Critical Path Method (CPM)
 The critical path method is a project modeling

technique developed in the late 1950s by Morgan
R. Walker of DuPont and James E. Kelley, Jr. of
Remington Rand. - Wikipedia
Critical Path
 The critical path method was examined by the

United States Navy, and established a version in
1958 called a PERT (Program Evaluation and
Review Technique) analysis. PERT claimed to
reduce project management time by up to 42
percent, and was first used in the development of
the Polaris missile.
Ref: http://www.ehow.com/about_4703555_whatcritical-path.html#ixzz2igTEV3Q7
Critical Path
 A Critical Path is the path with the least amount of

float or slack time. A float time is the amount of
time that an activity can be delayed without
delaying the project.
 A Critical Path is the longest amount of time it will
take to complete the project.
 A Critical Path usually has 0 float but may have
negative float if the end task is constrained to an
early finish date.
 If any of the task identified in the critical path is
late, then the project will be late.
6. Steps for identifying Critical
Path
1.
2.
3.

Specify the activates, duration and dependencies
Draw a network diagram.
Perform the forward pass to identify all Early Start and Early
Finish times for the network.
Early Finish = Early Start + Duration

4.

Perform the backward pass to identify all Late Start and Late
Finish times for the network.
Late Start = Late Finish – Duration

5.

Calculate the slack time.
Float = Late Start (LS) – Early Start (ES)

6.

Identify the task on critical path with 0 float (slack) time.
1. Task/Duration/Predecessor
TAS
K
A
B
C
D
E
F
G

Duratio Predecess
n
or
2
---2
A
1
A
3
A
1
C,D
3
B
2
E,F
Terminologies
 ID – Task ID
 D- Duration
 ES – Early Start
 EF – Early Finish
 LS – Late Start

ES

 LF – Late Finish

F ID DR
LS
LF

 S - Slack

EF
2. Network Diagram
B 2

F 3

Activity
A 2

C 1

G 2

Duratio
n
ES

D 3

E 1

F
LS

EF
ID DR
LF
3. Forward Pass
2

Early
Start

4
B 2

1st

2
A 2

7
F 3

Early

Duration=
9days

Finish
2

5
D 3

7

3
C 1

2

0

4

5

task starts at 0
EF = ES + DR
ES = EF of predecessor
When more than one predecessor, pick the
larger #

6
E 1

9
G 2

ES
F
LS

EF
ID DR
LF
4. Backward Pass
2

4
B 2

1st task should
end with LS = 0.

2

0

2
A 2
0
2
Late
Start

2

4

4

7
F 3
4
7
7

9
G 2
7
9

3

C 1
5

6

Late
Finish

2

LS = LF - DR
LF = LS of successor

5
D 3
3
6

5

6
E 1
6
7

When more than one successor, pick the
smallest #

ES
F
LS

EF
ID DR
LF
5. Slack / Float
2
4
0 B 2
2
4

0
2
0 A 2
0
2

4
7
0 F 3
4
7
7
9
0 G 2
7
9

2
3
3 C 1
5
6

Float = LS – ES

2
5
1 D 3
3
6

5
6
1 E 1
6
7

Float = Late Start (LS) – Early Start (ES)

ES
F
LS

EF
ID DR
LF
6. Critical Path
The path with 0 Float
is the critical path.

0
2
0 A 2
0
2

2
4
0 B 2
2
4

4
7
0 F 3
4
7

A-B-F-G is the critical
5
path. 6
0 C 1
5
6

2
5
0 D 3
2
5
LS = LF - DR
LF = LS of successor

7

0 G 2
7

5
6
1 E 1
6
7

9
9

ES
F
LS

EF
ID DR
LF
Thank You!
Vazi Okhandiar, PMP, MCT, MBA, MSCS, BSEE
NR Computer Learning Center
1835 W. Orangewood, Suite 200
Orange, CA 92868
www.nrclc.com . (714) 505. 3475
info@nrclc.com

Más contenido relacionado

La actualidad más candente

Critical path method
Critical path methodCritical path method
Critical path methodShubhi Verma
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksPrasad Thanthratey
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPMstudent
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Dr. Mahmoud Al-Naimi
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using PertVishnu RC Vijayan
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)chandkec
 

La actualidad más candente (20)

Critical path method
Critical path methodCritical path method
Critical path method
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPM
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using Pert
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project management - CPM & PERT
Project management   - CPM & PERTProject management   - CPM & PERT
Project management - CPM & PERT
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project Management
Project ManagementProject Management
Project Management
 
PROJECT SCHEDULING
PROJECT SCHEDULINGPROJECT SCHEDULING
PROJECT SCHEDULING
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)
 

Destacado

Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysistutor2u
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
The Network Diagram and Critical Path
The Network Diagram and Critical PathThe Network Diagram and Critical Path
The Network Diagram and Critical Pathdmdk12
 
Constructing a network diagram
Constructing a network diagramConstructing a network diagram
Constructing a network diagramnelramlawy
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path MethodSimplilearn
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)Areef Khan
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Scrum und Agile Software Entwicklung
Scrum und Agile Software EntwicklungScrum und Agile Software Entwicklung
Scrum und Agile Software EntwicklungAniello Bove
 
Critical chain and buffer management
Critical chain and buffer managementCritical chain and buffer management
Critical chain and buffer managementpinalti
 
Critical path method example by myassignmenthelp
Critical path method example by myassignmenthelpCritical path method example by myassignmenthelp
Critical path method example by myassignmenthelpwww.myassignmenthelp.net
 
Apics Pdm Buffer Mgt. 1 09 07
Apics Pdm Buffer Mgt. 1 09 07Apics Pdm Buffer Mgt. 1 09 07
Apics Pdm Buffer Mgt. 1 09 07rbernett
 
Critical path method (CPM)
Critical path method (CPM)Critical path method (CPM)
Critical path method (CPM)Nikhil Raj
 
C10 project management
C10 project managementC10 project management
C10 project managementhakimizaki
 
Critical path method
Critical path methodCritical path method
Critical path methodNicola2903
 

Destacado (19)

Critical path method
Critical path methodCritical path method
Critical path method
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
The Network Diagram and Critical Path
The Network Diagram and Critical PathThe Network Diagram and Critical Path
The Network Diagram and Critical Path
 
Constructing a network diagram
Constructing a network diagramConstructing a network diagram
Constructing a network diagram
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Scrum und Agile Software Entwicklung
Scrum und Agile Software EntwicklungScrum und Agile Software Entwicklung
Scrum und Agile Software Entwicklung
 
Planning and facilitating focus groups - University of Cambridge
Planning and facilitating focus groups - University of CambridgePlanning and facilitating focus groups - University of Cambridge
Planning and facilitating focus groups - University of Cambridge
 
Critical chain and buffer management
Critical chain and buffer managementCritical chain and buffer management
Critical chain and buffer management
 
Critical path method example by myassignmenthelp
Critical path method example by myassignmenthelpCritical path method example by myassignmenthelp
Critical path method example by myassignmenthelp
 
Apics Pdm Buffer Mgt. 1 09 07
Apics Pdm Buffer Mgt. 1 09 07Apics Pdm Buffer Mgt. 1 09 07
Apics Pdm Buffer Mgt. 1 09 07
 
Critical path method (CPM)
Critical path method (CPM)Critical path method (CPM)
Critical path method (CPM)
 
C10 project management
C10 project managementC10 project management
C10 project management
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 

Similar a Project Management - Critical path method

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering EconomicsDeepak Paithankar
 
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.pptNitin137794
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPMPadamNepal1
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1adeelmunir158
 
CPM.pptx
CPM.pptxCPM.pptx
CPM.pptxLJay7
 
Pb602 operation management chapter 7
Pb602  operation management chapter 7Pb602  operation management chapter 7
Pb602 operation management chapter 7Akihisa Akimoto
 
Management science
Management scienceManagement science
Management sciencekamrul islam
 
DEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdfDEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdfssuserc9c6261
 
chapter 8 examples of networks.pdf
chapter 8 examples of networks.pdfchapter 8 examples of networks.pdf
chapter 8 examples of networks.pdfssuserc9c6261
 
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdfEXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdfssuserc9c6261
 
Scheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdfScheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdfssuserc9c6261
 
network techniquies.pdf
network techniquies.pdfnetwork techniquies.pdf
network techniquies.pdfssuserc9c6261
 
Activity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdfActivity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdfssuserc9c6261
 
Arc with ES & EF time –.pdf
Arc with ES & EF time –.pdfArc with ES & EF time –.pdf
Arc with ES & EF time –.pdfssuserc9c6261
 
Example of Simple Network –.pdf
Example of Simple Network –.pdfExample of Simple Network –.pdf
Example of Simple Network –.pdfssuserc9c6261
 

Similar a Project Management - Critical path method (20)

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPM
 
Project admin lu3
Project admin   lu3Project admin   lu3
Project admin lu3
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1
 
CPM.pptx
CPM.pptxCPM.pptx
CPM.pptx
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Project management
Project managementProject management
Project management
 
Pb602 operation management chapter 7
Pb602  operation management chapter 7Pb602  operation management chapter 7
Pb602 operation management chapter 7
 
Management science
Management scienceManagement science
Management science
 
DEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdfDEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdf
 
chapter 8 examples of networks.pdf
chapter 8 examples of networks.pdfchapter 8 examples of networks.pdf
chapter 8 examples of networks.pdf
 
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdfEXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
 
Scheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdfScheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdf
 
network techniquies.pdf
network techniquies.pdfnetwork techniquies.pdf
network techniquies.pdf
 
Activity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdfActivity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdf
 
Arc with ES & EF time –.pdf
Arc with ES & EF time –.pdfArc with ES & EF time –.pdf
Arc with ES & EF time –.pdf
 
Example of Simple Network –.pdf
Example of Simple Network –.pdfExample of Simple Network –.pdf
Example of Simple Network –.pdf
 

Más de NR Computer Learning Center

App Development with Apple Swift Certification at Certiport Centers
App Development with Apple Swift Certification at Certiport CentersApp Development with Apple Swift Certification at Certiport Centers
App Development with Apple Swift Certification at Certiport CentersNR Computer Learning Center
 
Building a Dashboard in an hour with Power Pivot and Power BI
Building a Dashboard in an hour with Power Pivot and Power BIBuilding a Dashboard in an hour with Power Pivot and Power BI
Building a Dashboard in an hour with Power Pivot and Power BINR Computer Learning Center
 
Introduction to the basic mathematical concept with Python Turtle.
Introduction to the basic mathematical concept with Python Turtle.Introduction to the basic mathematical concept with Python Turtle.
Introduction to the basic mathematical concept with Python Turtle.NR Computer Learning Center
 
Stem presentation - Pathways to Technology Oriented Careers
Stem presentation - Pathways to Technology Oriented CareersStem presentation - Pathways to Technology Oriented Careers
Stem presentation - Pathways to Technology Oriented CareersNR Computer Learning Center
 
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BI
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BIBuilding a Dashboard in an Hour using Microsoft PowerPivot & Power BI
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BINR Computer Learning Center
 

Más de NR Computer Learning Center (20)

Power BI Desktop Overview
Power BI Desktop Overview Power BI Desktop Overview
Power BI Desktop Overview
 
Building Dashboard with Excel
Building Dashboard with ExcelBuilding Dashboard with Excel
Building Dashboard with Excel
 
Introduction to Data Analytics
Introduction to Data AnalyticsIntroduction to Data Analytics
Introduction to Data Analytics
 
Python - Data Structures
Python - Data StructuresPython - Data Structures
Python - Data Structures
 
Introduction to SQL
Introduction to SQLIntroduction to SQL
Introduction to SQL
 
Office 2019 tips & tricks
Office 2019 tips & tricksOffice 2019 tips & tricks
Office 2019 tips & tricks
 
App Development with Apple Swift Certification at Certiport Centers
App Development with Apple Swift Certification at Certiport CentersApp Development with Apple Swift Certification at Certiport Centers
App Development with Apple Swift Certification at Certiport Centers
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 
National College Testing Association (NCTA)
National College Testing Association (NCTA)National College Testing Association (NCTA)
National College Testing Association (NCTA)
 
National College Testing Association (NCTA)
National College Testing Association (NCTA)National College Testing Association (NCTA)
National College Testing Association (NCTA)
 
Building a Dashboard in an hour with Power Pivot and Power BI
Building a Dashboard in an hour with Power Pivot and Power BIBuilding a Dashboard in an hour with Power Pivot and Power BI
Building a Dashboard in an hour with Power Pivot and Power BI
 
Introduction to the basic mathematical concept with Python Turtle.
Introduction to the basic mathematical concept with Python Turtle.Introduction to the basic mathematical concept with Python Turtle.
Introduction to the basic mathematical concept with Python Turtle.
 
