Montenegro is currently a net energy importer, but seeks to export energy in the nearer future. An example
is the planned €100 million transmission line Lastva-Pljevlja between Montenegro and Italy, which will be con-
structed by Italian Transmission Company Terna and was approved funding from the European Bank for Re-
construction and Development of €65 million in April 2013. The transmission line aims to connect several
hydropower plants and a wind farm in Montenegro to the Italian grid (SECN, 2013). With technical assistance
from UNDP-GEF’s Promoting Renewable Energy Sources project, the Government of Montenegro developed
the Energy Law and other related bylaws regulating rights and obligations of entitled renewable energy pro-
ducers, including the introduction of power purchase obligations valid for 12 years, in combination with feed-
in tariffs:
Montenegro
General Country
Information
Population: 621,081
Surface Area: 13,810 km²
Capital City: Podgorica
GDP (2012): $ 4.2 billion
GDP Per Capita (2012): $ 6,813
WB Ease of Doing Business: 44
Sources: Kovacevic (2010); Ministry of Economy (2012); World Bank (2014); UNDP (2012); Italian Ministry of Environment, Land
and Sea (2007); EIA (2010); EIA (2013); Renewable Facts (2013); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); and
UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Montenegro
Empowered lives.
Resilient nations.
1%
RE Share
868 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
0 < 1 < 1 8.7
600 12,800 400 200
9 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
Despite the introduction of feed-in tariffs, the share of installed renewable energy capacity in the total installed
electricity capacity is stagnant at around 1 percent. However, the country was ranked in 44th
spot in the World
Bank’s Ease of Doing Business index, which represents a rise of six places over the previous year. Its rankings in
the sub-indicators, Dealing with Construction Permits (106) and Registration of Property (98) have increased sig-
nificantly by 68 and 16 places respectively (IFC & World Bank, 2014).
In line with EU Directive 2009/28/EC, Montenegro committed itself to a national binding target of 33 percent
share of renewable energy sources in gross final energy consumption by 2020 (EC, 2012). In accordance with the
Energy Law, an‘Energy Development Strategy by 2025’has been developed.There is also a final draft green paper
for the‘Energy Development Strategy by 2030’. The latter specifies electricity generation targets from renewable
sources by 2030, e.g. 436.3 GW-h/year for electricity production from wind power plants, and 52 GW-h/year from
solar power plants (Ministry of Economy, 2012).The Energy Law is the energy sector’s general policy paper.Together
with the Law on Concession, the Law on Energy Efficiency, and regulations such as the Decree on theTariff System
for Determining the Incentive Prices for Electricity produced from Renewable Sources, and the Rulebook on Criteria
for Issuance of Energy Licence, this is the foundation for Montenegro’s renewable energy legislation. In addition
to the feed-in tariffs for eligible renewable energy producers, there are other incentives for project developers in-
vesting in renewable energy in Montenegro. The feed-in tariff is adjusted annually for inflation and also applies
(with certain conditions) to reconstructed plants. Corporate profit tax rate is low at 9 percent. Foreign investors
enjoy tax exemption with certain conditions (MIPA, 2013). Renewable energy power plants with an installed ca-
pacity up to 30 kW have the right to electricity exchange within the system, while plants above that limit are
granted non-discriminatory access to the power grid (Energy Law, Articles 90 & 101). Energy generation is subject
to licencing by the Energy Regulatory Agency. A concession for the usage and construction of energy-related
structures used to generate, transmit or distribute electricity is also required (Law on Concessions, Article 6 (8)).
