Business Intelligence Project Case Studies : Exercise 1
1 | P a g e
-4
-2.25
-0.5
1.25
3
Cumulative Net Value (M)
Cumulative Net Value
(M)
Waseem Bari
Instructor: Bill Chadwick
SCS 0245-026 Business Intelligence Fundamentals
BUSINESS CASES FOR BUSINESS INTELLIGENCE PROJECTS
Case No. 1
1st Year 2nd Year 3rd Year 4th Year 5th Year
Project IT Costs 2M 0.5M 0.5M 0.5M 0.5M
Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M
Cumulative Total Costs 2M 2.875M 3.75M 4.625M 5.5M
Extra Revenue/year 0 3.1M 3.1M 3.1M 3.1M
Cumulative Benefits 0 3.1M 6.2M 9.3M 12.4M
Cumulative Net Value (2M) 0.225M 2.45M 4.675M 6.9M
Benefit/Cost Ratio () 108% 165% 201% 225%
Evaluation of Case 1
Benefit/Cost Ratio
Payback Period
Net Cummulative Value
If we look at the Total Cost and Cummulative benefits, we will get
to know that our business is covering the cost it is incurring, that is
108% in 2 years
This project is feasible for the company because the benefit/cost
ratio is greater than 200% within 5 years.
If we look at the Cummulative Net Value and Cummulative Total
Cost, the project cost is being covered, so its feasible.
Business Intelligence Project Case Studies : Exercise 1
2 | P a g e
Case No. 2A
1st Year 2nd Year 3rd Year 4th Year 5th Year
Project IT Costs 4M 1M 1M 1M 1M
Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M
Cumulative Total Costs 4M 5.375M 6.75M 8.125M 9.5M
Extra Revenue/year 0 3.1M 3.1M 3.1M 3.1M
Cumulative Benefits 0 3.1M 6.2M 9.3M 12.4M
Cumulative Net Value (4M) (22.275M) (0.55M) 1.175M 2.9M
Benefit/Cost Ratio () 58% 92% 114% 131%
Evaluation of Case 2A
Benefit/Cost Ratio
Payback Period
Net Cummulative Value
Although the increase of CNV is steady, it is too slow. If the main purpose
of building this DW is to decrease churn rate, Extra Revenue/year should
be better for the Project
This project is not feasible for the company because the benefit/cost ratio
is less than 200% (131%) in 5 years.
If we look at the Total Cost and Cummulative benefits, we will get to know
that our business is not covering the cost in 2 years
Business Intelligence Project Case Studies : Exercise 1
3 | P a g e
Case No. 2B
1st Year 2nd Year 3rd Year 4th Year 5th Year
Project IT Costs 4M 1M 1M 1M 1M
Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M
Cumulative Total Costs 4M 5.375M 6.75M 8.125M 9.5M
Extra Revenue/year 0 6.2M 6.2M 6.2M 6.2M
Cumulative Benefits 0 6.2M 12.4M 18.8M 25M
Cumulative Net Value (4M) 0.825M 5.65M 10.47M 15.3M
Benefit//Cost Ratio () 115% 184% 229% 261%
Evaluation of Case 2B
Benefit/Cost Ratio
Payback Period
Net Cummulative Value
This project is feasible for the company because the benefit/cost ratio is
greater than 200% within 5 years.
If we look at the Total Cost and Cummulative benefits, we will get to know
that our business is covering the cost it is incurring
If we look at the Cummulative Net Value and Cummulative Total Cost, the
project cost is being covered, so its feasible.
Business Intelligence Project Case Studies : Exercise 1
4 | P a g e
Business Intelligence Project Case Studies : Exercise 1
5 | P a g e
Similarities amongst cases:
1. Same project time period
2. Beginning of the project in first year value went in to minus (-)
Differences amongst Cases
1. Payback Period for Case 2A takes more than three years, compared to other two
accomplish that by the end of year two.
2. To reach to 200% Benefit/Cost Ratio within 5 years, the initial Project IT cost and
yearly IT cost of Case 1 leads to the quicker accomplishment without improving Extra
Revenue/year.
3. In Case 2A, because Project IT cost and yearly IT cost is double the Case 1, it is
impossible to meet 2 year Payback Period without improving Extra Revenue/year by
reducing churn rate. Also, 200% Benefit/Cost Ratio in 5 years will not be accomplished.
Having identified the dimensions and the measures we then need to make some
business judgments about the feasibility of a BI solution or solutions. Here are
some points to consider
· Look for the easy wins, tactical solutions delivering business benefit that
can be achieved quickly and cheaply.
· Identify measures where no current data exists, these are more difficult to
implement as data collecting systems will have to be build and put in place
before they can be used.
· Watch out for high data volumes, if they are very large it may be that data
has to be summarized to reduce the volume.
· Strategic, cross-departmental solutions will need board level sponsorship
· and support to be successful.