Stem presentation - Pathways to Technology Oriented Careers
Stem presentation - Pathways to Technology Oriented CareersStem presentation - Pathways to Technology Oriented Careers
Stem presentation - Pathways to Technology Oriented Careers
 
MTA 98 364 - database fundamentals
MTA 98 364 - database fundamentalsMTA 98 364 - database fundamentals
MTA 98 364 - database fundamentals
 
MTA 361 software development fundamentals
MTA 361   software development fundamentalsMTA 361   software development fundamentals
MTA 361 software development fundamentals
 
Introduction to java
Introduction to javaIntroduction to java
Introduction to java
 
Introduction to c++
Introduction to c++Introduction to c++
Introduction to c++
 
Executive dashboard for small business
Executive dashboard for small businessExecutive dashboard for small business
Executive dashboard for small business
 
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BI
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BIBuilding a Dashboard in an Hour using Microsoft PowerPivot & Power BI
Building a Dashboard in an Hour using Microsoft PowerPivot & Power BI
 
Arduino for teens
Arduino for teensArduino for teens
Arduino for teens
 

Último

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Último (20)

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

Project Management - Critical path method

  • 1. Critical Path Vazi Okhandiar, PMP, MCT, MBA, MSCS, BSEE NR Computer Learning Center 1835 W. Orangewood, #200 Orange . CA 92868 (714) 505-3475 www.nrclc.com
  • 2. Critical Path Method (CPM)  The critical path method is a project modeling technique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand. - Wikipedia
  • 3. Critical Path  The critical path method was examined by the United States Navy, and established a version in 1958 called a PERT (Program Evaluation and Review Technique) analysis. PERT claimed to reduce project management time by up to 42 percent, and was first used in the development of the Polaris missile. Ref: http://www.ehow.com/about_4703555_whatcritical-path.html#ixzz2igTEV3Q7
  • 4. Critical Path  A Critical Path is the path with the least amount of float or slack time. A float time is the amount of time that an activity can be delayed without delaying the project.  A Critical Path is the longest amount of time it will take to complete the project.  A Critical Path usually has 0 float but may have negative float if the end task is constrained to an early finish date.  If any of the task identified in the critical path is late, then the project will be late.
  • 5. 6. Steps for identifying Critical Path 1. 2. 3. Specify the activates, duration and dependencies Draw a network diagram. Perform the forward pass to identify all Early Start and Early Finish times for the network. Early Finish = Early Start + Duration 4. Perform the backward pass to identify all Late Start and Late Finish times for the network. Late Start = Late Finish – Duration 5. Calculate the slack time. Float = Late Start (LS) – Early Start (ES) 6. Identify the task on critical path with 0 float (slack) time.
  • 7. Terminologies  ID – Task ID  D- Duration  ES – Early Start  EF – Early Finish  LS – Late Start ES  LF – Late Finish F ID DR LS LF  S - Slack EF
  • 8. 2. Network Diagram B 2 F 3 Activity A 2 C 1 G 2 Duratio n ES D 3 E 1 F LS EF ID DR LF
  • 9. 3. Forward Pass 2 Early Start 4 B 2 1st 2 A 2 7 F 3 Early Duration= 9days Finish 2 5 D 3 7 3 C 1 2 0 4 5 task starts at 0 EF = ES + DR ES = EF of predecessor When more than one predecessor, pick the larger # 6 E 1 9 G 2 ES F LS EF ID DR LF
  • 10. 4. Backward Pass 2 4 B 2 1st task should end with LS = 0. 2 0 2 A 2 0 2 Late Start 2 4 4 7 F 3 4 7 7 9 G 2 7 9 3 C 1 5 6 Late Finish 2 LS = LF - DR LF = LS of successor 5 D 3 3 6 5 6 E 1 6 7 When more than one successor, pick the smallest # ES F LS EF ID DR LF
  • 11. 5. Slack / Float 2 4 0 B 2 2 4 0 2 0 A 2 0 2 4 7 0 F 3 4 7 7 9 0 G 2 7 9 2 3 3 C 1 5 6 Float = LS – ES 2 5 1 D 3 3 6 5 6 1 E 1 6 7 Float = Late Start (LS) – Early Start (ES) ES F LS EF ID DR LF
  • 12. 6. Critical Path The path with 0 Float is the critical path. 0 2 0 A 2 0 2 2 4 0 B 2 2 4 4 7 0 F 3 4 7 A-B-F-G is the critical 5 path. 6 0 C 1 5 6 2 5 0 D 3 2 5 LS = LF - DR LF = LS of successor 7 0 G 2 7 5 6 1 E 1 6 7 9 9 ES F LS EF ID DR LF
  • 13. Thank You! Vazi Okhandiar, PMP, MCT, MBA, MSCS, BSEE NR Computer Learning Center 1835 W. Orangewood, Suite 200 Orange, CA 92868 www.nrclc.com . (714) 505. 3475 info@nrclc.com