The UNDP-GEF project, Promotion of Renewable Energy Sources, supported the Government in developing the
renewable energy legislation and improving the tender process. Since 2008, 13 concessions with a total installed
capacity of 97 MW for small hydropower plants and two wind power concessions with a total installed capacity
of 96 MW were granted to investors (Vener, 2013). As a result of this project, in 2013 the Ministry of Economy an-
nounced tender calls for seven small hydropower concessions in Montenegro (Ministry of Economy, 2013).1
Legislation and policy
R E N E W A B L E E N E R G Y S N A P S H O T :
Feed-in tariffs in Montenegro
Source: Government of Montenegro (2011)
Eligible technologies Additional condition Tariff granted in €/MW-h
Wind - 96.10
Solar For buildings and engineering constructions 150.00
Hydro produced electricity up to 3.0 GW-h
produced electricity between 3.0 - 15 GW-h
produced electricity exceeding 15 GW-h
104.40
74.40
50.40
Biomass Forestry and Agriculture
Wood
137.10
123.10
1 More information regarding the latest small hydropower stations tenders is available at: www.mek.gov.me/en/library/tenderi
Montenegro
Institutions
Organization Responsibility Website
Ministry of Economy - Responsible for shaping the state’s energy policy and
strategy, and for preparing laws and key bylaws
www.mek.gov.me/
Energy Regulatory Agency - Responsible for issuing licences for energy activities
- Issues guarantees of origin to confirm renewable en-
ergy sources
- Approves the status of privileged renewable energy
producers
www.regagen.co.me/
Crnogorski Elektroprenosni
Sistem (CGES)
- As transmission system operator responsible for op-
eration, development and maintenance of the na-
tional the national grid
www.tso-epcg.com/
Crnogorski Operator Trzista
Elektricne Energije (COTE)
- Market operator responsible for organization and
management of the electricity market
- Privileged renewable energy producers trade electric-
ity with the market operator under specific licencing
and tariff conditions where the market operator pays
the tariff monthly to the energy producer
www.cotee.me/
Elektroprivreda
Crne Gore (EPCG)
- Main electricity company responsible for generation,
transmission and distribution of electricity
www.epcg.co.me
Montenegro Investment
Promotion Agency (MIPA)
- State-owned Montenegrin investment promotion
agency responsible for attracting, consulting with
and facilitating potential investors
www.mipa.co.me/
Opportunities to finance renewable energy projects in Montenegro
Financing organization Details Website
Western Balkans
Sustainable Energy
Direct Financing
Facility (WeBSEDFF)
Locally small and medium enterprises with a sound fi-
nancial and economic structure and sufficient means
of equity capital can apply for direct loans from the
European Bank for Reconstruction and Development’s
Western Balkan Sustainable Energy Direct Financing
Facility of between €2 million and €6 million.
www.websedff.com
Green Growth Fund Provides direct and indirect (through financial inter-
mediaries) financing for small scale renewable energy
projects usually not larger than €50 million.
www.ggf.lu/
EU Means via EIB Loans and guarantees through commercial banks as
intermediaries (e.g. Crnogorska Komercijalna Banka
and Erste Bank Montenegro) are available.
www.europa.eu/youreurope/business/fi-
nance-support/access-to-finance/
International
Finance Corporation (IFC)
With investment (equity, loans and other financial in-
struments) and advisory services, IFC supports invest-
ments that focus on climate change, including
investments in infrastructure and energy sectors.
www.ifc.org/
Montenegro
References
Energy Community (EC), 2012: Energy Community
Ministerial Council adopts Renewable Energy 2020
targets. Available at: www.energy-
community.org/portal/page/portal/ENC_HOME/NEWS
/News_Details?p_new_id=6342
Government of Montenegro, 2009: Law on Concessions.
Available at:
www.questionnaire.gov.me/Annexes/Annex024.pdf
