SlideShare a Scribd company logo
1 of 34
© 2014
Texas Drought and Watermaster
Update
Molly Cagle
March 5, 2014
2014 LCRA Emergency Order
Look at the watershed above and the Highland Lakes
Key Points
 600,000 af storage is 2010 WMP cutoff
 100% curtailment for interruptible
 20% pro rata curtailment on firm
 Cutoff modified in '12 and '13 emergency orders
 Should cutoff be modified in 2014?
 If so, at what storage capacity should it be lifted?
Historical Trend
Inflows to Highland Lakes
Five of the
lowest inflow
years on
record
occurred within
the last six
years.
How did we get here?
LCRA applies for
Emergency Order
Commission
considers
ED's Order
ED issues
Emergency Order
Exceptions
Commission considers
Emergency Order
Dec. 10, 2013
Jan. 27, 2014
Feb. 12
Hearing on
the merits
Feb. 17
PFD
Feb. 21 Feb. 24
Feb. 26
ED Emergency Order
 No interruptible releases now
 1.1 trigger on future releases
 Automatic renewal if below 1.1 M AF on May 26
 Cap on total releases depends upon storage
If combined storage is… Interruptible releases up to…
< 1.1 M zero
≥ 1.1 M but < 1.2 M 100,000 AF
≥ 1.2 M but < 1.3 M 124,000 AF
≥ 1.3 M but < 1.4 M 148,000 AF
≥ 1.4 M 172,000 AF
How did we get here?
LCRA applies for
Emergency Order
Commission
considers
ED's Order
ED issues
Emergency Order
Exceptions
Commission issues
Modified Emergency
Order
Dec. 10, 2013
Jan. 27, 2014
Feb. 12
Hearing on
the merits
Feb. 17
PFD
Feb. 21 Feb. 24
Feb. 26
Legal Issue
 Texas Water Code 11.139
 "Emergency conditions exist which present an
imminent threat to the public health and safety and
which override the necessity to comply with established
statutory procedures"
 No feasible practicable alternatives to the
emergency authorization.
 Emergency Order has 120 day life; may be renewed
once for not longer than 60 days.
 Affirm, modify, or set aside the emergency
authorization.
"Imminent threat to public health and safety"
 Intake structures already out of water-more soon
 Wells already dry
 Firefighters unable to access lake water
 Urban tree canopy
 Concrete foundations
 No alternatives
Reality
 Concern about hitting 600,000 af -DWDR
 Concern about indoor water use restrictions
 Comfort zone
 Precedent of cap
 Precedent generally
 Economics and public perception
Future With Irrigation Release
Future Without Irrigation Release
Results
ALJ Recommends
 No interruptible
releases now
 1.4 M AF trigger
 172,000 AF cap on
releases
 Automatic renewal
TCEQ Adopts
 No interruptible
releases now
 No trigger level
 No automatic renewal
To be continued…
BRAZOS RIVER WATERMASTER
Brazos River Overview
• 840 miles long
• 42,620 sq. mi
watershed
• 19 major
reservoirs
Planning Regions G, H, and O
October Snapshot 2000 - 2013
Texas Water Code § 11.027
As Between Appropriators,
First in Time,
First in Right
Senior Priority Calls
 2009
 2011
 2012
 2013
Texas Watermaster Programs
Tex. Water Code § 11.325 - Water Divisions
 The commission shall divide the state into water
divisions for the purpose of administering
adjudicated water rights.
 Water divisions may be created from time to time
as the necessity arises.
 The divisions shall be constituted to secure the
best protection to the holders of water rights and
the most economical supervision on the part of
the state.
Sunset legislation, HB 2694 (2011)
 11.326(g) For a water basin in which a
watermaster is not appointed, the executive
director shall:
 (1) evaluate the water basin at least once every five
years to determine whether a watermaster should be
appointed; and
 (2) report the findings and make recommendations to
the commission.
Executive Director October 2012 Brazos Basin
Recommendation
 34 water right holders commented
 23 opposed
 7 in favor
 4 neutral
 ED recommendation: Threat to senior water rights
would be best articulated by those water rights
holders impacted
 Invited petition per §11.451
Tex. Water Code §11.451
 On petition of 25 or more holders of water rights in a
river basin or segment of a river basin or on its own
motion the commission may authorize the executive
director to appoint a watermaster for a river basin or
segment of a river basin if the commission finds that
the rights of senior water rights holders in the basin or
segment of the basin are threatened.
Tex. Water Code § 11.452
 (a) On receiving a petition for appointment of a watermaster or
on its own motion, the commission shall call and hold a hearing
to determine if a need exists for appointment of a watermaster
for the river basin or segment of the river basin.
 (b) At the hearing persons who hold water rights in the river
basin or segment of the river basin may appear before the
commission and submit testimony and evidence relating to the
need for appointment of a watermaster.
 (c) After the hearing, the commission shall make a written
determination as to whether a threat exists to the rights of
senior water rights holders in the river basin or segment of the
river basin and shall issue an order either finding that a threat
exists and directing appointment of a watermaster or denying
appointment of a watermaster.
Brazos River Watermaster Hearing
 Threat
 Need
 Appropriate Geographic Scope
January 2013
Petition Filed
April 2013
Preliminary Hearing
February 2013
Petition Considered at
Agenda
December 2013
Proposal for Decision
Sept. 23-26, 2013
Live Hearing
April or May ?
Agenda
Proponents Hearing Themes
 Prior appropriation is the law and it exists to deal
with shortages
 Recurring periods of shortage and increasing basin
demands
 Protection of vested property rights
 Planning tools assume implementation of prior
appropriation
 Reactive management to calls or complaints does
not negate existence of or sufficiently address threat
 Whole basin is hydrologically connected
 Watermaster is the tool provided by Legislature to
enable data collection and proactive management
Opponents Hearing Themes
 Priority Call implementation is sufficient
 Drought Tiger Teams
 Improvement from 40+ days to goal of less than 10 Days
 Limited occurrence
 Government intrusiveness
 "Upper Basin" is distinct in climate and hydrology
and Possum Kingdom is a sufficient divide
 Other carve outs
Jurisdictional challenge
 Particularly preyed upon by [supporters of the
watermaster] were the deceased, the cancer
ridden,the demented and elderly and their naïve
sullen survivors.
 Some Petitioners dropped out
Proposal for Decision
 Threat - Clearly exists
 Need - Evidence was overwhelming
 Geographic scope - Entire Basin is appropriate
Brazos Watermaster Outcome
 TCEQ Agenda
 Legislature
2014 Texas Drought and Watermaster Update

More Related Content

What's hot

Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...TWCA
 
TWCA Annual Convention: Water Rights Developments in Other States, Lyn Clancy
TWCA Annual Convention: Water Rights Developments in Other States, Lyn ClancyTWCA Annual Convention: Water Rights Developments in Other States, Lyn Clancy
TWCA Annual Convention: Water Rights Developments in Other States, Lyn ClancyTWCA
 
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...TWCA
 
Mesa County Town Hall Meeting
Mesa County Town Hall MeetingMesa County Town Hall Meeting
Mesa County Town Hall MeetingWalter Davidson
 
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA
 
Case Law Update, Emily Rogers
Case Law Update, Emily RogersCase Law Update, Emily Rogers
Case Law Update, Emily RogersTWCA
 
Hofmann, Managing the Drought / Flood Cycle
Hofmann, Managing the Drought / Flood CycleHofmann, Managing the Drought / Flood Cycle
Hofmann, Managing the Drought / Flood CycleTWCA
 
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...The Texas Network, LLC
 
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Global Water Partnership
 
Wi Lake Level Proposal Clmn
Wi Lake Level Proposal   ClmnWi Lake Level Proposal   Clmn
Wi Lake Level Proposal ClmnUWEX Lakes
 
Nisqually Water Banking Feasibility Study Introduction
Nisqually Water Banking Feasibility Study IntroductionNisqually Water Banking Feasibility Study Introduction
Nisqually Water Banking Feasibility Study IntroductionNisqually River Council
 
SAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectSAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectThe Texas Network, LLC
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyTWCA
 
Operation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatOperation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatTWCA
 
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Nebraska Water Center
 
Water organization in india and russia
Water organization in india and russiaWater organization in india and russia
Water organization in india and russiaAshok Kumar
 
Environmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithEnvironmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithTWCA
 
Produced Water | Session IX - JP Nicot
Produced Water | Session IX - JP NicotProduced Water | Session IX - JP Nicot
Produced Water | Session IX - JP Nicotatlanticcouncil
 
Waukesha Diversion Impacts on the Baseflow of the Fox River
Waukesha Diversion Impacts on the Baseflow of the Fox RiverWaukesha Diversion Impacts on the Baseflow of the Fox River
Waukesha Diversion Impacts on the Baseflow of the Fox RiverPatrick Siwula
 

What's hot (20)

Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
 
TWCA Annual Convention: Water Rights Developments in Other States, Lyn Clancy
TWCA Annual Convention: Water Rights Developments in Other States, Lyn ClancyTWCA Annual Convention: Water Rights Developments in Other States, Lyn Clancy
TWCA Annual Convention: Water Rights Developments in Other States, Lyn Clancy
 
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...
TWCA Annual Convention: Can/Should Texas Learn from Colorado? Jordan Furnans ...
 
Mesa County Town Hall Meeting
Mesa County Town Hall MeetingMesa County Town Hall Meeting
Mesa County Town Hall Meeting
 
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
 
Case Law Update, Emily Rogers
Case Law Update, Emily RogersCase Law Update, Emily Rogers
Case Law Update, Emily Rogers
 
Hofmann, Managing the Drought / Flood Cycle
Hofmann, Managing the Drought / Flood CycleHofmann, Managing the Drought / Flood Cycle
Hofmann, Managing the Drought / Flood Cycle
 
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...
Civil Works Multi-purpose Reservoir Infrastructure Strategy & Future Opportun...
 
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
 
Wi Lake Level Proposal Clmn
Wi Lake Level Proposal   ClmnWi Lake Level Proposal   Clmn
Wi Lake Level Proposal Clmn
 
Nisqually Water Banking Feasibility Study Introduction
Nisqually Water Banking Feasibility Study IntroductionNisqually Water Banking Feasibility Study Introduction
Nisqually Water Banking Feasibility Study Introduction
 
SAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectSAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination Project
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen Bondy
 
Operation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatOperation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard Donat
 
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
 
Water organization in india and russia
Water organization in india and russiaWater organization in india and russia
Water organization in india and russia
 
Prop 6 and hb
Prop 6 and hbProp 6 and hb
Prop 6 and hb
 
Environmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithEnvironmental Flows Update, Tony Smith
Environmental Flows Update, Tony Smith
 
Produced Water | Session IX - JP Nicot
Produced Water | Session IX - JP NicotProduced Water | Session IX - JP Nicot
Produced Water | Session IX - JP Nicot
 
Waukesha Diversion Impacts on the Baseflow of the Fox River
Waukesha Diversion Impacts on the Baseflow of the Fox RiverWaukesha Diversion Impacts on the Baseflow of the Fox River
Waukesha Diversion Impacts on the Baseflow of the Fox River
 

Similar to 2014 Texas Drought and Watermaster Update

U.S. Army Corps of Engineers Briefing- Texoma Region Public Meeting
U.S. Army Corps of Engineers Briefing- Texoma Region Public MeetingU.S. Army Corps of Engineers Briefing- Texoma Region Public Meeting
U.S. Army Corps of Engineers Briefing- Texoma Region Public MeetingLakeTexoma
 
Rockland county water sah
Rockland county water sahRockland county water sah
Rockland county water sahSally Haas
 
Water Law and Policy in the U.S.
Water Law and Policy in the U.S.Water Law and Policy in the U.S.
Water Law and Policy in the U.S.Chuck Bowen
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Texas Network, LLC
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 HydroCEQAplanner
 
Mitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethMitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethYourAlberta
 
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...TWCA
 
Coalition for the Delaware River Watershed
Coalition for the Delaware River WatershedCoalition for the Delaware River Watershed
Coalition for the Delaware River WatershedKim Beidler
 
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013San Diego County Water Authority
 
Water conservation guidelines and plans
Water conservation guidelines and plansWater conservation guidelines and plans
Water conservation guidelines and plansCharles Bwalya
 
Environmental Issues Affecting Real Estate Smu Cox Real Estate Law Class
Environmental Issues Affecting Real Estate   Smu Cox Real Estate Law ClassEnvironmental Issues Affecting Real Estate   Smu Cox Real Estate Law Class
Environmental Issues Affecting Real Estate Smu Cox Real Estate Law Classslongroy
 
Introduction to Stormwater BMP's in North Carolina
Introduction to Stormwater BMP's in North CarolinaIntroduction to Stormwater BMP's in North Carolina
Introduction to Stormwater BMP's in North CarolinaKurt Bland
 
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...awaltner
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency SevernEstuary
 
Wetlands Challenges and Use of Mitigation Bank Credits
Wetlands Challenges and Use of Mitigation Bank CreditsWetlands Challenges and Use of Mitigation Bank Credits
Wetlands Challenges and Use of Mitigation Bank CreditsScott Deatherage
 

Similar to 2014 Texas Drought and Watermaster Update (20)

U.S. Army Corps of Engineers Briefing- Texoma Region Public Meeting
U.S. Army Corps of Engineers Briefing- Texoma Region Public MeetingU.S. Army Corps of Engineers Briefing- Texoma Region Public Meeting
U.S. Army Corps of Engineers Briefing- Texoma Region Public Meeting
 
Rockland county water sah
Rockland county water sahRockland county water sah
Rockland county water sah
 
Water Law and Policy in the U.S.
Water Law and Policy in the U.S.Water Law and Policy in the U.S.
Water Law and Policy in the U.S.
 
FITFIR Webinar
FITFIR WebinarFITFIR Webinar
FITFIR Webinar
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Maryland Water Laws and Regulations
Maryland Water Laws and RegulationsMaryland Water Laws and Regulations
Maryland Water Laws and Regulations
 
Comp Plan 2020 Public Input Summary
Comp Plan 2020 Public Input SummaryComp Plan 2020 Public Input Summary
Comp Plan 2020 Public Input Summary
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
 
Sustainable Water Supplies WS - Bill Golden
Sustainable Water Supplies WS - Bill GoldenSustainable Water Supplies WS - Bill Golden
Sustainable Water Supplies WS - Bill Golden
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 Hydro
 
Mitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethMitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard Lindseth
 
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...
Opportunities & Limitations of ASR as a Water Management Strategy in Texas - ...
 
Coalition for the Delaware River Watershed
Coalition for the Delaware River WatershedCoalition for the Delaware River Watershed
Coalition for the Delaware River Watershed
 
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
 
Water conservation guidelines and plans
Water conservation guidelines and plansWater conservation guidelines and plans
Water conservation guidelines and plans
 
Environmental Issues Affecting Real Estate Smu Cox Real Estate Law Class
Environmental Issues Affecting Real Estate   Smu Cox Real Estate Law ClassEnvironmental Issues Affecting Real Estate   Smu Cox Real Estate Law Class
Environmental Issues Affecting Real Estate Smu Cox Real Estate Law Class
 
Introduction to Stormwater BMP's in North Carolina
Introduction to Stormwater BMP's in North CarolinaIntroduction to Stormwater BMP's in North Carolina
Introduction to Stormwater BMP's in North Carolina
 
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
 
Wetlands Challenges and Use of Mitigation Bank Credits
Wetlands Challenges and Use of Mitigation Bank CreditsWetlands Challenges and Use of Mitigation Bank Credits
Wetlands Challenges and Use of Mitigation Bank Credits
 

More from The Texas Network, LLC

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017The Texas Network, LLC
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleThe Texas Network, LLC
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesThe Texas Network, LLC
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayThe Texas Network, LLC
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Texas Network, LLC
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)The Texas Network, LLC
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...The Texas Network, LLC
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSThe Texas Network, LLC
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT The Texas Network, LLC
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasThe Texas Network, LLC
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersThe Texas Network, LLC
 

More from The Texas Network, LLC (20)

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017
 
WHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIPWHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIP
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” Rule
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal Challenges
 
Texas Water Development Board Update
Texas Water Development Board UpdateTexas Water Development Board Update
Texas Water Development Board Update
 
Professional Ethics
Professional EthicsProfessional Ethics
Professional Ethics
 
Groundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD PanelGroundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD Panel
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda Bay
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on Reuse
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
 
TWCA Speech – Rep. James Frank
TWCA Speech – Rep. James FrankTWCA Speech – Rep. James Frank
TWCA Speech – Rep. James Frank
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board Members
 
From Projectile to Pump Station
From Projectile to Pump StationFrom Projectile to Pump Station
From Projectile to Pump Station
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
National Floodplain Policy: FFRMS
National Floodplain Policy: FFRMSNational Floodplain Policy: FFRMS
National Floodplain Policy: FFRMS
 

2014 Texas Drought and Watermaster Update

  • 1. © 2014 Texas Drought and Watermaster Update Molly Cagle March 5, 2014
  • 3. Look at the watershed above and the Highland Lakes
  • 4. Key Points  600,000 af storage is 2010 WMP cutoff  100% curtailment for interruptible  20% pro rata curtailment on firm  Cutoff modified in '12 and '13 emergency orders  Should cutoff be modified in 2014?  If so, at what storage capacity should it be lifted?
  • 6. Inflows to Highland Lakes Five of the lowest inflow years on record occurred within the last six years.
  • 7. How did we get here? LCRA applies for Emergency Order Commission considers ED's Order ED issues Emergency Order Exceptions Commission considers Emergency Order Dec. 10, 2013 Jan. 27, 2014 Feb. 12 Hearing on the merits Feb. 17 PFD Feb. 21 Feb. 24 Feb. 26
  • 8. ED Emergency Order  No interruptible releases now  1.1 trigger on future releases  Automatic renewal if below 1.1 M AF on May 26  Cap on total releases depends upon storage If combined storage is… Interruptible releases up to… < 1.1 M zero ≥ 1.1 M but < 1.2 M 100,000 AF ≥ 1.2 M but < 1.3 M 124,000 AF ≥ 1.3 M but < 1.4 M 148,000 AF ≥ 1.4 M 172,000 AF
  • 9. How did we get here? LCRA applies for Emergency Order Commission considers ED's Order ED issues Emergency Order Exceptions Commission issues Modified Emergency Order Dec. 10, 2013 Jan. 27, 2014 Feb. 12 Hearing on the merits Feb. 17 PFD Feb. 21 Feb. 24 Feb. 26
  • 10. Legal Issue  Texas Water Code 11.139  "Emergency conditions exist which present an imminent threat to the public health and safety and which override the necessity to comply with established statutory procedures"  No feasible practicable alternatives to the emergency authorization.  Emergency Order has 120 day life; may be renewed once for not longer than 60 days.  Affirm, modify, or set aside the emergency authorization.
  • 11. "Imminent threat to public health and safety"  Intake structures already out of water-more soon  Wells already dry  Firefighters unable to access lake water  Urban tree canopy  Concrete foundations  No alternatives
  • 12. Reality  Concern about hitting 600,000 af -DWDR  Concern about indoor water use restrictions  Comfort zone  Precedent of cap  Precedent generally  Economics and public perception
  • 15. Results ALJ Recommends  No interruptible releases now  1.4 M AF trigger  172,000 AF cap on releases  Automatic renewal TCEQ Adopts  No interruptible releases now  No trigger level  No automatic renewal To be continued…
  • 17. Brazos River Overview • 840 miles long • 42,620 sq. mi watershed • 19 major reservoirs
  • 20. Texas Water Code § 11.027 As Between Appropriators, First in Time, First in Right
  • 21. Senior Priority Calls  2009  2011  2012  2013
  • 23. Tex. Water Code § 11.325 - Water Divisions  The commission shall divide the state into water divisions for the purpose of administering adjudicated water rights.  Water divisions may be created from time to time as the necessity arises.  The divisions shall be constituted to secure the best protection to the holders of water rights and the most economical supervision on the part of the state.
  • 24. Sunset legislation, HB 2694 (2011)  11.326(g) For a water basin in which a watermaster is not appointed, the executive director shall:  (1) evaluate the water basin at least once every five years to determine whether a watermaster should be appointed; and  (2) report the findings and make recommendations to the commission.
  • 25. Executive Director October 2012 Brazos Basin Recommendation  34 water right holders commented  23 opposed  7 in favor  4 neutral  ED recommendation: Threat to senior water rights would be best articulated by those water rights holders impacted  Invited petition per §11.451
  • 26. Tex. Water Code §11.451  On petition of 25 or more holders of water rights in a river basin or segment of a river basin or on its own motion the commission may authorize the executive director to appoint a watermaster for a river basin or segment of a river basin if the commission finds that the rights of senior water rights holders in the basin or segment of the basin are threatened.
  • 27. Tex. Water Code § 11.452  (a) On receiving a petition for appointment of a watermaster or on its own motion, the commission shall call and hold a hearing to determine if a need exists for appointment of a watermaster for the river basin or segment of the river basin.  (b) At the hearing persons who hold water rights in the river basin or segment of the river basin may appear before the commission and submit testimony and evidence relating to the need for appointment of a watermaster.  (c) After the hearing, the commission shall make a written determination as to whether a threat exists to the rights of senior water rights holders in the river basin or segment of the river basin and shall issue an order either finding that a threat exists and directing appointment of a watermaster or denying appointment of a watermaster.
  • 28. Brazos River Watermaster Hearing  Threat  Need  Appropriate Geographic Scope January 2013 Petition Filed April 2013 Preliminary Hearing February 2013 Petition Considered at Agenda December 2013 Proposal for Decision Sept. 23-26, 2013 Live Hearing April or May ? Agenda
  • 29. Proponents Hearing Themes  Prior appropriation is the law and it exists to deal with shortages  Recurring periods of shortage and increasing basin demands  Protection of vested property rights  Planning tools assume implementation of prior appropriation  Reactive management to calls or complaints does not negate existence of or sufficiently address threat  Whole basin is hydrologically connected  Watermaster is the tool provided by Legislature to enable data collection and proactive management
  • 30. Opponents Hearing Themes  Priority Call implementation is sufficient  Drought Tiger Teams  Improvement from 40+ days to goal of less than 10 Days  Limited occurrence  Government intrusiveness  "Upper Basin" is distinct in climate and hydrology and Possum Kingdom is a sufficient divide  Other carve outs
  • 31. Jurisdictional challenge  Particularly preyed upon by [supporters of the watermaster] were the deceased, the cancer ridden,the demented and elderly and their naïve sullen survivors.  Some Petitioners dropped out
  • 32. Proposal for Decision  Threat - Clearly exists  Need - Evidence was overwhelming  Geographic scope - Entire Basin is appropriate
  • 33. Brazos Watermaster Outcome  TCEQ Agenda  Legislature

Editor's Notes

  1. Both lakes Buchanan and Travis were last full on February 13, 2005 (PFD at pg 16; citing LCRA exhibit 5A at pg 9)
  2. from LCRA exhibits at hearing (exhibit K)
  3. Caps on releases:If storage is below 1.1 M AF, no releasesIf storage is at or above 1.1 M AF but below 1.2, release up to 100,000If storage is at or above 1.2 M AF but below 1.3, release up to 124,000If storage is at or above 1.3 M AF but below 1.4, release up to 148,000If storage is at or above 1.4 M AF, release up to 172,000.
  4. FromCWIC exhibits, LCRA exhibits.
  5. Focusing on the Brazos, let&apos;s get a some context. This map shows the full extent of the Brazos River basin in Texas.Watershed that stretches 1,050 milesover 800 miles down to the Gulf of MexicoComprises 44,620 square miles, 42,000 of which are in TexasBrazos crosses most of the physiographic regions of Texas - the High Plains, West Texas Rolling Plains, West Cross Timbers, Grand Prairie and Gulf Coastal PlainsThe Brazos is a complex system - 19 major reservoirs with collectively over 3.3 million acre-feet of conservation storage. There are several principle tributaries and also numerous subtributaries. Reservoirs are located both on the main stem and on tributaries.
  6. The Brazos River spans three regional water planning groups. The Llano Estacado (Region O) up toward the panhandle - Lubbock is in Region O. Moving down Region G -Brazos G Area is about 31,600 square miles in area, or 12 percent of the State’s total area. About 90 percent of the region lies in the Brazos River Basin. Cities in the region with current populations greater than 50,000 are Abilene, Bryan, Cedar Park, College Station, Killeen, Round Rock, Temple, and Waco.Region H then extends down to the gulf of mexico. Region H includes the Three river basins (Brazos, San Jacinto Trinity) and four coastal basins (San Jacinto Brazos, San Jacinto-Trinity, Neches-Trinity, [Brazos-Colorado])Demands in the Brazos have of course increased over time and are projected to increase substantially over time. Region G covers 37 central Texas counties. About 90 percent of Region G lies in the Brazos River Basin. Cities in the region with currentpopulations greater than 50,000 are Abilene, Bryan, Cedar Park, College Station, Killeen, Round Rock, Temple, and Waco. The Brazos G Area is about 31,600 square miles in area, or 12 percent of the State’s total area. You can see here that water demand is expected to increase from the 2010 levels by about 200K acre-feet. Population is projected to rise substantially as well.Region H - The significant increase in demand - about an additional 200K acre-feet by 2060. SJ-Coastal (not shown) has a little less that 200Kacr-feet of additional demand by 2060. There is a corresponding trend in population. Brazos 250K in 2020 but over 600K by 2060 in the Brazos portion of Region H. SJ-Brazos coastal has 1.2m now and projected to be over 2m by 2060.Both basins also have projected increases in manufacturing demand as well (Brazos -240Kacr-ft in 2020 and 617K ac-ft by 2060. SJ-Brazos - 166Kacr-ft 2020 and 202Kacr-ft by 2060).Region O [NOT SHOWN]in contrast has relatively low population growth and actually projects a slight decrease in water demandsTotal water use in 2000 was estimated at 4,530,040 acft/yr. Projected total water demand for the region is 3,724,154 acft/yr in 2060. Projections of future water demands for municipal, industrial, steam-electric power, and livestock increase, while projections for irrigation and mining purposes decrease. The reasons for the decline in the projections of demand in future years for irrigation are predictions of increased efficiency in irrigation, economic factors adversely affecting the profitability of irrigation in future years, and expectation of decreased government programs supporting agricultural incomes, and supplies of water available for irrigation are projected to decrease. Projections for mining water demand decrease due to the expectation that secondary recovery of crude petroleum using water flooding will decrease in future years as this method is phased out or is no longer a viable technology for the industry in the Llano Estacado Region.
  7. So you have overall growth in demand. Now let&apos;s look at pressure on the system -This a snapshot of the first week of October from 2000 to 2013 - so not a complete picture of the world but just some sense of drought conditions. 2011 obviously glaring and carries out into 2012 and 2013. But look at 2000 and 2005 and 2006 and remember the full arc of the Brazos so you see drought conditions in portions of the basin on a regular basis.
  8. The first senior priority call was made by Dow Chemical Company on the Brazos River in 2009. Dow has multiple senior priority dates including some very senior and it is located down at Freeport - It is the first major water right above the mouth of the Brazos River. 1929 (20K ac-ft), 1942 (150K ac-ft)1960 (65K)2009 Call was new territory and it was implemented by the Executive Director&apos;s staff sending suspension letters - it took upwards of 40 days from when Dow made the call for it to be implemented. The call was issued at 1980and suspended NON-municipal diversions. It was only implemented below the BRA reservoirs. It lasted a little over a month.2011 - another call by Dow resulted in an iterative approach. In May 2011 the call was implemented by again suspending non-municipal diversions junior to 1980 in reaches below BRA reservoirs.In June 2011 the suspension was extended to 1960and in August it was extended geographically to all areas below Possum Kingdom reservoir (Possum Kingdom has a 1938 priority date). Again this was done by a letter to water rights holders from the ED and the ED cited to the TCEQ&apos;s statutory duty to protect senior water rights in accordance with Tex. water code 11.027.2012 -Rights junior to 1942 Suspended842 junior rights ( 755 for irrigation); 117, 227 af/yr authorized useRights Exempted from Suspension66 junior rights (municipal and power); 2,858, 238 af/yr authorized use [Kathy disputes this number and it may include some non-consumptive]Amendments to the 2012 Order -- Authorization of use during high flow periods; Requiring Conservation; Elimination of unnecessary exemptions (19 Rights not suspended; 1,829,781 af/yr authorized use)Texas Farm Bureau files suit2013 - GCWA makes a call but Dow trumps it with a call at 1942 which issued by the ED July 2, 2013. That call had built in authorization to divert during high flow periods so it remained in place despite some short periods of higher flow until _______.
  9. Priority calls and litigation, that&apos;sonflict… is conflict avoidable? Maybe not. But while one mechanism to deal with shortage and prior appropriation is priority calls, there is a different approach available -- a watermaster -- and some believe that approach can at least mitigate conflict and maximize beneficial use.This map shows the existing watermaster areas. Many of you may be familiar particularly with the South Texas Watermaster area. but there is also the ConchoRio grande has a watermaster but it also has some unique factors and so has its own set of rules.What is a watermaster? Ideally manager but also enforcer. One of the key characteristics of a wm program is that diverters file advanced declarations of intent. So you actually have a mechanism to know what people want to divert on a daily, advanced basis. So there is actually the data and a means to implement prior appropriation. but there is also a means to get to compromise that simply does not exist when the choice is make a priority call or don&apos;t. I&apos;ve heard the South Texas watermaster describe his efforts to coordinate the timing of diversions in a way that maximizes beneficial use.
  10. how do you create a watermaster program? There are a variety of paths.First, there is the water division method. The commission can do this at an agenda based on the &quot;best protection to the holders of water rightsand the most economical supervision on the part of the state.The South Texas Water Division and the Colorado-lavaca division were both created under this authority.
  11. how do you create a watermaster program? There are a variety of paths.First, there is the water division method. The commission can do this at an agenda based on the &quot;best protection to the holders of water rightsand the most economical supervision on the part of the state.The South Texas Water Division and the Colorado-lavaca division were both created under this authority.
  12. In doing the evaluation for the Brazos basin in 2012 there was a stakeholder process and there was a vocal opposition. It appears that because of the stakeholder process TCEQ deferred to the other mechanism to get a watermaster -- 11.451 and 11.452, which require an evidentiary hearing. And the statutory criteria for those provisions is threat -- which the commission thought would be best articulated by water right holders.
  13. I&apos;ve provided the statutory provisions for your reference -- you can see here that this authority can be by petition or by the commissions own motion (but with different criteria than the 11.325).
  14. There is sometimes the word threat and sometimes the word need in this description of the procedures for the hearing process. These provisions have been construed by the Commission one time -- in the hearing that resulted in the Concho Watermaster program (and there was legislation layering on that after the commission created it).
  15. For the brazos the referral to the state office of administrative hearings referred the issues of threat, need and appropriate geographic scope