Jisc FE and skills development and resource programme – innovation through
technology
Annex A – proposal template
Section 1 (contact details, project type and project objectives)
Name of lead provider Birmingham Metropolitan College
Full contact details for primary contract:
Name: Anthony Gribben-Lisle
Position: Director of Technology and Innovation
Email: anthony.gribben-lisle@bmetc.ac.uk
Tel: 0121 362 1105
Address: Sutton Coldfield Campus, Lichfield Road, Sutton Coldfield, B74 2NW
Which project type are you bidding for? (you must tick one of the boxes below):
Type A: Small project
Type B: Medium project
√ Type C: Large project
Which project objective does your bid mainly focus on? (you must tick one of the boxes below):
Integrating new technologies
Overcoming barriers to the adoption and use of technology in the sector
√ Developing new uses of technology and / or the innovative adaption and rollout of
technologies
Section 2 (project description)
Describe how the funding you are seeking will be used to address the project objective(s) that you
are focussing on and take account of Phase 1 activity as appropriate. You should identify the
customer need for the project outputs and address issues of sustainability and capacity building,
making evident how the resulting benefits will be realised. (800 words)
Project context
The Auto Share and Learn project has the objective of creating an online web-based support system for
supply chain companies in the automotive sector. The intention is that the supply chain support system
model developed by the project will be transferrable and of benefit across the automotive sector and
manufacturing industry generally.
The project is partnering with a major employer, Jaguar Land Rover (JLR), and the SEMTA Sector Skills
Council. JLR has announced large-scale investment in the UK to extend its production. New investments
have generated 9,000 jobs which will increase to almost 11,000 with the creation of a further 1,700 jobs.
Each job created at JLR will be mirrored by several more in the supply chain. A key issue is the
recruitment, retention and development of a workforce with the required skills to meet the pace and
related technology of this growth. As a result, Jaguar Land Rover set up a ‘Suppliers Training Group’ with
the support of SEMTA to enhance skills development across JLR and its supply chain. The same supply
chain skills support model will be needed by other companies as the economy recovers.
Project need
The Suppliers Training Group has identified a need for utilising online resources and social media to
support suppliers and accelerate their ability to up-skill existing and entry level staff, with a focus on:
• Utilising online learning resources
• Sharing expertise and resources
• Self/mutual help and support
• Collaborative developments
A similar need has also been identified in South Wales, where a large number of automotive supply chain
companies are also located.
Project aims and objectives
This is a collaborative bid led by Birmingham Metropolitan College together with JLR and Coleg Sir Gâr,
strongly supported by three experts with significant experience of the automotive sector and Jisc projects.
The main project aim is to use the JLR Suppliers Training Group experience in developing its “Auto Share
and Learn” online web resource as a model that can be used for general supply chain support across
manufacturing industry as well as in other sectors such as construction, and transport.
The project has four key phases and the objectives of each phase are as follows:
• Phase 1: Project set-up and research:
o Develop a project team with clearly identified project plan, stakeholder communications and
engagement plan and clear benefits for all partners.
o Identify available learning resources and tools (especially from the FE/Skills phase 1 programme)
and how they can be contextualised.
o Develop a specification for the “Auto Share and Learn” system covering its functionality and how it
will deliver the supply chain skills developments.
• Phase 2: Supplier engagement:
o Develop systems (hosted infrastructure and “apps”) as defined in the Phase 1 specification for use
by JLR and supply chain companies and to engage end-users in the process.
o Within both the West Midland and Wales:
 Develop and implement a comprehensive programme of end-user involvement.
 Carry out pilots, evaluate and make appropriate updates.
 Implement, monitor and evaluate the system.
• Phase 3: Engaging FE and HE:
o Further develop strategies and systems to engage local FE/HE specialist providers with the
automotive supply chain companies through practical implementation of the online support
system.
o Develop and implement a comprehensive programme of end-user training
o Carry out pilots, evaluate and refine.
o Implement, monitor and evaluate).
• Phase 4: Evaluation, sustaining and embedding:
o Evaluate progress and performance improvement.
o Evaluate the project.
o Develop and implement a business model for sustainability of the system.
Technologies
• The primary infrastructure is likely to be Moodle with other integrated technologies.
• “Apps” will be applications/software that operate on the infrastructure e.g. self/learner diagnostics,
discussions, digital literacy diagnostics, online badges, team diagnostics, skills-swap, “Trip Advisor”
ratings of resources.
• E-Resources will include learning materials, re-usable learning objects, case studies, OERs.
Key project outputs and outcomes
The overall output of the project will represent a model of an online resource to support supply chain
companies:
• A specification for a hosted open source ICT infrastructure.
• A series of “apps” and resources applicable to all industry supply chains.
• Resources to support implementation of the model focused around end-user preparation and “best
practice” guides.
The overall outcomes of the project will be:
• Increased engagement with learning by the automotive industry and supply chain companies, in the
West Midlands and Wales.
• A positive contribution towards the JLR Suppliers Training Group’s goals.
• A model for online supply chain development and support.
Evaluation as a key element of sustainability and capacity building
As part of evaluating the impact of the project, the outcomes will demonstrate how it effectively piloted a
mechanism to better articulate the skills needs to providers and hence contributed to sustainability. This
applies equally to other sectors.
Write how many words you have used in this section in this box:
Section 3 (work plan and outputs) I have attached the
requested document
Attach a high level work plan (or a Gantt chart) which identifies the
outputs and sets out key activities and dates to show how you will
achieve the required objectives and deliverables expected in this call
and its timescale. Type B and C projects (ie those above £15,000) should
detail the work packages that will be undertaken (2 single sides of A4).
YES
Section 4 (engaging with the community and Jisc)
Describe how your project will involve external organisations as appropriate and work with Jisc and
use other resources, to evaluate the work, enhance the outcomes of the project and achieve wider
dissemination and embedding of these outcomes. (700 words)
Engaging with the automotive sector
The project partners (Birmingham Metropolitan College, Coleg Sir Gâr and JLR) and stakeholders
represent a broad range of external organisations including employers (vehicle manufacturers and supply
chain companies in the West Midlands and South Wales) and will embrace other FE/HE education
providers in these regions within Phase 2 of the project. A key member of the JLR team is on part-time
secondment from the sector skills council, SEMTA, thus bringing their extensive employer-led expertise
and knowledge of UK engineering and manufacturing skills needs and practices. Phase 3 of the project, as
well as being focused on developing a sustainable business model, will also aim to scale-up the project
within the UK as a whole, with a focus on geographical hubs such as the Northwest/Northeast and the
South East of England which have key vehicle manufacturers as well as local supply chain companies. The
project will engage (as part of Phase 3) with other sector bodies such as the Northwest Automotive
Alliance (www.nwautoalliance.com) and the National Apprenticeship service
(http://www.apprenticeships.org.uk) in order to explore possible synergies and collaborations.
The project will work closely with SEMTA to ensure that its developments align with clearly identified
skills development needs and how these link with productivity.
Engaging with learners
Learner engagement is a key concept being developed by FE/HE institutions and the project will seek to
actively engage learners throughout the project to help shape the development and implementation of
the Auto Share & Learn system and will draw on the Jisc Guide to setting up and implementing student
partnerships.
800
Engaging with other sectors
Phase 3 will also seek to establish motivation in other sectors for the model that has been developed.
Likely sectors include construction, manufacturing and rail. In the latter case, the rail sector is also
witnessing growth in manufacturing and subsequent need for rapid skills development e.g. with Hitachi
Rail’s new construction plan (see http://www.hitachirailproject.co.uk). The project will seek initial
guidance from BIS as to the key employers/employer & sector bodies to engage with and then work to
motivate such sectors to adopt the model. Possible collaborations will also be explored.
Engaging with Jisc
The project team members/partners include many who have a great deal of experience of working on
Jisc-funded programmes and are aware of the extensive resources available that have resulted as outputs
from such programmes e.g. from the first phase of the FE and skills development and resources
programme as well as having been actively involved in developing sector guides and toolkits such as the
Work-based learning maturity toolkit, effective practice for critical friends, sustaining and embedding
innovations good practice.
Already established resources of interest include online resources to help engage adult learners, TechDis
materials for accessibility and inclusion, digital literacy resources, resources to support mobile learning,
apps to engage learners with their own planning and monitoring of time and workload.