Más contenido relacionado

La actualidad más candente

Risk management
Risk managementRisk management
Risk managementtumetr1
 
SAPM lecture 3 Capital Asset Pricing Model
SAPM lecture 3 Capital Asset Pricing ModelSAPM lecture 3 Capital Asset Pricing Model
SAPM lecture 3 Capital Asset Pricing Modelyogesh ingle
 
Cost & value management
Cost & value management Cost & value management
Cost & value management kamariya keyur
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost managementghizlanejabri
 
Managerial Accounting at Apple Inc.
Managerial Accounting at Apple Inc.Managerial Accounting at Apple Inc.
Managerial Accounting at Apple Inc.Praveen Uduweriya
 
Project cost & control
Project cost & controlProject cost & control
Project cost & controlAMARAYYA
 
Bus 7800 week 5 cost allocations
Bus 7800 week 5 cost allocationsBus 7800 week 5 cost allocations
Bus 7800 week 5 cost allocationsOUHainesM
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
Om 0015 – maintenance management winter 2014
Om 0015 – maintenance management winter 2014Om 0015 – maintenance management winter 2014
Om 0015 – maintenance management winter 2014Mba Assignments
 
Turn Your Business Energy Evaluation into a Savings Plan
Turn Your Business Energy Evaluation into a Savings PlanTurn Your Business Energy Evaluation into a Savings Plan
Turn Your Business Energy Evaluation into a Savings PlanFlorida Power & Light
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM UMT
 
GBL: Taking You Further With Outsourced Services
GBL: Taking You Further With Outsourced ServicesGBL: Taking You Further With Outsourced Services
GBL: Taking You Further With Outsourced ServicesSource-A-Tech
 
Indirect Rates & Pricing Models
Indirect Rates & Pricing Models Indirect Rates & Pricing Models
Indirect Rates & Pricing Models Robert E Jones
 

La actualidad más candente (20)

Risk management
Risk managementRisk management
Risk management
 
Pmp procurement chapter 12
Pmp procurement chapter 12Pmp procurement chapter 12
Pmp procurement chapter 12
 
SAPM lecture 3 Capital Asset Pricing Model
SAPM lecture 3 Capital Asset Pricing ModelSAPM lecture 3 Capital Asset Pricing Model
SAPM lecture 3 Capital Asset Pricing Model
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost management
 
Managerial Accounting at Apple Inc.
Managerial Accounting at Apple Inc.Managerial Accounting at Apple Inc.
Managerial Accounting at Apple Inc.
 
Project cost & control
Project cost & controlProject cost & control
Project cost & control
 
Bus 7800 week 5 cost allocations
Bus 7800 week 5 cost allocationsBus 7800 week 5 cost allocations
Bus 7800 week 5 cost allocations
 
Brm presentation
Brm presentationBrm presentation
Brm presentation
 
Cost Management
Cost ManagementCost Management
Cost Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Om 0015 – maintenance management winter 2014
Om 0015 – maintenance management winter 2014Om 0015 – maintenance management winter 2014
Om 0015 – maintenance management winter 2014
 
Cost managment
Cost managmentCost managment
Cost managment
 
Turn Your Business Energy Evaluation into a Savings Plan
Turn Your Business Energy Evaluation into a Savings PlanTurn Your Business Energy Evaluation into a Savings Plan
Turn Your Business Energy Evaluation into a Savings Plan
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM
 
GBL: Taking You Further With Outsourced Services
GBL: Taking You Further With Outsourced ServicesGBL: Taking You Further With Outsourced Services
GBL: Taking You Further With Outsourced Services
 
Indirect Rates & Pricing Models
Indirect Rates & Pricing Models Indirect Rates & Pricing Models
Indirect Rates & Pricing Models
 
