History of Cable Systems
HISTORICAL OVERVIEW OF
MEDIUM & HIGH VOLTAGE CABLES
Nigel Hampton
Copyright GTRC 2012
History of Cable Systems
Objective
2
“To present the evolution of cables in time to understand
the lessons from the past: the legacy problems and their
solution”
Outline
• Timeline
• Cable components
• Legacy problems - Cables
• Current challenges
History of Cable Systems
Timeline
3
History of Cable Systems
Cable History
4
Historical perspective is
important, it tells us:
• What works
• What does not
• What is still out there
• What challenges it presents
• How large the problems may be
or become
• How to avoid mistakes
History of Cable Systems
Timeline 1812-1942
5
1812: First cables used to detonate ores in a mine in Russia
1942: First use of Polyethylene
(PE) in cables
1917: First screened cables
1870: Cables insulated with natural rubber
1880: DC cables insulated with jute in “Street Pipes” –
Thomas Edison
1890: Ferranti develops the concentric construction for
cables
1925: The first pressurized paper cables
1937: Polyethylene (PE) developed
History of Cable Systems
Timeline 1963-1990
6
1963: Invention of crosslinked polyethylene – XLPE
1990: Widespread use of WTR
materials - Be, Ca, De, Ch & US
1982: WTR materials for MV in USA & Germany
1967: HMWPE insulation on UG cables in the US (Unjacketed
tape shields)
1968: First use of XLPE cables for MV (mostly unjacketed,
tape shields)
1972: Problems associated with water trees (MV) and
contaminants (HV)
Introduction of extruded semicon screens
1978: Widespread use of polymeric jackets in US & Ca
1989: Supersmooth conductor shields for MV
cable in North America
History of Cable Systems
Insulation History - Global
7
Year
Voltage(kV)
20001975195019251900
600
500
400
300
200
100
0
Paper
Polymer
Type
Ref [11]
History of Cable Systems
AEIC Standards Development - MV
8
MV Cables
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1900 1920 1940 1960 1980 2000 2020
Year
EditionNumber
Laminated Insulation Extruded Insulation
Laminated Insulation:
AEIC CS1
Extruded Insulation:
AEIC CS8 (previous
CS5 and CS6)
History of Cable Systems
AEIC Standards Development – HV / EHV
9
Laminated Insulation:
AEIC CS4 (Low-
Medium Pressure)
AEIC CS2 (High
Pressure)
Extruded Insulation:
AEIC CS7, CS9 and
CG40
1
2
3
4
5
6
7
8
9
1920 1940 1960 1980 2000 2020
EditionNumber
Year
HV-EHV Cables
Laminated Insulation Low-Medium Pressure
Laminated Insulation High Pressure
Extruded Insulation
History of Cable Systems
Initial American Installations
10
Ref [7]
History of Cable Systems
From Edison’s to Today’s Cable
11
Edison “Street Pipe”
Picture: Brian Besconnal
Pictures: PrysmianPicture: Southwire
Picture: Black, 1983
History of Cable Systems
Cable Components
12
6. Jacket (Recommended)
5. Metallic Shield
4. Insulation Shield or Screen
3. Insulation
2. Conductor Shield or Screen
1. Conductor
Picture: Southwire
History of Cable Systems
1. Conductor
13
“Carries the current”
• Resistance should be small to reduce power losses:
• Flexibility, weight and susceptibility to corrosion are
concerns together with economical issues such as
cost, availability, and salvage value
P = R x I2
History of Cable Systems
Conductor Characteristics
14
Conductor
Aluminum
Stranded Solid
Copper
Stranded
Blocked
Unblocked
Blocked
Unblocked
History of Cable Systems
2. Conductor Shield
15
With no conductor shield,
electric field lines are
concentrated, creating high
stress points at the
conductor/insulation interface.
“Provides for a smooth interface between the conductor and
the insulation”
Finite
Element
Simulation
High
Stress
History of Cable Systems
Conductor Shield Characteristics
16
Conductor Shield
Bonded
Conventional
Supersmooth
Superclean (SS/SC)
Conductor shields are semiconductive, so they are neither an insulator
nor a conductor. Semiconducting materials are based on carbon black
(manufactured by controlled combustion of hydrocarbons) that is
dispersed within a polymer matrix
On larger conductor sizes, tape shields are often used to prevent
material “fall-in” between the strands during manufacture
History of Cable Systems
3. Insulation
17
“Contains voltage between the conductor and ground”
• Must be clean
• Must have smooth interfaces with the conductor
and insulation shields
• Must be able to operate at the desired:
– Electrical Stress
– Temperatures
History of Cable Systems
Insulation - MV
18
Insulation
Laminated Extruded
PILC Thermoplastic Thermoset
HMWPE XLPE
WTR XLPE
EPR
Prior Technologies
Today’s Technologies
History of Cable Systems
MV Cable “Installed Capacity” In USA
19
Oldest Youngest
Ref [18]
History of Cable Systems
MV Extruded Cable Installed in USA
20
Year
MVcablesinstalledintheUS(Millionsofft)
2000199419881982197619701964
7000
6000
5000
4000
3000
2000
1000
0
EPR
TR XLPE
XLPE
HMWPE
Data courtesy of Glen Bertini
Ref [18]
History of Cable Systems
Insulation – HV / EHV
21
Insulation
Laminated Extruded
Self
Contained
Thermoset
XLPE
EPR
– HV only
Pipe Type
PPL
- EHV only
Paper
Prior Technologies
Today’s Technologies
History of Cable Systems
Examples of Laminar Insulation Cables
22
Picture: Southwire
Pictures: Prysmian
History of Cable Systems
Examples of Extruded Insulation Cables
23
Pictures: Southwire
Pictures:
Prysmian
History of Cable Systems
4. Insulation Shield
24
“Keeps the voltage and stress within the insulation”
With no insulation shield,
electric field lines are
concentrated, creating
high stress points on the
outside surface of the
insulation.
Finite
Element
Simulation
High
Stress
History of Cable Systems
Belted Cables
25
• Early laminated cables had a “belt” of insulation over the
core insulation.
• This led to
tangential
stresses that
were a cause of
a lot of early
failures
Finite
Element
Simulation
History of Cable Systems
Conductor and Insulation Shield (CS & IS) Effect
26
When both shields are:
• smooth
• intact
Then, electric field lines
are uniform, with a
controlled electrical
stress distribution.
Finite
Element
Simulation
History of Cable Systems
Insulation Shield – MV, HV, and EHV
27
Laminated Insulation
Carbon Black Paper
Perforated metallized paper
Preferred in North America, Asia & parts of
Europe.
Thought to permit easier termination & splicing
of cables but service performance is very
dependent upon the workmanship / training of
the installer, which is often variable
Often same
compound as CS
History of Cable Systems
Types of Metallic Shields
28
Metallic Shield
Tape
Copper
Aluminum
Copper
Laminated
Sheath
Stainless
Steel
Aluminum
Copper
Lead
Corrugated
Sheath
Concentric
Copper Wire
Wire
Flat Strap
Extruded
Aluminum Aluminum
History of Cable Systems
Examples of Metallic Shields
29
Courtesy of Southwire
A B C D E
A – Welded Copper Corrugated Sheath
B – Welded Aluminum Corrugated Sheath
C – Concentric Copper Neutrals
D – Copper Neutrals with Copper
Composite Laminate Sheath
E – Copper Neutrals with Aluminum
Composite Laminate Sheath
Pictures: Southwire
History of Cable Systems
Types of Jackets Materials
30
Jacket
Semiconductive
Special
Carbon black filled
co polymers Neoprene
Nylon
Polypropylene
LSF
Hypalon*
Standard
PE PPPVC
LLDPE
MDPE
HDPE
* No longer available
Enhanced Grounding Chemical / Thermal Resistance
History of Cable Systems
Legacy Issues
Cables
31
History of Cable Systems
PILC Cables
32
• Differing designs
– Belted vs. shielded
– Jacketed vs. unjacketed
• Lead corrosion (PILC)
• Temperature performance and stability of impregnants
• Draining of compounds
– Dry insulations
– Collapsed Joints
• Overheating due to high dielectric losses
• Moisture ingress leading to overheating
• Loss of impregnant due to lead sheath leaks
• Combinations of the above
History of Cable Systems
Remaining PILC in US Networks
33
Where PILC
remains on the
system it retains
a significant
presence
Estimated for US
Utilities in 2010
(some utilities
segregated)
Ref [15]
History of Cable Systems
The PILC experience teaches us that today’s decisions
will be with engineers for a very long time
34
Ref [15]
History of Cable Systems
Extruded Cables
35
• Differing designs
– Jacketed vs unjacketed
– Extruded shields vs graphite shields
• Dirty insulation compounds (PE, early XLPE)
• Insulations that were susceptible to water treeing (PE , early XLPE)
• Poor manufacturing processes
– Open compound handling procedures
– Changing Formulations (EPR)
• Inadequate cable designs
– Unblocked conductors
– Unjacketed cables
– Cables with inadequate neutral designs
• Combinations of the above
History of Cable Systems
Current Challenges
36
History of Cable Systems
37
Percentages of failures of each component
Termination
1.4%
Joints
55.4%
Cable
43.2%
Accessories: Joints or splices, and Terminations
Percentage of Failures per each Component
Ref [17]
History of Cable Systems
38
Failure Modes
Overheat
4%
Dielectric
breakdown
10%
Aging
6%
Corrosion
4%
Moisture
4%
Event
3%
Manufacturing
problem
14%
Overload
2%
Maintenance failure
2%
Mechanical Damage
1%
Contamination
1%
Poor
workmanship
49%
Ref [17]
History of Cable Systems
Building a Reliable Cable System
39
Customer
Service
Application
Design Specs
Materials Manu-
facturing
Testing
Installation
Operation
Awareness

