On
Practical Training & Industrial Visit
Submitted By:
Shubham Jain
IV B.Tech Electrical Engg.
SWAMI KESHWANAND INSTITUTE OF
TECHNOLOGY M&G
INTRODUCTION
• In Kota Super Thermal Power Station electricity is generated.
• The project was proposed by Central Electric Authority of
India in April, 1973.
• The project was revised in 1975 and approved in Sep., 1976.
• At first two units were installed each producing 110 MW of
power.
• The first estimated cost was Rs. 143 Crores.
 LOACTION : Sakatpura, Kota
 CAPACITY : 1240 MW.
 GENERAL LAYOUT : 1. Fuel And Ash Circuit.
2. Air And Gas Circuit.
3. Feed Water Steam Circuit.
4. Cooling Water Circuit.
 FUEL USED : Coal
 SOURCE OF COAL : BCCL, SECL & ECL
 SOURCE OF WATER : CHAMBEL RIVER
STAGE I
2x110 MW STAGE Il
2x210 MW
STAGE Ill
1x210 MW
STAGE IV
1x195 MW
STAGE V
1x195 MW
Coal
Storage
Coal Handling
Plant
Ash
Storage
Ash Handling
Plant Boiler Super
Heater
Economizer
Air
Pre-heater
Turbine
Chi
mn
ey
Feed Water
Heater
Deaerator
Cooling
Tower
Make up
Water
Air
Coal
Ash
COAL
ASH
STEAM
WATER
FLUE GASES
Altern
ator
Condenser
Exciter
COAL HANDLING PLANT
 The coal is brought to the
KSTPS through rails.
 There are fourteen tracks in
all for transportation of coal
through rails.
 Everyday 3 to 4 trains of coal
are unloaded at KSTPS.
 The approximate per day
consumption at KSTPS
is about 3074 tones.
WAGON TRIPLER
 Wagons From the
coal yard come to the
tippler and are emptied
here.
 The process is
performed by a Slip ring
motor of rating 55KW,
415V, 1480 RPM.
 This motor turns the
wagon by 150 degree
and coal falls directly on
the conveyor through
vibrators
WATER TREATMENT PLANT
 The principle problem in high pressure boiler are corrosion
are steam impurities.
 These impurities form deposit over turbine blades and
nozzels.
 Corrosion costs power station crores in repair
BOILER
Temperature of Super
Heated Steam – 540’c
Pressure-144 kg/cm*cm
• Boilers are used for
electrical power
generation, heat energy is
released from the
combustion of fuels.
• BHEL make direct fired
natural circulation
balanced draft tube
boilers are used here,
having capacity of 375
tones/hour and efficiency
of 86.6%.
STEAM TURBINE
Steam Flow
HP Turbine
IP Turbine
LP Turbine
 It convert heat
energy of steam into
mechanical energy
and drive generator.
 It uses the principle
the steam when
issuing from a small
opening attains a
high velocity.
GENERATORS
TRANSFORMER
 Transformer is a static device which
is used to change the voltage level
keeping the power and frequency
same.
 In the whole plant there are about 83
transformer installed at various
places to operate the auxiliaries.
 Main transformers, which are
necessary:
1. To step up the generated voltage.
2. To supply power to the
auxiliaries from the generator.
3. To start the plant by taking the
supply from the grid
Fly ash (80%).
Used for making bricks.
Cement.
Bottom ash (20%)
Used to improve fertility.
Roads.
BOILER –FLY ASH PRODUCESD
E.S.P. – BOTTOM ASH
(in small amount)
 In KSTPS hydrogen
cooling system is
employed for generator
cooling.
 Hydrogen is used because
of its superior cooling
properties & flow density.
 Thermal conductivity of
Hydrogen 7.3 times of air.
 Water Cooling is also used
to cooling system.
 Two 220 KV bus
bars have been
provided in switch
yard and are inter-
connected through
a bus coupler
 Two step down
transformer each
feeding 6.6 KV
system
 12 Feeders
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)

Más contenido relacionado

La actualidad más candente

Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
Hîmãńshu Mêęńä
 
kstps summer training 36 slides
 kstps summer training 36 slides kstps summer training 36 slides
kstps summer training 36 slides
Danveer Singh
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
ravi kant
 

La actualidad más candente (20)

NTPC ,sipat voccational training
NTPC ,sipat voccational trainingNTPC ,sipat voccational training
NTPC ,sipat voccational training
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
 
kstps summer training 36 slides
 kstps summer training 36 slides kstps summer training 36 slides
kstps summer training 36 slides
 
kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training report
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
 

Destacado (6)

Ktps presentation
Ktps presentationKtps presentation
Ktps presentation
 
Indoor & outdoor substations, an overview
Indoor & outdoor substations, an overviewIndoor & outdoor substations, an overview
Indoor & outdoor substations, an overview
 
Coal Handling System
Coal Handling SystemCoal Handling System
Coal Handling System
 
Ash handeling1
Ash handeling1Ash handeling1
Ash handeling1
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 

Similar a kota super thermal power plant (kstps)

Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
Vedant Sumaria
 

Similar a kota super thermal power plant (kstps) (20)

ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant ppt
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
KTPS
KTPSKTPS
KTPS
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 

Más de vaibyfrndz (6)

paper presentaton topic on power theft prevention and quality improvement by ...
paper presentaton topic on power theft prevention and quality improvement by ...paper presentaton topic on power theft prevention and quality improvement by ...
paper presentaton topic on power theft prevention and quality improvement by ...
 
