How Does Cementing Work?
Part of the process of preparing a well for further drilling, production or abandonment,
cementing a well is the procedure of developing and pumping cement into place in a wellbore.
Onshore Cementing Operations and Equipment
Source: Schlumberger
Used for a number of different reasons, cementing protects and seals the wellbore. Most
commonly, cementing is used to permanently shut off water penetration into the well. Part of the
completion process of a prospective production well, cementing can be used to seal the annulus
after a casing string has been run in a wellbore. Additionally, cementing is used to seal a lost
circulation zone, or an area where there is a reduction or absence of flow within the well. In
directional drilling, cementing is used to plug an existing well, in order to run a directional well
from that point. Also, cementing is used to plug a well to abandon it.
Cementing is performed when the cement slurry is deployed into the well via pumps, displacing
the drilling fluids still located within the well, and replacing them with cement. The cement
slurry flows to the bottom of the wellbore through the casing, which will eventually be the pipe
through which the hydrocarbons flow to the surface. From there it fills in the space between the
casing and the actual wellbore, and hardens. This creates a seal so that outside materials cannot
enter the well flow, as well as permanently positions the casing in place.
PREPARING THE CEMENT
In preparing a well for cementing, it is important to establish the amount of cement required for
the job. This is done by measuring the diameter of the borehole along its depth, using a caliper
log. Utilizing both mechanical and sonic means, multifinger caliper logs measure the diameter of
the well at numerous locations simultaneously in order to accommodate for irregularities in the
wellbore diameter and determine the volume of the openhole.
Additionally, the required physical properties of the cement are essential before commencing
cementing operations. The proper set cement is also determined, including the density and
viscosity of the material, before actually pumping the cement into the hole.
Cementing a WellSource: MPG Petroleum
Special mixers, including hydraulic jet mixers, re-circulating mixers or batch mixers, are used to
combine dry cement with water to create the wet cement, also known as slurry. The cement used
in the well cementing process is Portland cement, and it is calibrated with additives to form one
of eight different API classes of cement. Each is employed for various situations.
Additives can include accelerators, which shorten the setting time required for the cement, as
well as retarders, which do the opposite and make the cement setting time longer. In order to
decrease or increase the density of the cement, lightweight and heavyweight additives are added.
Additives can be added to transform the compressive strength of the cement, as well as flow
properties and dehydration rates. Extenders can be used to expand the cement in an effort to
reduce the cost of cementing, and antifoam additives can be added to prevent foaming within the
well. In order to plug lost circulation zones, bridging materials are added, as well.
CEMENTING THE WELL
After casing, or steel pipe, is run into the well, an L-shaped cementing head is fixed to the top of
the wellhead to receive the slurry from the pumps. Two wiper plugs, or cementing plugs, that
sweep the inside of the casing and prevent mixing: the bottom plug and the top plug.
Keeping the drilling fluids from mixing with the cement slurry, the bottom plug is introduced
into the well, and cement slurry is pumped into the well behind it. The bottom plug is then
caught just above the bottom of the wellbore by the float collar, which functions as a one-way
valve allowing the cement slurry to enter the well.
Then the pressure on the cement being pumped into the well is increased until a diaphragm is
broken within the bottom plug, permitting the slurry to flow through it and up the outside of the
casing string.
Bottom and Top PlugsSource: Schlumberger
After the proper volume of cement is pumped into the well, a top plug is pumped into the casing
pushing the remaining slurry through the bottom plug. Once the top plug reaches the bottom
plug, the pumps are turned off, and the cement is allowed to set.
The amount of time it takes cement to harden is called thickening time or pumpability time. For
setting wells at deep depths, under high temperature or pressure, as well as in corrosive
environments, special cements can be employed.

Más contenido relacionado

Destacado

Federick Glenn Resume -2
Federick Glenn Resume -2Federick Glenn Resume -2
Federick Glenn Resume -2
Frederick Glenn
 
Iodine Paper Nigerian Salts Publication Feb2013
Iodine Paper Nigerian Salts Publication Feb2013Iodine Paper Nigerian Salts Publication Feb2013
Iodine Paper Nigerian Salts Publication Feb2013
Mohammed Idris
 
Presentation_Resume.p168579.f1671272 (2)
Presentation_Resume.p168579.f1671272 (2)Presentation_Resume.p168579.f1671272 (2)
Presentation_Resume.p168579.f1671272 (2)
Lee Cornett
 
International_Trade_Regulation_Presentation
International_Trade_Regulation_PresentationInternational_Trade_Regulation_Presentation
International_Trade_Regulation_Presentation
Jeffrey Neeley
 
Memorial slide show
Memorial slide showMemorial slide show
Memorial slide show
kneelycpucc
 
Final-Benchmarking-Report-FINALsm
Final-Benchmarking-Report-FINALsmFinal-Benchmarking-Report-FINALsm
Final-Benchmarking-Report-FINALsm
Gabriela Kappes
 

Destacado (15)

Federick Glenn Resume -2
Federick Glenn Resume -2Federick Glenn Resume -2
Federick Glenn Resume -2
 
Iodine Paper Nigerian Salts Publication Feb2013
Iodine Paper Nigerian Salts Publication Feb2013Iodine Paper Nigerian Salts Publication Feb2013
Iodine Paper Nigerian Salts Publication Feb2013
 
