Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Weekly report template march7
1. [INC 281 Multidisciplinary workshop weekly report]
March 7, 2012
Name-Surname Mrs. Marin Rattanapapra (You)
Student ID. 53211823
Group Name Habithai
Gangs53211833 Art53211839
EngineeringTeam
Toss 53211841 O53211846
Members
Boon 53211806 Tob53211808
Product Design
P”pete,P”ice,P”pae,P”tuang
Team Members
Weekly Progress
On 1 March 2012, I’m going to kmuttBangkunthein.My group determines to design
mosquito’s killer machine. In this process of mosquito’s killer machine consist of stimulation
(maybe temperature like body human temperature), fan for pull and pick (when it fly into the
machine it can’t fly out from the machine). In stimulation we use UV light because UV light has heat
in it-self and wave length that make color purple with black.
By my group use UVA or black light because it have long wave. It’s different from UVB and
UVC. UVB and UVC, it’s cause of skin cancer because it go to damage DNA.
Another point that we think in meeting such as quantity of mosquitoes per day, machine
work over 8 hours, titanium tray and touch screen.
Engineering Analysis
Strong Point
- We can find important information
- We products passed and approved by professor from architect, can continuous do products in real
state
- We had clearly concept what products that we want to do.
Week Point
- Architects in my team can’t conclude about function in products
Next Week Job
-Next week we will learning about how to make CO2
-Next week we design function, spec, pattern before make it’s real.
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI