Halla Razak, Director of Public Utilities for the City of San Diego presented to the League of California Cities, San Diego Division on October 13, 2014.
2024: The FAR, Federal Acquisition Regulations - Part 26
Pure Water San Diego
1. Halla Razak
Director of Public Utilities
City of San Diego
League of California Cities
San Diego Division
October 13, 2014
2. San Diego Public Utilities Department…
•
Delivers high quality drinking water, collects and treats wastewater, produces and delivers recycled water, and generates green energy– every day
•
Maintains and operates extensive infrastructure
•
Keeps rate-payer affordability top of mind
3. 85% of San Diego’s water is imported
San Diego
Bay Delta
Colorado River
4. •
Limited local & imported supplies
•
Recurring drought
•
Population growth
•
Bay Delta constraints
•
Natural disaster risk
•
Rising imported water costs
Numerous Water Challenges
$0
$200
$400
$600
$800
$1,000
$1,200
1996
1998
2000
2002
2004
2006
2008
2010
2012
Imported Water Cost
per Acre-Foot
5. 5
City of San Diego:
•
Water Conservation
•
Groundwater Development
•
Recycled Water
•Indirect Potable Reuse (Pure Water)
Regional:
•
Importing Water
•Water Conservation
•Desalination (SDCWA)
What Options Does San Diego Have?
6. Pure Water: Our Opportunity
•
A 20-year program to provide a safe, secure, and sustainable local water supply
•
Provides over 1/3 of the City’s water (83-mgd)
•
A cost effective, integrated water and wastewater solution 6
7. Advanced Water Purification
•
Advanced multi-barrier treatment process
–
Microfiltration and Ultrafiltration
–
Reverse Osmosis
–
Advanced Oxidation with Ultraviolet Light and Hydrogen Peroxide
Microfiltration & Ultrafiltration
Reverse Osmosis
Advanced Oxidation with UV Light & Hydrogen Peroxide
7
8. Developing Our Local Water Supply
15 MGD
Wastewater will be purified at North City Plant and delivered to San Vicente Reservoir
Initial phase 2023
83 MGD
Wastewater will be purified at Harbor Drive and South Bay Plants and delivered to San Vicente and Otay Reservoirs
Long- term 2035
San Vicente
Reservoir
Miramar Water
Treatment Plant
Alvarado Water
Treatment Plant
Lower Otay Reservoir
Otay Water
Treatment Plant
Full Scale AWP Facility at North City
Harbor Drive Treatment Facility
South Bay Treatment Facility
9. Wastewater Treatment System
•Significant Regional Asset:
–2.5 million served
–12 Participating Agencies
–4 Wastewater Facilities
•Point Loma is the main treatment facility
–Operates with a 5-year modified permit
–Renewal application due to EPA in January 2015
9
10. Pure Water Supports Permit Renewal
•
Commitment to Pure Water would divert flow from Pt. Loma
•
Reduces treated water flow to the ocean
•
Supports legislative changes to the Clean Water Act to allow for “secondary equivalency”
10
11. Secondary Equivalency
•
Secondary treatment achieves certain levels of water quality in the flow to the ocean
•
We can achieve the same outcome and avoid expensive upgrades by reducing flow to the plant
•
In the process we create Pure Water, while protecting ocean water quality 11
12. 12
Local Water Control
Most Economical
Creates sustainable new water supply
Imported Water Dependent
Vulnerable to Rising Costs
Continued Ocean Discharge
San Diego at a Fork in the Road
13. Pure Water San Diego Saves Money
$500
$1,000
$1,500
$2,000
2015
2020
2025
2030
2035
2040
2045
2050
Ratepayer Costs (Millions)
Pure Water
Secondary
Pure Water
San Diego
System upgrades w/o Pure Water
About $250 million in ratepayer savings
14. Who Supports Pure Water?
•
Elected Officials
–
City Council Resolution, April 29, 2014
•
Environmental Groups
•
Wastewater Participating Agencies
•
Professional Engineering Community
•
Water Reliability Coalition
•
Business Community
•
Independent Rates Oversight Committee
Friends of Infrastructure
15. Pure Water Program Next Steps
•
Stakeholder and Customer Outreach
–
Underway and continuous
•
Solicitation for Engineering and Technical Support Services
–
Underway
•
Finalize Facilities Plan and Cost Estimate/Rate Impact
–
Fall 2014
•
Point Loma Permit Application
–
January 2015
•
Secondary Equivalency Approval
–
December 2015
16. Summary
•
20-year program to develop supply of safe, reliable, sustainable local water supply
•
Continued ocean environment protection
–
Diverts flows from Pt. Loma Wastewater Treatment Plant
•
Cost-effective approach through an integrated water and waste water solution
–
Avoids unnecessary costly upgrades to Pt. Loma
–
Reduces reliance on rapidly increasing price of water imports 16