SlideShare una empresa de Scribd logo
1 de 16
Descargar para leer sin conexión
Delivering Oracle Success



                R12 Upgrade Vs.
              Re-implementation


                         John Malone
Heartland Oracle Users Group Conference
                        October 20, 2011
About DBAK
 Oracle solution provider
 Co-founded in 2005
 Based in Englewood, CO
 Core Technology and EBS Applications
 More than 140 implementations, upgrades,
 conversions, and support projects for 90+ clients
 Average 15 years of Oracle expertise
 Oracle Gold Partner
 OEM “Specialized”
Agenda
         Upgrade vs. Re-implementation
         Impact Analysis
         Case Studies
         Questions




© DBAK 2011                              3
Upgrade vs. Reimplementation
          Data quality
          Changes to Key Flexfields
          Multiple Oracle EBS environments
          Significant changes to business structures
          (acquisitions, mergers, re-organizations) since
          initial implementation
          Number and complexity of customizations
          Changes to business process requirements
          Oracle EBS version



© DBAK 2011                                                 4
Upgrade vs. Reimplementation
                                                          Upgrade                                                    Re - Implement
                                                                1       2       3         4    5   6   7       8        9      10


              Does your Application configuration still meet
              your business requirements? (considering              They meet our
                                                                                                       A change is needed
              growth,expansion, acquisition)                        requirements



              Do you wish to make changes to
              configurations that cannot be easily                  Our existing                                We require
              modified (flexfield structures, Customizations,       configuration is OK                          changes
              Calendar)


              Has your business structure changed
                                                                    Our structure is correct                  Our structure
              significantly since your implementation
                                                                    for our needs                          needs to change
              ( more/less business units/orgs,
              currencies, shared services)

              How significantly have you integrated
              with 3rd party applications that could be              Not Much                                  Significantly
              replaced with new Oracle Applications
              modules, features or functionality?




© DBAK 2011                                                                                                                           5
R12 Methodology


                 Phase I                                                            Phase II

                                                  Test
       R12 Assessment and Impact Analysis      Iteration 1


                                                                     Test
                                                                  Iteration 2


                                                                                       Test
                                                                                    Iteration 3
         - New Features Prioritization
         - Technical Architecture Analysis                                                        UAT
         - Application Architecture Analysis
         - Assessment Review
         - Project Scope                                                                                Training
         - Project Schedule

                                                                                                                   Post-Production Support




                                                             Planning and Execution Milestones            R12 Go Live




© DBAK 2011                                                                                                                                  6
Impact Analysis
          New Features Prioritization
          Technical Architecture Analysis
          Application Architecture Analysis
          Assessment Review
          Project Scope
          Project Schedule




© DBAK 2011                                   7
Impact Analysis
         New Features Prioritization
         New/Changed R12 Features and Functionality
          • Review existing (standard and custom) functionality within 11i and
            look for opportunities to leverage new features within R12
                  – Primary goals are to:
                       » Remove customizations where possible
                       » Identify opportunities to leverage new R12 functionality
              • Analyze impacts to current business processes and determine the
                approach going forward with R12
              • Determine which new features will be included in the R12 upgrade
                and which features could be included in post upgrade projects
              • Reference Materials
                  –   Release Content Documents (RCD)
                  –   Release Value Proposition (RVP) documents
                  –   Product specific upgrade guides (e.g. Financials, Procurement)
                  –   Oracle E-Business Suite Release 12.x Information Center



© DBAK 2011                                                                            8
Impact Analysis
         Technical Architecture Analysis
         Technical Architecture
          • Analyze impacts to the infrastructure between 11i and R12
                  –   Servers
                  –   Operating System version
                  –   Database version
                  –   Application Server version
                  –   Disk Space (Storage) requirements
                  –   Reporting
                  –   Workstations (e.g. browsers, memory, CPU)
                  –   Third party software impacts
              • Reference Materials
                  – Upgrade Guide for 11i to R12
                  – R12 Infrastructure - Differences between 11i and 12
                  – Oracle Applications Release 12 Upgrade Sizing and Best Practices




© DBAK 2011                                                                            9
Impact Analysis
         Application Architecture Analysis
         Application Architecture and Extensions/Customizations
          • Interfaces with 3rd party applications
          • Workflow
          • Reporting tools (e.g. BI Publisher, e-Text)
          • New application modules
          • Impact to existing extensions/customizations
          • Reference Materials
              •   Upgrade Guide for 11i to R12
              •   11.5.10 to 12.x EBS Object Changes




© DBAK 2011                                                       10
Impact Analysis
         Assessment Review
         Review Impact Analysis results

         Project Scope
         Develop Project Scope
          • Determine Upgrade or Reimplementation Approach
          • Consider:
              –   Technical Architecture Impact
              –   Applications Architecture and Extensions/Customizations Impact
              –   New/Changed Features Prioritization
              –   Functional and Business Process Impact Assessment




© DBAK 2011                                                                        11
Impact Analysis
         Project Schedule
         Develop Project Schedule based on Impact Assessment results
          • Including timeline, resources, and cost
          • Leverage experienced R12 resources to supplement internal team
            members
          • Project schedule/plan
          • Reference Materials
              •   E-Business Suite Technical Guided Upgrade Path from 11.5.10.2 to
                  12.1.3
              •   Planning Your Oracle E-Business Suite Upgrade from Release 11i to
                  Release 12.1

         Next Steps
         Organize and launch Phase II (Upgrade)
          • Determine if you want to use Maintenance Wizard or other tools
            (MS-Project, Excel) to track and manage upgrade tasks
          • Start Iteration 1 test and customizations migration

© DBAK 2011                                                                           12
Case Study – R12 Upgrade for an Energy Company

      Company Description                                             Scope
       • Leading provider in the mid-stream services for the           • Develop the methodology and tools for completing the R12
         natural gas industry. Headquartered in Denver, the              upgrade project.
         company is engaged in the gathering, processing and           • Conduct the upgrade assessments to define the project
         transportation of natural gas; the transportation,              scope, resource requirements, and project schedule.
         fractionation, storage and marketing of NGLs; and the         • Manage the upgrade project tasks, resources, issues, and
         gathering and transportation of crude oil.                      risks
      Management Challenge                                            Results
       • The company implemented Oracle Financials, Projects,          • Completed the impact analysis for new/changed features,
         iExpense, and Logical Apps in the 2007-2008. They have          customizations, application architecture and infrastructure
         approximately 200 core application users and all
         employees are iExpense users. They have a moderate            • Created a detail project schedule and assigned resources
         number of extensions/ customizations and several                to the various work streams.
         mission critical interfaces between Oracle EBS and their      • Utilized extract out of Maintenance Wizard to create the
         revenue/operations applications.                                initial list of upgrade tasks
       • The project objective was to migrate the Oracle               • Completed three upgrade test cycles (iterations) and User
         applications from 11.5.10 to R12 and also upgrade the           Acceptance testing
         database from 10g to 11g. The upgrade would be                • Created end user training materials and conducted training
         installed on a new server and include an upgrade of the         courses
         operating system.                                             • Executed the production cutover plan to complete the
       • High level planning had been completed but the approach         upgrade over a weekend to minimize impact on daily
         for executing the project had not been determined.              business operations.
                                                                       • Project was completed on-time (6 months) and under
                                                                         budget. There were very few post-production issues.




© DBAK 2011                                                                                                                            13
                                                                 13
Case Study – R12 Implementation for Services Company

      Company Description                                                Scope - Re-implement Oracle E-Business Suite (R12.1.3)
       • Leading provider of software and services that help the          • Impact Assessment
         world’s best companies manage their extended workforce              – Review existing 11i functionality
         and procured services.                                              – New R12 functionality
       • Global provider of contingent labor.                                    »   Prioritize new features
      Management Challenge                                                • Leverage setups from existing 11i system
       • The companies Oracle E-Business suite had not been               • Re-implement Oracle R12 for existing modules
         upgraded in many years (version 11.5.4), however                 • Migrate required customizations and interfaces to R12
         business changes required changes in how the company
                                                                          • Limited Data Conversion:
         used Oracle.
           – Due to increasing volume and a need for additional              – GL –Balances and current year transactions
             flexibility, a custom front office application was              – AR/AP – Customers/Suppliers
             developed to replace Oracle Projects. The legacy                – AR/AP – Open invoices
             Projects data still exists and there is a large quantity
             of data that is no longer used.                                 – Fixed Assets – load existing into R12
           – Implement new module: Fixed Assets.                          • System Setup / System Validation / Integration Testing
           – Consolidation of many operating units                        • Migration to Production
       • The company wanted to expand use Oracle functionality           Expected Results
         to enable business processes                                     • Expand usage of current Oracle functionality to enable
           – The company wanted to take advantage of new                    business processes
             features within Oracle R12
                                                                          • Ability to use new R12 functionality
           – Enable existing functionality not being used to
             automate business processes                                  • Reduction of customizations
       • Key implementation versus upgrade decision factors               • Clean-up of old/non-used data
           – Limited Down-time available for cutover                      • Ability to quickly cut-over to the new system
           – 11.5.4 version expanded the tasks required for               • Deployment on new hardware platform
             upgrade                                                      • Consolidated operating units
           – The company is switching to a new hardware
             platform

© DBAK 2011                                                                                                                          14
                                                                    14
Questions




© DBAK 2011      15
Contact

                      John Malone
                      720.475-8600
                 jmalone@dbaknow.com

                Presentation available at:
              www.dbaknow.com/downloads


                 www.dbaknow.com



© DBAK 2011                                  16

Más contenido relacionado

La actualidad más candente

SAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningSAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningEric Stajda
 
Stages Product Development BPM Suite - Better Processes in Practice
Stages Product Development BPM Suite - Better Processes in PracticeStages Product Development BPM Suite - Better Processes in Practice
Stages Product Development BPM Suite - Better Processes in Practiceehmeier
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyalIBM
 
Oracle Bpa Suite Overview
Oracle Bpa Suite OverviewOracle Bpa Suite Overview
Oracle Bpa Suite OverviewPedro Gallardo
 
Opportunities in challenging_times-steve_robinson
Opportunities in challenging_times-steve_robinsonOpportunities in challenging_times-steve_robinson
Opportunities in challenging_times-steve_robinsonIBM
 
2 trasnformation design_patterns-sandeep_katoch
2 trasnformation design_patterns-sandeep_katoch2 trasnformation design_patterns-sandeep_katoch
2 trasnformation design_patterns-sandeep_katochIBM
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008sissie1234
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsCAMO Solutions LLC
 
SEC Presentation V2
SEC Presentation V2SEC Presentation V2
SEC Presentation V2Salim Sheikh
 
KBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented ArchitectureKBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented ArchitectureKBACE Technologies, Inc.
 
The IBM Rational Insight Reporting Solution
The IBM Rational Insight Reporting SolutionThe IBM Rational Insight Reporting Solution
The IBM Rational Insight Reporting SolutionMarc Nehme
 
BenchmarkQA Performance Testing Quality Forum March 2012
BenchmarkQA Performance Testing Quality Forum March 2012BenchmarkQA Performance Testing Quality Forum March 2012
BenchmarkQA Performance Testing Quality Forum March 2012BenchmarkQA
 
IBM Rational Insight Overview 2014
IBM Rational Insight Overview 2014IBM Rational Insight Overview 2014
IBM Rational Insight Overview 2014Marc Nehme
 
Innovating the Software Development Process at Cadence Design Systems
Innovating the Software Development Process at Cadence Design SystemsInnovating the Software Development Process at Cadence Design Systems
Innovating the Software Development Process at Cadence Design SystemsRahul Razdan
 
ASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution ManagerASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution ManagerSabine Margolis
 
IBM Innovate 2011- What every System i Developer Needs to Know
IBM Innovate 2011- What every System i Developer Needs to KnowIBM Innovate 2011- What every System i Developer Needs to Know
IBM Innovate 2011- What every System i Developer Needs to KnowStrongback Consulting
 