Resources in other Jisc programmes will be researched including those from the LLL-WFD, curriculum
design/delivery, digital literacies, business & community engagement, distributed VLE, e-portfolio
interoperability and OER programmes. Key resources to be researched will include the various Jisc
InfoNet infoKits and practical tools e.g. cloud computing, collaborative online tools, costing technologies,
embedding BCE and mobile learning.
Dissemination and engagement activities
The project will actively engage in partnership with Jisc in its dissemination and evaluation activities with
a specific focus on sustainability e.g. through development of a business model and engaging other
sectors. As well as engagement with employers, employer/sector bodies as described above, the project
will seek to disseminate and engage as follows:
• Conference papers – target 8 (e.g. ALT-C, Greenwich employer engagement conference, Wales
Future Directions conference, QAA (Scotland) Enhancement Theme conference, Jisc conferences,
HEA conferences, automotive sector/skills development conferences)
• Jisc mail lists - engage with Jisc e-mail lists such as Jisc Employability.
• Workshops – target three key workshops (England, Wales and Scotland).
• Webinars – target three key webinars.
• Case studies – target two broad case studies focused on the West Midlands and south Wales supply
chain, with mini-case studies of individual companies of how they have benefited.
• Publishing of the model and all supporting resources via an online wiki.
Write how many words you have used in this section in this box:
Section 5 (activity costs) I have attached the
requested
document
All type A projects must complete (and attach) the activity costing
template (Annex B). NO
690
Section 6 (budget)
All type C and D projects (where the budget requested is over £15,000)
must complete (and attach) the budget template (Annex C) YES
Section 7 (risk assessment)
Complete (and attach) the risk assessment template (Annex D) (1 single
side of A4) YES
Section 8 (project team)
Provide information about the experience and capacity of the project
team and any partners involved in the project. (2 single side of A4) YES
Section 9 (letters of support)
Attach letter(s) of support from a senior organisational manager/ (and
any project partners) which describes how they and other relevant staff
will engage in the project process.
YES
Terms and conditions of grant (project)
I have read the Jisc terms and conditions of grant (project) available at
http://www.jisc.ac.uk/fundingopportunities/terms-and-conditions-grant-
project
Tick the box to
indicate you have
read the T&Cs
Attachments to be included with the completed proposal template are:
• Activity costs for type A projects only (see template at Annex B)
• Budget for type C and D projects only (see template at Annex C)
• Risk assessment (see template at Annex D)
√
Work-plan and outputs
The work-plan consists of four key work-packages which are detailed in the Table below:
WP Work-package Key activities Key outputs/outcomes Start End
1 Phase 1: Project set-up and research
1(a) Project set-up,
management &
stakeholder
engagement
• Kick-off meeting
• Develop partnership agreements and
contracts
• Detailed project plan
• Review/identify key stakeholders and
develop stakeholder communications
and engagement plan
• On-going project management
• On-going stakeholder communications
and engagement (including with Jisc
and the wider sector communities)
• Shared understanding/documentation of
project; governance arrangements,
IPR/ownership, roles, responsibilities
• Partner/advisor agreements and contracts
• Detailed project plan including, budget and
updated risk management
• Stakeholder communications and
engagement plan & its implementation
• Regular review, meetings and updating of
project plan
On-going
throughout
project
1(b) Initial research,
needs analysis &
specification
• Identify skills-learning-accreditation-
business needs of VMs, supply chain
companies, educational suppliers and
other key stakeholders
• Identify end-user technology access and
digital literacies
• Develop outline specification and seek
approvals
• Identify third-party resources (e.g.
outputs from Jisc programmes (inc FE
skills Phase 1), support tools, learning
resources, OERs)
• Develop detailed specification
• Develop framework for
measuring/evaluating business/learner
performance improvement
• Develop on-going project evaluation
• Identify requirements for system
management, security and privacy
(including e.g. private areas)
• Report detailing needs of key stakeholders
together with constraints, issues, challenges.
• Assessment of end-user technologies and
digital literacies which will shape technology
specification and end-user support, guidance
and training.
• Outline specification for technology
infrastructure, apps, usability, accessibility,
end-user technologies.
• List of resources
• Detailed specification for technology
infrastructure, apps, usability, accessibility,
end-user technologies.
• Framework for measuring/evaluating
business/learner performance improvement
• Evaluation approach.
• System management specification
02/14 04/14
2 Phase 2: Supplier engagement
2(a) System
development
• Develop mock-up/prototype and seek
feedback from key stakeholders
• Set-up hosted (cloud-based)
infrastructure technologies (e.g.
Moodle) including integration
• Develop systems for monitoring of
usage (& stats/reporting)
• Develop Apps
• Feedback on prototype.
• Infrastructure set-up and integration of
technologies
• Systems to help evaluate usage
• Apps
03/14 05/14
2(b) Preparation and
orientation for
pilots
• Develop user guides and online training
(e.g. using screencasts)
• Define and develop support
arrangements.
• Develop induction programme
(including feedback mechanisms).
• User guides and training.
• Agreed support.
• Induction programme.
04/14 05/14
2(c) Pilots & updates • Run induction programme
• Pilot system and gain feedback (Wales
and West Midlands)
• Evaluate pilots and update system,
guides, training etc.
• End-users familiar with purpose and use of
system
• Understanding of user
• Updated system, guides, training.
05/14 06/14
2(d) Implement
system
• Run induction programme
• Roll-out system
• Monitor usage and gain feedback and
evaluate.
• End-users familiar with purpose and use of
system
• Evaluation of usage
06/14 08/14
3 Phase 3: Engaging FE and HE
3(a) Further system
development
• Develop mock-up/prototype and seek
feedback from key stakeholders
• Further develop hosted (cloud-based)
infrastructure technologies where
needed
• Develop systems for monitoring of
usage (& stats/reporting)
• Develop Apps
• Feedback on prototype.
• Refinement of infrastructure
• Systems to help evaluate usage
• Apps
07/14 09/14
3(b) Preparation and
orientation for
pilots
• Develop user guides and online training
(e.g. using screencasts)
• Define and develop support
arrangements.
• Develop induction programme
(including feedback mechanisms).
• User guides and training.
• Agreed support.
• Induction programme.
09/14 10/14
3(c) Pilot & update • Run induction programme
• Pilot system (Wales and West
Midlands) and gain feedback
• Evaluate pilots and update system,
guides, training etc.
• End-users familiar with purpose and use of
system
• Understanding of user
• Updated system, guides, training.
11/14 12/14
3(d) Implement
system
• Run induction programme
• Roll-out system
• Monitor usage and gain feedback and
evaluate.
• End-users familiar with purpose and use of
system
• Evaluation of usage
12/14 2/15
4 Phase 4: Evaluation, sustaining and embedding
• Evaluate use of system through surveys,
focus groups.
• Evaluate
learning/performance/business
improvement.
• Develop business model of
sustainability and support
• Implement business model
• Evaluation.
• Evaluation.
• Business model.
• Implementation of business model.
2/15 6/15
Experience and capacity of project team and partners
PARTNERS
• Birmingham Metropolitan College
Birmingham Metropolitan College is a large General Further Education College with campuses across the
Birmingham, Black Country and Wyre Forest areas. The college has a large engineering and manufacturing
faculty providing apprenticeship and higher education solution for SMEs and large organisations throughout
the UK. JLR, BMW, Caterpillar, Samsung and Cadbury/Kraft are amongst the organisations engaged in the
delivery of engineering training programmes.
The college has been recognised for innovative and excellent delivery in achieving the following awards:
Training Quality Standard – Engineering Manufacturing; Centre of Vocational Excellence – Computer
Integrated Manufacturing; Queen’s Anniversary Prize for Further and Higher Education; TES FE 2011 Award for
Outstanding Innovation in Teaching; AOC Beacon Award for Lifelong Learning; Edge Award for Practical
Teaching and Practical Learning; AOC 2013 Beacon Award for College Engagement with Employers.
• Jaguar Land Rover
The current growth by Jaguar Land Rover anticipates an increase in supply chain jobs of 24,000 in the
foreseeable future. The company has created a ‘supply training forum’ to share information, resources, best
practice and employee training to ensure that the supply chain has the skills to meet all quality requirements.
JLR have also engaged with seven relevant Local Enterprise Council’s to develop a common blue print with the
aim to work collectively and collaboratively to address the skills challenges across these LEP areas.
JLR won the ‘Education Award’ which recognizes businesses that are building sustainable partnerships with
schools to raise aspirations of young people, to enable them to build successful working lives. Birmingham
MET have recently taken over the Jaguar Land Rover Education Business Partnership Centres and are
championing their community agenda and the delivery of Traineeships.
• Coleg Sir Gâr
Coleg Sir Gâr is a Further and Higher Education college in South West Wales with a large Engineering Faculty
that supports the training needs of an extensive automotive supply chain network of companies in the region.
It also works closely with TATA, the owners of JLR, which has a major manufacturing plant in Llanelli where the
college is based. Tony Toole was Dean of Faculty of Engineering at the college for 15 years and the current
Principal, Barry Liles, was (and remains) instrumental in developing the supply chain training support network
in the area. The college therefore has extensive experience of manufacturing supply chain support.
The college also has a well-established track record in the development and delivery of online distance
learning courses and Technology Enhanced Learning innovation. It has been lead organisation for a large
number of Jisc, Welsh Government and EU funded collaborative TEL projects.
PROJECT TEAM
All team members named below have confirmed their availability and capacity to contribute to the project.
• Dr Julie Nugent – Project Board and Executive Sponsor (Birmingham Metropolitan College)
Julie is Executive Director for Strategy and Development and has 20 years experience in education and
economic development, and extensive experience in managing large scale, multi-million pound projects –
including significant web-enabled, customer-focused solutions. Julie previously worked as Director of Funding
for the Skills Funding Agency, supporting the creation of a single system for funding FE and Deputy Director for
FE at the Department for Business and Innovation and is now Exec Director for Strategy and Development at
BMet, overseeing internal transformation programmes, external partnerships and new opportunities.
• Anthony Gribben-Lisle – Project Board and Project Director (Birmingham Metropolitan College)
Anthony is Director of Technology and Innovation with 10 years’ experience in leadership and management
roles in the Further Education sector, and 5 years working in product management and business consultancy
roles for an FE software and services provider, Anthony has experience of IT Systems, ILT, business systems
and management information across a wide range of FE environments. In addition, his experience as a senior
manager in a number of FE colleges includes strategic leadership of marketing and business development
functions, employer and partner relationships, and quality improvement, ensure that solutions delivered from
a technology perspective are targeted to support organisational objectives, and are focussed on high quality
outcomes for learners.
• Anthony Nicholls – Project Board and Project Manager (Birmingham Metropolitan College)
Anthony is Head of Business Systems and has 20 years FE experience, across a range of IT and Information
systems roles. A database and software development specialist, Anthony now heads up the Business and
Online Systems team for the College, managing a portfolio of projects to harmonise, integrate and develop
systems to meet business need.
• Rita Davey – Project Board and Partner Lead (Jaguar Land Rover and SEMTA)
Rita has 20 years experience in the Learning and Development sector where she has gained multi dimensional
knowledge and experience addressing the skills needs of the manufacturing/engineering sector. This
experience covers activity regionally and nationally through all sizes of employer’s. As curriculum leader at City
College Birmingham she was responsible for all work based training. After leaving the college she worked on a
number of manufacturing related projects such including Rover Task Force, Automotive Academy and National
Skills Academy for Manufacturing. Rita developed regional trainer/assessor standards that were applied
nationally. Rita is currently employed by SEMTA and is seconded to Jaguar Land Rover to lead their supplier
engagement programme aiming to address their key skill challenges as a result of the recent and on-going
Jaguar Land Rover growth.
• Dave Howells – Project Board (Coleg Sir Gâr )
Dave is Director of Business Development and was previously Head of e-Learning at the college. He is
responsible for training and consultancy services, partnership development and Innovation. Working with
numerous partners and consultants across most sectors he is currently developing and delivering a range of
new products and services to support the business sector in Leadership and Management, Construction,
Manufacturing and ICT.
• Dr Tony Toole – Project Board and Partner Lead (Coleg Sir Gâr )
Dr Tony Toole was Dean of Faculty of Engineering at Coleg Sir Gâr and then Director of Online Learning. He has
successfully managed over 20 large-scale, collaborative and multi-institutional e-learning projects funded by
Jisc, the Welsh Government and the EU. He has worked with Jisc as a Committee Member, Critical Friend and
is a Board Member of Cetis. As Dean of Faculty he worked closely with manufacturing industry in the region,
including their supply chain companies. Tony is a Visiting Professor at both the University of Wales Trinity Saint
David and at the University of South Wales and works with both institutions as a consultant in the areas of
Engineering, High Performance Computing, and Technology Enhanced Learning.
• Dr Peter Chatterton – Project Board
Dr Peter Chatterton has worked extensively in the area of HE/FE educational innovation (enabled through the
use of new media/technologies) with a strong focus on employer engagement, partnerships and graduate
employability. He has worked on over ten Jisc-funded projects in roles such as Critical Friend and Evaluator and
has written many Jisc/QAA guides and toolkits. He has worked extensively with QAA, LFHE, HEA, HEFCW,
Becta, LSIS and HEFCE. He has also been a consultant to the Ford Motor Company on flexible means to deliver
HE programmes to employees as well as being a partner and board member in the Automotive College (a
FE/HE/industry/DTI partnership) which designed and delivered learning/business improvement programmes
to SMEs in the UK automotive supply chain.
• Mark Stiles – Project Board and Project Evaluator
Mark is Emeritus Professor of Technology Supported Learning, conferred by Staffordshire University. He was
Professor of Technology Supported Learning at Staffordshire University from 2000 to 2012, leading a team
which had corporate responsibility for eLearning and carried out work on strategy and policy for eLearning as
well as many pedagogic and technical projects at national, regional and local levels, mostly funded by JISC. He
is Chair of the new CETIS board, having been Chair of the JISC-CETIS Board for 5 years prior to reorganisation,
and was Deputy Chair of the JISC Learning and Teaching Committee for 3 years. For the last 6 years he has
represented JISC on the board of the IMS international standards body.
Annex C: Project Budget
Amount Other information
Staff costs (including on costs)
Project Director
(Senior Manager, 0.1FTE)
£6,000
(matched funding)
Birmingham Metropolitan
College
Project Management
(Senior Manager, 2 x 0.2FTE)
£24,000 Birmingham Metropolitan
College and Coleg Sir Gâr
Technical Systems Development
(Systems Designer, 0.2FTE + Technical
Support)
£15,000 Birmingham Metropolitan
College
Training Materials Development
(Academic Staff, 2 x 0.1FTE)
£14,000 Birmingham Metropolitan
College, Coleg Sir Gâr, JLR
Implementation and Pilot Delivery
(Academic Staff, 2 x 0.2FTE)
£15,000 Birmingham Metropolitan
College, Coleg Sir Gâr, JLR
Evaluation and Embedding
(Academic Staff, Management, 0.1 FTE)
£4,000 Birmingham Metropolitan
College, Coleg Sir Gâr, JLR
Professional and Industry Based Project
Support
(External Consultants, 2 x 0.2FTE)
£15,000 External Consultants, including
SEMTA
Non staff costs
Travel and expenses £5,000 Primarily for company visits.
Project meetings will be
mainly online.
Dissemination £2,000 Final dissemination event and
conference costs.
Evaluation £3,000 External evaluation
Additional costs (specify) £3,000 web hosting, printing,
telephone, etc.
Overheads (provide breakdown)
Institutional Staff overheads:
1.3FTE @ £13.53/hr (Funding Council
Calculation)
£26,000 Included in the institutional
contribution figure below
Total project costs £132,000
Total requested from Jisc £100,000
Organisational contribution £32,000 Contribution from institutional
senior management and staff
overheads.
Summary of the qualitative, and any quantitative, benefits your organisation will expect to receive
from the project
The qualitative benefits that both FE institutions will receive from the project outcomes will include:
• Increased engagement with the manufacturing sector and its supply chain
• Access to an online supplier support website to provide flexible and accessible support for the
supply chain industries
• An improved collaborative network that includes the FHE sector, SEMTA, and a range of
manufacturing and supply chain companies
• Greater experience in the use of online technologies to support skills based training that will be
valuable and transferrable across industry sectors
Annex D: Risk Assessment
Type of risk
Probability
of
occurrence
(1 Low-5
High)
Severity of
impact
(1 Low
- 5 High)
Overall
score
(probability
x severity)
Action to prevent/mitigate
the risk
Conflicting needs of
different stakeholders
(Issues of confidentiality, IPR,
contractual constraints etc)
2 2 4 The project planning process
will include a partnership
agreement that addresses all
such issues.
Difficulty in engaging
SMEs
(Access to supply chain
information, consultation,
agreement to participate in
development and testing)
2 4 8 A clearly important issue that
will be addressed through the
early negotiation with JLR and
an agreed selection of supply
chain companies. A major
attraction for the SMEs will be
the rapid prototyping
deliverable.
Tight project time-scale
(website design and
development, testing with
companies, evaluation)
1 4 4 The project partners are
experienced and well placed to
manage the project plan within
the timescale specified.
Technical development
issues
(Staff capacity, design
experience, web hosting)
2 4 8 Capacity, experience and
hosting arrangements have
been discussed in project
planning and appropriate
arrangements agreed and
budgeted for.
Transferring the model
(Transferrable format, IPR
agreement, creative
commons licensing etc)
1 4 4 As a Jisc funded project the
outcomes will be designed to
be made freely available to the
community of practice.
Identifying an appropriate
business model for
sustainability
(Appropriate platform, cost
effective operation, quality
assurance plan, funding etc)
2 2 4 Sustainability will be central to
the project planning process
from the outset. Where open
source software and cloud
hosting is appropriate, this will
be included.
There is a strong indication of
sustainability funding from
companies.
Key project team member
leaves
2 3 6 The fact that there are two
experienced and resourceful FE
colleges involve in this bid
means that there is significant
capacity to address this issue if
it were to occur.

