Discussion points

1. Cost of generating energy

2. Cost of transporting energy

3. Loss costs for investment analysis

4. Regulatory positioning
1.1 No-load and load losses
                                               •   No-load (shunt) losses occur
                                                   all the time and are relatively
                  Supply network                   constant. They occur due to
                                                   unavoidable leakage within
                        Series resistance
                                                   electrical equipment like
                                                   transformers, capacitors and
                           Load current
                                                   meters
                                               •   Load (series) losses occur
Generator                                          due to the delivery of energy
            Leakage
             current
                       Shunt
                                            Load   through the network. They
                       resistance                  vary approximately with the
                                                   square of the loading. Series
                                                   losses occur due to the
                                                   electrical resistance in
                                                   components of the network
                                                   like lines and transformers
1.2 Energy market outcomes in 2008-09
      $10,000




       $1,000
RRP




        $100




         $10



                                                                                                                      R² = 0.46

          $1
                Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09   5,000   7,000        9,000   11,000   13,000   15,000

                                                          Date                                                           NSW Demand MW


 •          Large variation in regional reference price
 •          Reasonable correspondence of price with
            regional demand using logarithmic fit
1.3 Load and loss profiles




•   Load loss (series) is ‘peakier’ than the system load
    profile
•   No-load (shunt) loss is constant
                Cost of energy  Shunt loss System load Series loss
                2008-09 for NSW $      39 $         43 $       47
1.4 Forecast generation patterns
                                                                           100%

Generation pattern                                                         90%                                  Wind & unscheduled

assumes generation is
                                                                                                                Hydro
                                                                                                                OCGT
                                                                           80%


operated to minimise
                                                                                                                Coal
                                                                                                                CCGT
                                                                           70%


overall costs




                                                    Demand, % of maximum
                                                                           60%


Generation                    LRMC                                         50%

type                 excl. CPRS incl. CPRS                                 40%
                      $/MWh      $/MWh
Wind & unscheduled   $      114 $      114                                 30%

OCGT                 $      162 $      190                                 20%
Coal                 $       60 $       81
                                                                           10%
CCGT                 $       60 $       77
                                                                            0%
                                                                                  0%   10%   20%   30%   40%     50%       60%       70%   80%   90%   100%

                                                                                                         Duration, % of hours




Generation costs
translate to different                       LRMC of energy Shunt loss System load Series loss
costs for loads of                                           $/MWh       $/MWh      $/MWh

different profiles                           Cost incl. CPRS $
                                             Cost excl. CPRS $
                                                                   81 $
                                                                   60 $
                                                                                91 $
                                                                                71 $
                                                                                           92
                                                                                           72
1.5 Summary of energy generation
    costs
                                                   Wholesale price 2008-09
                                                   Forecast cost 2020 exc. CPRS
           Shunt loss                              Forecast cost 2020 inc. CPRS




          System load




           Series loss




                         $0   $20   $40      $60              $80             $100

                                     Cost $/MWh

•   LRMC of generation is much higher than historical
    wholesale price
•   The ‘peakier’ load profile of load losses has a
    higher cost of generation
2.1 Network configuration
    Transmission


                                         Subtransmission            High Voltage          Low Voltage

                   132 kV                  66, 33 kV                 22, 11 kV                  230/400 V

                               ST                        Zone                    Distribution
                            Substation                 Substation                Substation




•   The network comprises several levels with load
    supplied from each
•   Load or loss supplied by the network:
    o  generates upstream energy losses in
       network equipment; and
    o  requires upstream network capacity for
       its transport
Meters and load
                                                                                      control      Shrinkage 1%
   2.2 ‘Leaky pipe’ loss diagram                                                        4%                Subtransmission
                                                                                                             network

       for EnergyAustralia
                                                                          LV network                            15%
                                                                              12%
                                                                                                                   Subtransmission
                                                                                                                    substations
                                                                                                                     6%

                                                                                                                     Zone
                                                                 Distribution                                        substations
                                                                  substations                                        9%
                                                                         27%


                                                                                                               HV Network
                                                                                                                  26%
            Transmission loss
                                ST loss               HV loss             LV loss
                 1.3%
                                 1.1%                  1.8%               2.30%



                                                    Distribution losses 5.2%
 Energy                                                  of delivery into
Purchases      Energy to                             distribution network
                                                                                              LV load
  from        Distribution                                                                     77.8%
  RRN           100.0%
 101.3%




                                                                HV load
                                                                 6.3%
                                          ST load
                                          10.7%
2.3 Network cost allocation
                  100%
                                                         •    Network capacity is required
                  90%                                         to meet peak period loads
                                   Peak load
                  80%              Base load             •    The LRMC of network
                  70%
                                   Network cost               capacity is around 80% of
                                                              average network charges
Load, % of peak




                                                              Capacity cost allocation is to
                  60%
                                                         •
                  50%
                                                              the peak 30% of the load
                  40%
                                                         •    Capacity cost allocation is
                  30%                                         dependent upon the load
                  20%
                                                              profile
                  10%
                                                             Network cost            Shunt loss System load Series loss
                                                             Proportion of average      75%         80%        131%
                   0%
                         1                        8760
                             Duration, hours
3.1 Summary of loss costs
                                            Metropolitan distributor                     Regional distributor
                            Energy
       Shunt loss
                       Transmission
                     Subtransmission
                        High Voltage                                                                                             LRMC energy
                        Low Voltage                                                                                              TUoS
                            Energy                                                                                               Transmission losses
       System load




                       Transmission                                                                                              DUoS to ST
                     Subtransmission                                                                                             Losses to ST
                        High Voltage                                                                                             DUoS to HV
                        Low Voltage                                                                                              Losses to HV
                                                                                                                                 DUoS to LV
                            Energy
       Series loss




                                                                                                                                 Losses to LV
                       Transmission
                     Subtransmission
                        High Voltage
                        Low Voltage
                                       $0   $50   $100   $150   $200   $250   $300 $0   $50   $100   $150   $200   $250   $300


•   The cost of losses:
    o  depends upon the configuration of the network;
    o  depends upon the level in the network;
    o  depends upon the load profile; and
    o  is very substantially higher than the
       wholesale cost of energy
4.1 Network investment framework

•   Loss costs are settled as part of the Australian
    National Energy Market (NEM) trading
    arrangements
•   With large transmission network investments,
    market effects such as losses are considered
    under the Regulatory Investment Test for
    Transmission (RIT-T)
•   There is a strong financial incentive in the
    current regulatory arrangements for distributors
    to minimise capital and direct operating costs
•   There is no explicit requirement for distributors
    to consider loss costs in network investments
4.2 Network investment framework (2)

•   There is no explicit requirement for distributors
    to consider loss costs in network investments
•   A loss incentive has been tried and failed in the
    late 1990’s, by NSW regulator IPART. The natural
    annual variation in losses makes this
    problematic
•   The least intrusive approach is to impose an
    obligation on distributors to use a reasonable
    cost for losses in their investment analysis
4.3 Minimum Energy Performance
    Standards
•   MEPS are established by the Ministerial Council
    on Energy’s Equipment Energy Efficiency (E3)
    committees, with DEWHA as secretariat
•   Distribution transformer MEPS:
    o   have been in place since October 2004
    o   Stage 1 Regulatory Impact Statement (RIS) was
        based on the 2002 market cost of energy
    o   review of stage 2 distribution transformer MEPS
        commenced in 2007
    o   Consultation RIS on new MEPS delayed
•   Opportunity to influence outcome?
Thank You

                      Energeia
   L20 Tower 2, 201 Sussex Street, Sydney NSW 2000
P +61 2 9006 1550 F +61 2 9420 1634 M +61 412 328 549
             E hcolebourn@energia.net.au

               W www.energeia.net.au

Más contenido relacionado

Similar a Webinar - Cost of Losses for Network Investment

E liu atbs
E liu   atbsE liu   atbs
E liu atbsigvision
 
Grid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergyGrid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergySonia Large
 
Wsed%20presentation
Wsed%20presentationWsed%20presentation
Wsed%20presentationvamodi
 
