StepMoArt
 
CORROSION PROYECTO BLOQUE IV MANUEL PS
CORROSION PROYECTO BLOQUE IV MANUEL PSCORROSION PROYECTO BLOQUE IV MANUEL PS
CORROSION PROYECTO BLOQUE IV MANUEL PS
Manuel Silva
 
J. herculano pires mediunidade
J. herculano pires   mediunidadeJ. herculano pires   mediunidade
J. herculano pires mediunidade
Helio Cruz
 
Colombianos recomiendan más sus marcas
Colombianos recomiendan más sus marcasColombianos recomiendan más sus marcas
Colombianos recomiendan más sus marcas
BrandStrat
 
Diapositivas
DiapositivasDiapositivas
Diapositivas
guisaito
 

Destacado (20)

Leccion los apóstoles y la ley
Leccion los apóstoles y la leyLeccion los apóstoles y la ley
Leccion los apóstoles y la ley
 
Grupo 16
Grupo 16Grupo 16
Grupo 16
 
Autumn Colors in the U.P.
Autumn Colors in the U.P.Autumn Colors in the U.P.
Autumn Colors in the U.P.
 
Bar San Juan Menu
Bar San Juan MenuBar San Juan Menu
Bar San Juan Menu
 
Millstone Menu
Millstone Menu Millstone Menu
Millstone Menu
 
Gbi soe soraca
Gbi soe soracaGbi soe soraca
Gbi soe soraca
 
Pseudocódigo de Programación
Pseudocódigo de ProgramaciónPseudocódigo de Programación
Pseudocódigo de Programación
 
Step Mo Art1
Step Mo Art1Step Mo Art1
Step Mo Art1
 
CORROSION PROYECTO BLOQUE IV MANUEL PS
CORROSION PROYECTO BLOQUE IV MANUEL PSCORROSION PROYECTO BLOQUE IV MANUEL PS
CORROSION PROYECTO BLOQUE IV MANUEL PS
 
Julio cesar jaimes
Julio cesar jaimesJulio cesar jaimes
Julio cesar jaimes
 
Friedrich Hundertwasser 2003
Friedrich Hundertwasser 2003Friedrich Hundertwasser 2003
Friedrich Hundertwasser 2003
 
Cre Forum 2012 : e-schkg, (Thomas Marx)
Cre Forum 2012 : e-schkg, (Thomas Marx)Cre Forum 2012 : e-schkg, (Thomas Marx)
Cre Forum 2012 : e-schkg, (Thomas Marx)
 
Coorporacion universitaria minuto de dios
Coorporacion universitaria minuto  de diosCoorporacion universitaria minuto  de dios
Coorporacion universitaria minuto de dios
 
J. herculano pires mediunidade
J. herculano pires   mediunidadeJ. herculano pires   mediunidade
J. herculano pires mediunidade
 
Colombianos recomiendan más sus marcas
Colombianos recomiendan más sus marcasColombianos recomiendan más sus marcas
Colombianos recomiendan más sus marcas
 
Diapositivas
DiapositivasDiapositivas
Diapositivas
 
Trabajo Práctico 6
Trabajo Práctico 6 Trabajo Práctico 6
Trabajo Práctico 6
 
Mainspens quiosque
Mainspens quiosqueMainspens quiosque
Mainspens quiosque
 
Partes del craneo
Partes del craneoPartes del craneo
Partes del craneo
 
Problematica ambiental
Problematica ambientalProblematica ambiental
Problematica ambiental
 

Similar a Rhumb lines ERB

Similar a Rhumb lines ERB (20)

Balancing the force
Balancing the forceBalancing the force
Balancing the force
 
Rhumblines august 2011 balancing the force
Rhumblines august 2011 balancing the forceRhumblines august 2011 balancing the force
Rhumblines august 2011 balancing the force
 
Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011
 
Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011
 
Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011Npc force weekly 2 6 may 2011
Npc force weekly 2 6 may 2011
 
Npc force weekly 8 12 august 2011
Npc force weekly 8 12  august  2011Npc force weekly 8 12  august  2011
Npc force weekly 8 12 august 2011
 
Npc force weekly 8 12 august 2011
Npc force weekly 8 12  august  2011Npc force weekly 8 12  august  2011
Npc force weekly 8 12 august 2011
 
Npc force weekly 8 12 august 2011
Npc force weekly 8 12  august  2011Npc force weekly 8 12  august  2011
Npc force weekly 8 12 august 2011
 
Sailor gram 011 11 erb
Sailor gram 011 11 erbSailor gram 011 11 erb
Sailor gram 011 11 erb
 
Npc force weekly jan 30 feb 3 2012
Npc force weekly jan 30 feb 3 2012Npc force weekly jan 30 feb 3 2012
Npc force weekly jan 30 feb 3 2012
 
Reserve Force weekly 11 july 2011
Reserve Force weekly 11 july 2011Reserve Force weekly 11 july 2011
Reserve Force weekly 11 july 2011
 
November 7 2011 ERB Transition Assistance
November 7 2011  ERB Transition AssistanceNovember 7 2011  ERB Transition Assistance
November 7 2011 ERB Transition Assistance
 
Erb timeline
Erb timelineErb timeline
Erb timeline
 
Reserve force weekly 3 october 2011
Reserve force weekly 3 october 2011Reserve force weekly 3 october 2011
Reserve force weekly 3 october 2011
 