Más contenido relacionado

La actualidad más candente

Spanish experience of a sectoral training fund: Fundación Laboral de la Const...
Spanish experience of a sectoral training fund: Fundación Laboral de la Const...Spanish experience of a sectoral training fund: Fundación Laboral de la Const...
Spanish experience of a sectoral training fund: Fundación Laboral de la Const...Fundación Laboral de la Construcción
 
Pcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enPcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enDr Lendy Spires
 
Flexible short learning programs and MOOCs for the European Labour Market
Flexible short learning programs and MOOCs for the European Labour MarketFlexible short learning programs and MOOCs for the European Labour Market
Flexible short learning programs and MOOCs for the European Labour MarketEADTU
 
Hassan el meligy cv sc vc 20160212
Hassan el meligy cv sc vc 20160212Hassan el meligy cv sc vc 20160212
Hassan el meligy cv sc vc 20160212Beta-Research.org
 
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...KTN
 
Case Study: TULI Programme, Finland
Case Study: TULI Programme, FinlandCase Study: TULI Programme, Finland
Case Study: TULI Programme, FinlandDUCO
 
CEN eInvoice Phase 2 Intermediary Report
CEN eInvoice Phase 2 Intermediary ReportCEN eInvoice Phase 2 Intermediary Report
CEN eInvoice Phase 2 Intermediary ReportFriso de Jong
 
HiTech Presentation 2018
HiTech Presentation 2018HiTech Presentation 2018
HiTech Presentation 2018HiSeedTech
 
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOC
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOCFun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOC
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOCEADTU
 
Fast track to innovation pilot - 22 july 2014
Fast track to innovation pilot -  22 july 2014Fast track to innovation pilot -  22 july 2014
Fast track to innovation pilot - 22 july 2014Alicja Wiśniewska
 
Analyzing Innovation related Risks and Impacts
Analyzing Innovation related Risks and ImpactsAnalyzing Innovation related Risks and Impacts
Analyzing Innovation related Risks and ImpactsPiotrNowak97
 
2010 Highlighting Collaborative Research_brochure
2010 Highlighting Collaborative Research_brochure2010 Highlighting Collaborative Research_brochure
2010 Highlighting Collaborative Research_brochureHelena Reis, PhD, MBA
 
Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Open Concept
 
Mobility, Quality and Impact
Mobility, Quality and ImpactMobility, Quality and Impact
Mobility, Quality and ImpactSiegfried WIllems
 
Emc lm convention by alessandra biancolini (anpal)
Emc lm convention by alessandra biancolini (anpal)Emc lm convention by alessandra biancolini (anpal)
Emc lm convention by alessandra biancolini (anpal)EADTU
 
2006-2011 MIT-Portugal Education Report Vol_II
2006-2011 MIT-Portugal Education Report Vol_II2006-2011 MIT-Portugal Education Report Vol_II
2006-2011 MIT-Portugal Education Report Vol_IIHelena Reis, PhD, MBA
 
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)KTN
 

La actualidad más candente (20)

Spanish experience of a sectoral training fund: Fundación Laboral de la Const...
Spanish experience of a sectoral training fund: Fundación Laboral de la Const...Spanish experience of a sectoral training fund: Fundación Laboral de la Const...
Spanish experience of a sectoral training fund: Fundación Laboral de la Const...
 
Pcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enPcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 en
 
Flexible short learning programs and MOOCs for the European Labour Market
Flexible short learning programs and MOOCs for the European Labour MarketFlexible short learning programs and MOOCs for the European Labour Market
Flexible short learning programs and MOOCs for the European Labour Market
 
ENIT introduction
ENIT introductionENIT introduction
ENIT introduction
 
Hassan el meligy cv sc vc 20160212
Hassan el meligy cv sc vc 20160212Hassan el meligy cv sc vc 20160212
Hassan el meligy cv sc vc 20160212
 
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...
Network Rail & Innovate UK: Applicant Briefing "SBRI Innovation in Rail Secur...
 
Logic presenty.ppt
Logic presenty.pptLogic presenty.ppt
Logic presenty.ppt
 
Case Study: TULI Programme, Finland
Case Study: TULI Programme, FinlandCase Study: TULI Programme, Finland
Case Study: TULI Programme, Finland
 
CEN eInvoice Phase 2 Intermediary Report
CEN eInvoice Phase 2 Intermediary ReportCEN eInvoice Phase 2 Intermediary Report
CEN eInvoice Phase 2 Intermediary Report
 
HiTech Presentation 2018
HiTech Presentation 2018HiTech Presentation 2018
HiTech Presentation 2018
 
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOC
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOCFun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOC
Fun EMC-LM empowering seminar 25 11-2021 by Catherine Mongenet, FUNMOOC
 
Prime Ministers Initiative Presentation
Prime Ministers Initiative PresentationPrime Ministers Initiative Presentation
Prime Ministers Initiative Presentation
 
Fast track to innovation pilot - 22 july 2014
Fast track to innovation pilot -  22 july 2014Fast track to innovation pilot -  22 july 2014
Fast track to innovation pilot - 22 july 2014
 
Analyzing Innovation related Risks and Impacts
Analyzing Innovation related Risks and ImpactsAnalyzing Innovation related Risks and Impacts
Analyzing Innovation related Risks and Impacts
 
2010 Highlighting Collaborative Research_brochure
2010 Highlighting Collaborative Research_brochure2010 Highlighting Collaborative Research_brochure
2010 Highlighting Collaborative Research_brochure
 
Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.
 
Mobility, Quality and Impact
Mobility, Quality and ImpactMobility, Quality and Impact
Mobility, Quality and Impact
 
Emc lm convention by alessandra biancolini (anpal)
Emc lm convention by alessandra biancolini (anpal)Emc lm convention by alessandra biancolini (anpal)
Emc lm convention by alessandra biancolini (anpal)
 
2006-2011 MIT-Portugal Education Report Vol_II
2006-2011 MIT-Portugal Education Report Vol_II2006-2011 MIT-Portugal Education Report Vol_II
2006-2011 MIT-Portugal Education Report Vol_II
 
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
 

Similar a Jisc fe and skills development and resource programme proposal

L&T Construction- Ananya Sharma
L&T Construction- Ananya SharmaL&T Construction- Ananya Sharma
L&T Construction- Ananya SharmaAnanyaSharma152
 
Built Environment BSc Architectural Design & Technology BSc Buildi.docx
Built Environment BSc Architectural Design & Technology BSc Buildi.docxBuilt Environment BSc Architectural Design & Technology BSc Buildi.docx
Built Environment BSc Architectural Design & Technology BSc Buildi.docxchestnutkaitlyn
 
Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...KTN
 
RICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMERICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMEChris Williams-Lilley
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingInnovate UK
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingcmb80
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation MasterclassCaribbean Development Bank
 
Virtual cnc training lab story
Virtual cnc training lab storyVirtual cnc training lab story
Virtual cnc training lab storyLiu PeiLing
 
Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...KTN
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange ProgrammeCaribbean Development Bank
 
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in Korea
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in KoreaTCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in Korea
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in KoreaTCI Network
 
Axon advisory recruiting presentation
Axon advisory   recruiting presentationAxon advisory   recruiting presentation
Axon advisory recruiting presentationAxon Partners Group
 
Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...KTN
 
Program structure: ALA Diploma in Supply Chain Management
Program structure: ALA Diploma in Supply Chain ManagementProgram structure: ALA Diploma in Supply Chain Management
Program structure: ALA Diploma in Supply Chain ManagementVietNam Institute of Logistics
 
Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0RaishKhanji
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 CourAbramMartino96
 

Similar a Jisc fe and skills development and resource programme proposal (20)

L&T Construction- Ananya Sharma
L&T Construction- Ananya SharmaL&T Construction- Ananya Sharma
L&T Construction- Ananya Sharma
 
The KTN Digital and Creative Business Briefing : June 2019
The KTN Digital and Creative Business Briefing : June 2019The KTN Digital and Creative Business Briefing : June 2019
The KTN Digital and Creative Business Briefing : June 2019
 
Built Environment BSc Architectural Design & Technology BSc Buildi.docx
Built Environment BSc Architectural Design & Technology BSc Buildi.docxBuilt Environment BSc Architectural Design & Technology BSc Buildi.docx
Built Environment BSc Architectural Design & Technology BSc Buildi.docx
 
Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...
 
RICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMERICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SME
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
World bank project a case study of africa region
World bank project a case study of africa region World bank project a case study of africa region
World bank project a case study of africa region
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation Masterclass
 
Virtual cnc training lab story
Virtual cnc training lab storyVirtual cnc training lab story
Virtual cnc training lab story
 
Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...
 
Ktn business briefing may 2019
Ktn business briefing may 2019Ktn business briefing may 2019
Ktn business briefing may 2019
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
 
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in Korea
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in KoreaTCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in Korea
TCI 2015 Boosting Cluster & Mini-Cluster-Based Programs in Korea
 
Axon advisory recruiting presentation
Axon advisory   recruiting presentationAxon advisory   recruiting presentation
Axon advisory recruiting presentation
 
Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...
 
Program structure: ALA Diploma in Supply Chain Management
Program structure: ALA Diploma in Supply Chain ManagementProgram structure: ALA Diploma in Supply Chain Management
Program structure: ALA Diploma in Supply Chain Management
 
Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 

Más de Tony Toole

Health and safety
Health and safetyHealth and safety
Health and safetyTony Toole
 
5 s techniques
5 s techniques5 s techniques
5 s techniquesTony Toole
 
5 s techniques
5 s techniques5 s techniques
5 s techniquesTony Toole
 
Tony Toole CV 2014
Tony Toole CV 2014Tony Toole CV 2014
Tony Toole CV 2014Tony Toole
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain managementTony Toole
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain managementTony Toole
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Tony Toole
 
Tel survey report
Tel survey reportTel survey report
Tel survey reportTony Toole
 
Tel survey, csg (final)
Tel survey, csg (final)Tel survey, csg (final)
Tel survey, csg (final)Tony Toole
 
Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tony Toole
 
Tel survey, swansea (final)
Tel survey, swansea (final)Tel survey, swansea (final)
Tel survey, swansea (final)Tony Toole
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice GuideTony Toole
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice GuideTony Toole
 
Alt c 2013 presentation
Alt c 2013 presentationAlt c 2013 presentation
Alt c 2013 presentationTony Toole
 
Tony toole cv 2013
Tony toole cv 2013Tony toole cv 2013
Tony toole cv 2013Tony Toole
 
Sip tel innovation report 3
Sip tel innovation report 3Sip tel innovation report 3
Sip tel innovation report 3Tony Toole
 
Sip tel innovation report 2
Sip tel innovation report 2Sip tel innovation report 2
Sip tel innovation report 2Tony Toole
 
Moocs and Open Education
Moocs and Open EducationMoocs and Open Education
Moocs and Open EducationTony Toole
 
Sip tel innovation report 1
Sip tel innovation report 1Sip tel innovation report 1
Sip tel innovation report 1Tony Toole
 

Más de Tony Toole (20)

Health and safety
Health and safetyHealth and safety
Health and safety
 
Kaizen
KaizenKaizen
Kaizen
 
5 s techniques
5 s techniques5 s techniques
5 s techniques
 
5 s techniques
5 s techniques5 s techniques
5 s techniques
 
Tony Toole CV 2014
Tony Toole CV 2014Tony Toole CV 2014
Tony Toole CV 2014
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain management
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain management
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)
 
Tel survey report
Tel survey reportTel survey report
Tel survey report
 
Tel survey, csg (final)
Tel survey, csg (final)Tel survey, csg (final)
Tel survey, csg (final)
 
Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)
 
Tel survey, swansea (final)
Tel survey, swansea (final)Tel survey, swansea (final)
Tel survey, swansea (final)
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice Guide
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice Guide
 
Alt c 2013 presentation
Alt c 2013 presentationAlt c 2013 presentation
Alt c 2013 presentation
 
Tony toole cv 2013
Tony toole cv 2013Tony toole cv 2013
Tony toole cv 2013
 
Sip tel innovation report 3
Sip tel innovation report 3Sip tel innovation report 3
Sip tel innovation report 3
 
Sip tel innovation report 2
Sip tel innovation report 2Sip tel innovation report 2
Sip tel innovation report 2
 
Moocs and Open Education
Moocs and Open EducationMoocs and Open Education
Moocs and Open Education
 
Sip tel innovation report 1
Sip tel innovation report 1Sip tel innovation report 1
Sip tel innovation report 1
 

Último

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Último (20)

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Jisc fe and skills development and resource programme proposal

  • 1. Jisc FE and skills development and resource programme – innovation through technology Annex A – proposal template Section 1 (contact details, project type and project objectives) Name of lead provider Birmingham Metropolitan College Full contact details for primary contract: Name: Anthony Gribben-Lisle Position: Director of Technology and Innovation Email: anthony.gribben-lisle@bmetc.ac.uk Tel: 0121 362 1105 Address: Sutton Coldfield Campus, Lichfield Road, Sutton Coldfield, B74 2NW Which project type are you bidding for? (you must tick one of the boxes below): Type A: Small project Type B: Medium project √ Type C: Large project Which project objective does your bid mainly focus on? (you must tick one of the boxes below): Integrating new technologies Overcoming barriers to the adoption and use of technology in the sector √ Developing new uses of technology and / or the innovative adaption and rollout of technologies Section 2 (project description) Describe how the funding you are seeking will be used to address the project objective(s) that you are focussing on and take account of Phase 1 activity as appropriate. You should identify the customer need for the project outputs and address issues of sustainability and capacity building, making evident how the resulting benefits will be realised. (800 words) Project context The Auto Share and Learn project has the objective of creating an online web-based support system for supply chain companies in the automotive sector. The intention is that the supply chain support system model developed by the project will be transferrable and of benefit across the automotive sector and manufacturing industry generally. The project is partnering with a major employer, Jaguar Land Rover (JLR), and the SEMTA Sector Skills Council. JLR has announced large-scale investment in the UK to extend its production. New investments have generated 9,000 jobs which will increase to almost 11,000 with the creation of a further 1,700 jobs. Each job created at JLR will be mirrored by several more in the supply chain. A key issue is the recruitment, retention and development of a workforce with the required skills to meet the pace and related technology of this growth. As a result, Jaguar Land Rover set up a ‘Suppliers Training Group’ with the support of SEMTA to enhance skills development across JLR and its supply chain. The same supply chain skills support model will be needed by other companies as the economy recovers. Project need The Suppliers Training Group has identified a need for utilising online resources and social media to support suppliers and accelerate their ability to up-skill existing and entry level staff, with a focus on: • Utilising online learning resources • Sharing expertise and resources • Self/mutual help and support • Collaborative developments
  • 2. A similar need has also been identified in South Wales, where a large number of automotive supply chain companies are also located. Project aims and objectives This is a collaborative bid led by Birmingham Metropolitan College together with JLR and Coleg Sir Gâr, strongly supported by three experts with significant experience of the automotive sector and Jisc projects. The main project aim is to use the JLR Suppliers Training Group experience in developing its “Auto Share and Learn” online web resource as a model that can be used for general supply chain support across manufacturing industry as well as in other sectors such as construction, and transport. The project has four key phases and the objectives of each phase are as follows: • Phase 1: Project set-up and research: o Develop a project team with clearly identified project plan, stakeholder communications and engagement plan and clear benefits for all partners. o Identify available learning resources and tools (especially from the FE/Skills phase 1 programme) and how they can be contextualised. o Develop a specification for the “Auto Share and Learn” system covering its functionality and how it will deliver the supply chain skills developments. • Phase 2: Supplier engagement: o Develop systems (hosted infrastructure and “apps”) as defined in the Phase 1 specification for use by JLR and supply chain companies and to engage end-users in the process. o Within both the West Midland and Wales:  Develop and implement a comprehensive programme of end-user involvement.  Carry out pilots, evaluate and make appropriate updates.  Implement, monitor and evaluate the system. • Phase 3: Engaging FE and HE: o Further develop strategies and systems to engage local FE/HE specialist providers with the automotive supply chain companies through practical implementation of the online support system. o Develop and implement a comprehensive programme of end-user training o Carry out pilots, evaluate and refine. o Implement, monitor and evaluate). • Phase 4: Evaluation, sustaining and embedding: o Evaluate progress and performance improvement. o Evaluate the project. o Develop and implement a business model for sustainability of the system. Technologies • The primary infrastructure is likely to be Moodle with other integrated technologies. • “Apps” will be applications/software that operate on the infrastructure e.g. self/learner diagnostics, discussions, digital literacy diagnostics, online badges, team diagnostics, skills-swap, “Trip Advisor” ratings of resources. • E-Resources will include learning materials, re-usable learning objects, case studies, OERs. Key project outputs and outcomes The overall output of the project will represent a model of an online resource to support supply chain companies: • A specification for a hosted open source ICT infrastructure. • A series of “apps” and resources applicable to all industry supply chains. • Resources to support implementation of the model focused around end-user preparation and “best practice” guides.
  • 3. The overall outcomes of the project will be: • Increased engagement with learning by the automotive industry and supply chain companies, in the West Midlands and Wales. • A positive contribution towards the JLR Suppliers Training Group’s goals. • A model for online supply chain development and support. Evaluation as a key element of sustainability and capacity building As part of evaluating the impact of the project, the outcomes will demonstrate how it effectively piloted a mechanism to better articulate the skills needs to providers and hence contributed to sustainability. This applies equally to other sectors. Write how many words you have used in this section in this box: Section 3 (work plan and outputs) I have attached the requested document Attach a high level work plan (or a Gantt chart) which identifies the outputs and sets out key activities and dates to show how you will achieve the required objectives and deliverables expected in this call and its timescale. Type B and C projects (ie those above £15,000) should detail the work packages that will be undertaken (2 single sides of A4). YES Section 4 (engaging with the community and Jisc) Describe how your project will involve external organisations as appropriate and work with Jisc and use other resources, to evaluate the work, enhance the outcomes of the project and achieve wider dissemination and embedding of these outcomes. (700 words) Engaging with the automotive sector The project partners (Birmingham Metropolitan College, Coleg Sir Gâr and JLR) and stakeholders represent a broad range of external organisations including employers (vehicle manufacturers and supply chain companies in the West Midlands and South Wales) and will embrace other FE/HE education providers in these regions within Phase 2 of the project. A key member of the JLR team is on part-time secondment from the sector skills council, SEMTA, thus bringing their extensive employer-led expertise and knowledge of UK engineering and manufacturing skills needs and practices. Phase 3 of the project, as well as being focused on developing a sustainable business model, will also aim to scale-up the project within the UK as a whole, with a focus on geographical hubs such as the Northwest/Northeast and the South East of England which have key vehicle manufacturers as well as local supply chain companies. The project will engage (as part of Phase 3) with other sector bodies such as the Northwest Automotive Alliance (www.nwautoalliance.com) and the National Apprenticeship service (http://www.apprenticeships.org.uk) in order to explore possible synergies and collaborations. The project will work closely with SEMTA to ensure that its developments align with clearly identified skills development needs and how these link with productivity. Engaging with learners Learner engagement is a key concept being developed by FE/HE institutions and the project will seek to actively engage learners throughout the project to help shape the development and implementation of the Auto Share & Learn system and will draw on the Jisc Guide to setting up and implementing student partnerships. 800
  • 4. Engaging with other sectors Phase 3 will also seek to establish motivation in other sectors for the model that has been developed. Likely sectors include construction, manufacturing and rail. In the latter case, the rail sector is also witnessing growth in manufacturing and subsequent need for rapid skills development e.g. with Hitachi Rail’s new construction plan (see http://www.hitachirailproject.co.uk). The project will seek initial guidance from BIS as to the key employers/employer & sector bodies to engage with and then work to motivate such sectors to adopt the model. Possible collaborations will also be explored. Engaging with Jisc The project team members/partners include many who have a great deal of experience of working on Jisc-funded programmes and are aware of the extensive resources available that have resulted as outputs from such programmes e.g. from the first phase of the FE and skills development and resources programme as well as having been actively involved in developing sector guides and toolkits such as the Work-based learning maturity toolkit, effective practice for critical friends, sustaining and embedding innovations good practice. Already established resources of interest include online resources to help engage adult learners, TechDis materials for accessibility and inclusion, digital literacy resources, resources to support mobile learning, apps to engage learners with their own planning and monitoring of time and workload. Resources in other Jisc programmes will be researched including those from the LLL-WFD, curriculum design/delivery, digital literacies, business & community engagement, distributed VLE, e-portfolio interoperability and OER programmes. Key resources to be researched will include the various Jisc InfoNet infoKits and practical tools e.g. cloud computing, collaborative online tools, costing technologies, embedding BCE and mobile learning. Dissemination and engagement activities The project will actively engage in partnership with Jisc in its dissemination and evaluation activities with a specific focus on sustainability e.g. through development of a business model and engaging other sectors. As well as engagement with employers, employer/sector bodies as described above, the project will seek to disseminate and engage as follows: • Conference papers – target 8 (e.g. ALT-C, Greenwich employer engagement conference, Wales Future Directions conference, QAA (Scotland) Enhancement Theme conference, Jisc conferences, HEA conferences, automotive sector/skills development conferences) • Jisc mail lists - engage with Jisc e-mail lists such as Jisc Employability. • Workshops – target three key workshops (England, Wales and Scotland). • Webinars – target three key webinars. • Case studies – target two broad case studies focused on the West Midlands and south Wales supply chain, with mini-case studies of individual companies of how they have benefited. • Publishing of the model and all supporting resources via an online wiki. Write how many words you have used in this section in this box: Section 5 (activity costs) I have attached the requested document All type A projects must complete (and attach) the activity costing template (Annex B). NO 690
  • 5. Section 6 (budget) All type C and D projects (where the budget requested is over £15,000) must complete (and attach) the budget template (Annex C) YES Section 7 (risk assessment) Complete (and attach) the risk assessment template (Annex D) (1 single side of A4) YES Section 8 (project team) Provide information about the experience and capacity of the project team and any partners involved in the project. (2 single side of A4) YES Section 9 (letters of support) Attach letter(s) of support from a senior organisational manager/ (and any project partners) which describes how they and other relevant staff will engage in the project process. YES Terms and conditions of grant (project) I have read the Jisc terms and conditions of grant (project) available at http://www.jisc.ac.uk/fundingopportunities/terms-and-conditions-grant- project Tick the box to indicate you have read the T&Cs Attachments to be included with the completed proposal template are: • Activity costs for type A projects only (see template at Annex B) • Budget for type C and D projects only (see template at Annex C) • Risk assessment (see template at Annex D) √
  • 6. Work-plan and outputs The work-plan consists of four key work-packages which are detailed in the Table below: WP Work-package Key activities Key outputs/outcomes Start End 1 Phase 1: Project set-up and research 1(a) Project set-up, management & stakeholder engagement • Kick-off meeting • Develop partnership agreements and contracts • Detailed project plan • Review/identify key stakeholders and develop stakeholder communications and engagement plan • On-going project management • On-going stakeholder communications and engagement (including with Jisc and the wider sector communities) • Shared understanding/documentation of project; governance arrangements, IPR/ownership, roles, responsibilities • Partner/advisor agreements and contracts • Detailed project plan including, budget and updated risk management • Stakeholder communications and engagement plan & its implementation • Regular review, meetings and updating of project plan On-going throughout project 1(b) Initial research, needs analysis & specification • Identify skills-learning-accreditation- business needs of VMs, supply chain companies, educational suppliers and other key stakeholders • Identify end-user technology access and digital literacies • Develop outline specification and seek approvals • Identify third-party resources (e.g. outputs from Jisc programmes (inc FE skills Phase 1), support tools, learning resources, OERs) • Develop detailed specification • Develop framework for measuring/evaluating business/learner performance improvement • Develop on-going project evaluation • Identify requirements for system management, security and privacy (including e.g. private areas) • Report detailing needs of key stakeholders together with constraints, issues, challenges. • Assessment of end-user technologies and digital literacies which will shape technology specification and end-user support, guidance and training. • Outline specification for technology infrastructure, apps, usability, accessibility, end-user technologies. • List of resources • Detailed specification for technology infrastructure, apps, usability, accessibility, end-user technologies. • Framework for measuring/evaluating business/learner performance improvement • Evaluation approach. • System management specification 02/14 04/14 2 Phase 2: Supplier engagement 2(a) System development • Develop mock-up/prototype and seek feedback from key stakeholders • Set-up hosted (cloud-based) infrastructure technologies (e.g. Moodle) including integration • Develop systems for monitoring of usage (& stats/reporting) • Develop Apps • Feedback on prototype. • Infrastructure set-up and integration of technologies • Systems to help evaluate usage • Apps 03/14 05/14 2(b) Preparation and orientation for pilots • Develop user guides and online training (e.g. using screencasts) • Define and develop support arrangements. • Develop induction programme (including feedback mechanisms). • User guides and training. • Agreed support. • Induction programme. 04/14 05/14
  • 7. 2(c) Pilots & updates • Run induction programme • Pilot system and gain feedback (Wales and West Midlands) • Evaluate pilots and update system, guides, training etc. • End-users familiar with purpose and use of system • Understanding of user • Updated system, guides, training. 05/14 06/14 2(d) Implement system • Run induction programme • Roll-out system • Monitor usage and gain feedback and evaluate. • End-users familiar with purpose and use of system • Evaluation of usage 06/14 08/14 3 Phase 3: Engaging FE and HE 3(a) Further system development • Develop mock-up/prototype and seek feedback from key stakeholders • Further develop hosted (cloud-based) infrastructure technologies where needed • Develop systems for monitoring of usage (& stats/reporting) • Develop Apps • Feedback on prototype. • Refinement of infrastructure • Systems to help evaluate usage • Apps 07/14 09/14 3(b) Preparation and orientation for pilots • Develop user guides and online training (e.g. using screencasts) • Define and develop support arrangements. • Develop induction programme (including feedback mechanisms). • User guides and training. • Agreed support. • Induction programme. 09/14 10/14 3(c) Pilot & update • Run induction programme • Pilot system (Wales and West Midlands) and gain feedback • Evaluate pilots and update system, guides, training etc. • End-users familiar with purpose and use of system • Understanding of user • Updated system, guides, training. 11/14 12/14 3(d) Implement system • Run induction programme • Roll-out system • Monitor usage and gain feedback and evaluate. • End-users familiar with purpose and use of system • Evaluation of usage 12/14 2/15 4 Phase 4: Evaluation, sustaining and embedding • Evaluate use of system through surveys, focus groups. • Evaluate learning/performance/business improvement. • Develop business model of sustainability and support • Implement business model • Evaluation. • Evaluation. • Business model. • Implementation of business model. 2/15 6/15
  • 8. Experience and capacity of project team and partners PARTNERS • Birmingham Metropolitan College Birmingham Metropolitan College is a large General Further Education College with campuses across the Birmingham, Black Country and Wyre Forest areas. The college has a large engineering and manufacturing faculty providing apprenticeship and higher education solution for SMEs and large organisations throughout the UK. JLR, BMW, Caterpillar, Samsung and Cadbury/Kraft are amongst the organisations engaged in the delivery of engineering training programmes. The college has been recognised for innovative and excellent delivery in achieving the following awards: Training Quality Standard – Engineering Manufacturing; Centre of Vocational Excellence – Computer Integrated Manufacturing; Queen’s Anniversary Prize for Further and Higher Education; TES FE 2011 Award for Outstanding Innovation in Teaching; AOC Beacon Award for Lifelong Learning; Edge Award for Practical Teaching and Practical Learning; AOC 2013 Beacon Award for College Engagement with Employers. • Jaguar Land Rover The current growth by Jaguar Land Rover anticipates an increase in supply chain jobs of 24,000 in the foreseeable future. The company has created a ‘supply training forum’ to share information, resources, best practice and employee training to ensure that the supply chain has the skills to meet all quality requirements. JLR have also engaged with seven relevant Local Enterprise Council’s to develop a common blue print with the aim to work collectively and collaboratively to address the skills challenges across these LEP areas. JLR won the ‘Education Award’ which recognizes businesses that are building sustainable partnerships with schools to raise aspirations of young people, to enable them to build successful working lives. Birmingham MET have recently taken over the Jaguar Land Rover Education Business Partnership Centres and are championing their community agenda and the delivery of Traineeships. • Coleg Sir Gâr Coleg Sir Gâr is a Further and Higher Education college in South West Wales with a large Engineering Faculty that supports the training needs of an extensive automotive supply chain network of companies in the region. It also works closely with TATA, the owners of JLR, which has a major manufacturing plant in Llanelli where the college is based. Tony Toole was Dean of Faculty of Engineering at the college for 15 years and the current Principal, Barry Liles, was (and remains) instrumental in developing the supply chain training support network in the area. The college therefore has extensive experience of manufacturing supply chain support. The college also has a well-established track record in the development and delivery of online distance learning courses and Technology Enhanced Learning innovation. It has been lead organisation for a large number of Jisc, Welsh Government and EU funded collaborative TEL projects. PROJECT TEAM All team members named below have confirmed their availability and capacity to contribute to the project. • Dr Julie Nugent – Project Board and Executive Sponsor (Birmingham Metropolitan College) Julie is Executive Director for Strategy and Development and has 20 years experience in education and economic development, and extensive experience in managing large scale, multi-million pound projects – including significant web-enabled, customer-focused solutions. Julie previously worked as Director of Funding for the Skills Funding Agency, supporting the creation of a single system for funding FE and Deputy Director for FE at the Department for Business and Innovation and is now Exec Director for Strategy and Development at BMet, overseeing internal transformation programmes, external partnerships and new opportunities. • Anthony Gribben-Lisle – Project Board and Project Director (Birmingham Metropolitan College) Anthony is Director of Technology and Innovation with 10 years’ experience in leadership and management roles in the Further Education sector, and 5 years working in product management and business consultancy roles for an FE software and services provider, Anthony has experience of IT Systems, ILT, business systems and management information across a wide range of FE environments. In addition, his experience as a senior manager in a number of FE colleges includes strategic leadership of marketing and business development
  • 9. functions, employer and partner relationships, and quality improvement, ensure that solutions delivered from a technology perspective are targeted to support organisational objectives, and are focussed on high quality outcomes for learners. • Anthony Nicholls – Project Board and Project Manager (Birmingham Metropolitan College) Anthony is Head of Business Systems and has 20 years FE experience, across a range of IT and Information systems roles. A database and software development specialist, Anthony now heads up the Business and Online Systems team for the College, managing a portfolio of projects to harmonise, integrate and develop systems to meet business need. • Rita Davey – Project Board and Partner Lead (Jaguar Land Rover and SEMTA) Rita has 20 years experience in the Learning and Development sector where she has gained multi dimensional knowledge and experience addressing the skills needs of the manufacturing/engineering sector. This experience covers activity regionally and nationally through all sizes of employer’s. As curriculum leader at City College Birmingham she was responsible for all work based training. After leaving the college she worked on a number of manufacturing related projects such including Rover Task Force, Automotive Academy and National Skills Academy for Manufacturing. Rita developed regional trainer/assessor standards that were applied nationally. Rita is currently employed by SEMTA and is seconded to Jaguar Land Rover to lead their supplier engagement programme aiming to address their key skill challenges as a result of the recent and on-going Jaguar Land Rover growth. • Dave Howells – Project Board (Coleg Sir Gâr ) Dave is Director of Business Development and was previously Head of e-Learning at the college. He is responsible for training and consultancy services, partnership development and Innovation. Working with numerous partners and consultants across most sectors he is currently developing and delivering a range of new products and services to support the business sector in Leadership and Management, Construction, Manufacturing and ICT. • Dr Tony Toole – Project Board and Partner Lead (Coleg Sir Gâr ) Dr Tony Toole was Dean of Faculty of Engineering at Coleg Sir Gâr and then Director of Online Learning. He has successfully managed over 20 large-scale, collaborative and multi-institutional e-learning projects funded by Jisc, the Welsh Government and the EU. He has worked with Jisc as a Committee Member, Critical Friend and is a Board Member of Cetis. As Dean of Faculty he worked closely with manufacturing industry in the region, including their supply chain companies. Tony is a Visiting Professor at both the University of Wales Trinity Saint David and at the University of South Wales and works with both institutions as a consultant in the areas of Engineering, High Performance Computing, and Technology Enhanced Learning. • Dr Peter Chatterton – Project Board Dr Peter Chatterton has worked extensively in the area of HE/FE educational innovation (enabled through the use of new media/technologies) with a strong focus on employer engagement, partnerships and graduate employability. He has worked on over ten Jisc-funded projects in roles such as Critical Friend and Evaluator and has written many Jisc/QAA guides and toolkits. He has worked extensively with QAA, LFHE, HEA, HEFCW, Becta, LSIS and HEFCE. He has also been a consultant to the Ford Motor Company on flexible means to deliver HE programmes to employees as well as being a partner and board member in the Automotive College (a FE/HE/industry/DTI partnership) which designed and delivered learning/business improvement programmes to SMEs in the UK automotive supply chain. • Mark Stiles – Project Board and Project Evaluator Mark is Emeritus Professor of Technology Supported Learning, conferred by Staffordshire University. He was Professor of Technology Supported Learning at Staffordshire University from 2000 to 2012, leading a team which had corporate responsibility for eLearning and carried out work on strategy and policy for eLearning as well as many pedagogic and technical projects at national, regional and local levels, mostly funded by JISC. He is Chair of the new CETIS board, having been Chair of the JISC-CETIS Board for 5 years prior to reorganisation, and was Deputy Chair of the JISC Learning and Teaching Committee for 3 years. For the last 6 years he has represented JISC on the board of the IMS international standards body.
  • 10. Annex C: Project Budget Amount Other information Staff costs (including on costs) Project Director (Senior Manager, 0.1FTE) £6,000 (matched funding) Birmingham Metropolitan College Project Management (Senior Manager, 2 x 0.2FTE) £24,000 Birmingham Metropolitan College and Coleg Sir Gâr Technical Systems Development (Systems Designer, 0.2FTE + Technical Support) £15,000 Birmingham Metropolitan College Training Materials Development (Academic Staff, 2 x 0.1FTE) £14,000 Birmingham Metropolitan College, Coleg Sir Gâr, JLR Implementation and Pilot Delivery (Academic Staff, 2 x 0.2FTE) £15,000 Birmingham Metropolitan College, Coleg Sir Gâr, JLR Evaluation and Embedding (Academic Staff, Management, 0.1 FTE) £4,000 Birmingham Metropolitan College, Coleg Sir Gâr, JLR Professional and Industry Based Project Support (External Consultants, 2 x 0.2FTE) £15,000 External Consultants, including SEMTA Non staff costs Travel and expenses £5,000 Primarily for company visits. Project meetings will be mainly online. Dissemination £2,000 Final dissemination event and conference costs. Evaluation £3,000 External evaluation Additional costs (specify) £3,000 web hosting, printing, telephone, etc. Overheads (provide breakdown) Institutional Staff overheads: 1.3FTE @ £13.53/hr (Funding Council Calculation) £26,000 Included in the institutional contribution figure below Total project costs £132,000 Total requested from Jisc £100,000 Organisational contribution £32,000 Contribution from institutional senior management and staff overheads.
  • 11. Summary of the qualitative, and any quantitative, benefits your organisation will expect to receive from the project The qualitative benefits that both FE institutions will receive from the project outcomes will include: • Increased engagement with the manufacturing sector and its supply chain • Access to an online supplier support website to provide flexible and accessible support for the supply chain industries • An improved collaborative network that includes the FHE sector, SEMTA, and a range of manufacturing and supply chain companies • Greater experience in the use of online technologies to support skills based training that will be valuable and transferrable across industry sectors
  • 12. Annex D: Risk Assessment Type of risk Probability of occurrence (1 Low-5 High) Severity of impact (1 Low - 5 High) Overall score (probability x severity) Action to prevent/mitigate the risk Conflicting needs of different stakeholders (Issues of confidentiality, IPR, contractual constraints etc) 2 2 4 The project planning process will include a partnership agreement that addresses all such issues. Difficulty in engaging SMEs (Access to supply chain information, consultation, agreement to participate in development and testing) 2 4 8 A clearly important issue that will be addressed through the early negotiation with JLR and an agreed selection of supply chain companies. A major attraction for the SMEs will be the rapid prototyping deliverable. Tight project time-scale (website design and development, testing with companies, evaluation) 1 4 4 The project partners are experienced and well placed to manage the project plan within the timescale specified. Technical development issues (Staff capacity, design experience, web hosting) 2 4 8 Capacity, experience and hosting arrangements have been discussed in project planning and appropriate arrangements agreed and budgeted for. Transferring the model (Transferrable format, IPR agreement, creative commons licensing etc) 1 4 4 As a Jisc funded project the outcomes will be designed to be made freely available to the community of practice. Identifying an appropriate business model for sustainability (Appropriate platform, cost effective operation, quality assurance plan, funding etc) 2 2 4 Sustainability will be central to the project planning process from the outset. Where open source software and cloud hosting is appropriate, this will be included. There is a strong indication of sustainability funding from companies. Key project team member leaves 2 3 6 The fact that there are two experienced and resourceful FE colleges involve in this bid means that there is significant capacity to address this issue if it were to occur.