Más contenido relacionado

La actualidad más candente

Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work pptDemsew Mitiku
 
Underground cables
Underground cablesUnderground cables
Underground cablesAnu71
 
Underground Cables.pptx
Underground Cables.pptxUnderground Cables.pptx
Underground Cables.pptxkarthik prabhu
 
Electrical Wiring:Types of wires and Cables and the circuit control on domest...
Electrical Wiring:Types of wires and Cables and the circuit control on domest...Electrical Wiring:Types of wires and Cables and the circuit control on domest...
Electrical Wiring:Types of wires and Cables and the circuit control on domest...maharshi solanki
 
Domestic wiring
Domestic wiringDomestic wiring
Domestic wiringVima Mali
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methodsLeonardo ENERGY
 
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...Thorne & Derrick International
 
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects SSudhaVelan
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 CablesThorne & Derrick International
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...Thorne & Derrick International
 
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnNexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnThorne & Derrick International
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 CablesThorne & Derrick International
 

La actualidad más candente (20)

Power cables
Power cablesPower cables
Power cables
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Insulators
InsulatorsInsulators
Insulators
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Underground Cables.pptx
Underground Cables.pptxUnderground Cables.pptx
Underground Cables.pptx
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 
Electrical Wiring:Types of wires and Cables and the circuit control on domest...
Electrical Wiring:Types of wires and Cables and the circuit control on domest...Electrical Wiring:Types of wires and Cables and the circuit control on domest...
Electrical Wiring:Types of wires and Cables and the circuit control on domest...
 
Domestic wiring
Domestic wiringDomestic wiring
Domestic wiring
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
 
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
 
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
 
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnNexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
 
Cable catalogue 2016
Cable catalogue 2016Cable catalogue 2016
Cable catalogue 2016
 
Underground cables
Underground cablesUnderground cables
Underground cables
 

Destacado

CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)
CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)
CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)Thorne & Derrick International
 
Sahkoinen liikenne_1-4 Rae Ensto sähköauto
Sahkoinen liikenne_1-4 Rae Ensto sähköauto Sahkoinen liikenne_1-4 Rae Ensto sähköauto
Sahkoinen liikenne_1-4 Rae Ensto sähköauto Sito_Group
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearSchneider Electric
 
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...Thorne & Derrick International
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Thorne & Derrick International
 
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)Thorne & Derrick International
 
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)Thorne & Derrick International
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...Ajjay Kumar Gupta
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazardsmichaeljmack
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationRina Florentes
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueThorne & Derrick International
 
Application Considerations for Power System Grounding
Application Considerations for Power System GroundingApplication Considerations for Power System Grounding
Application Considerations for Power System Groundingmichaeljmack
 
Types of cables
Types of cables Types of cables
Types of cables Nisarg Amin
 
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Thorne & Derrick International
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Shahab Khan
 
Power Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionPower Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionLiving Online
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesThorne & Derrick International
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineeringNishkam Dhiman
 

Destacado (20)

CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)
CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)
CUBIS RAILduct Cable Trough - Rail Cable Protection (Power, Signal, Telecoms)
 
Sahkoinen liikenne_1-4 Rae Ensto sähköauto
Sahkoinen liikenne_1-4 Rae Ensto sähköauto Sahkoinen liikenne_1-4 Rae Ensto sähköauto
Sahkoinen liikenne_1-4 Rae Ensto sähköauto
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
 
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
 
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)
Okonite - Cable Engineering Handbook (Copper & Aluminium Cables)
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazards
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault Location
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations Catalogue
 
Application Considerations for Power System Grounding
Application Considerations for Power System GroundingApplication Considerations for Power System Grounding
Application Considerations for Power System Grounding
 
Hv Cable Testing
Hv Cable TestingHv Cable Testing
Hv Cable Testing
 
Types of cables
Types of cables Types of cables
Types of cables
 
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
 
Power Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionPower Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault Detection
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage Cables
 
Joints and terminations
Joints and terminationsJoints and terminations
Joints and terminations
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineering
 

Similar a A History of Medium & High Voltage Cables - Georgia Tech & NEETRAC

ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookThorne & Derrick International
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cablesFaizanAli244
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission lineFazlur Rahman
 
Xlpe insulated power cable
Xlpe insulated power cableXlpe insulated power cable
Xlpe insulated power cable辉 李
 
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhjCableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhjKamalMohamed47
 
Power cable
Power cablePower cable
Power cable辉 李
 
Learn How Wires and Cables are Made.pdf
Learn How Wires and Cables are Made.pdfLearn How Wires and Cables are Made.pdf
Learn How Wires and Cables are Made.pdfSumpermac India
 
Types of cabels and its uses.pptx
Types of cabels and its uses.pptxTypes of cabels and its uses.pptx
Types of cabels and its uses.pptxPrathameshSonar10
 
integrated circuits
integrated circuitsintegrated circuits
integrated circuitsAJAL A J
 
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdf
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdfLecture 01 Introduction and applications of Electronics & SemiConductors.pdf
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdfAthar Baig
 
Foa fttx material 3-4
Foa fttx material 3-4Foa fttx material 3-4
Foa fttx material 3-4Igors Cardoso
 
Electrical power system
Electrical power systemElectrical power system
Electrical power systemChovatiya
 
CSS L13 STRUCTURED CABLING SYSTEM
CSS L13 STRUCTURED CABLING SYSTEMCSS L13 STRUCTURED CABLING SYSTEM
CSS L13 STRUCTURED CABLING SYSTEMMarvin Bronoso
 

Similar a A History of Medium & High Voltage Cables - Georgia Tech & NEETRAC (20)

ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cables
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission line
 
Xlpe insulated power cable
Xlpe insulated power cableXlpe insulated power cable
Xlpe insulated power cable
 
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhjCableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
 
Cable and laying
Cable and layingCable and laying
Cable and laying
 
Power cable
Power cablePower cable
Power cable
 
Learn How Wires and Cables are Made.pdf
Learn How Wires and Cables are Made.pdfLearn How Wires and Cables are Made.pdf
Learn How Wires and Cables are Made.pdf
 
Types of cabels and its uses.pptx
Types of cabels and its uses.pptxTypes of cabels and its uses.pptx
Types of cabels and its uses.pptx
 
Underground cable
Underground cableUnderground cable
Underground cable
 
integrated circuits
integrated circuitsintegrated circuits
integrated circuits
 
Pfisterer presentation
Pfisterer   presentationPfisterer   presentation
Pfisterer presentation
 
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdf
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdfLecture 01 Introduction and applications of Electronics & SemiConductors.pdf
Lecture 01 Introduction and applications of Electronics & SemiConductors.pdf
 
Ug cables
Ug cablesUg cables
Ug cables
 
Foa fttx material 3-4
Foa fttx material 3-4Foa fttx material 3-4
Foa fttx material 3-4
 
Electrical power system
Electrical power systemElectrical power system
Electrical power system
 
Cable Course.pptx
Cable Course.pptxCable Course.pptx
Cable Course.pptx
 
Lec20
Lec20Lec20
Lec20
 
CSS L13 STRUCTURED CABLING SYSTEM
CSS L13 STRUCTURED CABLING SYSTEMCSS L13 STRUCTURED CABLING SYSTEM
CSS L13 STRUCTURED CABLING SYSTEM
 
76-09.pdf
76-09.pdf76-09.pdf
76-09.pdf
 

Más de Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

Más de Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 

Último

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Último (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

