SlideShare una empresa de Scribd logo
1 de 16
Value Engineering
Definition
• Value engineering (VE) is a systematic and organized
approach to provide the necessary functions in a project
at the lowest cost.
• It promotes the substitution of materials and methods
with less expensive alternatives, without sacrificing
functionality.
• It is focused solely on the functions of various
components and materials, rather than their physical
attributes.
• Also called value analysis.
• Value is the ratio of function to cost.
Therefore, VALUE = FUNCTION / COST .
VALUE CONCEPT
QUALITY
COSTFUNCTION
20-Jul-15 Group 1 (VALUE ENGINEERING) 3
Value is an effective balance
between the Quality, the
Function and the Cost as
shown in the given figure:
Importance Of VE
Value Engineering can improve decision-making.
It leads to optimal expenditure of owner funds
while meeting required function and quality
level.
The success of the Value Engineering process is
due to its ability to identify opportunities to
remove unnecessary costs while assuring quality,
reliability, performance and other critical factors
that meet or exceed customers expectation.
The Job Plan
• Value engineering is often done
by systematically following a
multi-stage job plan.
• Depending on the application,
there may be four, five, six, or
more stages.
Four basic steps in the job plan
are:
• Information gathering - This asks what the
requirements are for the object. Function analysis, an
important technique in value engineering, is usually
done in this initial stage. It tries to determine what
functions or performance characteristics are
important. It asks questions like;
What does the object do?
What must it do?
What should it do?
What could it do?
What must it not do?
• Alternative generation (creation) - In this stage
value engineers ask;
What are the various alternative ways of meeting
requirements?
What else will perform the desired function?
• Evaluation - In this stage all the alternatives are
assessed by evaluating how well they meet the
required functions and how great the cost savings
will be.
• Presentation - In the final stage, the best alternative
will be chosen and presented to the client for final
decision.
How it works
VE follows a structured thought process to evaluate options as
follows.
Gather information
• What is being done now?
• Who is doing it?
• What could it do?
• What must it not do?
Measure
• How will the alternatives be measured?
• What are the alternate ways of meeting requirements?
• What else can perform the desired function?
Analyze
• What must be done?
• What does it cost?
Generate
• What else will do the job?
Evaluate
• Which Ideas are the best?
Develop and expand ideas
• What are the impacts?
• What is the cost?
• What is the performance?
Present ideas
• Sell alternatives
Diagram showing Value
Engineering
Example of Value Engineering
When a product incorporates a computer, it
replaces many parts with software that fits
into a single light-weight, low-power
memory part or microcontroller. As
computers grow faster, digital signal
processing software is beginning to replace
many analog electronic circuits for audio and
sometimes radio frequency processing.
Case Study: Centex Homes of Dallas,
Texas
Over a period of five years Centex Homes, one of the nation’s
top ten homebuilders, applied value-engineering methods to
save over one billion dollars.
They did it by:
• Actively seeking input from suppliers and contractors;
• Red-lining to perfection;
• Improving communication with contractors and suppliers, to
avoid mistakes;
• Focusing on unit pricing of material and labor;
• Splitting purchasing into materials and labor and avoiding turn-
key operations whenever possible;
• Avoiding over-engineering;
• Challenging suppliers and contractors to justify increases; and
• Scheduling aggressively to shorten cycle time.
This made it possible for Centex to:
• Reduce the structure cost of their homes
from 60% to 50% of sales price,
• Lower direct construction costs by nearly
$8,000,
• Negotiate $800 per home in rebates, and
Source: Randy Luther, Vice President of Construction Technology,
Centex Homes
If a value analysis approach is followed
the company should reap huge benefits
including:
A reduction in costs but not in quality
Improving product quality and attracting more
customers
Increased sales might lead to economies of scale and
either increase profits or reduce selling prices
The company may decide to increase selling prices if
the quality has improved
Thus it can be concluded that...
• Value analysis is not an exact science, and there
is no one approach that fits all situations.
• Companies operate in a dynamic environment
and need to be able to accommodate the
emergence of new products, new competitors,
and changing economic circumstances.
• Value analysis is simply one of the many tools
available to companies when balancing costs,
price and profit.
Value engineering _2_

Más contenido relacionado

La actualidad más candente

Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant
Enamul Khan
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
Ayush dixit
 

La actualidad más candente (20)

Line balancing
Line balancingLine balancing
Line balancing
 
PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )
PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )
PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )
 
Assembly Line Production Introduction
Assembly Line Production   IntroductionAssembly Line Production   Introduction
Assembly Line Production Introduction
 
Lamont Boiler-Working, Advantages & Disadvantages
Lamont Boiler-Working, Advantages & DisadvantagesLamont Boiler-Working, Advantages & Disadvantages
Lamont Boiler-Working, Advantages & Disadvantages
 
types of facility layout algorithm
types of facility layout algorithmtypes of facility layout algorithm
types of facility layout algorithm
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Vapour Compression Cycle: Types and Numerical Analysis
Vapour Compression Cycle: Types and Numerical AnalysisVapour Compression Cycle: Types and Numerical Analysis
Vapour Compression Cycle: Types and Numerical Analysis
 
Value analysis
Value analysisValue analysis
Value analysis
 
Profile projector
Profile projectorProfile projector
Profile projector
 
Value engineering case study ppt
Value engineering case study pptValue engineering case study ppt
Value engineering case study ppt
 
Absolute and incremental in CAD & CAM
Absolute and incremental in CAD & CAMAbsolute and incremental in CAD & CAM
Absolute and incremental in CAD & CAM
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant
 
Steam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plantSteam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plant
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Lesson 2 Projections of Straight Lines - Part II
Lesson 2 Projections of Straight Lines - Part IILesson 2 Projections of Straight Lines - Part II
Lesson 2 Projections of Straight Lines - Part II
 

Destacado

Value Engineering And Value Analysis
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysis
thombremahesh
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
T HARI KUMAR
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
Reff Ren
 

Destacado (10)

Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Value Engineering And Value Analysis
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysis
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
 
Value Analysis & Value Engineering
Value Analysis & Value EngineeringValue Analysis & Value Engineering
Value Analysis & Value Engineering
 
Design For Assembly
Design For AssemblyDesign For Assembly
Design For Assembly
 
Value engineering
Value engineeringValue engineering
Value engineering
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineering
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 

Similar a Value engineering _2_

572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
ssuser149600
 
TARGET COSTING AND COST ACCOUNTINGFSGSGGSG
TARGET COSTING AND COST ACCOUNTINGFSGSGGSGTARGET COSTING AND COST ACCOUNTINGFSGSGGSG
TARGET COSTING AND COST ACCOUNTINGFSGSGGSG
drluminajulier
 
making of cost of quality
  making of cost of quality  making of cost of quality
making of cost of quality
Devika Rajagopal
 
Design-to-Value Approach for Telcos - JP Romieu
Design-to-Value Approach for Telcos - JP RomieuDesign-to-Value Approach for Telcos - JP Romieu
Design-to-Value Approach for Telcos - JP Romieu
Jean-Philippe Romieu
 

Similar a Value engineering _2_ (20)

Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysis
 
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering
 
Value engineering
Value engineeringValue engineering
Value engineering
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
TARGET COSTING AND COST ACCOUNTINGFSGSGGSG
TARGET COSTING AND COST ACCOUNTINGFSGSGGSGTARGET COSTING AND COST ACCOUNTINGFSGSGGSG
TARGET COSTING AND COST ACCOUNTINGFSGSGGSG
 
making of cost of quality
  making of cost of quality  making of cost of quality
making of cost of quality
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
 
Vm presentation
Vm presentationVm presentation
Vm presentation
 
Value Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxValue Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptx
 
Value Analysis by Jomy Mathew
Value Analysis by Jomy MathewValue Analysis by Jomy Mathew
Value Analysis by Jomy Mathew
 
Value analysis -2
Value analysis -2Value analysis -2
Value analysis -2
 
Value analysis
Value analysisValue analysis
Value analysis
 
Value analysis
Value analysisValue analysis
Value analysis
 
Lean Project Portfolio Management
Lean Project Portfolio ManagementLean Project Portfolio Management
Lean Project Portfolio Management
 
Design-to-Value Approach for Telcos - JP Romieu
Design-to-Value Approach for Telcos - JP RomieuDesign-to-Value Approach for Telcos - JP Romieu
Design-to-Value Approach for Telcos - JP Romieu
 
Project Cost Management for IEM talk on 13 January 2018.
Project Cost Management  for IEM talk on 13 January 2018.Project Cost Management  for IEM talk on 13 January 2018.
Project Cost Management for IEM talk on 13 January 2018.
 
Sfm module iv
Sfm module ivSfm module iv
Sfm module iv
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Value engineering significance
Value engineering significanceValue engineering significance
Value engineering significance
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Value engineering _2_

  • 2. Definition • Value engineering (VE) is a systematic and organized approach to provide the necessary functions in a project at the lowest cost. • It promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality. • It is focused solely on the functions of various components and materials, rather than their physical attributes. • Also called value analysis. • Value is the ratio of function to cost. Therefore, VALUE = FUNCTION / COST .
  • 3. VALUE CONCEPT QUALITY COSTFUNCTION 20-Jul-15 Group 1 (VALUE ENGINEERING) 3 Value is an effective balance between the Quality, the Function and the Cost as shown in the given figure:
  • 4. Importance Of VE Value Engineering can improve decision-making. It leads to optimal expenditure of owner funds while meeting required function and quality level. The success of the Value Engineering process is due to its ability to identify opportunities to remove unnecessary costs while assuring quality, reliability, performance and other critical factors that meet or exceed customers expectation.
  • 5. The Job Plan • Value engineering is often done by systematically following a multi-stage job plan. • Depending on the application, there may be four, five, six, or more stages.
  • 6. Four basic steps in the job plan are: • Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like; What does the object do? What must it do? What should it do? What could it do? What must it not do?
  • 7. • Alternative generation (creation) - In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function? • Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great the cost savings will be. • Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision.
  • 8. How it works VE follows a structured thought process to evaluate options as follows. Gather information • What is being done now? • Who is doing it? • What could it do? • What must it not do? Measure • How will the alternatives be measured? • What are the alternate ways of meeting requirements? • What else can perform the desired function?
  • 9. Analyze • What must be done? • What does it cost? Generate • What else will do the job? Evaluate • Which Ideas are the best? Develop and expand ideas • What are the impacts? • What is the cost? • What is the performance? Present ideas • Sell alternatives
  • 11. Example of Value Engineering When a product incorporates a computer, it replaces many parts with software that fits into a single light-weight, low-power memory part or microcontroller. As computers grow faster, digital signal processing software is beginning to replace many analog electronic circuits for audio and sometimes radio frequency processing.
  • 12. Case Study: Centex Homes of Dallas, Texas Over a period of five years Centex Homes, one of the nation’s top ten homebuilders, applied value-engineering methods to save over one billion dollars. They did it by: • Actively seeking input from suppliers and contractors; • Red-lining to perfection; • Improving communication with contractors and suppliers, to avoid mistakes; • Focusing on unit pricing of material and labor; • Splitting purchasing into materials and labor and avoiding turn- key operations whenever possible; • Avoiding over-engineering; • Challenging suppliers and contractors to justify increases; and • Scheduling aggressively to shorten cycle time.
  • 13. This made it possible for Centex to: • Reduce the structure cost of their homes from 60% to 50% of sales price, • Lower direct construction costs by nearly $8,000, • Negotiate $800 per home in rebates, and Source: Randy Luther, Vice President of Construction Technology, Centex Homes
  • 14. If a value analysis approach is followed the company should reap huge benefits including: A reduction in costs but not in quality Improving product quality and attracting more customers Increased sales might lead to economies of scale and either increase profits or reduce selling prices The company may decide to increase selling prices if the quality has improved
  • 15. Thus it can be concluded that... • Value analysis is not an exact science, and there is no one approach that fits all situations. • Companies operate in a dynamic environment and need to be able to accommodate the emergence of new products, new competitors, and changing economic circumstances. • Value analysis is simply one of the many tools available to companies when balancing costs, price and profit.