SlideShare una empresa de Scribd logo
1 de 2
Teofilo A. Tubo June 18, 2015
Sat. 8:00am-11:00am Dr. Eduardo M. Bisquera Jr., Ph.D.
REACTION PAPER
in
THE POLITICS ON THE ISSUANCE OF ENVIRONMENTAL
COMPLIANCE CERTIFICATE (ECC)
The licensee must properly operate and maintain the facility to prevent any actual or
potential threat to the public health, safety, welfare and the environment. In addition, the licensee
shall act to prevent all actual and potential adverse impacts to persons and the environment resulting
from non-compliance and will be responsible for paying for damages caused by such non-
compliance.
Standardizing requirements to ensure focus on critical environment parameters;
Simplifying procedures for processing ECC applications, and establishing measures to ensure
adherence to ECC conditions by project proponents, and assuring that critical environmental
concerns are addressed during project development and implementation
ECC processing requirements shall focus on information needed to assess critical
environmental impacts of projects. Processing requirements shall be customized based on the
project categories.
The power to uphold and impose an ex-parte Cease and Desist Order on the
following grounds: When there is immediate threat to life, public health, safety or welfare, or to
animal or plant life; or When the wastes or discharge exceeds the allowable standards set by the
Commission. The expressed power to order closure of a firm for non-payment of fines. The
decision of the National Pollution Control Commission is considered final and may be appealed
only to the Court of Appeals on questions both of facts and law, or to the Supreme Court on
questions of law.
There is the need to study whether the Permit to Operate should be renewed on a
yearly basis. This function makes the Department of Environment and Natural Resources mainly
an industry-regulating office when resources should be devoted rather to initiating, supporting,
and implementing environmental protection programs. It is also consuming too much of the
industry’s time and effort when the burden of monitoring should be on the Department of
Environment and Natural Resources. It is better to simply require the industry to install a self-
monitoring device and to regularly submit reports together with the result of the indicators in
their analyzer or monitoring equipment. The Regional Office can then just perform spot-
checking instead of inspecting all the industrial plants in the region yearly.
One weakness in the Department of Environment and Natural Resources’
permitting regulation is the lack of power of the Regional Office to stop the industry from
constructing and operating the antipollution device or undertaking activities that cause pollution.
2
The continuing development and refinement of the Environmental Impact
Assessment process brought into focus public participation and social acceptability concerns in
environmental assessment and monitoring. Several major projects were shelved due to non-
issuance of Environmental Compliance Certificates because of public opposition.
The Philippine should have strategy for sustainable development is basically the
country’s response to the worldwide call for undertaking development without destruction and
meeting the needs of the citizens of today without limiting the options of future generations to
fulfill their needs. Specifically, it aims to achieve and maintain economic growth without
depleting the stock of natural resources and degrading environmental quality.

Más contenido relacionado

La actualidad más candente

Batas ng Wikang Filipino
Batas ng Wikang FilipinoBatas ng Wikang Filipino
Batas ng Wikang FilipinoAllan Ortiz
 
Calabrzon march lyrics
Calabrzon march lyricsCalabrzon march lyrics
Calabrzon march lyricsJoelPatropez1
 
Bill of rights article iii; section 3 to 6
Bill of rights   article iii; section 3 to 6Bill of rights   article iii; section 3 to 6
Bill of rights article iii; section 3 to 6tyreal
 
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...BPA ABATAYO Land Surveying Services
 
Environmental Laws RA 6969
Environmental Laws RA 6969Environmental Laws RA 6969
Environmental Laws RA 6969Ramses Bato
 
Summary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsSummary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsRoqui Malijan
 
Final Research Sample
Final Research SampleFinal Research Sample
Final Research Samplecocolatto
 
Ang sampung utos ng diyos
Ang sampung utos ng diyosAng sampung utos ng diyos
Ang sampung utos ng diyosMBVNHS
 
Ang Tungkulin Ng Wika
Ang Tungkulin Ng WikaAng Tungkulin Ng Wika
Ang Tungkulin Ng WikaPersia
 
Qualitative Research Chapter 3 g11 Research Method and Procedures
Qualitative Research Chapter 3 g11 Research Method and ProceduresQualitative Research Chapter 3 g11 Research Method and Procedures
Qualitative Research Chapter 3 g11 Research Method and ProceduresGhail RC
 
Traffic laws, rules and regulations and
Traffic laws, rules and regulations andTraffic laws, rules and regulations and
Traffic laws, rules and regulations andMaricar Lavayna
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Gus Agosto
 
Bucor manual of operations
Bucor manual of operationsBucor manual of operations
Bucor manual of operationsrubytamayo2
 

La actualidad más candente (20)

Batas ng Wikang Filipino
Batas ng Wikang FilipinoBatas ng Wikang Filipino
Batas ng Wikang Filipino
 
Calabrzon march lyrics
Calabrzon march lyricsCalabrzon march lyrics
Calabrzon march lyrics
 
Bill of rights article iii; section 3 to 6
Bill of rights   article iii; section 3 to 6Bill of rights   article iii; section 3 to 6
Bill of rights article iii; section 3 to 6
 
Extinction of criminal liability
Extinction of criminal liabilityExtinction of criminal liability
Extinction of criminal liability
 
Rule 117 motion to quash
Rule 117 motion to quashRule 117 motion to quash
Rule 117 motion to quash
 
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
 
Environmental Laws RA 6969
Environmental Laws RA 6969Environmental Laws RA 6969
Environmental Laws RA 6969
 
Road widening ppt
Road widening pptRoad widening ppt
Road widening ppt
 
Summary, Conclusions and Recommendations
Summary, Conclusions and RecommendationsSummary, Conclusions and Recommendations
Summary, Conclusions and Recommendations
 