A History of Medium & High Voltage Cables - Georgia Tech & NEETRAC

  • 1. History of Cable Systems HISTORICAL OVERVIEW OF MEDIUM & HIGH VOLTAGE CABLES Nigel Hampton Copyright GTRC 2012
  • 2. History of Cable Systems Objective 2 “To present the evolution of cables in time to understand the lessons from the past: the legacy problems and their solution” Outline • Timeline • Cable components • Legacy problems - Cables • Current challenges
  • 3. History of Cable Systems Timeline 3
  • 4. History of Cable Systems Cable History 4 Historical perspective is important, it tells us: • What works • What does not • What is still out there • What challenges it presents • How large the problems may be or become • How to avoid mistakes
  • 5. History of Cable Systems Timeline 1812-1942 5 1812: First cables used to detonate ores in a mine in Russia 1942: First use of Polyethylene (PE) in cables 1917: First screened cables 1870: Cables insulated with natural rubber 1880: DC cables insulated with jute in “Street Pipes” – Thomas Edison 1890: Ferranti develops the concentric construction for cables 1925: The first pressurized paper cables 1937: Polyethylene (PE) developed
  • 6. History of Cable Systems Timeline 1963-1990 6 1963: Invention of crosslinked polyethylene – XLPE 1990: Widespread use of WTR materials - Be, Ca, De, Ch & US 1982: WTR materials for MV in USA & Germany 1967: HMWPE insulation on UG cables in the US (Unjacketed tape shields) 1968: First use of XLPE cables for MV (mostly unjacketed, tape shields) 1972: Problems associated with water trees (MV) and contaminants (HV) Introduction of extruded semicon screens 1978: Widespread use of polymeric jackets in US & Ca 1989: Supersmooth conductor shields for MV cable in North America
  • 7. History of Cable Systems Insulation History - Global 7 Year Voltage(kV) 20001975195019251900 600 500 400 300 200 100 0 Paper Polymer Type Ref [11]
  • 8. History of Cable Systems AEIC Standards Development - MV 8 MV Cables 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1900 1920 1940 1960 1980 2000 2020 Year EditionNumber Laminated Insulation Extruded Insulation Laminated Insulation: AEIC CS1 Extruded Insulation: AEIC CS8 (previous CS5 and CS6)
  • 9. History of Cable Systems AEIC Standards Development – HV / EHV 9 Laminated Insulation: AEIC CS4 (Low- Medium Pressure) AEIC CS2 (High Pressure) Extruded Insulation: AEIC CS7, CS9 and CG40 1 2 3 4 5 6 7 8 9 1920 1940 1960 1980 2000 2020 EditionNumber Year HV-EHV Cables Laminated Insulation Low-Medium Pressure Laminated Insulation High Pressure Extruded Insulation
  • 10. History of Cable Systems Initial American Installations 10 Ref [7]
  • 11. History of Cable Systems From Edison’s to Today’s Cable 11 Edison “Street Pipe” Picture: Brian Besconnal Pictures: PrysmianPicture: Southwire Picture: Black, 1983
  • 12. History of Cable Systems Cable Components 12 6. Jacket (Recommended) 5. Metallic Shield 4. Insulation Shield or Screen 3. Insulation 2. Conductor Shield or Screen 1. Conductor Picture: Southwire
  • 13. History of Cable Systems 1. Conductor 13 “Carries the current” • Resistance should be small to reduce power losses: • Flexibility, weight and susceptibility to corrosion are concerns together with economical issues such as cost, availability, and salvage value P = R x I2
  • 14. History of Cable Systems Conductor Characteristics 14 Conductor Aluminum Stranded Solid Copper Stranded Blocked Unblocked Blocked Unblocked
  • 15. History of Cable Systems 2. Conductor Shield 15 With no conductor shield, electric field lines are concentrated, creating high stress points at the conductor/insulation interface. “Provides for a smooth interface between the conductor and the insulation” Finite Element Simulation High Stress
  • 16. History of Cable Systems Conductor Shield Characteristics 16 Conductor Shield Bonded Conventional Supersmooth Superclean (SS/SC) Conductor shields are semiconductive, so they are neither an insulator nor a conductor. Semiconducting materials are based on carbon black (manufactured by controlled combustion of hydrocarbons) that is dispersed within a polymer matrix On larger conductor sizes, tape shields are often used to prevent material “fall-in” between the strands during manufacture
  • 17. History of Cable Systems 3. Insulation 17 “Contains voltage between the conductor and ground” • Must be clean • Must have smooth interfaces with the conductor and insulation shields • Must be able to operate at the desired: – Electrical Stress – Temperatures
  • 18. History of Cable Systems Insulation - MV 18 Insulation Laminated Extruded PILC Thermoplastic Thermoset HMWPE XLPE WTR XLPE EPR Prior Technologies Today’s Technologies