Government of Montenegro, 2010: Energy Law.
Available at: www.oie-res.me/uploads/archive/E_
Energy-Law_final.pdf
Government of Montenegro, 2011: Decree on theTariff
System for Determining the Incentive Prices for
Electricity produced from Renewable Energy Sources
and High Efficient Cogeneration. Available at: www.oie-
res.me/uploads/archive/News%202010/E_Decree%20o
n%20the%20tariff%20system.pdf
Hoogwijk, M., 2004: On the global and regional
potential of renewable energy sources. Utrecht:
Universiteit Utrecht, Faculteit Scheikunde. Dissertation.
Available at: http://igitur-archive.library.uu.nl
/dissertations/2004-0309-123617/full.pdf
Hoogwiijk, M. andW. Graus, 2008: Global Potential of
Renewable Energy Sources: A Literature Assessment.
Available at: www.ecofys.com/files/files/report_global_
potential_of_renewable_energy_sources_a_literature_
assessment.pdf
International Finance Corporation (IFC) andWorld Bank,
2014: Doing Business – Measuring Business
Regulations. Available at: www.doingbusiness.org/
data/exploreeconomies/montenegro/
Italian Ministry of Environment, Land and Sea, 2007:
Renewable Energy Resource Assessment Republic of
Montenegro. Available at:
www.oie-res.me/uploads/archive/Renewable%20
Energy%20Resource%20Assessment%20Feb.2007.pdf
Joint Research Centre of the European Commission
(JRC), 2011:Technical Assessment of the Renewable
Energy Action Plans. Available at:
http://ec.europa.eu/dgs/jrc/downloads/jrc_reference
_report_2011_reap.pdf
Kovacevic, I., 2010: Renewable Energy Sources in
Montenegro. Available at: www.energy-
community.org/pls/portal/docs/566194.PDF
Ministry of Economy, 2012: Update / Upgrade of“Energy
Development Strategy of Montenegro by 2030. (Green
Book and draftWhite Book). Available at:
www.seaeds.me/images/120627_Output_3-
1_Green_Book_final_draft_ENG.pdf
Ministry of Economy, 2013: Renewable Energy Sources.
Available at: http://www.oie-res.me/
Montenegrin investment Promotion Agency (MIPA),
2013: Investment Opportunities. Available at:
www.mipa.co.me
Renewable Facts, 2013: Montenegro. Available at:
www.renewablefacts.com/country/montenegro
See–Change Network (SEECN), 2013: Invest in Haste,
Repent at Leisure - Are IFIs behaving as if EU accession
criteria and extreme energy losses do not exist in South
East Europe. Available at:
http://bankwatch.org/sites/default/files/SEE-IFI-
energy.pdf
UNDP, 2012: Sustainable Energy for All (SE4ALL) -
Montenegro Rapid Assessment and Gap Analysis
U.S. Energy Information Administration (EIA), 2010:
Electricity Data -Total Electricity Installed Capacity.
Available at:
http://www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm
?tid=2&pid=2&aid=7
U.S. Energy Information Administration (EIA), 2013:
Levelized Cost of New Generation Resources in the
Annual Energy Outlook 2013. Available at:
www.eia.gov/forecasts/aeo/electricity_generation.cfm
Vener, J. M., 2013: UNDP-GEF Power Sector Policy
Reform to Promote Small Hydropower Development in
the Republic of Montenegro - Summary of
Achievements and Lessons Learned. Available at:
http://erc.undp.org/evaluationadmin/manageevaluatio
n/viewevaluationdetail.html?evalid=5733
World Bank, 2014: Data Catalog. Available at:
http://datacatalog.worldbank.org/
Recent projects
Company Project Status
Fersa Energias Renovables
(Spain)
Is currently developing a 46 MW wind park at Mozura.
The park will have 23 wind generators with a pro-
jected generation of approximate 97 GW-h.
Under development
Ivicom Consulting (Austria)
and Mitsubishi (Japan)
Is currently developing a 50 MW wind park at Krnovo.
The park will have 21 wind generators with a pro-
jected generation of approximate 110 GW-h.
Under development
Financing organization Details Website
European Bank for Recon-
struction and Development
(EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Poland
PolandPoland
Poland
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Day2 session 3: Morocco
Day2 session 3: MoroccoDay2 session 3: Morocco
Day2 session 3: Morocco
 