4. project cost management
4. project cost management4. project cost management
4. project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Cost benefit
Cost benefitCost benefit
Cost benefit
 

Destacado

operadores matemáticos 1
operadores matemáticos 1operadores matemáticos 1
operadores matemáticos 1alsvr2013
 
Кейс упоминаний в социальных сетях
Кейс упоминаний в социальных сетяхКейс упоминаний в социальных сетях
Кейс упоминаний в социальных сетяхOleg Zaharov
 
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012ILACADA.Strategies to Help Underrepresented and First Generation Students 2012
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012Marilyn Saavedra-Leyva
 
Presentazione ginevra bianchini
Presentazione  ginevra bianchiniPresentazione  ginevra bianchini
Presentazione ginevra bianchiniGINEVRA92
 
Is the Cloud ready for Your Firm?
Is the Cloud ready for Your Firm?Is the Cloud ready for Your Firm?
Is the Cloud ready for Your Firm?SS&C Advent
 
Help or Hindrance?
Help or Hindrance?Help or Hindrance?
Help or Hindrance?SS&C Advent
 
Advent for Investment Management
Advent for Investment ManagementAdvent for Investment Management
Advent for Investment ManagementSS&C Advent
 
Deconstructing Ikea by Waseem Bari
Deconstructing Ikea by Waseem BariDeconstructing Ikea by Waseem Bari
Deconstructing Ikea by Waseem BariWaseem Bari
 
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...Waseem Bari
 
Client Portal: Delivering the Complete Wealth Picture
Client Portal: Delivering the Complete Wealth PictureClient Portal: Delivering the Complete Wealth Picture
Client Portal: Delivering the Complete Wealth PictureSS&C Advent
 

Destacado (15)

operadores matemáticos 1
operadores matemáticos 1operadores matemáticos 1
operadores matemáticos 1
 
Кейс упоминаний в социальных сетях
Кейс упоминаний в социальных сетяхКейс упоминаний в социальных сетях
Кейс упоминаний в социальных сетях
 
Love event
Love eventLove event
Love event
 
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012ILACADA.Strategies to Help Underrepresented and First Generation Students 2012
ILACADA.Strategies to Help Underrepresented and First Generation Students 2012
 
Biz plan
Biz planBiz plan
Biz plan
 
Presentazione ginevra bianchini
Presentazione  ginevra bianchiniPresentazione  ginevra bianchini
Presentazione ginevra bianchini
 
Is the Cloud ready for Your Firm?
Is the Cloud ready for Your Firm?Is the Cloud ready for Your Firm?
Is the Cloud ready for Your Firm?
 
Help or Hindrance?
Help or Hindrance?Help or Hindrance?
Help or Hindrance?
 
Advent for Investment Management
Advent for Investment ManagementAdvent for Investment Management
Advent for Investment Management
 
Deconstructing Ikea by Waseem Bari
Deconstructing Ikea by Waseem BariDeconstructing Ikea by Waseem Bari
Deconstructing Ikea by Waseem Bari
 
U
UU
U
 
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...
A BUSINESS APPLICAION FOR AN E-COMMERCE BUSINESS MANGEMENT THAT ANALYSES THE ...
 
Analyse strategique
Analyse strategiqueAnalyse strategique
Analyse strategique
 
Client Portal: Delivering the Complete Wealth Picture
Client Portal: Delivering the Complete Wealth PictureClient Portal: Delivering the Complete Wealth Picture
Client Portal: Delivering the Complete Wealth Picture
 
2015 ReSAKSS Conference – Day 1 - Yacouba SANON
2015 ReSAKSS Conference – Day 1 - Yacouba SANON�2015 ReSAKSS Conference – Day 1 - Yacouba SANON�
2015 ReSAKSS Conference – Day 1 - Yacouba SANON
 

Similar a BI Project Case Study Analysis: Evaluating Costs & Benefits

Deficiency in it controls 2017
Deficiency in it controls 2017Deficiency in it controls 2017
Deficiency in it controls 2017John Gardner, CMC
 
Business Case Presentation V0.9
Business Case Presentation V0.9Business Case Presentation V0.9
Business Case Presentation V0.9Sylverflash
 
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentHow to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentGotransverse
 
Benefits Auditing in Oracle HRMS
Benefits Auditing in Oracle HRMSBenefits Auditing in Oracle HRMS
Benefits Auditing in Oracle HRMSguesta7771aa
 
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013Har ni koll på balansräkningens största post? - IBM Smarter Business 2013
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013IBM Sverige
 
Budgeting & Forecasting for High Growth Companies (Updated!)
Budgeting & Forecasting for High Growth Companies (Updated!)Budgeting & Forecasting for High Growth Companies (Updated!)
Budgeting & Forecasting for High Growth Companies (Updated!)Chris Arndt
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxPart ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxherbertwilson5999
 
A Comprehensive Guide to US CMA Syllabus 2022
A Comprehensive Guide to US CMA Syllabus 2022A Comprehensive Guide to US CMA Syllabus 2022
A Comprehensive Guide to US CMA Syllabus 2022chinuroula
 
Process engineering economics i industrial engineering management
Process engineering economics i industrial engineering managementProcess engineering economics i industrial engineering management
Process engineering economics i industrial engineering managementLuis Cabrera
 
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】Jerimi Soma
 
5 ways CFOs can make cost cuts stick
5 ways CFOs can make cost cuts stick5 ways CFOs can make cost cuts stick
5 ways CFOs can make cost cuts stickManuel A. Velazquez
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Copperberg
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason Uyder
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
IBM: The Long term investment Myth | Multi-Act
IBM: The Long term investment Myth | Multi-ActIBM: The Long term investment Myth | Multi-Act
IBM: The Long term investment Myth | Multi-ActMulti-Act
 

Similar a BI Project Case Study Analysis: Evaluating Costs & Benefits (20)

Deficiency in it controls 2017
Deficiency in it controls 2017Deficiency in it controls 2017
Deficiency in it controls 2017
 
Business Case Presentation V0.9
Business Case Presentation V0.9Business Case Presentation V0.9
Business Case Presentation V0.9
 
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology InvestmentHow to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
How to Build a Great Cloud/SaaS Business Case Analysis for Technology Investment
 
Benefits Auditing in Oracle HRMS
Benefits Auditing in Oracle HRMSBenefits Auditing in Oracle HRMS
Benefits Auditing in Oracle HRMS
 
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013Har ni koll på balansräkningens största post? - IBM Smarter Business 2013
Har ni koll på balansräkningens största post? - IBM Smarter Business 2013
 
Budgeting & Forecasting for High Growth Companies (Updated!)
Budgeting & Forecasting for High Growth Companies (Updated!)Budgeting & Forecasting for High Growth Companies (Updated!)
Budgeting & Forecasting for High Growth Companies (Updated!)
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Spi Cost Roi
Spi Cost RoiSpi Cost Roi
Spi Cost Roi
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxPart ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
 
A Comprehensive Guide to US CMA Syllabus 2022
A Comprehensive Guide to US CMA Syllabus 2022A Comprehensive Guide to US CMA Syllabus 2022
A Comprehensive Guide to US CMA Syllabus 2022
 
Process engineering economics i industrial engineering management
Process engineering economics i industrial engineering managementProcess engineering economics i industrial engineering management
Process engineering economics i industrial engineering management
 
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】
Use Cases for ISO20000-1 based on ITIL in English 【Continuous Study】
 
5 ways CFOs can make cost cuts stick
5 ways CFOs can make cost cuts stick5 ways CFOs can make cost cuts stick
5 ways CFOs can make cost cuts stick
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
IBM: The Long term investment Myth | Multi-Act
IBM: The Long term investment Myth | Multi-ActIBM: The Long term investment Myth | Multi-Act
IBM: The Long term investment Myth | Multi-Act
 

Último

"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Último (20)

E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

BI Project Case Study Analysis: Evaluating Costs & Benefits

  • 1. Business Intelligence Project Case Studies : Exercise 1 1 | P a g e -4 -2.25 -0.5 1.25 3 Cumulative Net Value (M) Cumulative Net Value (M) Waseem Bari Instructor: Bill Chadwick SCS 0245-026 Business Intelligence Fundamentals BUSINESS CASES FOR BUSINESS INTELLIGENCE PROJECTS Case No. 1 1st Year 2nd Year 3rd Year 4th Year 5th Year Project IT Costs 2M 0.5M 0.5M 0.5M 0.5M Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M Cumulative Total Costs 2M 2.875M 3.75M 4.625M 5.5M Extra Revenue/year 0 3.1M 3.1M 3.1M 3.1M Cumulative Benefits 0 3.1M 6.2M 9.3M 12.4M Cumulative Net Value (2M) 0.225M 2.45M 4.675M 6.9M Benefit/Cost Ratio () 108% 165% 201% 225% Evaluation of Case 1 Benefit/Cost Ratio Payback Period Net Cummulative Value If we look at the Total Cost and Cummulative benefits, we will get to know that our business is covering the cost it is incurring, that is 108% in 2 years This project is feasible for the company because the benefit/cost ratio is greater than 200% within 5 years. If we look at the Cummulative Net Value and Cummulative Total Cost, the project cost is being covered, so its feasible.
  • 2. Business Intelligence Project Case Studies : Exercise 1 2 | P a g e Case No. 2A 1st Year 2nd Year 3rd Year 4th Year 5th Year Project IT Costs 4M 1M 1M 1M 1M Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M Cumulative Total Costs 4M 5.375M 6.75M 8.125M 9.5M Extra Revenue/year 0 3.1M 3.1M 3.1M 3.1M Cumulative Benefits 0 3.1M 6.2M 9.3M 12.4M Cumulative Net Value (4M) (22.275M) (0.55M) 1.175M 2.9M Benefit/Cost Ratio () 58% 92% 114% 131% Evaluation of Case 2A Benefit/Cost Ratio Payback Period Net Cummulative Value Although the increase of CNV is steady, it is too slow. If the main purpose of building this DW is to decrease churn rate, Extra Revenue/year should be better for the Project This project is not feasible for the company because the benefit/cost ratio is less than 200% (131%) in 5 years. If we look at the Total Cost and Cummulative benefits, we will get to know that our business is not covering the cost in 2 years
  • 3. Business Intelligence Project Case Studies : Exercise 1 3 | P a g e Case No. 2B 1st Year 2nd Year 3rd Year 4th Year 5th Year Project IT Costs 4M 1M 1M 1M 1M Extra Customer Upkeep 0 0.375M 0.375M 0.375M 0.375M Cumulative Total Costs 4M 5.375M 6.75M 8.125M 9.5M Extra Revenue/year 0 6.2M 6.2M 6.2M 6.2M Cumulative Benefits 0 6.2M 12.4M 18.8M 25M Cumulative Net Value (4M) 0.825M 5.65M 10.47M 15.3M Benefit//Cost Ratio () 115% 184% 229% 261% Evaluation of Case 2B Benefit/Cost Ratio Payback Period Net Cummulative Value This project is feasible for the company because the benefit/cost ratio is greater than 200% within 5 years. If we look at the Total Cost and Cummulative benefits, we will get to know that our business is covering the cost it is incurring If we look at the Cummulative Net Value and Cummulative Total Cost, the project cost is being covered, so its feasible.
  • 4. Business Intelligence Project Case Studies : Exercise 1 4 | P a g e
  • 5. Business Intelligence Project Case Studies : Exercise 1 5 | P a g e Similarities amongst cases: 1. Same project time period 2. Beginning of the project in first year value went in to minus (-) Differences amongst Cases 1. Payback Period for Case 2A takes more than three years, compared to other two accomplish that by the end of year two. 2. To reach to 200% Benefit/Cost Ratio within 5 years, the initial Project IT cost and yearly IT cost of Case 1 leads to the quicker accomplishment without improving Extra Revenue/year. 3. In Case 2A, because Project IT cost and yearly IT cost is double the Case 1, it is impossible to meet 2 year Payback Period without improving Extra Revenue/year by reducing churn rate. Also, 200% Benefit/Cost Ratio in 5 years will not be accomplished. Having identified the dimensions and the measures we then need to make some business judgments about the feasibility of a BI solution or solutions. Here are some points to consider · Look for the easy wins, tactical solutions delivering business benefit that can be achieved quickly and cheaply. · Identify measures where no current data exists, these are more difficult to implement as data collecting systems will have to be build and put in place before they can be used. · Watch out for high data volumes, if they are very large it may be that data has to be summarized to reduce the volume. · Strategic, cross-departmental solutions will need board level sponsorship · and support to be successful.