4. 500
400
300
USD Million
200
100
0
2007 2008 2009
Year
5. 40 years’ experience in engineering & construction
880 experienced professional staff (Engineers, Architects, QS,
Accountants)
USD 315 million paid up capital
USD 1.3 billion total assets
Machineries available for local and international projects
USD 80mil worth of equipment in India, Malaysia and Qatar
7. NORTH SOUTH EXPRESSWAY
848 km of tolled expressway
Completed in 1993
Project cost: USD 1.8 bil.
Role: Concessionaire, Project Management,
Construction
8. KUALA LUMPUR INTERNATIONAL AIRPORT
Integrated Development
Development Area 100 km2
Development Period 7 years
Gross Development Value (GDV) USD 3.6 bil
Project Management
Role Construction (Satellite
Building)
9. NATIONAL SPORTS COMPLEX
100,000 seat capacity National Stadium (outdoor stadium)
16,000 seat Putra Stadium (indoor stadium)
3,700 seat National Aquatic Centre (swimming complex)
Completed in 1998
Project cost: USD 400 million
Role: Concessionaire, Project Management, Construction
10. KUALA LUMPUR LIGHT RAIL TRANSIT
Total length: 29 km (22 km elevated, 5 km underground and 2 km
at-grade)
First world’s longest driverless LRT system completed in 1999
Capacity: 25,000 passengers/hr/direction
Project cost: USD2.04 billion
Role: Concessionaire, Project Management, Construction.
12. EXPRESSWAYS
NORTH SOUTH
EXPRESSWAY
Construction and O&M of
955 km tolled Highway
PENANG BRIDGE
Operation and Maintenance of 13.5 km bridge
MALAYSIA SINGAPORE SECOND CROSSING
Construction and O&M of 44 km of highways including 2 km bridge
NORTH SOUTH EXPRESSWAY
CENTRAL LINK
Construction and O&M of 45 km of tolled
expressway
13. NORTH-SOUTH EXPRESSWAY
Construction of several packages amounting to 203 km dual
two lanes tolled expressway.
Involved in implementation of heavy repair works and
routine maintenance of the completed 848 km
expressway since 1994.
Completed in May 1995.
Project cost: USD 630 million.
14. NORTH SOUTH EXPRESSWAY CENTRAL LINK
Construction of 45 km of tolled expressway linking NKVE to
Nilai North Interchange at NSE. Gateway to KLIA airport and
Cyberjaya/Putrajaya.
Involved in implementation of heavy repair works and routine
maintenance of the completed 60 km expressway since 1997.
Completed in December 1997.
Project cost: USD 236 million.
15. MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE
Construction of 44 km of dual two/three lane tolled
expressway and 2 km of bridge linking Johor to Singapore
and to Johor City & NSE.
Involved in implementation of heavy repair works and
routine maintenance of the completed 44 km expressway
since 1997.
Completed in December 1997.
Project cost: USD 310 million.
16. NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING
North South Expressway – Proposed Third
Lane Widening and Modification for Non-
Stop Through Traffic for Packages 1, 2A,
2B, 3A, 3B, 4, 5 and 5A.
Commenced:
Package 1 -July 2005 (Completed)
Package 2A,2B,3A,3B & 4 –Aug 2005
(Completed)
Package 5 – August 2005 (Completed)
Package 5A –July 2005 (Completed)
Value : USD 253 million
17. PENANG BRIDGE WIDENING
Construction of widening of the existing Penang Bridge.
Involvement of rejuvenation of the existing east side
approach embankment foundations alongside extending
the existing substructure of the main viaduct and
providing longitudinal beams and construction of Uni-
Directional Ramps to mainland side.
Completed on August 2009.
Project cost: USD 143 million.
19. MAJOR HIGHWAYS COMPLETED IN INDIA
Construction & Maintenance (for 15 years) of
Tuni - Anakapalli, NH 5, Andhra Pradesh
Length : 59 km.
Project Cost (@ EPC) : USD 48 mil.
Construction & Maintenance (for 15 years) of
Tambaram-Tindivanam,NH 45,Tamil Nadu
Length : 93 km.
Project Cost : USD 63 mil.
Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka
Length : 200 km.
Project Cost (@ EPC) : USD 152.7 mil.
20. MAJOR HIGHWAYS COMPLETED IN INDIA
Bhiwandi-Kalyan-Shil Phata, Maharastra
Length : 25 km.
Project Cost : USD 17 mil.
Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C
Length : 72km.
Project Cost : USD 63 mil.
Kerala State Transport Project Phase-1
Length : 127 km.
Project Cost : USD 50 mil.
21. MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES
Upgrading of existing R1 Expressway
Length: 6.6km dual 3-lane highway
Completed: April 1998
Project cost: USD23 million
22. PROJECT IN QATAR
Qatar Primary Routes - Salwa Road Phase 1
Upgrading 81 km dual 4 lane highway linking
Qatar-Saudi Border at Salwa to Doha
Total project cost: USD 265 million.
Completed: December 2008
23. TRANSPORTATION
ELECTRIFIED DOUBLE TRACK
Construction of total 182km of
Electrified Double Track Railway Lines
between two major cities
LIGHT RAIL TRANSIT SYSTEM
Construction of total 29km elevated, underground and at
grade track including stations for the driverless automated
Light Rail Transit.
24. PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR
Completed: 1999
Value: USD 494.3 million
Project involved the construction of 29 km track way for Light
Rail Transit System in Kuala Lumpur involving 22 km elevated
track, 5 km underground tunnel and 2 km at-grade track.
Construction of 5 underground LRT stations, 17 above-ground
and 2 at-grade stations throughout the LRT system.
Longest driverless automated LRT in the world.
Implemented in November 1994 and completed in June 1999.
25. IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING
Construction of 155 bridge crossings for the 182 km
electrified railway line linking Rawang to Ipoh.
Project Cost: USD 436 million.
31st March 2007
26. BUILDINGS & FACILITIES
MARDI Agriculture Centre
Construction of National Stadium,
aquatic centre and indoor stadium NATIONAL HEART INSTITUTE
for the nation sport facilities. Construction of new healthcare facilities for the
extension of the National Heart Institute.
NATIONAL SPORTS COMPLEX KUALA LUMPUR INTERNATIONAL
Construction of National Stadium, aquatic centre
and indoor stadium for the nation sport facilities. AIRPORT (KLIA)
Construction of Satellite Building and ancillary
works for the Malaysia’s largest airport.
MINISTRY OF FINANCE II BUILDING
Construction of Government Building for the
Federal Government Administrative Centre in
Putrajaya. JSNAC
Construction of Johor State New
Administration Centre in Johor
27. NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR
Completed: 1998
Value: USD 286 million
100,000 capacity National Stadium (outdoor
stadium), 3,700 seat National Aquatic Centre
(swimming complex) and 16,000 seat Putra
Stadium (indoor stadium).
Implemented in January 1994 and completed in
July 1998 for the XVI Commonwealth Games.
28. COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR
Completed: 1998
Value: USD 77.7 million
Gross Floor Area: 198,774 m²
Construction of multi storey apartment blocks
complete with recreational facilities.
1,500 units were built in total.
29. KUALA LUMPUR INTERNATIONAL AIRPORT,
SATELLITE BUILDING, SEPANG
Completed: 1998
Value: USD 157 million
Gross Floor Area: 148,000 m².
Design and construction of the satellite building
and its ancillary works as part of the Kuala
Lumpur International Airport Complex.
Project implementation in joint venture with
international construction companies as
consortium partners.
30. EAST MALAYSIA HOSPITALS
Completed: 2005
Value: USD 256 million
The planning, design, construction, equipping, commissioning
and maintenance of six hospitals with a combined total of 976
beds were delivered to the Ministry of Health Malaysia in stages
from 2002 till 2005. Five of the hospitals are located in the state
of Sabah in East Malaysia, namely Lahad Datu, Keningau,
Kuala Penyu, Pitas and Kunak. One more hospital is located in
the state of Sarawak, also in East Malaysia, in Sarikei.
31. EAST MALAYSIA HOSPITALS
Sarikei, Sarawak
Completed: December 2005
Value: USD 74 million
Total of 268 beds
Gross Floor Area: 40,000 sq. ft
Pitas, Sabah
Completed: June 2005
Value: USD 24 million
Total of 76 beds
Gross Floor Area: 15,284 m2
32. EAST MALAYSIA HOSPITALS
Kuala Penyu, Sabah
Completed: May 2005
Value: USD 22 million
Total of 76 beds
Gross Floor Area: 15,284 m2
Kunak, Sabah
Completed: May 2005
Value: USD 24 million
Total of 76 beds
Gross Floor Area: 15,284 m2
33. EAST MALAYSIA HOSPITALS
Keningau, Sabah
Completed: September 2002
Value: USD 58 million
Total of 212 beds
Gross Floor Area: 63,477 m2
34. EAST MALAYSIA HOSPITALS
Lahad Datu, Sabah
Completed: January 2002
Value: USD 61 million
Total of 268 beds
Gross Floor Area: 68,1000 m2
35. EAST MALAYSIA HOSPITALS
Sarikei Hospital, Malaysia (268 Beds)
Completed: December 2003
Value: USD 74 million
Total of 268 beds
Gross Floor Area: 40,000 sqft.
36. UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE,
TRONOH, PERAK
Completed: October 2005
Value: USD 7.7 million
Gross Floor Area: 5,659 m²
The construction and completion of this
uniquely designed ‘floating’ mosque at
Bandar Seri Iskandar, Perak has a
capacity to accommodate 4,000
people.
The enclosed main prayer area is air-
conditioned and can accommodate
1,000 people. The covered prayer area,
accommodating 3,000 people, which
was previously ventilated naturally, has
been changed into an air-conditioned
system.
37. DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR
• Commenced: 10 September 2004
• Completion: 6 November 2005
• Value: USD90.5 million
Construction and completion of 64
units of 3-storey link home and
sewerage pump, Danau Villa Link
Home, Taman Desa, Kuala Lumpur.
38. MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA
Commenced: 4 December 2002
Completed: 30 April 2007
Value: USD 60 million
Gross Floor Area: 67,108 m²
Design, construction and completion of office
buildings to house agencies under the Ministry of
Finance at the New Federal Government
Administrative Centre in Putrajaya.
2 office blocks, 8 and 10-storey high with each
housing two levels of basement car parks.
Scope of works include interior design works.
39. CASA DESA CONDOMINIUM, KUALA LUMPUR
Commenced: 11 July 2005
Completed : 31 March 2008 For the 410-unit Casa Desa Condominium, the
Value: USD 24 million contract package consists of substructure works and
Gross Floor Area: 9,794 m2 superstructure works.
Project involves construction of 7 blocks of
condominium buildings including earthworks, bored
piling and pile caps.
40. AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG
Project : Agriculture Exposition Centre (Phase 2) –
MARDI, Serdang
Commenced : 27 November 2007
Completed : 30 June 2008
Value : USD 64 million
Gross Floor Area: 25,000 m²
41. JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC),
PHASE 1, JOHOR
Commenced: November 2005
Completed: August 2008
Value: USD 62 million
The development of the JSNAC on a 320-acre site
located at Bandar Nusajaya, 25 km from Johor
Bahru, Johor is divided into three precincts
comprising the Government precinct (273 acres), VIP
residences and Istana reserve (17 acres) and
government housing reserve (30 acres).
Phase 1 of this development is
divided into five packages where
three packages, has been
awarded. Project involves the
construction of office buildings
for the new state administrative
centre in Johor.
42. STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA
Commenced: November 2005
Completed: February 2009
Value: USD 63 million
43. UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR
Commenced: 1 June 2005
Completed: December 2008
Value: USD 45 million
Gross Floor Area: 35,000 m²
This project involves the design and construction of a 29-
storey office building with an 8-storey annex building at
KL Sentral. The scope of works involves interior design.
44. PLUS HEADQUARTERS, SUBANG
Development of one block of 10-storey
office tower at Subang Toll, Petaling Jaya,
Selangor Darul Ehsan
Commenced : 15 January 2007
Completed : December 2008
Value : USD 29 million
45. NATIONAL HEART INSTITUTE, KUALA LUMPUR
Commenced: 5 September 2005
Completed: March 2009
Value: USD 64.6 million
Gross Floor Area: 32,840 m²
Design, construction, supply and commissioning
and maintenance of new healthcare facilities for
the extension of the National Heart Institute.
This project is divided into four phases and works
entail the renovating and refurbishing of existing
facilities.
46. COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR
Constructionof 21 multidisciplinary buildings comprising
classrooms, workshops/labs, cafeterias, recreation facilities,
auditorium and administration buildings with a total area of
63,000 m2 and external infrastructure for campus area of
300,000 m2.
Project cost: USD 100 million.
Completed: October 2006
47. GOVERNMENT APARTMENTS, PUTRAJAYA
Project : 548 Units (5 Blocks) Apartment
Using Industrialised Building System (IBS) Method
Commenced : September 2006
Exp. Completion : March 2008
Value : USD 39 million
Gross Floor Area: 60,500 m²
48. RESORTS WORLD AT SENTOSA, SINGAPORE
Proposed Basement Structural Works for
Universal Studio
Commenced: March 2008 MC04-F1
Completed: July 2008
Value: USD 4.5 million
Gross Floor Area: 65,800 m²
50. BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR
Design, construction and completion of 2 office
towers (32 and 38-storeys), 1 block of 8-storey
annex comprises of car parks and 1 unit PPU
Commenced : 1 June 2009
Exp. Completion : December 2011
Value : USD 26 million
Gross Floor Area: 188,000 m²
51. PENANG SECOND BRIDGE
Project : Design, Construction and Completion of the
Penang Second Bridge.
Package 2 : Super-structure Works of Approach Spans.
• Overall length - 24 km
• Length over water - 17 km,
• Main span : Length - 250 meters
• Height clearance (above water) – 30 meters
• Number of vehicle lanes – 2 + 1 for motorcycles (each
direction)
Commenced : June 2009
Exp. Completion : March 2013
Value : USD 473 million
52. PHG’-S’GOR RAW WATER TRANSFER PROJECT
Pahang - Selangor Raw Water Transfer
Project Lot 1-1, Water Transfers
Tunnel & Related Works (2,260 Mld.)
Commenced : June 2009
Exp. Completion : May 2014
Value : USD 400 million
Length: 44.6km ; Diameter: 5.2m
53. 1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh
Project : Construction of various
building and engineering works at
Sushant Golf City, Lucknow U.P. India.
Commenced : 1 April 2008
Exp. Completion : February 2012
Value : USD 497 million
Total Development Area : 1,765 acre
54. 4000 UNITS HOUSING PROJECT, BRUNEI
Project : 4000 units Housing Project for the
National Housing Scheme, Brunei.
Commenced : 2 February 2010
Exp. Completion : February 2014
Value : USD 290 million
Total Development Area: 309 hectares
55. NEW LCC TERMINAL AT KLIA, SEPANG
Project : Design, Construction and Completion,
Testing, Commissioning and Maintenance of Main
Terminal Building, Satellite Building, Sky Bridge
and Piers.
Commenced : 16 August 2010
Exp. Completion : April 2012
Value : USD 316 million
56. Thank You
This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without
written permission of United Engineers (Malaysia) Berhad.
This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its
preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers
(Malaysia) Berhad.