Romania
RomaniaRomania
Romania
 
Albania[1]
Albania[1]Albania[1]
Albania[1]
 
Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020
 
Latvia
LatviaLatvia
Latvia
 
Slovenia
SloveniaSlovenia
Slovenia
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Subsidies and costs of EU energy (2014)
Subsidies and costs of EU energy (2014)Subsidies and costs of EU energy (2014)
Subsidies and costs of EU energy (2014)
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
 
Turkey
TurkeyTurkey
Turkey
 
Moldova
MoldovaMoldova
Moldova
 
Estonia
EstoniaEstonia
Estonia
 
MARIE ESCO GOLEA MODELLI
MARIE ESCO GOLEA MODELLIMARIE ESCO GOLEA MODELLI
MARIE ESCO GOLEA MODELLI
 
Armenia
ArmeniaArmenia
Armenia
 
Lithuania
LithuaniaLithuania
Lithuania
 
B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
Guarantees of Origin Michael Börner
Guarantees of Origin   Michael BörnerGuarantees of Origin   Michael Börner
Guarantees of Origin Michael Börner
 

Destacado (7)

Montenegro
MontenegroMontenegro
Montenegro
 
Montenegro
MontenegroMontenegro
Montenegro
 
Montenegro
MontenegroMontenegro
Montenegro
 
MONTENEGRO
MONTENEGROMONTENEGRO
MONTENEGRO
 
Bosnia
Bosnia Bosnia
Bosnia
 
Serbia
SerbiaSerbia
Serbia
 
Presentation of Montenegro
Presentation of MontenegroPresentation of Montenegro
Presentation of Montenegro
 

Similar a Montenegro's renewable energy snapshot outlines key info

Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketEnerjimiz Güneş
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013UNDPhr
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTRenato Borra
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMouhcine Benmeziane
 
Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015Informest
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniLorenc Gordani
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phonesVito Gamberale
 

Similar a Montenegro's renewable energy snapshot outlines key info (17)

Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
Belarus
BelarusBelarus
Belarus
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
 
czech (1)
czech (1)czech (1)
czech (1)
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Georgia
GeorgiaGeorgia
Georgia
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 
The European Energy Infrastructure Challenge. Alberto Pototschnig
The European Energy Infrastructure Challenge. Alberto PototschnigThe European Energy Infrastructure Challenge. Alberto Pototschnig
The European Energy Infrastructure Challenge. Alberto Pototschnig
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phones
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 

Más de UNDP Eurasia

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan ZverzhanovskiUNDP Eurasia
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben SlayUNDP Eurasia
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta AyoungUNDP Eurasia
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka CetkovicUNDP Eurasia
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim BouevUNDP Eurasia
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 

Más de UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Último

Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 

Último (20)

Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 

Montenegro's renewable energy snapshot outlines key info

  • 1. Montenegro is currently a net energy importer, but seeks to export energy in the nearer future. An example is the planned €100 million transmission line Lastva-Pljevlja between Montenegro and Italy, which will be con- structed by Italian Transmission Company Terna and was approved funding from the European Bank for Re- construction and Development of €65 million in April 2013. The transmission line aims to connect several hydropower plants and a wind farm in Montenegro to the Italian grid (SECN, 2013). With technical assistance from UNDP-GEF’s Promoting Renewable Energy Sources project, the Government of Montenegro developed the Energy Law and other related bylaws regulating rights and obligations of entitled renewable energy pro- ducers, including the introduction of power purchase obligations valid for 12 years, in combination with feed- in tariffs: Montenegro General Country Information Population: 621,081 Surface Area: 13,810 km² Capital City: Podgorica GDP (2012): $ 4.2 billion GDP Per Capita (2012): $ 6,813 WB Ease of Doing Business: 44 Sources: Kovacevic (2010); Ministry of Economy (2012); World Bank (2014); UNDP (2012); Italian Ministry of Environment, Land and Sea (2007); EIA (2010); EIA (2013); Renewable Facts (2013); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Montenegro Empowered lives. Resilient nations. 1% RE Share 868 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 0 < 1 < 1 8.7 600 12,800 400 200 9 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW
  • 2. Despite the introduction of feed-in tariffs, the share of installed renewable energy capacity in the total installed electricity capacity is stagnant at around 1 percent. However, the country was ranked in 44th spot in the World Bank’s Ease of Doing Business index, which represents a rise of six places over the previous year. Its rankings in the sub-indicators, Dealing with Construction Permits (106) and Registration of Property (98) have increased sig- nificantly by 68 and 16 places respectively (IFC & World Bank, 2014). In line with EU Directive 2009/28/EC, Montenegro committed itself to a national binding target of 33 percent share of renewable energy sources in gross final energy consumption by 2020 (EC, 2012). In accordance with the Energy Law, an‘Energy Development Strategy by 2025’has been developed.There is also a final draft green paper for the‘Energy Development Strategy by 2030’. The latter specifies electricity generation targets from renewable sources by 2030, e.g. 436.3 GW-h/year for electricity production from wind power plants, and 52 GW-h/year from solar power plants (Ministry of Economy, 2012).The Energy Law is the energy sector’s general policy paper.Together with the Law on Concession, the Law on Energy Efficiency, and regulations such as the Decree on theTariff System for Determining the Incentive Prices for Electricity produced from Renewable Sources, and the Rulebook on Criteria for Issuance of Energy Licence, this is the foundation for Montenegro’s renewable energy legislation. In addition to the feed-in tariffs for eligible renewable energy producers, there are other incentives for project developers in- vesting in renewable energy in Montenegro. The feed-in tariff is adjusted annually for inflation and also applies (with certain conditions) to reconstructed plants. Corporate profit tax rate is low at 9 percent. Foreign investors enjoy tax exemption with certain conditions (MIPA, 2013). Renewable energy power plants with an installed ca- pacity up to 30 kW have the right to electricity exchange within the system, while plants above that limit are granted non-discriminatory access to the power grid (Energy Law, Articles 90 & 101). Energy generation is subject to licencing by the Energy Regulatory Agency. A concession for the usage and construction of energy-related structures used to generate, transmit or distribute electricity is also required (Law on Concessions, Article 6 (8)). The UNDP-GEF project, Promotion of Renewable Energy Sources, supported the Government in developing the renewable energy legislation and improving the tender process. Since 2008, 13 concessions with a total installed capacity of 97 MW for small hydropower plants and two wind power concessions with a total installed capacity of 96 MW were granted to investors (Vener, 2013). As a result of this project, in 2013 the Ministry of Economy an- nounced tender calls for seven small hydropower concessions in Montenegro (Ministry of Economy, 2013).1 Legislation and policy R E N E W A B L E E N E R G Y S N A P S H O T : Feed-in tariffs in Montenegro Source: Government of Montenegro (2011) Eligible technologies Additional condition Tariff granted in €/MW-h Wind - 96.10 Solar For buildings and engineering constructions 150.00 Hydro produced electricity up to 3.0 GW-h produced electricity between 3.0 - 15 GW-h produced electricity exceeding 15 GW-h 104.40 74.40 50.40 Biomass Forestry and Agriculture Wood 137.10 123.10 1 More information regarding the latest small hydropower stations tenders is available at: www.mek.gov.me/en/library/tenderi