ITIL At Companies With Sap ItSMf Atlanta 2009
ITIL At Companies With Sap   ItSMf Atlanta 2009ITIL At Companies With Sap   ItSMf Atlanta 2009
ITIL At Companies With Sap ItSMf Atlanta 2009Robert Max
 

La actualidad más candente (20)

SAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningSAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) Redlining
 
Stages Product Development BPM Suite - Better Processes in Practice
Stages Product Development BPM Suite - Better Processes in PracticeStages Product Development BPM Suite - Better Processes in Practice
Stages Product Development BPM Suite - Better Processes in Practice
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal
 
Oracle Bpa Suite Overview
Oracle Bpa Suite OverviewOracle Bpa Suite Overview
Oracle Bpa Suite Overview
 
Opportunities in challenging_times-steve_robinson
Opportunities in challenging_times-steve_robinsonOpportunities in challenging_times-steve_robinson
Opportunities in challenging_times-steve_robinson
 
2 trasnformation design_patterns-sandeep_katoch
2 trasnformation design_patterns-sandeep_katoch2 trasnformation design_patterns-sandeep_katoch
2 trasnformation design_patterns-sandeep_katoch
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO Solutions
 
SEC Presentation V2
SEC Presentation V2SEC Presentation V2
SEC Presentation V2
 
KBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented ArchitectureKBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented Architecture
 
The IBM Rational Insight Reporting Solution
The IBM Rational Insight Reporting SolutionThe IBM Rational Insight Reporting Solution
The IBM Rational Insight Reporting Solution
 
BenchmarkQA Performance Testing Quality Forum March 2012
BenchmarkQA Performance Testing Quality Forum March 2012BenchmarkQA Performance Testing Quality Forum March 2012
BenchmarkQA Performance Testing Quality Forum March 2012
 
IBM Rational Insight Overview 2014
IBM Rational Insight Overview 2014IBM Rational Insight Overview 2014
IBM Rational Insight Overview 2014
 
Mc Laren V2 0
Mc Laren V2 0Mc Laren V2 0
Mc Laren V2 0
 
Innovating the Software Development Process at Cadence Design Systems
Innovating the Software Development Process at Cadence Design SystemsInnovating the Software Development Process at Cadence Design Systems
Innovating the Software Development Process at Cadence Design Systems
 
ASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution ManagerASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution Manager
 
IBM Innovate 2011- What every System i Developer Needs to Know
IBM Innovate 2011- What every System i Developer Needs to KnowIBM Innovate 2011- What every System i Developer Needs to Know
IBM Innovate 2011- What every System i Developer Needs to Know
 
Piyush_Profile
Piyush_ProfilePiyush_Profile
Piyush_Profile
 
ITIL At Companies With Sap ItSMf Atlanta 2009
ITIL At Companies With Sap   ItSMf Atlanta 2009ITIL At Companies With Sap   ItSMf Atlanta 2009
ITIL At Companies With Sap ItSMf Atlanta 2009
 
Life After PPM
Life After PPMLife After PPM
Life After PPM
 

Destacado

Removing the FUD from Oracle R12 Upgrades
Removing the FUD from Oracle R12 UpgradesRemoving the FUD from Oracle R12 Upgrades
Removing the FUD from Oracle R12 UpgradesJade Global
 
Accelerate your R12 Upgrade Path with Propero
Accelerate your R12 Upgrade Path with ProperoAccelerate your R12 Upgrade Path with Propero
Accelerate your R12 Upgrade Path with ProperoJade Global
 
The Major Advantages of Oracle EBS R12 Upgrade!
The Major Advantages of Oracle EBS R12 Upgrade!The Major Advantages of Oracle EBS R12 Upgrade!
The Major Advantages of Oracle EBS R12 Upgrade!Smith James
 
Panaya UKOUG APPS13 presentation
Panaya UKOUG APPS13 presentationPanaya UKOUG APPS13 presentation
Panaya UKOUG APPS13 presentationdrdavidtaylor
 
Preparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-fullPreparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-fullBerry Clemens
 
Oracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learnedbpellot
 

Destacado (6)

Removing the FUD from Oracle R12 Upgrades
Removing the FUD from Oracle R12 UpgradesRemoving the FUD from Oracle R12 Upgrades
Removing the FUD from Oracle R12 Upgrades
 
Accelerate your R12 Upgrade Path with Propero
Accelerate your R12 Upgrade Path with ProperoAccelerate your R12 Upgrade Path with Propero
Accelerate your R12 Upgrade Path with Propero
 
The Major Advantages of Oracle EBS R12 Upgrade!
The Major Advantages of Oracle EBS R12 Upgrade!The Major Advantages of Oracle EBS R12 Upgrade!
The Major Advantages of Oracle EBS R12 Upgrade!
 
Panaya UKOUG APPS13 presentation
Panaya UKOUG APPS13 presentationPanaya UKOUG APPS13 presentation
Panaya UKOUG APPS13 presentation
 
Preparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-fullPreparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-full
 
Oracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learned
 

Similar a Malone r12 upgrade-versus-reimplementation

Übersicht Cloud Control - EM 12c
Übersicht Cloud Control - EM 12cÜbersicht Cloud Control - EM 12c
Übersicht Cloud Control - EM 12cVolker Linz
 
Propero Datasheet 2
Propero Datasheet 2Propero Datasheet 2
Propero Datasheet 2Jade Global
 
Automated BI Modernizations
Automated BI ModernizationsAutomated BI Modernizations
Automated BI Modernizationsdlautzenheiser
 
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...InSync2011
 
Hanyool Chang Resume English (201002)
Hanyool Chang Resume English (201002)Hanyool Chang Resume English (201002)
Hanyool Chang Resume English (201002)signalx
 
An Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringAn Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringCorrelsense
 
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...InSync2011
 
Resume Aden bahdon
Resume Aden bahdonResume Aden bahdon
Resume Aden bahdonAden Bahdon
 
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...EPM Live
 
Modernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructureModernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructurezslmarketing
 
Opposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDAOpposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDADenzil Wasson
 
In sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalIn sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalBendjedou Nadia
 
In sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalIn sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalInSync Conference
 

Similar a Malone r12 upgrade-versus-reimplementation (20)

Unit03: Process and Business Models
Unit03: Process and Business ModelsUnit03: Process and Business Models
Unit03: Process and Business Models
 
Übersicht Cloud Control - EM 12c
Übersicht Cloud Control - EM 12cÜbersicht Cloud Control - EM 12c
Übersicht Cloud Control - EM 12c
 
Propero Datasheet 2
Propero Datasheet 2Propero Datasheet 2
Propero Datasheet 2
 
Automated BI Modernizations
Automated BI ModernizationsAutomated BI Modernizations
Automated BI Modernizations
 
Madhu_Resume
Madhu_ResumeMadhu_Resume
Madhu_Resume
 
Harikrishna yaddanapudi
Harikrishna yaddanapudiHarikrishna yaddanapudi
Harikrishna yaddanapudi
 
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...
E-Business Suite 1 | Nadia Bendjedou | Planning your Oracle E-Business Suite ...
 
Hanyool Chang Resume English (201002)
Hanyool Chang Resume English (201002)Hanyool Chang Resume English (201002)
Hanyool Chang Resume English (201002)
 
An Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringAn Introduction to Software Performance Engineering
An Introduction to Software Performance Engineering
 
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
E-Business Suite 1 | Nadia Bendjedou | Oracle E-Business Suite applications s...
 
Resume Aden bahdon
Resume Aden bahdonResume Aden bahdon
Resume Aden bahdon
 
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
 
R12 upgrade webinar
R12 upgrade webinarR12 upgrade webinar
R12 upgrade webinar
 
Jagan_Resume
Jagan_ResumeJagan_Resume
Jagan_Resume
 
Modernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructureModernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructure
 
Oracle Fusion Application
Oracle Fusion ApplicationOracle Fusion Application
Oracle Fusion Application
 
Opposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDAOpposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDA
 
In sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalIn sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-final
 
In sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-finalIn sync10 nadiabendjedou-10things-final
In sync10 nadiabendjedou-10things-final
 