prevention of power theft and power uality by the help of fuzzy logic
prevention of power theft and power uality by the help of fuzzy logicprevention of power theft and power uality by the help of fuzzy logic
prevention of power theft and power uality by the help of fuzzy logic
 
SOLAR POWERED THREE PHASE MOTOR FOR VARIOUS APPLICATION
SOLAR POWERED THREE PHASE MOTOR FOR VARIOUS APPLICATIONSOLAR POWERED THREE PHASE MOTOR FOR VARIOUS APPLICATION
SOLAR POWERED THREE PHASE MOTOR FOR VARIOUS APPLICATION
 
CONCEPT OF SYMMETRICAL COMPONENT AS A TECHNIQUE FOR ANALYSIS OF FAULT AND IMP...
CONCEPT OF SYMMETRICAL COMPONENT AS A TECHNIQUE FOR ANALYSIS OF FAULT AND IMP...CONCEPT OF SYMMETRICAL COMPONENT AS A TECHNIQUE FOR ANALYSIS OF FAULT AND IMP...
CONCEPT OF SYMMETRICAL COMPONENT AS A TECHNIQUE FOR ANALYSIS OF FAULT AND IMP...
 
improvement of thrust force ripple in ultra high speed train
improvement of thrust force ripple in ultra high speed trainimprovement of thrust force ripple in ultra high speed train
improvement of thrust force ripple in ultra high speed train
 
harduaganj thermal power station h.t.p.s.
harduaganj thermal power station h.t.p.s.harduaganj thermal power station h.t.p.s.
harduaganj thermal power station h.t.p.s.
 

Último

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Último (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

kota super thermal power plant (kstps)

  • 1. Presentation On Practical Training & Industrial Visit Submitted By: Shubham Jain IV B.Tech Electrical Engg. SWAMI KESHWANAND INSTITUTE OF TECHNOLOGY M&G
  • 2. INTRODUCTION • In Kota Super Thermal Power Station electricity is generated. • The project was proposed by Central Electric Authority of India in April, 1973. • The project was revised in 1975 and approved in Sep., 1976. • At first two units were installed each producing 110 MW of power. • The first estimated cost was Rs. 143 Crores.
  • 3.  LOACTION : Sakatpura, Kota  CAPACITY : 1240 MW.  GENERAL LAYOUT : 1. Fuel And Ash Circuit. 2. Air And Gas Circuit. 3. Feed Water Steam Circuit. 4. Cooling Water Circuit.  FUEL USED : Coal  SOURCE OF COAL : BCCL, SECL & ECL  SOURCE OF WATER : CHAMBEL RIVER
  • 4. STAGE I 2x110 MW STAGE Il 2x210 MW STAGE Ill 1x210 MW STAGE IV 1x195 MW STAGE V 1x195 MW
  • 5. Coal Storage Coal Handling Plant Ash Storage Ash Handling Plant Boiler Super Heater Economizer Air Pre-heater Turbine Chi mn ey Feed Water Heater Deaerator Cooling Tower Make up Water Air Coal Ash COAL ASH STEAM WATER FLUE GASES Altern ator Condenser Exciter
  • 6.
  • 7. COAL HANDLING PLANT  The coal is brought to the KSTPS through rails.  There are fourteen tracks in all for transportation of coal through rails.  Everyday 3 to 4 trains of coal are unloaded at KSTPS.  The approximate per day consumption at KSTPS is about 3074 tones.
  • 8. WAGON TRIPLER  Wagons From the coal yard come to the tippler and are emptied here.  The process is performed by a Slip ring motor of rating 55KW, 415V, 1480 RPM.  This motor turns the wagon by 150 degree and coal falls directly on the conveyor through vibrators
  • 9. WATER TREATMENT PLANT  The principle problem in high pressure boiler are corrosion are steam impurities.  These impurities form deposit over turbine blades and nozzels.  Corrosion costs power station crores in repair
  • 10. BOILER Temperature of Super Heated Steam – 540’c Pressure-144 kg/cm*cm • Boilers are used for electrical power generation, heat energy is released from the combustion of fuels. • BHEL make direct fired natural circulation balanced draft tube boilers are used here, having capacity of 375 tones/hour and efficiency of 86.6%.
  • 12. Steam Flow HP Turbine IP Turbine LP Turbine  It convert heat energy of steam into mechanical energy and drive generator.  It uses the principle the steam when issuing from a small opening attains a high velocity.
  • 14.
  • 15. TRANSFORMER  Transformer is a static device which is used to change the voltage level keeping the power and frequency same.  In the whole plant there are about 83 transformer installed at various places to operate the auxiliaries.  Main transformers, which are necessary: 1. To step up the generated voltage. 2. To supply power to the auxiliaries from the generator. 3. To start the plant by taking the supply from the grid
  • 16. Fly ash (80%). Used for making bricks. Cement. Bottom ash (20%) Used to improve fertility. Roads. BOILER –FLY ASH PRODUCESD E.S.P. – BOTTOM ASH (in small amount)
  • 17.  In KSTPS hydrogen cooling system is employed for generator cooling.  Hydrogen is used because of its superior cooling properties & flow density.  Thermal conductivity of Hydrogen 7.3 times of air.  Water Cooling is also used to cooling system.
  • 18.  Two 220 KV bus bars have been provided in switch yard and are inter- connected through a bus coupler  Two step down transformer each feeding 6.6 KV system  12 Feeders