Final Research Sample
Final Research SampleFinal Research Sample
Final Research Sample
 
Ang sampung utos ng diyos
Ang sampung utos ng diyosAng sampung utos ng diyos
Ang sampung utos ng diyos
 
Lucio San Pedro
Lucio San PedroLucio San Pedro
Lucio San Pedro
 
Fil
FilFil
Fil
 
Arraignment and plea
Arraignment and pleaArraignment and plea
Arraignment and plea
 
Ang Tungkulin Ng Wika
Ang Tungkulin Ng WikaAng Tungkulin Ng Wika
Ang Tungkulin Ng Wika
 
Statement of the Problem
Statement of the ProblemStatement of the Problem
Statement of the Problem
 
Qualitative Research Chapter 3 g11 Research Method and Procedures
Qualitative Research Chapter 3 g11 Research Method and ProceduresQualitative Research Chapter 3 g11 Research Method and Procedures
Qualitative Research Chapter 3 g11 Research Method and Procedures
 
Traffic laws, rules and regulations and
Traffic laws, rules and regulations andTraffic laws, rules and regulations and
Traffic laws, rules and regulations and
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting,
 
Bucor manual of operations
Bucor manual of operationsBucor manual of operations
Bucor manual of operations
 

Similar a Reaction paper on ecc

Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfPranshuSharma18498
 
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiCloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiWaqas Tariq
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Why is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfWhy is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfJagriti Agarwal
 
Environment Compliance and Monitoring, Surveillance
Environment Compliance and Monitoring, SurveillanceEnvironment Compliance and Monitoring, Surveillance
Environment Compliance and Monitoring, SurveillanceJanesEngineeringLife
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxSubhajitNandi15
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentPramoda Raj
 
EIA Malaysia Philippines
EIA Malaysia PhilippinesEIA Malaysia Philippines
EIA Malaysia PhilippinesSEGi University
 
Session 2: Legal Requirements, Biodiversity and Business
Session 2: Legal Requirements, Biodiversity and BusinessSession 2: Legal Requirements, Biodiversity and Business
Session 2: Legal Requirements, Biodiversity and BusinessEthical Sector
 

Similar a Reaction paper on ecc (20)

Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
What is eia
What is eiaWhat is eia
What is eia
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
 
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiCloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Why is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfWhy is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdf
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
Environment Compliance and Monitoring, Surveillance
Environment Compliance and Monitoring, SurveillanceEnvironment Compliance and Monitoring, Surveillance
Environment Compliance and Monitoring, Surveillance
 
Eia requirements
Eia requirementsEia requirements
Eia requirements
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
EIA Malaysia Philippines
EIA Malaysia PhilippinesEIA Malaysia Philippines
EIA Malaysia Philippines
 
Session 2: Legal Requirements, Biodiversity and Business
Session 2: Legal Requirements, Biodiversity and BusinessSession 2: Legal Requirements, Biodiversity and Business
Session 2: Legal Requirements, Biodiversity and Business
 

Reaction paper on ecc

  • 1. Teofilo A. Tubo June 18, 2015 Sat. 8:00am-11:00am Dr. Eduardo M. Bisquera Jr., Ph.D. REACTION PAPER in THE POLITICS ON THE ISSUANCE OF ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) The licensee must properly operate and maintain the facility to prevent any actual or potential threat to the public health, safety, welfare and the environment. In addition, the licensee shall act to prevent all actual and potential adverse impacts to persons and the environment resulting from non-compliance and will be responsible for paying for damages caused by such non- compliance. Standardizing requirements to ensure focus on critical environment parameters; Simplifying procedures for processing ECC applications, and establishing measures to ensure adherence to ECC conditions by project proponents, and assuring that critical environmental concerns are addressed during project development and implementation ECC processing requirements shall focus on information needed to assess critical environmental impacts of projects. Processing requirements shall be customized based on the project categories. The power to uphold and impose an ex-parte Cease and Desist Order on the following grounds: When there is immediate threat to life, public health, safety or welfare, or to animal or plant life; or When the wastes or discharge exceeds the allowable standards set by the Commission. The expressed power to order closure of a firm for non-payment of fines. The decision of the National Pollution Control Commission is considered final and may be appealed only to the Court of Appeals on questions both of facts and law, or to the Supreme Court on questions of law. There is the need to study whether the Permit to Operate should be renewed on a yearly basis. This function makes the Department of Environment and Natural Resources mainly an industry-regulating office when resources should be devoted rather to initiating, supporting, and implementing environmental protection programs. It is also consuming too much of the industry’s time and effort when the burden of monitoring should be on the Department of Environment and Natural Resources. It is better to simply require the industry to install a self- monitoring device and to regularly submit reports together with the result of the indicators in their analyzer or monitoring equipment. The Regional Office can then just perform spot- checking instead of inspecting all the industrial plants in the region yearly. One weakness in the Department of Environment and Natural Resources’ permitting regulation is the lack of power of the Regional Office to stop the industry from constructing and operating the antipollution device or undertaking activities that cause pollution.
  • 2. 2 The continuing development and refinement of the Environmental Impact Assessment process brought into focus public participation and social acceptability concerns in environmental assessment and monitoring. Several major projects were shelved due to non- issuance of Environmental Compliance Certificates because of public opposition. The Philippine should have strategy for sustainable development is basically the country’s response to the worldwide call for undertaking development without destruction and meeting the needs of the citizens of today without limiting the options of future generations to fulfill their needs. Specifically, it aims to achieve and maintain economic growth without depleting the stock of natural resources and degrading environmental quality.