Nca symposium slide deck (monday 24 june 1230)
Nca symposium slide deck (monday 24 june 1230)Nca symposium slide deck (monday 24 june 1230)
Nca symposium slide deck (monday 24 june 1230)
 
Reserve force weekly 14 january 11
Reserve force weekly 14 january 11Reserve force weekly 14 january 11
Reserve force weekly 14 january 11
 
Erb navadmin update talking points (8 jun)
Erb navadmin update talking points (8 jun)Erb navadmin update talking points (8 jun)
Erb navadmin update talking points (8 jun)
 
MARCOTTE RESUME
MARCOTTE RESUMEMARCOTTE RESUME
MARCOTTE RESUME
 
Npc force weekly 28 feb 4 mar 2011
Npc force weekly 28 feb   4 mar 2011Npc force weekly 28 feb   4 mar 2011
Npc force weekly 28 feb 4 mar 2011
 
Force weekly 1 july 2011
Force weekly 1 july 2011Force weekly 1 july 2011
Force weekly 1 july 2011
 

Más de Sullivans Ombudsmen (6)

February 2012 OMB Newsletter
February 2012 OMB NewsletterFebruary 2012 OMB Newsletter
February 2012 OMB Newsletter
 
January 2012 newsletter
January 2012 newsletterJanuary 2012 newsletter
January 2012 newsletter
 
Ted's Montana Grill Menu
Ted's Montana Grill MenuTed's Montana Grill Menu
Ted's Montana Grill Menu
 
Dec.2011ceiliflyer
Dec.2011ceiliflyerDec.2011ceiliflyer
Dec.2011ceiliflyer
 
PTS step by step guide
PTS step by step guidePTS step by step guide
PTS step by step guide
 
PTS step by step guide
PTS step by step guidePTS step by step guide
PTS step by step guide
 

Último

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Último (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 

Rhumb lines ERB

  • 1. A product of... Navy Office of Information www.navy.mil August 18, 2011 Enlisted Retention Board (ERB) "We value every Sailor--it is important that our people understand why we are conducting this board, feel the process has been transparent and believe they have been treated fairly. These Sailors have served honorably and the Navy is committed to doing all it can to help in the transition process." – Adm. Jonathan W. Greenert, Vice Chief of Naval Operations The competition to stay Navy is intense. Overmanning in some ratings is not sustainable because it causes undermanning in others. To ensure Navy is positioned to meet future mission requirements, we must balance the force by retaining Sailors in the right mix of ratings and paygrades. To meet our end strength requirement and afford high performing Sailors an opportunity to reenlist and advance, the Enlisted Retention Board will review the records of Sailors in 31 of 84 ratings. Which Sailors Will be Affected? • The ERB will review roughly 16,000 records to identify approximately 13,000 to be retained; approximately 3,000 Sailors will be separated. In essence, the board will review about 6% of the force to separate 1%. • Selected third class petty officers through senior chief petty officers in 31 overmanned ratings with greater than seven but less than 15 years of cumulative service as of Oct. 1, 2011 are eligible for the ERB. • The overmanned ratings are: ABF, AD, AE, AG, AM, AS, AT, AWF, AWR, AWV, AZ, BU, CE, CM, EA, EMSW, EO, ETSW, FC(Non-AEGIS), GSE, MMSW, MN, MR, OS, PR, PS, RP, SH, STG, SW and UT. How Will the Board Work? • The board is more fair than solely relying on PTS to shape the force to meet future manpower requirements in a fair and transparent manner. • The board will be conducted in two independent phases - Phase I will review the records of E4 to E5 Sailors and will convene Aug. 22. Phase II will review the records of E6 to E8 Sailors and will convene Sept. 26. • Maximum retention quotas were developed by rating, paygrade and years of service. • Approximately 2,000 conversion requests were received from ERB eligible Sailors. Sailors who are not selected for retention within their rate will be considered for conversion after the board to provide an opportunity for continued service. • Sailors not selected for retention can compete for a Selected Reserve quota through PTS, if eligible. • The board will consider both performance criteria and specific quotas for each rating. Sailors not retained for performance reasons will not be afforded an opportunity to convert, or transition to the Selected Reserve. What Happens After the Board? • Once the board results are reviewed and approved, commanding officers (CO) will be notified via NAVADMIN. The results will be posted on Bupers Online with CO restricted access for 7 days. COs will personally contact and provide counseling to each affected Sailor IAW NAVADMIN 129/11. Key Messages Facts & Figures • The ERB enables the Navy to manage manpower Important Dates: requirements in a fair and transparent manner. • Aug. 22, 2011: ERB Phase I Convenes (E4/E5) • The Navy is committed to doing all it can to help • Sept. 26, 2011: ERB Phase II Convenes (E6-E8) Sailors transition to a different rating or into the • October 2011: ERB Phase I Results Announced civilian sector. • November 2011: ERB Phase II Results Announced • The Navy will provide additional transition services • Jan. 13, 2012: Operational Waiver Requests Due to affected Sailors to help build on the skills, success • Jun. 30, 2012: Last Day to Separate (Unless Waived) and training acquired during their Navy careers to • Sept. 30, 2012: Last Day to Separate ALL Sailors Not succeed in the civilian job market. Selected for Retention