Amit_Resume
Amit_ResumeAmit_Resume
Amit_Resume
 

Último

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 

Último (20)

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 

Malone r12 upgrade-versus-reimplementation

  • 1. Delivering Oracle Success R12 Upgrade Vs. Re-implementation John Malone Heartland Oracle Users Group Conference October 20, 2011
  • 2. About DBAK Oracle solution provider Co-founded in 2005 Based in Englewood, CO Core Technology and EBS Applications More than 140 implementations, upgrades, conversions, and support projects for 90+ clients Average 15 years of Oracle expertise Oracle Gold Partner OEM “Specialized”
  • 3. Agenda Upgrade vs. Re-implementation Impact Analysis Case Studies Questions © DBAK 2011 3
  • 4. Upgrade vs. Reimplementation Data quality Changes to Key Flexfields Multiple Oracle EBS environments Significant changes to business structures (acquisitions, mergers, re-organizations) since initial implementation Number and complexity of customizations Changes to business process requirements Oracle EBS version © DBAK 2011 4
  • 5. Upgrade vs. Reimplementation Upgrade Re - Implement 1 2 3 4 5 6 7 8 9 10 Does your Application configuration still meet your business requirements? (considering They meet our A change is needed growth,expansion, acquisition) requirements Do you wish to make changes to configurations that cannot be easily Our existing We require modified (flexfield structures, Customizations, configuration is OK changes Calendar) Has your business structure changed Our structure is correct Our structure significantly since your implementation for our needs needs to change ( more/less business units/orgs, currencies, shared services) How significantly have you integrated with 3rd party applications that could be Not Much Significantly replaced with new Oracle Applications modules, features or functionality? © DBAK 2011 5
  • 6. R12 Methodology Phase I Phase II Test R12 Assessment and Impact Analysis Iteration 1 Test Iteration 2 Test Iteration 3 - New Features Prioritization - Technical Architecture Analysis UAT - Application Architecture Analysis - Assessment Review - Project Scope Training - Project Schedule Post-Production Support Planning and Execution Milestones R12 Go Live © DBAK 2011 6
  • 7. Impact Analysis New Features Prioritization Technical Architecture Analysis Application Architecture Analysis Assessment Review Project Scope Project Schedule © DBAK 2011 7
  • 8. Impact Analysis New Features Prioritization New/Changed R12 Features and Functionality • Review existing (standard and custom) functionality within 11i and look for opportunities to leverage new features within R12 – Primary goals are to: » Remove customizations where possible » Identify opportunities to leverage new R12 functionality • Analyze impacts to current business processes and determine the approach going forward with R12 • Determine which new features will be included in the R12 upgrade and which features could be included in post upgrade projects • Reference Materials – Release Content Documents (RCD) – Release Value Proposition (RVP) documents – Product specific upgrade guides (e.g. Financials, Procurement) – Oracle E-Business Suite Release 12.x Information Center © DBAK 2011 8
  • 9. Impact Analysis Technical Architecture Analysis Technical Architecture • Analyze impacts to the infrastructure between 11i and R12 – Servers – Operating System version – Database version – Application Server version – Disk Space (Storage) requirements – Reporting – Workstations (e.g. browsers, memory, CPU) – Third party software impacts • Reference Materials – Upgrade Guide for 11i to R12 – R12 Infrastructure - Differences between 11i and 12 – Oracle Applications Release 12 Upgrade Sizing and Best Practices © DBAK 2011 9
  • 10. Impact Analysis Application Architecture Analysis Application Architecture and Extensions/Customizations • Interfaces with 3rd party applications • Workflow • Reporting tools (e.g. BI Publisher, e-Text) • New application modules • Impact to existing extensions/customizations • Reference Materials • Upgrade Guide for 11i to R12 • 11.5.10 to 12.x EBS Object Changes © DBAK 2011 10
  • 11. Impact Analysis Assessment Review Review Impact Analysis results Project Scope Develop Project Scope • Determine Upgrade or Reimplementation Approach • Consider: – Technical Architecture Impact – Applications Architecture and Extensions/Customizations Impact – New/Changed Features Prioritization – Functional and Business Process Impact Assessment © DBAK 2011 11
  • 12. Impact Analysis Project Schedule Develop Project Schedule based on Impact Assessment results • Including timeline, resources, and cost • Leverage experienced R12 resources to supplement internal team members • Project schedule/plan • Reference Materials • E-Business Suite Technical Guided Upgrade Path from 11.5.10.2 to 12.1.3 • Planning Your Oracle E-Business Suite Upgrade from Release 11i to Release 12.1 Next Steps Organize and launch Phase II (Upgrade) • Determine if you want to use Maintenance Wizard or other tools (MS-Project, Excel) to track and manage upgrade tasks • Start Iteration 1 test and customizations migration © DBAK 2011 12
  • 13. Case Study – R12 Upgrade for an Energy Company Company Description Scope • Leading provider in the mid-stream services for the • Develop the methodology and tools for completing the R12 natural gas industry. Headquartered in Denver, the upgrade project. company is engaged in the gathering, processing and • Conduct the upgrade assessments to define the project transportation of natural gas; the transportation, scope, resource requirements, and project schedule. fractionation, storage and marketing of NGLs; and the • Manage the upgrade project tasks, resources, issues, and gathering and transportation of crude oil. risks Management Challenge Results • The company implemented Oracle Financials, Projects, • Completed the impact analysis for new/changed features, iExpense, and Logical Apps in the 2007-2008. They have customizations, application architecture and infrastructure approximately 200 core application users and all employees are iExpense users. They have a moderate • Created a detail project schedule and assigned resources number of extensions/ customizations and several to the various work streams. mission critical interfaces between Oracle EBS and their • Utilized extract out of Maintenance Wizard to create the revenue/operations applications. initial list of upgrade tasks • The project objective was to migrate the Oracle • Completed three upgrade test cycles (iterations) and User applications from 11.5.10 to R12 and also upgrade the Acceptance testing database from 10g to 11g. The upgrade would be • Created end user training materials and conducted training installed on a new server and include an upgrade of the courses operating system. • Executed the production cutover plan to complete the • High level planning had been completed but the approach upgrade over a weekend to minimize impact on daily for executing the project had not been determined. business operations. • Project was completed on-time (6 months) and under budget. There were very few post-production issues. © DBAK 2011 13 13
  • 14. Case Study – R12 Implementation for Services Company Company Description Scope - Re-implement Oracle E-Business Suite (R12.1.3) • Leading provider of software and services that help the • Impact Assessment world’s best companies manage their extended workforce – Review existing 11i functionality and procured services. – New R12 functionality • Global provider of contingent labor. » Prioritize new features Management Challenge • Leverage setups from existing 11i system • The companies Oracle E-Business suite had not been • Re-implement Oracle R12 for existing modules upgraded in many years (version 11.5.4), however • Migrate required customizations and interfaces to R12 business changes required changes in how the company • Limited Data Conversion: used Oracle. – Due to increasing volume and a need for additional – GL –Balances and current year transactions flexibility, a custom front office application was – AR/AP – Customers/Suppliers developed to replace Oracle Projects. The legacy – AR/AP – Open invoices Projects data still exists and there is a large quantity of data that is no longer used. – Fixed Assets – load existing into R12 – Implement new module: Fixed Assets. • System Setup / System Validation / Integration Testing – Consolidation of many operating units • Migration to Production • The company wanted to expand use Oracle functionality Expected Results to enable business processes • Expand usage of current Oracle functionality to enable – The company wanted to take advantage of new business processes features within Oracle R12 • Ability to use new R12 functionality – Enable existing functionality not being used to automate business processes • Reduction of customizations • Key implementation versus upgrade decision factors • Clean-up of old/non-used data – Limited Down-time available for cutover • Ability to quickly cut-over to the new system – 11.5.4 version expanded the tasks required for • Deployment on new hardware platform upgrade • Consolidated operating units – The company is switching to a new hardware platform © DBAK 2011 14 14
  • 16. Contact John Malone 720.475-8600 jmalone@dbaknow.com Presentation available at: www.dbaknow.com/downloads www.dbaknow.com © DBAK 2011 16