Thesis_Arthur_Chisanga
Thesis_Arthur_ChisangaThesis_Arthur_Chisanga
Thesis_Arthur_Chisanga
 
Presentation_Resume.p168579.f1671272 (2)
Presentation_Resume.p168579.f1671272 (2)Presentation_Resume.p168579.f1671272 (2)
Presentation_Resume.p168579.f1671272 (2)
 
Prezentare engleza
Prezentare englezaPrezentare engleza
Prezentare engleza
 
сайти
сайтисайти
сайти
 
International_Trade_Regulation_Presentation
International_Trade_Regulation_PresentationInternational_Trade_Regulation_Presentation
International_Trade_Regulation_Presentation
 
Memorial slide show
Memorial slide showMemorial slide show
Memorial slide show
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City Council
 
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation SpecialistCV - Jeff Lloyd - Engineering Manager and Automation Specialist
CV - Jeff Lloyd - Engineering Manager and Automation Specialist
 
Confindustria - rapporto innovazione 2015
Confindustria - rapporto innovazione 2015Confindustria - rapporto innovazione 2015
Confindustria - rapporto innovazione 2015
 
SustainabilityCenterAnnualReport_FY15
SustainabilityCenterAnnualReport_FY15SustainabilityCenterAnnualReport_FY15
SustainabilityCenterAnnualReport_FY15
 
Prezentare engleza
Prezentare englezaPrezentare engleza
Prezentare engleza
 
curriculum-vitae
curriculum-vitaecurriculum-vitae
curriculum-vitae
 
Final-Benchmarking-Report-FINALsm
Final-Benchmarking-Report-FINALsmFinal-Benchmarking-Report-FINALsm
Final-Benchmarking-Report-FINALsm
 

Último

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

How does cementing work

  • 1. How Does Cementing Work? Part of the process of preparing a well for further drilling, production or abandonment, cementing a well is the procedure of developing and pumping cement into place in a wellbore. Onshore Cementing Operations and Equipment Source: Schlumberger Used for a number of different reasons, cementing protects and seals the wellbore. Most commonly, cementing is used to permanently shut off water penetration into the well. Part of the completion process of a prospective production well, cementing can be used to seal the annulus after a casing string has been run in a wellbore. Additionally, cementing is used to seal a lost circulation zone, or an area where there is a reduction or absence of flow within the well. In directional drilling, cementing is used to plug an existing well, in order to run a directional well from that point. Also, cementing is used to plug a well to abandon it. Cementing is performed when the cement slurry is deployed into the well via pumps, displacing the drilling fluids still located within the well, and replacing them with cement. The cement slurry flows to the bottom of the wellbore through the casing, which will eventually be the pipe through which the hydrocarbons flow to the surface. From there it fills in the space between the casing and the actual wellbore, and hardens. This creates a seal so that outside materials cannot enter the well flow, as well as permanently positions the casing in place. PREPARING THE CEMENT In preparing a well for cementing, it is important to establish the amount of cement required for the job. This is done by measuring the diameter of the borehole along its depth, using a caliper log. Utilizing both mechanical and sonic means, multifinger caliper logs measure the diameter of the well at numerous locations simultaneously in order to accommodate for irregularities in the wellbore diameter and determine the volume of the openhole.
  • 2. Additionally, the required physical properties of the cement are essential before commencing cementing operations. The proper set cement is also determined, including the density and viscosity of the material, before actually pumping the cement into the hole. Cementing a WellSource: MPG Petroleum Special mixers, including hydraulic jet mixers, re-circulating mixers or batch mixers, are used to combine dry cement with water to create the wet cement, also known as slurry. The cement used in the well cementing process is Portland cement, and it is calibrated with additives to form one of eight different API classes of cement. Each is employed for various situations. Additives can include accelerators, which shorten the setting time required for the cement, as well as retarders, which do the opposite and make the cement setting time longer. In order to decrease or increase the density of the cement, lightweight and heavyweight additives are added. Additives can be added to transform the compressive strength of the cement, as well as flow properties and dehydration rates. Extenders can be used to expand the cement in an effort to reduce the cost of cementing, and antifoam additives can be added to prevent foaming within the well. In order to plug lost circulation zones, bridging materials are added, as well.
  • 3. CEMENTING THE WELL After casing, or steel pipe, is run into the well, an L-shaped cementing head is fixed to the top of the wellhead to receive the slurry from the pumps. Two wiper plugs, or cementing plugs, that sweep the inside of the casing and prevent mixing: the bottom plug and the top plug. Keeping the drilling fluids from mixing with the cement slurry, the bottom plug is introduced into the well, and cement slurry is pumped into the well behind it. The bottom plug is then caught just above the bottom of the wellbore by the float collar, which functions as a one-way valve allowing the cement slurry to enter the well. Then the pressure on the cement being pumped into the well is increased until a diaphragm is broken within the bottom plug, permitting the slurry to flow through it and up the outside of the casing string. Bottom and Top PlugsSource: Schlumberger After the proper volume of cement is pumped into the well, a top plug is pumped into the casing pushing the remaining slurry through the bottom plug. Once the top plug reaches the bottom plug, the pumps are turned off, and the cement is allowed to set. The amount of time it takes cement to harden is called thickening time or pumpability time. For setting wells at deep depths, under high temperature or pressure, as well as in corrosive environments, special cements can be employed.