  • 19. History of Cable Systems MV Cable “Installed Capacity” In USA 19 Oldest Youngest Ref [18]
  • 20. History of Cable Systems MV Extruded Cable Installed in USA 20 Year MVcablesinstalledintheUS(Millionsofft) 2000199419881982197619701964 7000 6000 5000 4000 3000 2000 1000 0 EPR TR XLPE XLPE HMWPE Data courtesy of Glen Bertini Ref [18]
  • 21. History of Cable Systems Insulation – HV / EHV 21 Insulation Laminated Extruded Self Contained Thermoset XLPE EPR – HV only Pipe Type PPL - EHV only Paper Prior Technologies Today’s Technologies
  • 22. History of Cable Systems Examples of Laminar Insulation Cables 22 Picture: Southwire Pictures: Prysmian
  • 23. History of Cable Systems Examples of Extruded Insulation Cables 23 Pictures: Southwire Pictures: Prysmian
  • 24. History of Cable Systems 4. Insulation Shield 24 “Keeps the voltage and stress within the insulation” With no insulation shield, electric field lines are concentrated, creating high stress points on the outside surface of the insulation. Finite Element Simulation High Stress
  • 25. History of Cable Systems Belted Cables 25 • Early laminated cables had a “belt” of insulation over the core insulation. • This led to tangential stresses that were a cause of a lot of early failures Finite Element Simulation
  • 26. History of Cable Systems Conductor and Insulation Shield (CS & IS) Effect 26 When both shields are: • smooth • intact Then, electric field lines are uniform, with a controlled electrical stress distribution. Finite Element Simulation
  • 27. History of Cable Systems Insulation Shield – MV, HV, and EHV 27 Laminated Insulation Carbon Black Paper Perforated metallized paper Preferred in North America, Asia & parts of Europe. Thought to permit easier termination & splicing of cables but service performance is very dependent upon the workmanship / training of the installer, which is often variable Often same compound as CS
  • 28. History of Cable Systems Types of Metallic Shields 28 Metallic Shield Tape Copper Aluminum Copper Laminated Sheath Stainless Steel Aluminum Copper Lead Corrugated Sheath Concentric Copper Wire Wire Flat Strap Extruded Aluminum Aluminum
  • 29. History of Cable Systems Examples of Metallic Shields 29 Courtesy of Southwire A B C D E A – Welded Copper Corrugated Sheath B – Welded Aluminum Corrugated Sheath C – Concentric Copper Neutrals D – Copper Neutrals with Copper Composite Laminate Sheath E – Copper Neutrals with Aluminum Composite Laminate Sheath Pictures: Southwire
  • 30. History of Cable Systems Types of Jackets Materials 30 Jacket Semiconductive Special Carbon black filled co polymers Neoprene Nylon Polypropylene LSF Hypalon* Standard PE PPPVC LLDPE MDPE HDPE * No longer available Enhanced Grounding Chemical / Thermal Resistance
  • 31. History of Cable Systems Legacy Issues Cables 31
  • 32. History of Cable Systems PILC Cables 32 • Differing designs – Belted vs. shielded – Jacketed vs. unjacketed • Lead corrosion (PILC) • Temperature performance and stability of impregnants • Draining of compounds – Dry insulations – Collapsed Joints • Overheating due to high dielectric losses • Moisture ingress leading to overheating • Loss of impregnant due to lead sheath leaks • Combinations of the above
  • 33. History of Cable Systems Remaining PILC in US Networks 33 Where PILC remains on the system it retains a significant presence Estimated for US Utilities in 2010 (some utilities segregated) Ref [15]
  • 34. History of Cable Systems The PILC experience teaches us that today’s decisions will be with engineers for a very long time 34 Ref [15]
  • 35. History of Cable Systems Extruded Cables 35 • Differing designs – Jacketed vs unjacketed – Extruded shields vs graphite shields • Dirty insulation compounds (PE, early XLPE) • Insulations that were susceptible to water treeing (PE , early XLPE) • Poor manufacturing processes – Open compound handling procedures – Changing Formulations (EPR) • Inadequate cable designs – Unblocked conductors – Unjacketed cables – Cables with inadequate neutral designs • Combinations of the above
  • 36. History of Cable Systems Current Challenges 36
  • 37. History of Cable Systems 37 Percentages of failures of each component Termination 1.4% Joints 55.4% Cable 43.2% Accessories: Joints or splices, and Terminations Percentage of Failures per each Component Ref [17]
  • 38. History of Cable Systems 38 Failure Modes Overheat 4% Dielectric breakdown 10% Aging 6% Corrosion 4% Moisture 4% Event 3% Manufacturing problem 14% Overload 2% Maintenance failure 2% Mechanical Damage 1% Contamination 1% Poor workmanship 49% Ref [17]
  • 39. History of Cable Systems Building a Reliable Cable System 39 Customer Service Application Design Specs Materials Manu- facturing Testing Installation Operation Awareness