  • 3. Montenegro Institutions Organization Responsibility Website Ministry of Economy - Responsible for shaping the state’s energy policy and strategy, and for preparing laws and key bylaws www.mek.gov.me/ Energy Regulatory Agency - Responsible for issuing licences for energy activities - Issues guarantees of origin to confirm renewable en- ergy sources - Approves the status of privileged renewable energy producers www.regagen.co.me/ Crnogorski Elektroprenosni Sistem (CGES) - As transmission system operator responsible for op- eration, development and maintenance of the na- tional the national grid www.tso-epcg.com/ Crnogorski Operator Trzista Elektricne Energije (COTE) - Market operator responsible for organization and management of the electricity market - Privileged renewable energy producers trade electric- ity with the market operator under specific licencing and tariff conditions where the market operator pays the tariff monthly to the energy producer www.cotee.me/ Elektroprivreda Crne Gore (EPCG) - Main electricity company responsible for generation, transmission and distribution of electricity www.epcg.co.me Montenegro Investment Promotion Agency (MIPA) - State-owned Montenegrin investment promotion agency responsible for attracting, consulting with and facilitating potential investors www.mipa.co.me/ Opportunities to finance renewable energy projects in Montenegro Financing organization Details Website Western Balkans Sustainable Energy Direct Financing Facility (WeBSEDFF) Locally small and medium enterprises with a sound fi- nancial and economic structure and sufficient means of equity capital can apply for direct loans from the European Bank for Reconstruction and Development’s Western Balkan Sustainable Energy Direct Financing Facility of between €2 million and €6 million. www.websedff.com Green Growth Fund Provides direct and indirect (through financial inter- mediaries) financing for small scale renewable energy projects usually not larger than €50 million. www.ggf.lu/ EU Means via EIB Loans and guarantees through commercial banks as intermediaries (e.g. Crnogorska Komercijalna Banka and Erste Bank Montenegro) are available. www.europa.eu/youreurope/business/fi- nance-support/access-to-finance/ International Finance Corporation (IFC) With investment (equity, loans and other financial in- struments) and advisory services, IFC supports invest- ments that focus on climate change, including investments in infrastructure and energy sectors. www.ifc.org/
  • 4. Montenegro References Energy Community (EC), 2012: Energy Community Ministerial Council adopts Renewable Energy 2020 targets. Available at: www.energy- community.org/portal/page/portal/ENC_HOME/NEWS /News_Details?p_new_id=6342 Government of Montenegro, 2009: Law on Concessions. Available at: www.questionnaire.gov.me/Annexes/Annex024.pdf Government of Montenegro, 2010: Energy Law. Available at: www.oie-res.me/uploads/archive/E_ Energy-Law_final.pdf Government of Montenegro, 2011: Decree on theTariff System for Determining the Incentive Prices for Electricity produced from Renewable Energy Sources and High Efficient Cogeneration. Available at: www.oie- res.me/uploads/archive/News%202010/E_Decree%20o n%20the%20tariff%20system.pdf Hoogwijk, M., 2004: On the global and regional potential of renewable energy sources. Utrecht: Universiteit Utrecht, Faculteit Scheikunde. Dissertation. Available at: http://igitur-archive.library.uu.nl /dissertations/2004-0309-123617/full.pdf Hoogwiijk, M. andW. Graus, 2008: Global Potential of Renewable Energy Sources: A Literature Assessment. Available at: www.ecofys.com/files/files/report_global_ potential_of_renewable_energy_sources_a_literature_ assessment.pdf International Finance Corporation (IFC) andWorld Bank, 2014: Doing Business – Measuring Business Regulations. Available at: www.doingbusiness.org/ data/exploreeconomies/montenegro/ Italian Ministry of Environment, Land and Sea, 2007: Renewable Energy Resource Assessment Republic of Montenegro. Available at: www.oie-res.me/uploads/archive/Renewable%20 Energy%20Resource%20Assessment%20Feb.2007.pdf Joint Research Centre of the European Commission (JRC), 2011:Technical Assessment of the Renewable Energy Action Plans. Available at: http://ec.europa.eu/dgs/jrc/downloads/jrc_reference _report_2011_reap.pdf Kovacevic, I., 2010: Renewable Energy Sources in Montenegro. Available at: www.energy- community.org/pls/portal/docs/566194.PDF Ministry of Economy, 2012: Update / Upgrade of“Energy Development Strategy of Montenegro by 2030. (Green Book and draftWhite Book). Available at: www.seaeds.me/images/120627_Output_3- 1_Green_Book_final_draft_ENG.pdf Ministry of Economy, 2013: Renewable Energy Sources. Available at: http://www.oie-res.me/ Montenegrin investment Promotion Agency (MIPA), 2013: Investment Opportunities. Available at: www.mipa.co.me Renewable Facts, 2013: Montenegro. Available at: www.renewablefacts.com/country/montenegro See–Change Network (SEECN), 2013: Invest in Haste, Repent at Leisure - Are IFIs behaving as if EU accession criteria and extreme energy losses do not exist in South East Europe. Available at: http://bankwatch.org/sites/default/files/SEE-IFI- energy.pdf UNDP, 2012: Sustainable Energy for All (SE4ALL) - Montenegro Rapid Assessment and Gap Analysis U.S. Energy Information Administration (EIA), 2010: Electricity Data -Total Electricity Installed Capacity. Available at: http://www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm ?tid=2&pid=2&aid=7 U.S. Energy Information Administration (EIA), 2013: Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013. Available at: www.eia.gov/forecasts/aeo/electricity_generation.cfm Vener, J. M., 2013: UNDP-GEF Power Sector Policy Reform to Promote Small Hydropower Development in the Republic of Montenegro - Summary of Achievements and Lessons Learned. Available at: http://erc.undp.org/evaluationadmin/manageevaluatio n/viewevaluationdetail.html?evalid=5733 World Bank, 2014: Data Catalog. Available at: http://datacatalog.worldbank.org/ Recent projects Company Project Status Fersa Energias Renovables (Spain) Is currently developing a 46 MW wind park at Mozura. The park will have 23 wind generators with a pro- jected generation of approximate 97 GW-h. Under development Ivicom Consulting (Austria) and Mitsubishi (Japan) Is currently developing a 50 MW wind park at Krnovo. The park will have 21 wind generators with a pro- jected generation of approximate 110 GW-h. Under development Financing organization Details Website European Bank for Recon- struction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml