Operations Management Session 8 –  JIT and Lean Operations
Learning Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object],[object Object]
Toyota Motor Corporation ,[object Object],[object Object],[object Object],[object Object]
Toyota Motor Corporation ,[object Object],[object Object],[object Object],[object Object],[object Object]
Just-In-Time, TPS, and  Lean Operations ,[object Object],[object Object],[object Object]
Just-In-Time, TPS, and  Lean Operations ,[object Object],[object Object],[object Object]
Eliminate Waste ,[object Object],[object Object]
Ohno’s Seven Wastes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eliminate Waste ,[object Object],[object Object],[object Object]
The 5 Ss ,[object Object],[object Object],[object Object],[object Object],[object Object]
The 5 Ss ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Remove Variability ,[object Object],[object Object],[object Object],[object Object]
Sources of Variability ,[object Object],[object Object],[object Object]
Sources of Variability ,[object Object],[object Object],[object Object],Both JIT and inventory reduction are effective tools in identifying causes of variability
Improve Throughput ,[object Object],[object Object],[object Object]
Improve Throughput ,[object Object],[object Object],[object Object]
Just-In-Time (JIT) ,[object Object],[object Object],[object Object],[object Object]
JIT and Competitive Advantage Figure 16.1
JIT and Competitive Advantage Figure 16.1
JIT Partnerships ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Partnerships Figure 16.2
Concerns of Suppliers ,[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Layout Table 16.1 Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility
Distance Reduction ,[object Object],[object Object],[object Object]
Increased Flexibility ,[object Object],[object Object],[object Object]
Impact on Employees ,[object Object],[object Object],[object Object]
Reduced Space and Inventory ,[object Object],[object Object]
Inventory Inventory is at the minimum level necessary to keep operations running Table 16.2 JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology
Reduce Variability Inventory level Figure 16.3 Process downtime Scrap Setup time Late deliveries Quality problems
Reduce Variability Inventory level Scrap Setup time Late deliveries Quality problems Process downtime Figure 16.3
Reduce Lot Sizes Figure 16.4 200  – 100  – Inventory Time Q 2 When average order size = 100 average inventory is 50 Q 1 When average order size = 200 average inventory is 100
Reduce Lot Sizes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lot Size Example D = Annual demand = 400,000 units d = Daily demand = 400,000/250 = 1,600 per day p = Daily production rate = 4,000 units Q = EOQ desired = 400 H = Holding cost = $20 per unit S = Setup cost (to be determined) Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes Q = 2DS H(1 - d/p) Q 2  = 2DS H(1 - d/p) S =  =  = $2.40 (Q 2 )(H)(1 - d/p) 2D (3,200,000)(0.6) 800,000
Reduce Setup Costs ,[object Object],[object Object],[object Object]
Lower Setup Costs Figure 16.5 Sum of ordering and holding costs Holding cost Setup cost curves (S 1 , S 2 ) T 1 S 1 T 2 S 2 Cost Lot size
Reduce Setup Times Figure 16.6 Use one-touch system to eliminate adjustments (save 10 minutes) Step 4 Step 5 Training operators and standardizing work procedures (save 2 minutes) Initial Setup Time Step 2 Move material closer and improve material handling (save 20 minutes) Step 1 Separate setup into preparation and actual setup, doing as much as possible while the machine/process is operating  (save 30 minutes) Step 3 Standardize and improve tooling (save 15 minutes) 90 min  — 60 min  — 45 min  — 25 min  — 15 min  — 13 min  — — Repeat cycle until subminute setup is achieved Step 6
JIT Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Scheduling Table 16.3 Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part
Level Schedules ,[object Object],[object Object],[object Object],[object Object]
Scheduling Small Lots Figure 16.7 A B C A A A B B B B B C JIT Level Material-Use Approach A C A A A B B B B B C C B B B B A A Large-Lot Approach Time
Kanban ,[object Object],[object Object],[object Object],[object Object]
Kanban ,[object Object],[object Object],Figure 16.8 Part numbers mark location Signal marker on boxes
Kanban Figure 16.9 Purchased Parts Supplier Work cell Raw Material Supplier Kanban Sub-assembly Ship Kanban Kanban Kanban Kanban Finished goods Customer order Final assembly Kanban
More Kanban ,[object Object],[object Object],[object Object]
More Kanban ,[object Object],[object Object],[object Object]
More Kanban ,[object Object],[object Object]
The Number of Kanban Cards or Containers ,[object Object],[object Object],Number of kanbans (containers) Demand during  Safety lead time + stock Size of container =
Number of Kanbans Example Daily demand = 500 cakes Production lead time = 2 days (Wait time +  Material handling time +  Processing time) Safety stock = 1/2 day Container size = 250 cakes Demand during lead time = 2 days x 500 cakes = 1,000 Number of kanbans =  = 5 1,000 + 250 250
Advantages of Kanban ,[object Object],[object Object],[object Object],[object Object]
Quality ,[object Object],[object Object],[object Object],[object Object]
JIT Quality Tactics Table 16.4 Use statistical process control Empower employees Build fail-safe methods (poka-yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback
Toyota Production System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Toyota Production System ,[object Object],[object Object],[object Object],[object Object],[object Object]
Lean Operations ,[object Object],[object Object],[object Object]
Building a Lean Organization ,[object Object],[object Object],[object Object],[object Object],[object Object]
Building a Lean Organization ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT in Services ,[object Object],[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
Sam Bishop
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
guest399e73
 
Lean awareness handouts
Lean awareness  handoutsLean awareness  handouts
Lean awareness handouts
jdrcables
 

La actualidad más candente (20)

Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Introduction to lean manufacturing
Introduction to lean manufacturingIntroduction to lean manufacturing
Introduction to lean manufacturing
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean awareness handouts
Lean awareness  handoutsLean awareness  handouts
Lean awareness handouts
 
Lean startup
Lean startupLean startup
Lean startup
 
How does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh AroraHow does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh Arora
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 

Similar a Session 8_OM

Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
sree19881988
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
sashi prabhu
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
sashi prabhu
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 

Similar a Session 8_OM (20)

Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Jit
JitJit
Jit
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Toyota way
Toyota wayToyota way
Toyota way
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6s
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industry
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Planning for high volume standardised product
Planning for high volume standardised productPlanning for high volume standardised product
Planning for high volume standardised product
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Jit
JitJit
Jit
 

Más de thangv

Session 7_OM
Session 7_OMSession 7_OM
Session 7_OM
thangv
 
Session 6
Session 6Session 6
Session 6
thangv
 
Session 2
Session 2Session 2
Session 2
thangv
 
Session 4_OM
Session 4_OMSession 4_OM
Session 4_OM
thangv
 
Session 5
Session 5Session 5
Session 5
thangv
 
Session 3
Session 3Session 3
Session 3
thangv
 
Session 8
Session 8Session 8
Session 8
thangv
 
Session 1
Session 1Session 1
Session 1
thangv
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
thangv
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
thangv
 
Session 1_OM
Session 1_OMSession 1_OM
Session 1_OM
thangv
 
Lesson03_static11
Lesson03_static11Lesson03_static11
Lesson03_static11
thangv
 
Lesson06_static11
Lesson06_static11Lesson06_static11
Lesson06_static11
thangv
 
Lesson05_Static11
Lesson05_Static11Lesson05_Static11
Lesson05_Static11
thangv
 
Lesson04_Static11
Lesson04_Static11Lesson04_Static11
Lesson04_Static11
thangv
 
Lesson08_static11
Lesson08_static11Lesson08_static11
Lesson08_static11
thangv
 
Lesson02_Static.11
Lesson02_Static.11Lesson02_Static.11
Lesson02_Static.11
thangv
 
Lesson01_Static.11
Lesson01_Static.11Lesson01_Static.11
Lesson01_Static.11
thangv
 

Más de thangv (18)

Session 7_OM
Session 7_OMSession 7_OM
Session 7_OM
 
Session 6
Session 6Session 6
Session 6
 
Session 2
Session 2Session 2
Session 2
 
Session 4_OM
Session 4_OMSession 4_OM
Session 4_OM
 
Session 5
Session 5Session 5
Session 5
 
Session 3
Session 3Session 3
Session 3
 
Session 8
Session 8Session 8
Session 8
 
Session 1
Session 1Session 1
Session 1
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
Session 1_OM
Session 1_OMSession 1_OM
Session 1_OM
 
Lesson03_static11
Lesson03_static11Lesson03_static11
Lesson03_static11
 
Lesson06_static11
Lesson06_static11Lesson06_static11
Lesson06_static11
 
Lesson05_Static11
Lesson05_Static11Lesson05_Static11
Lesson05_Static11
 
Lesson04_Static11
Lesson04_Static11Lesson04_Static11
Lesson04_Static11
 
Lesson08_static11
Lesson08_static11Lesson08_static11
Lesson08_static11
 
Lesson02_Static.11
Lesson02_Static.11Lesson02_Static.11
Lesson02_Static.11
 
Lesson01_Static.11
Lesson01_Static.11Lesson01_Static.11
Lesson01_Static.11
 

Último

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 

Último (20)

Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 

Session 8_OM

  • 1. Operations Management Session 8 – JIT and Lean Operations
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. JIT and Competitive Advantage Figure 16.1
  • 20. JIT and Competitive Advantage Figure 16.1
  • 21.
  • 23.
  • 24. JIT Layout Table 16.1 Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility
  • 25.
  • 26.
  • 27.
  • 28.
  • 29. Inventory Inventory is at the minimum level necessary to keep operations running Table 16.2 JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology
  • 30. Reduce Variability Inventory level Figure 16.3 Process downtime Scrap Setup time Late deliveries Quality problems
  • 31. Reduce Variability Inventory level Scrap Setup time Late deliveries Quality problems Process downtime Figure 16.3
  • 32. Reduce Lot Sizes Figure 16.4 200 – 100 – Inventory Time Q 2 When average order size = 100 average inventory is 50 Q 1 When average order size = 200 average inventory is 100
  • 33.
  • 34. Lot Size Example D = Annual demand = 400,000 units d = Daily demand = 400,000/250 = 1,600 per day p = Daily production rate = 4,000 units Q = EOQ desired = 400 H = Holding cost = $20 per unit S = Setup cost (to be determined) Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes Q = 2DS H(1 - d/p) Q 2 = 2DS H(1 - d/p) S = = = $2.40 (Q 2 )(H)(1 - d/p) 2D (3,200,000)(0.6) 800,000
  • 35.
  • 36. Lower Setup Costs Figure 16.5 Sum of ordering and holding costs Holding cost Setup cost curves (S 1 , S 2 ) T 1 S 1 T 2 S 2 Cost Lot size
  • 37. Reduce Setup Times Figure 16.6 Use one-touch system to eliminate adjustments (save 10 minutes) Step 4 Step 5 Training operators and standardizing work procedures (save 2 minutes) Initial Setup Time Step 2 Move material closer and improve material handling (save 20 minutes) Step 1 Separate setup into preparation and actual setup, doing as much as possible while the machine/process is operating (save 30 minutes) Step 3 Standardize and improve tooling (save 15 minutes) 90 min — 60 min — 45 min — 25 min — 15 min — 13 min — — Repeat cycle until subminute setup is achieved Step 6
  • 38.
  • 39. JIT Scheduling Table 16.3 Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part
  • 40.
  • 41. Scheduling Small Lots Figure 16.7 A B C A A A B B B B B C JIT Level Material-Use Approach A C A A A B B B B B C C B B B B A A Large-Lot Approach Time
  • 42.
  • 43.
  • 44. Kanban Figure 16.9 Purchased Parts Supplier Work cell Raw Material Supplier Kanban Sub-assembly Ship Kanban Kanban Kanban Kanban Finished goods Customer order Final assembly Kanban
  • 45.
  • 46.
  • 47.
  • 48.
  • 49. Number of Kanbans Example Daily demand = 500 cakes Production lead time = 2 days (Wait time + Material handling time + Processing time) Safety stock = 1/2 day Container size = 250 cakes Demand during lead time = 2 days x 500 cakes = 1,000 Number of kanbans = = 5 1,000 + 250 250
  • 50.
  • 51.
  • 52. JIT Quality Tactics Table 16.4 Use statistical process control Empower employees Build fail-safe methods (poka-yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.