Geti 2 t10_call_final_english
Geti 2 t10_call_final_englishGeti 2 t10_call_final_english
Geti 2 t10_call_final_englishAES Tietê
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical BrochureLegend Power
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Burton Lee
 
Ei Storage Presentation
Ei Storage PresentationEi Storage Presentation
Ei Storage Presentationadyjohn
 
Solar PV Financials
Solar PV FinancialsSolar PV Financials
Solar PV Financialstarunku08
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary ServicesIPPAI
 
7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall ConferenceJames Grice
 
California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11carriesisto
 
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6AREVA
 
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...pManifold
 
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezk
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezkMET 401 Chapter 10 -_economics_of_power_generation_-_a._rezk
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezkIbrahim AboKhalil
 
Energy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilityEnergy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilitySan Diego County Water Authority
 
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...pManifold
 
Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings RCREEE
 

Similar a Webinar - Cost of Losses for Network Investment (20)

E liu atbs
E liu   atbsE liu   atbs
E liu atbs
 
Grid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergyGrid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest Energy
 
Wsed%20presentation
Wsed%20presentationWsed%20presentation
Wsed%20presentation
 
Geti 2 t10_call_final_english
Geti 2 t10_call_final_englishGeti 2 t10_call_final_english
Geti 2 t10_call_final_english
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical Brochure
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
 
Ei Storage Presentation
Ei Storage PresentationEi Storage Presentation
Ei Storage Presentation
 
Electricity Economics
Electricity EconomicsElectricity Economics
Electricity Economics
 
Solar PV Financials
Solar PV FinancialsSolar PV Financials
Solar PV Financials
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary Services
 
7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference
 
California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11
 
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
 
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...
Webinar: Market & Customer Intelligence on Gwalior for Distribution Franchise...
 
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezk
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezkMET 401 Chapter 10 -_economics_of_power_generation_-_a._rezk
MET 401 Chapter 10 -_economics_of_power_generation_-_a._rezk
 
Energy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilityEnergy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination Facility
 
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
 
Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings
 
Resd technologies-epri
Resd technologies-epriResd technologies-epri
Resd technologies-epri
 
Session 27 ic2011 marinescu
Session 27 ic2011 marinescuSession 27 ic2011 marinescu
Session 27 ic2011 marinescu
 

Más de Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

Más de Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Último

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 

Último (20)

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 

Webinar - Cost of Losses for Network Investment

  • 1. LOSS COSTS FOR NETWORK INVESTMENT ANALYSIS May 2011 Harry Colebourn Energeia Pty Ltd
  • 2. Discussion points 1. Cost of generating energy 2. Cost of transporting energy 3. Loss costs for investment analysis 4. Regulatory positioning
  • 3. 1.1 No-load and load losses • No-load (shunt) losses occur all the time and are relatively Supply network constant. They occur due to unavoidable leakage within Series resistance electrical equipment like transformers, capacitors and Load current meters • Load (series) losses occur Generator due to the delivery of energy Leakage current Shunt Load through the network. They resistance vary approximately with the square of the loading. Series losses occur due to the electrical resistance in components of the network like lines and transformers
  • 4. 1.2 Energy market outcomes in 2008-09 $10,000 $1,000 RRP $100 $10 R² = 0.46 $1 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 5,000 7,000 9,000 11,000 13,000 15,000 Date NSW Demand MW • Large variation in regional reference price • Reasonable correspondence of price with regional demand using logarithmic fit
  • 5. 1.3 Load and loss profiles • Load loss (series) is ‘peakier’ than the system load profile • No-load (shunt) loss is constant Cost of energy Shunt loss System load Series loss 2008-09 for NSW $ 39 $ 43 $ 47
  • 6. 1.4 Forecast generation patterns 100% Generation pattern 90% Wind & unscheduled assumes generation is Hydro OCGT 80% operated to minimise Coal CCGT 70% overall costs Demand, % of maximum 60% Generation LRMC 50% type excl. CPRS incl. CPRS 40% $/MWh $/MWh Wind & unscheduled $ 114 $ 114 30% OCGT $ 162 $ 190 20% Coal $ 60 $ 81 10% CCGT $ 60 $ 77 0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Duration, % of hours Generation costs translate to different LRMC of energy Shunt loss System load Series loss costs for loads of $/MWh $/MWh $/MWh different profiles Cost incl. CPRS $ Cost excl. CPRS $ 81 $ 60 $ 91 $ 71 $ 92 72
  • 7. 1.5 Summary of energy generation costs Wholesale price 2008-09 Forecast cost 2020 exc. CPRS Shunt loss Forecast cost 2020 inc. CPRS System load Series loss $0 $20 $40 $60 $80 $100 Cost $/MWh • LRMC of generation is much higher than historical wholesale price • The ‘peakier’ load profile of load losses has a higher cost of generation
  • 8. 2.1 Network configuration Transmission Subtransmission High Voltage Low Voltage 132 kV 66, 33 kV 22, 11 kV 230/400 V ST Zone Distribution Substation Substation Substation • The network comprises several levels with load supplied from each • Load or loss supplied by the network: o generates upstream energy losses in network equipment; and o requires upstream network capacity for its transport
  • 9. Meters and load control Shrinkage 1% 2.2 ‘Leaky pipe’ loss diagram 4% Subtransmission network for EnergyAustralia LV network 15% 12% Subtransmission substations 6% Zone Distribution substations substations 9% 27% HV Network 26% Transmission loss ST loss HV loss LV loss 1.3% 1.1% 1.8% 2.30% Distribution losses 5.2% Energy of delivery into Purchases Energy to distribution network LV load from Distribution 77.8% RRN 100.0% 101.3% HV load 6.3% ST load 10.7%
  • 10. 2.3 Network cost allocation 100% • Network capacity is required 90% to meet peak period loads Peak load 80% Base load • The LRMC of network 70% Network cost capacity is around 80% of average network charges Load, % of peak Capacity cost allocation is to 60% • 50% the peak 30% of the load 40% • Capacity cost allocation is 30% dependent upon the load 20% profile 10% Network cost Shunt loss System load Series loss Proportion of average 75% 80% 131% 0% 1 8760 Duration, hours
  • 11. 3.1 Summary of loss costs Metropolitan distributor Regional distributor Energy Shunt loss Transmission Subtransmission High Voltage LRMC energy Low Voltage TUoS Energy Transmission losses System load Transmission DUoS to ST Subtransmission Losses to ST High Voltage DUoS to HV Low Voltage Losses to HV DUoS to LV Energy Series loss Losses to LV Transmission Subtransmission High Voltage Low Voltage $0 $50 $100 $150 $200 $250 $300 $0 $50 $100 $150 $200 $250 $300 • The cost of losses: o depends upon the configuration of the network; o depends upon the level in the network; o depends upon the load profile; and o is very substantially higher than the wholesale cost of energy
  • 12. 4.1 Network investment framework • Loss costs are settled as part of the Australian National Energy Market (NEM) trading arrangements • With large transmission network investments, market effects such as losses are considered under the Regulatory Investment Test for Transmission (RIT-T) • There is a strong financial incentive in the current regulatory arrangements for distributors to minimise capital and direct operating costs • There is no explicit requirement for distributors to consider loss costs in network investments
  • 13. 4.2 Network investment framework (2) • There is no explicit requirement for distributors to consider loss costs in network investments • A loss incentive has been tried and failed in the late 1990’s, by NSW regulator IPART. The natural annual variation in losses makes this problematic • The least intrusive approach is to impose an obligation on distributors to use a reasonable cost for losses in their investment analysis
  • 14. 4.3 Minimum Energy Performance Standards • MEPS are established by the Ministerial Council on Energy’s Equipment Energy Efficiency (E3) committees, with DEWHA as secretariat • Distribution transformer MEPS: o have been in place since October 2004 o Stage 1 Regulatory Impact Statement (RIS) was based on the 2002 market cost of energy o review of stage 2 distribution transformer MEPS commenced in 2007 o Consultation RIS on new MEPS delayed • Opportunity to influence outcome?