2. ART ENGINEERING is a dynamical architectural and development
ABOUT US company ready to fulfil growing expectations of Investors in
terms of the best quality, time management and
long-lasting business relationship on every project.
Our professional experience was gained in European Union, we
cooperate with big company like Carrefour, Leroy Merlin , Auchan,
OBI , PRACTIKER.
ART ENGINEERING integrates all investments process including
feasibility study and due diligence with the designing process,
building management , sales marketing, realisation and
supervision.
A complete Project Management evolves into a strategy that will
satisfy the most demanding Client who appreciates his time and
fully monitored capital return. Our main aim is a final product, and
the Clients’ satisfaction is our strongest motivation.
2
3. 1. Basic design includes 4 main stages:
OUR SERVICES
Stage 1.1 Site plan and Architectural Concept Design
Stage 1.2 Building Design (Stage “P”-permit )
Stage 1.3 Tender Documentation
Stage 1.4 Author supervision
2. Basic Building Site Coordination
Stage 2.1 Tender coordination
Stage 2.2 Construction Management
Stage 2.3 Inspector supervision
Stage 2.4 Shopping gallery tenant coordination
3. Shopping Gallery lease
3
4. “NEO-PARK” in KIEV, UKRAINE
NEO-PARK”
•
MAIN PROJECTS The retail, entertainment and office project
Project Management, volumetric and financial preliminary study.
Budget of the project: 58 000 000
Surface : 70 000 m2
Client: DOBRO LTD.
“HYPERMARKET O’KEY” in KRIVOI RIG, UKRAINE
O’KEY”
•
The retail park project
Project Management, designing project,
Budget of the project: 20 000 000 $.
Surface : 12 000 m2
Client: O’KEY UKRAINE
“HYPERMARKET O’KEY” in KHARKOV, UKRAINE
O’KEY”
•
The retail park project
•
Project Management: designing project,
Budget of the project: 40 000 000 $.
Surface : 35 000 m2
Client: O’KEY UKRAINE
“HYPERMARKET O’KEY” in MAKEEVKA, UKRAINE
O’KEY”
•
The retail park project
•
Project Management: designing project & tender,
Budget of the project: 40 000 000 $.
Surface : 11 000 m2
Client: O’KEY UKRAINE
4
5. MAIN PROJECTS
“HYPERMARKET” in KIEV, UKRAINE
HYPERMARKET”
•
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 100 000 000 $.
Surface : 92 000 m2
Client: SINTEC-OIL.
“HYPERMARKET” in ODESSA, UKRAINE
HYPERMARKET”
•
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 150 000 000 $.
Surface : 122 000 m2
Client: SINTEC-OIL.
“HYPERMARKET” in KHARKOV, UKRAINE
HYPERMARKET”
•
The retail park project
•
Project Management: designing project,
Budget of the project: 76 000 000 $.
Surface : 70 000 m2
Client: SINTEC-OIL.
5
6. MAIN PROJECTS
“HYPERMARKET” in ZAPOROZHIE, UKRAINE
HYPERMARKET”
•
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 0000$.
Surface : 50 000 m2
Client: FURSCHET.
“HYPERMARKET” in TCHERNIVTSY, UKRAINE
HYPERMARKET”
•
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 150 000 000 $.
Surface : 40 000 m2
Client: 1849 PLC.
“HYPERMARKET” in SIMFEROPOL, UKRAINE
HYPERMARKET”
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 76 000 000 $.
Surface : 15 000 m2
Client: FURSCHET.
“HYPERMARKET” in EVPATORIYA, UKRAINE
HYPERMARKET”
The retail park project
•
Project Management, volumetric and financial preliminary study.,
Budget of the project: 76 000 000 $.
Surface : 33 000 m2
Client: FURSCHET.
6
8. MAIN PROJECTS
“HOTELS/OFFICES/APARTAMENTS” in KIEV, UKRAINE
HOTELS/OFFICES/APARTAMENTS”
The retail, entertainment office AND APPARTMENT project
Project Management, volumetric and financial
preliminary study.,
Budget of the project: 76 000 000 $.
Surface : 210 000 m2
Client: ATLANTIC – DYNAMO
8