1. Page1
Richard Mason
EHV cable jointer / Client Rep AVAILABLE for onshore & offshore work upto 132kv
Experience
EHV Cable Jointer / Client Rep at GCS JointingGlobal Cabling Services Ltd
March 2015 - Present (4 months)
March to May for: Dynamo Electrical (Siem Offshore Contractors) Baltic 2 as Supervisor / Tester / Lead
Jointer May to Present for: Approved Power Services (General Cable) Legacy-Oswestry Reinforcement
Project as Site Manager
EHV Cable Jointer at Balfour Beatty Utilities
October 2005 - March 2015 (9 years 6 months)
Duties include lead jointer/supervisor up to 132kv cables and providing support for jointers on higher cables.
As a team we are responsible for constructing and maintaining both oil filled and XLPE cables for Faults
and Services, and Contract work. Working completing high voltage cables work on a variety of different
projects with different clients/companies in a wide range of environments. The varied projects worked on
include completing varied voltage requirements and constructing diverse ranges of joints for projects on the
railways, substation and high pressure pipe systems. Off shore work includes The Links project; repairing
132kv subsea cables and the Baltic 2 project; pulling cable, terminating and VLF testing ready to hand back
to client. Gained experience working within a team, as an individual and as a team leader. Responsible
for implementing/following Health and Safety and quality regulations and procedures throughout works.
Experienced in completing site records, daily interfacing with the clients, local authorities and general public
and working under different disciplines.
Supervisor / Cable Jointer at IES Instrumentation Electrical Services Ltd
2001 - 2005 (4 years)
Duties included, running a cable gangs for cable installation, glanding and terminating LV & HV cables upto
33kv, over seeing the other jointing teams, testing and commissioning. Dealing first hand with clients to
enure the job is complete and to their satisfaction.
Cable jointer at BCIS Beaver Cable Installistion Services
2000 - 2001 (1 year)
Duties included, cable installation, glanding and terminating LV & HV cables, testing and commissioning.
Cable Jointer at Inter GB
1998 - 2000 (2 years)
Duties included industrial/chemical electrical installations, tray/rack work, cable installation, glanding and
terminating LV & HV cables, testing and commissioning.
2. Page2
Apprentice Electrician / Trainee Cable Jointer at IES Instrumentation Electrical Services Ltd
1994 - 1998 (4 years)
Duties included industrial/chemical electrical installations, tray/rack work, cable installation, glanding and
terminating LV & HV cables. I also attended Hartlepool College of F.E as part of my apprenticeship.
Certifications
Basic Offshore Safety Induction & Emergency Training
Petrofac Training Services November 2011 to November 2016
Seafarer Medical Certificate
May 2014 to May 2016
Supervising Safely
Institution of Occupational Safety and Health February 2006
PASMA Certificate of Competence
PASMA July 2011 to July 2016
Manual Handling Training Certificate
July 2013
Raychem 11kv Joints & Terminations
Raychem part of Tyco Electronics and Tyco International July 2000
Helermann Heat Shrink Cable Joint & Termination Kits 11kv (XPLE/SWA) & (PILC/SWA)
Helermann May 2005
SHRINK POLYMER SYSTEMS Heatshrink Termination and Jointing systems for Voltages upto 36kv
Shrink Polymer Systems July 2000
33kv Fluid Filled Cable Jointing Course
Balfour Beatty Utilities January 2007
Plumbing Part Two Course
Balfour Beatty Utilities November 2005
3M 11kv-33kv Cold Shrink Joints and Terminations For Polymeric Insulated Cables
3M December 2006
3M QTIII Termination for application on Copper Wire Screened Cables and Lead. sheathed Cables at
72kv
3M January 2008
3M Cold Shrink Joints and Terminations for use on 11kv Three Core Polymeric Insulated, CopperTape
Screened, Armoured Cables
3M January 2009
3M Cold Shrink Joint and Termination for use on 72kv Single Core Polymeric Insulated Cables
3M November 2009
ABB Jointing and Terminating of Power Cables 84 - 170kv
ABB January 2007
Nexans 132kv XLPE cables
Nexans November 2005
Prysmian 132kv Click-fit
Prysmian Cables & Systems August 2006
3. Page3
NKT 132kv Termination
NTK cables September 2006
PFISTERER Size 1 to 3s up to 52kv
Pfisterer Kontaktsysteme GmbH February 2007
PFISTERER Size 4 up to 75kv
Pfisterer Kontaktsysteme GmbH February 2007
PFISTERER Size 6 up to 245kv plug & 145 kv Joint
Pfisterer Kontaktsysteme GmbH March 2010
VLF Testing
Megger May 2014
Safe Operation of Marine/ Offshore High Voltage Power Systems
THE FARADAY CENTRE LIMITED May 2014
GWO Working at Height
GLOBAL WIND ORGANISATION LTD May 2014
Working at Height and Rescue
RenewableUK May 2014
Confined Space
Falck Safety Services May 2014
3 Day First Aid at Work
St John Ambulance May 2014 to May 2017
Skills & Expertise
Fire Safety Awareness
Manual Handling
NPG Full Authorisation
ECS Health & Safety Assesment
Site Supervisors Safety Training Scheme
Confined Space
Emergency First Aid at Work
Problem Solving
Risk Assessment
Renewable Energy
High Voltage
Team Leadership
Cables
Power Cables
Substation
First Aid
Commissioning
HV
Petroleum
Power Distribution
Project Planning
Project Engineering